Loading...
SR 04-23-2019 6B City Council Report City Council Meeting: April 23, 2019 Agenda Item: 6.B 1 of 18 To: Mayor and City Council From: David Martin, Director, City Planning Subject: 1921 Ocean Front Walk: Appeal of Planning Commission's decision to approve Development Review Permit (DRP) 15ENT-0297 to allow a new five- story (47 feet) 34,750 square-foot mixed-use housing project consisting of 22 residential units, 4,000 square-feet of ground floor commercial space, and 56 automobile parking spaces within a two-level subterranean parking garage. Recommended Action Staff recommends that the City Council deny the appeal and uphold the Planning Commission’s approval by taking the following actions: 1. Deny Appeal 18ENT-0312; 2. Approve Development Review Permit 15ENT-0297; and 3. Adopt the Statement of Official Action, pursuant to the draft findings and conditions. Executive Summary A project has been proposed for 1921 Ocean Front Walk. On October 2, 2018, the Planning Commission approved Development Review Permit (DRP) 15ENT-0297 and Certified Environmental Impact Report (EIR) 18ENT-0215 to allow a new five-story (47 feet) 34,750 square-foot mixed-use housing project consisting of 22 residential units, 4,000 square-feet of ground floor commercial space, and 56 automobile parking spaces within a two-level subterranean parking garage. The Planning Commission staff report, Statement of Official Action (STOA), and additional attachments to this report are provided as attachments. On October 17, 2018, the appellant, UNITE HERE, filed an appeal (18ENT-0312) of the Planning Commission’s decision to approve the DRP. The EIR was not appealed and remains certified. The appeal statement raises concerns regarding: (1) expansion of hotel uses, (2) the potential for corporate housing, (3) compliance with the Zoning 2 of 18 Ordinance, (4) compliance with the California Environmental Quality Act (CEQA), and (5) consistency with the Coastal Act. Pursuant to SMMC Section 9.37.130, Council’s review of the DRP approval is de novo. This report describes the proposed project scope, provides relevant background information, and analyzes the issues of appeal raised by the appellant. Staff recommends that Council deny the appeal and approve the DRP based on the findings set forth in the Draft Statement of Official Action (Draft STOA). Background Existing Conditions and Setting The following table provides a brief summary of the project location, existing conditions and setting. Site Location Map Zoning District Oceanfront District and BCH Beach Overlay District Land Use Element Designation Oceanfront District Parcel Area (SF)/Dimensions 23,258 SF (120’ x 194’) Existing On-Site Improvements Vacant Lot Rent Control Status N/A Adjacent Zoning Districts & Land Uses North: OF and BCH – Hotel Casa Del Mar West: OS and BCH – Santa Monica Beach South: OS and BCH – Crescent Bay Park East: R4 and BCH – Multiple Family Housing 3 of 18 Historic Resources Inventory N/A The subject site consists of a single parcel, approximately 23,258 square feet in size. It is located on the northwest corner of Ocean Way and Bay Street. Surrounding uses include a hotel, multi-family housing, Crescent Bay Park, and Santa Monica Beach. Ocean Way is 20 feet 5 inches higher in elevation than Ocean Front Walk. Project Description The proposed project is a five-story building with a maximum height of 47 feet from Segmented Average Natural Grade that includes 4,000 square feet of ground floor commercial space, 22 residential units totaling 31,910 square-feet of residential area, and a floor area ratio of 1.65. Additionally, the project provides 8,100 square feet of open space consisting of 2,800 square feet of common open space and 5,300 square feet of private open space. There are 56 vehicle parking spaces provided in a two-level subterranean parking garage for the commercial uses, residential tenants, and guests of the building. Bicycle parking spaces are proposed at grade and within the subterranean garage totaling 47 spaces (8 short-term spaces, 39 long-term spaces). The tables below show the residential unit mix and average number of bedrooms, as they relate to the community benefits requirements for the proposed project. Unit Type Number of Units Percentage Number of bedrooms Studio 1-BR 12 54% 12 2-BR 7 32% 14 3-BR 3 14% 9 TOTAL 22 -- 35 Average Number of Bedrooms 1.59 Table 1: Market Rate Unit Mix Unit Type Number of Units Percentage of Entire Project Number of bedrooms 1-BR 2 Off-site* 2 2-BR 1 Off-site* 2 3-BR 1 Off-site* 3 4 of 18 TOTAL 4 Off-site* 7 Average Number of Bedrooms 1.75 Table 2: Affordable Unit Mix * Off-site affordable units would be located at 1828 Ocean Avenue. Figure 1: Project Rendering (Corner of Ocean Front Walk and Bay Street) As shown in Figure 2 below, the ground floor is comprised of two commercial tenant spaces at the building frontage totaling approximately 2,360 square feet in size with a 1,640 square-foot plaza area adjacent to Ocean Front Walk. The residential lobby is located on Ocean Way and provides access to an elevator and stairs to the residential units above and below. The upper floors consist entirely of residential units. 5 of 18 Figure 2: Ground Floor Plan Architectural Review Board Concept Review Pursuant to SMMC Section 9.40.040 (Development Review Permit - Procedures), a DRP requires a preliminary Architectural Review Board (ARB) discussion on the project design prior to Planning Commission’s formal review. The project was presented to the ARB at its July 31, 2017 meeting. The project design was generally well-received with the ARB expressing support of the project massing and acknowledging that the location of the new mixed-use project is challenging due to the site configuration and topography. While the ARB was positive regarding the overall direction of the project, there were some minor concerns expressed regarding certain aspects of the design. Staff expressed similar concerns with the overall project design and met with the applicant to convey these concerns. While the applicant responded to many of the ARB and staff comments, there were a few design comments provided by the Architectural Review Board that were not addressed. The Planning Commission included a condition that Board pay particular attention to these issues as pointed out below in the Planning Commission Action section of this report. 6 of 18 Planning Commission Action On October 3, 2018, a public hearing was held by the Planning Commission to consider the DRP. Public testimony was generally in opposition to the project, citing the potential for corporate housing, expansion of Casa del Mar Hotel, and lack of sufficient affordable housing. The Commission took formal action on the DRP and certified the Environmental Impact Report on October 3, 2018. The Planning Commission voted 5-1 (with 1 absent) to approve the project, with amendments to Condition #1 in the Planning Commission’s Statement of Official Action (Attachment B). In approving the project, the Commission included the following conditions: • The 22 residential units shall not be used for “Corporate Housing” as defined in SMMC Section 9.51.020(A)(2), or successor thereto, nor as “Lodging” as defined in SMMC Section 9.51.030(B)(15), or successor thereto. • The ARB shall pay particular attention to the following design elements: o The pedestrian oriented design of the ground floor commercial tenant spaces. o The relationship of the building along Bay Street and the connectivity to the public sidewalk. o Additional study of the stair element at the building’s southeast corner is needed. o Consider modifying the “sails” (planar elements at balconies along the Bay Street elevation) so they create a visual sense of movement as the features are placed on the building down the slope (west). o Consider modifying the proportions the building so they better relate to the proportions of Casa Del Mar to the north. o Study how to better integrate the west façade more fully into the rest of the building. 7 of 18 o Consider an art installation that commemorates the history of the nearby beach area known as the Inkwell and the history of the Z-Boys in Ocean Park [this is also provided as a recommendation to the City’s Arts Commission]. The City Council Draft Statement of Official Action (STOA) (Attachment A) includes this recommendation as Condition #1. Discussion The proposed project is five-story (47 feet) in height and has a 1.65 floor area ratio (FAR). The project exceeds the maximum Tier 1 limits (3 stories (36 feet) / 1.5 FAR) for the OF District for projects that include off-site affordable housing in compliance with the minimum requirements of the Affordable Housing Production Program (AHPP). The project complies with all development standards applicable to the site and is within the established maximums to qualify as a Tier 2 project (No limitation of stories and 47 feet high / 2.0 FAR) with off-site affordable housing provided. Development Review Permit Pursuant to Santa Monica Municipal Code Section 9.40.020, a DRP is required for any project that proposes to exceed Tier 1 zoning standards. A DRP is intended to allow the City to review certain projects for which the design, siting, and location of uses within the project could result in an adverse impact on the surrounding area. As such, the DRP allows for the discretionary review of: A. the location, size, massing, and placement of proposed structures; B. the location of proposed uses within the project; C. the project’s compliance with fixed and established land use standards; D. whether the proposed siting and design should be permitted by weighing the public need for the benefit to be derived from the proposed site plan use against the impact which it may cause. Pursuant to SMMC 9.40.050, in order to approve a DRP, Council on appeal must make the following findings in an affirmative manner: 8 of 18 A. The physical location, size, massing, setbacks, pedestrian orientation, and placement of proposed structures on the site and the location of proposed uses within the project are consistent with applicable standards and are both compatible and relate harmoniously to surrounding sites and neighborhoods; B. The rights-of-way can accommodate autos, bicycles, pedestrians, and multi- modal transportation methods, including adequate parking and access; C. The health and safety services (police, fire etc.) and public infrastructure (e.g., utilities) are sufficient to accommodate the new development; D. The project is generally consistent with the Municipal Code, General Plan, and any applicable Specific Plan; E. Based on environmental review, the proposed project has no potentially significant environmental impacts or any potentially significant environmental impacts have been reduced to less than significant levels because of mitigation measures incorporated in the project or a Statement of Overriding Considerations has been adopted; F. The project promotes the general welfare of the community; G. The project has no unacceptable adverse effects on public health or safety; and H. The project provides Community Benefits consistent with Chapter 9.23. Tier 2 Community Benefits According to Chapter 9.23 of the Zoning Ordinance, projects that exceed the maximum height or FAR allowed for Tier 1 projects are required to provide the community benefits outlined in subsection 9.23.030 of the Chapter. The purpose of the community benefits is to ensure that projects are allowed to exceed the base height and FAR of a respective zoning district, and in return provide community benefits that enhance the City’s community character. 9 of 18 The project provides the required community benefits identified in Chapter 9.23 (Community Benefits) of the Zoning Ordinance for Tier 2 projects. This includes at least 50% more affordable housing units than would be required by Section 9.64.050 (Affordable Housing Production Program) of the Zoning Ordinance, and a unit mix of at least 15% 3-BR units, at least 20% 2-BR units, and no more than 15% Studio units. Also, the average number of bedrooms for all of the affordable housing units in a Tier 2 project shall be equal to or greater than the average number of bedrooms for all of the market rate units in the project. Further, the project provides the augmented fees and TDM requirements established in Chapter 9.23 of the Zoning Ordinance. Building Massing & Modulation The unique site has a significant grade differential of 20 feet 5 inches from Ocean Way down to Ocean Front Walk at the beach. As such, the project steps down from Ocean Way to Ocean Front Walk with the slope of Bay Street for access to the project and fitting into the context of the surrounding neighborhood; the project is lower in height and mass in comparison to Hotel Casa del Mar to the north. The project design incorporates a series of modulating solid and void spaces that give the project a unique and clear identity for its prominent location and visibility from Santa Monica Beach. Open Space The proposed project contains 22 units, which requires a minimum of 2,200 square-feet of overall open space for the project. The project includes approximately 8,100 square- feet of open space consisting of approximately 2,800 square-feet of common open space and approximately 5,300 square-feet of private open space. The 5,300 square- feet of private open space proposed would be provided as balconies and distributed amongst the 22 units for an average of 241 square-feet of private open space per unit. Pedestrian Orientation / Active Commercial Design The building features a pedestrian orientation design along Ocean Front Walk by incorporating two separate 2,000 square-foot cafés that are level with the walking path grade, patios for outdoor dining, and a ground floor (floor-to-floor) height of 10 of 18 approximately 12 feet. Since the Active Commercial Design Standards are not applicable to the project site, a conditional of approval is included in the attached Draft Statement of Official Action to further reinforce the intent of a pedestrian oriented design for the commercial tenant spaces in highly walkable areas. Parking & Access A two-level subterranean garage with a driveway access from Bay Street is proposed and includes a total of 56 parking spaces to accommodate residents, guests, and commercial visitors. Additionally, the code requirements specify a minimum of 39 long- term and 8 short-term bicycle parking spaces be provided in combination. The project meets this requirement by providing 47 total spaces. Zoning Code Compliance The project is located in the Oceanfront (OF) and Beach Overlay (BCH) Districts, which establishes property development standards that govern height, FAR, and setbacks of the proposed building. The project is consistent with the OF and BCH Districts in that it is a mixed-use building providing 22 residential units with a variety number of bedrooms and commercial two commercial tenant spaces. Additinally, the project complies with all development standards of the OF Distrct. As a result of Proposition S, all restaurant uses in the Beach Overlay District expressly prohibits restaurants and/or food service facilities of more than 2,000 square feet and/or exeeding one story in height. The proposed restaurant tenant spaces do not exceed 2,000 square-feet per restaurant. General Plan Consistency The proposed development is also consistent with the goals, objectives and policies in the LUCE in that the project is located in Oceanfront District land use designation in the 2010 LUCE. The development parameters in the LUCE are implemented in the Zoning Ordinance for Tier 2 projects. The proposed project complies with all of the development standards outlined in the Zoning Ordinance. The proposed development is also consistent with the goals, objectives, and policies in the LUCE. Specifically, Policy D18.2 seeks to respect the scale and character of the district’s existing residential areas in the design and construction of new buildings and Policy D18.8 encourages visitor 11 of 18 serving uses consistent with Proposition S in commercial areas west of Ocean Avenue between Colorado Avenue and Pico Boulevard. The proposed building complies with the 47-foot building height volume that steps down toward Santa Monica Beach consistent with the height and mass of surrounding buildings. Additionally, the proposed project complies with these goals and policies in that it is a mixed-use building with two small (maximum 2,000 square-feet) ground floor cafés facing Ocean Front Walk with residential as the proposed use on the upper floors. The Oceanfront District designation is intended to maintain and enhance the Oceanfront District as an important visitor serving destination with lodging, restaurants, shopping and recreation, as well as to protect the existing residential enclaves in the area. The unique character and scale of the area is maintained, centering on the landmark Santa Monica Pier. New residential and commercial uses are consistent with the character of existing buildings. The proposed project complies with these goals and policies in that the mixed-use residential and commercial building is designed with an inviting and activated ground floor (proposed restaurants are a maximum 2,000 square-feet consistent with Proposition S), includes a variety of housing unit types and affordability, and formed in a manner that is sensitive to the context of the adjacent properties and surrounding neighborhoods. Housing Accountability Act (HAA) Under the Housing Accountability Act (Government Code section 65589.5(j)), when a proposed housing development project complies with applicable, objective general plan, zoning, and subdivision standards and criteria, including design review standards, in effect at the time that the housing development project's application is determined to be complete, but a local agency proposes to disapprove the project or to impose a condition that the project be developed at a lower density, the local agency must base its decision upon written findings supported by evidence on the record that both of the following conditions exist: 12 of 18 “(A) The housing development project would have a specific, adverse impact upon the public health or safety unless the project is disapproved or approved upon the condition that the project be developed at a lower density. As used in this paragraph, a “specific, adverse impact” means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete. (B) There is no feasible method to satisfactorily mitigate or avoid the adverse impact identified, other than the disapproval of the housing development project or the approval of the project upon the condition that it be developed at a lower density.” Therefore, if after consideration of all written and oral evidence presented to the City Council at the public hearing for the Project, the Council desires to either disapprove or impose a condition that the Project be developed at a lower density, Council must make the above referenced findings and direct staff to incorporate such findings and/or conditions into the STOA. The term “lower density” includes any conditions that have the same effect or impact on the ability of the project to provide housing. The Housing Accountability Act does not prevent Council from imposing conditions of approval that do not result in lower density; however, if Council imposes conditions of approval that it believes does not result in lower density, it should clarify on the record (i) the factual basis for imposing the conditions and (ii) why Council believes these conditions will not result in lower density. As explained in the body of the Planning Commission staff report for DRP 15ENT-0297 (Attachment D), staff has recommended approval of the Project based upon its determination that the Project met all of the findings for a Development Review Permit, subject to the applicant's compliance with all conditions in the City Council Statement of Official Action ("STOA"), which is attached to the staff report (Attachment A). The 13 of 18 Planning Commission approved the project because no oral or written evidence was presented at the public hearing, identifying “specific, adverse impacts” as defined in the Housing Accountability Act. California Environmental Quality Act (CEQA) In accordance with California Environmental Quality Act (CEQA), an Environmental Impact Report (EIR) was prepared to analyze the potential environmental effects of the 1921 Ocean Front Walk Project and the 1828 Ocean Avenue Project. While the Projects require two separate development review permit applications, both projects are analyzed together in the EIR as required by CEQA. Under CEQA, an agency cannot "piecemeal" the environmental review for a project. The EIR clearly provides an analysis of each site independently while also evaluating the potential for combined effects. On October 3, 2018, the Planning Commission certified the Final EIR with a 7-0 vote. Appeal Summary The appellant filed a timely appeal on October 17, 2018. The appellant’s appeal statement (Attachment G) raises many specific points as to why the appeal should be approved and DRP 15ENT-0297 denied by Council. In summary, the appeal statement raises concerns regarding: (1) expansion of hotel uses, (2) the potential for corporate housing, (3) compliance with the Zoning Ordinance, (4) compliance with CEQA, and (5) consistency with the Coastal Act. Appeal Analysis Staff has reviewed the issues raised by the appellant’s Statement of Appeal and provides the following analysis and responses: 1. Expansion of Hotel Uses The project is arguably an extension of the Casa del Mar / Shutters hotel complex, and therefore contravenes the spirit and purpose of the Oceanfront and Beach Overlay District standards. 14 of 18 The project description for the proposed project includes the following language: “The 22 residential units are intended for use by persons as their permanent place of residence and shall not be used as Corporate Housing or Lodging for persons who intend their occupancy to be temporary. Consistent with Proposition S, this project is not an expansion of any hotel use and there shall be no hotel amenities from the adjacent hotel (e.g., housekeeping, valet, food/room service) provided at the Project.” Additionally, the Planning Commission included Condition of Approval No. 2 with the following language: “The 22 residential units shall not be used for “Corporate Housing” as defined in Santa Monica Municipal Code (SMMC) Section 9.51.020(A)(2), or successor thereto, nor as “Lodging” as defined in SMMC Section 9.51.030(B)(15), or successor thereto.” Therefore, the proposed description and conditions of approval restrict the use of the proposed project from becoming corporate housing or lodging. Additionally, the project complies with all the development standards and land use restrictions in the Oceanfront District including height, floor area, open space, and setbacks. 2. The potential for corporate housing The conditions of approval are insufficient. Specifically, Condition of Approval No. 2, which seeks to assure the project would only be residential, merely reiterates what is already in the Municipal Code, and does not address a major loophole in the Municipal Code. The appellant recommends adding conditions of approval including that would a) prohibit converting the project to corporate housing and b) require leases be a minimum term of one year. The project description specifically states that the residential units are intended for use by persons as their permanent place of residence and 15 of 18 therefore corporate housing and lodging are not included in the proposed project. Although typically not required for residential projects, the Planning Commission has included a condition of approval to specifically prohibit corporate housing or lodging. If the project operates as corporate housing, lodging, or anything else not permitted in the Oceanfront District as defined by the Santa Monica Municipal Code (SMMC), the City would consider it an illegal operation and a violation of the SMMC and Planning Entitlement. Staff does not support adding the conditions recommended by the appellant. Prohibition of converting the project into corporate housing is repetitive in nature to Condition No. 2, which prevents corporate housing and lodging. Additionally, requiring leases be a minimum one year could restrict residential uses within the Oceanfront District that are otherwise permitted within multiple-unit dwelling development including Supportive Housing, Transitional Housing, and Group Residential. Therefore, staff does not recommend adding either of these recommended conditions. 3. Compliance with the Zoning Ordinance The appellant states that the project does not comply with the underlying zoning, which prohibits the proliferation of hotels and large restaurants. The project is located in the Oceanfront (OF) and Beach Overlay (BCH) Districts, which establish land use and property development standards that govern height, FAR, and setbacks of the proposed building. The BCH District was established as a result of Proposition S, enacated by the voters in 1990. The purpose of the BCH District is stated, “…to add a new overlay district to the City of Santa Monica’s Zoning Districts. This initiative ordinance is necessary to protect the public health, safety and welfare of present and future residents of the City of Santa Monica [the “City”] by avoiding the deleterious effects of uncontrolled growth in the Beach Overlay District and preserving the unique and diverse character of the Santa Monica oceanfront. 16 of 18 This purpose is achieved by limiting the proposed proliferation of excessive hotel, motel and large restaurant development within the Beach Overlay District. Such development ignores the need to preserve Santa Monica’s greatest asset — its oceanfront setting, view, and access to coastal resources — and to maintain its beach and oceanfront parks as open recreational area for present and future generations.” The project is consistent with the OF and BCH Districts in that it is a mixed-use building providing 22 residential units with a variety number of bedrooms and two commercial tenant spaces. As a result of Proposition S, the Beach Overlay District expressly prohibits restaurants and/or food service facilities of more than 2,000 square feet and/or exeeding one story in height. The proposed restaurant tenant spaces do not exceed 2,000 square-feet per restaurant. Therefore, the project complies with the zoning district as no hotels or restaurants greater than 2,000 square feeet in size are within the proposed project. 4. Compliance with CEQA The project’s EIR fails to comply with CEQA. In accordance with California Environmental Quality Act (CEQA), an Environmental Impact Report (EIR) was prepared to analyze the potential environmental effects of the 1921 Ocean Front Walk Project and the 1828 Ocean Avenue Project. While the Projects require two separate development review permit applications, both projects are analyzed together in the EIR as required by CEQA. Under CEQA, an agency cannot "piecemeal" the environmental review for a project. The EIR clearly provides an analysis of each site independently while also evaluating the potential for combined effects. On October 3, 2018, the Planning Commission certified the Final EIR with a 7-0 vote. The EIR was not appealed and remains certified. 5. Consistency with the Coastal Act The project is inconsistent with the Coastal Act. 17 of 18 The City of Santa Monica has a certified Land Use Plan for the Coastal Zone. However, the City does not have the authority to issue Coastal Development Permits on behalf of the California Coastal Commission. Therefore, all projects located in the California Coastal Zone are required to obtain approval from the California Coastal Commission prior to the issuance of any building permits by the City of Santa Monica. The applicant is responsible for obtaining any such permits. Moreover, the proposed project is consistent with various policies in the City’s Land Use Plan, including the following: Policy 58: New development shall be located within, contiguous with, or in close proximity to, existing developed areas able to accommodate it, or, where such areas are not able to accommodate it, in other areas with adequate public services and where it will not have significant adverse effects, either individually or cumulatively, on coastal resources. The project is located within an urban area contiguous with existing development in the area. The property is accessible from three public streets with adequate public services and the project will not have significant adverse effects on coastal resources. Recommendation The Planning Commission approved the DRP based on the findings set forth in the Planning Commission STOA as well as the oral and written testimony presented prior to or during the public hearing. Council reviews the project de novo. Staff recommends approval of the DRP based on the findings set forth in the draft STOA. Alternative Actions As an alternative to the staff recommendation, Council may choose to approve the appeal based on revised findings and deny the DRP (15ENT-0297). However, in order to do so, Council would be required to make additional findings under the Housing Accountability Act, as stated in this report. 18 of 18 Financial Impacts and Budget Actions There is no immediate financial impact or budget action required as a result of the recommended action. Prepared By: Russell Bunim, Associate Planner Approved Forwarded to Council Attachments: A. 1921 Ocean Front Walk DRP Appeal Plans B. 1921 Ocean Front Walk UNITE HERE Appeal Statement C. 18ENT-0312 - Appeal CC STOA (1921 Ocean Front Walk) D. Written Comments SANTA MONICA, CA 90405 DEVELOPMENT REVIEW PERMIT ON APPEAL APPLICATION: 15ENT - 0297 MARCH 8TH 2019 KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com All designs, ideas, arrangements and plans indicated by these drawings are the property and copyright of the Architect and shall neither be used on any other work nor be disclosed to any other person for any use whatsoever without written permission. Koning Eizenberg Architecture and/or its principals and employees waives any and all liability or responsibility for problems that may occur when these plans, drawings, specifications, and/or designs are followed without the professional’s guidance with ambiguities, or conflicts which are alleged. 1921 OCEAN FRONT WALK A2 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405 DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com KoningEiz 1454 25th St, 310.828.6131 310.828.0719 f All designs, ideas, a by these drawings a the Architect and sh work nor be disclose use whatsoever with Koning Eizenberg A and employees waiv responsibility for pro these plans, drawing are followed without ambiguities, or confl PROJECT TITLE PROJECT NO. ∆ # 1921 OCEA 1513 SANTA MONICA PROJECT INFORMATIONRESIDENTIAL AND COMMERCIAL PARKING TABULATIONSTIER 2 COMMUNITY BENEFITS PER 9.23 PROJECTDESCRIPTION: ADDRESS: ZONING DISTRICT: SETBACKS: PARCEL AREA: AVERAGE NATURALGRADE (A.N.G.): EXISTING USE: FLOOR LEVELR3 R2 R1P1REQD UNIT MIX %MIN UNITS REQDTOTAL UNITS PROVIDED PARKING REQ'S REQ'D PARKING RATIOTOTAL REQ'D STALLS GUEST PARKING 1:5 UNITS SEE SHEET A28 FOR AVERAGE UNIT SIZES PARKING PROVIDED LEVEL P1 GF/P2TOTAL STD 6 1420 COMPACT 8 1321 SHARE 0 00 TOTAL 29 27 56TOTAL PARKING STALLS PROVIDED ST 0 0 0 015% MAX00 10 1B 2 4 4 2N/A012 1.518 2B 0 3 3 120% MIN4.47 214 3B 2 1 0 015% MIN3.33 26 TOTAL 4 8 73 22 384.4 E.V. 2 02 1921 OCEAN FRONT WALK, SANTA MONICA, CA 90405 OCEANFRONT DISTRICT 47'. SEE SHEET A18 STREET FRONTAGE = 5',NO REQUIRED SIDE AND REAR YARD SETBACKS BECAUSE NOT ADJACENT TO RESIDENTIALPROJECT PROVIDES NON-REQUIRED SIDE AND REAR SETBACKS 23,258 SF; SEE SHEET A17FOR F.A.R. CALCULATION PURPOSES A 2,222 SF EASEMENT IS DEDUCTED FOR A REDUCED PARCEL AREA OF 21,036 SF DIVIDED INTO THREE EQUAL SEGMENTSSEE SHEET A18 VACANT LOT 2.0 ALLOWABLE; 1.65 PROPOSED WITH REDUCED PARCEL AREA SEE SHEET A28 PROPOSED F.A.R.: F.A.R. & PARCEL COVERAGE CALCULATIONS BICYCLE PARKING PROVIDED MAXIMUM HEIGHT PERMITTED: MAXIMUM F.A.R. PERMITTED: LEVEL GF/P2 R1TOTAL SHORT-TERM 4 (ON-SITE) 48 LONG-TERM COMM. 4 04 TOTAL 43 447 LONG-TERM RES. 35 035 LONG-TERM RESIDENTIAL = 1 / BEDROOMSHORT-TERM RESIDENTIAL = 10% OF LONG-TERM (2 MIN) LONG-TERM COMMERCIAL =1 / 3,000 SF (4 MIN) SHORT-TERM COMMERCIAL=1 / 4,000 SF (4 MIN) BICYCLE PARKING REQUIRED BICYCLE PARKING PER TABLE 9.28.140 COMMERCIAL PARKING REQUIREMENTS UNBUNDLED PARKING IS REQUIRED PER 9.28.1102 ELECTRIC VEHICLE CHARGING STATION REQUIRED (WHEN PROVIDING 50-99 TOTAL STALLS) PER 9.28.16010% OF TOTAL PARKING IS REQUIRED TO BE EV CAPABLEA PARKING PLAN FOR THE MECHANICAL LIFTS WILL BE SUBMITTED FOR MOBILITY REVIEW - SEE A27 FOR DETAIL UNIT TYPE MARKET-RATE RESIDENTIAL UNITS & PARKING REQUIREMENTS RESTAURANT 1 < 2,500 SFRESTAURANT 2 < 2,500 SF INCLUDING OUTDOOR DINING 2,000 SF @ 1/300 SF = 6.7INCLUDING OUTDOOR DINING 2,000 SF @ 1/300 SF = 6.7 55.8TOTAL REQ'D STALLS FOR PROJECT UPPER STORY SETBACKS: ADDITIONAL 5' SETBACK FOR 30% OF THE FRONT STREET FACING FACADE ABOVE THE MAXIMUM GROUND FLOOR HEIGHTSEE SHEET A30 OUTDOOR LIVING AREAS: TOTAL REQD:100 SF / UNIT PER CHAPTER 9.21.090 PRIVATE: 60 SF MIN / UNITSEE SHEET A29 RECYCLING & REFUSE: LOADING:1 PASSENGER LOADING SPACE (PER 9.28.080.D.3) IS REQ'D FOR PROJECTS WITH 2,501 - 7,500 SF OF COMMERCIAL FLOOR AREA PER 9.28.080.E.2.B. RESIDENTIAL PROJECTS WITH LESS THAN 50 UNITS ARE NOT REQUIRED TO PROVIDE A LOADING AREA. HC 3 03 (35 BEDROOMS * 1 =35)(.1 * 35 =4) (4,000 SF COMM ÷ 3,000 SF =4) (4,000 SF COMM ÷ 4,000 SF =4) TOTAL REQUIRED 47 PARCEL COVERAGE:70% ALLOWABLE; 63% PROPOSEDSEE SHEET A29 RESIDENTIAL UNIT FLOOR AREA 28,233 SFRESIDENTIAL COMMON AREAS 3,677 SFCOMMERCIAL FLOOR AREA 2,840 SF *TOTAL 34,750 SF FULL PARCEL AREA 23,258 SFFAR 1.50 PARCEL AREA LESS WEST EASEMENT 21,036 SFFAR 1.65 MAXIMUM PARCEL COVERAGE = 70% PER TABLE 9.14.030 PARCEL COVERAGE ÷ FULL PARCEL AREA 14,725 ÷ 23,258 = 63% PARCEL COVERAGE: 20,001 - 40,000 SF PER TABLE 9.21.130.BMIN: 28'W x 20'L x 10'H REQUIRED UNIT MIX FOR REFERENCEA) MARKET RATE UNITS: THREE-BEDROOM UNITS: 15% MIN TWO-BEDROOM UNITS: 20% MIN ONE BEDROOM UNITS: UNREGULATEDSTUDIO UNITS: NONE ANY FRACTIONAL HOUSING UNIT LESS THAN .5 THAT RESULTS FROM THIS UNIT MIX SHALL BE ROUNDED DOWN. ANY FRACTIONAL HOUSING UNIT EQUAL TO .5 OR MORE SHALL BE ROUNDED UP. B) AFFORDABLE HOUSING UNITS:THE AVERAGE NUMBER OF BEDROOMS FOR ALL OF THE AFFORDABLE HOUSING UNITS COMBINED SHALL BE EQUAL TO OR GREATER THAN THE AVERAGE NUMBER OF BEDROOMS PROVIDED FOR ALL OF THE MARKET RATE UNITS PURSUANT TO SUBSECTION A.2.A MECH. ASSIST 10 010 22 UNIT MULTI-FAMILY RESIDENTIAL PROJECT WITH GROUND FLOOR COMMERCIAL AND 15% VERY-LOW INCOME AFFORDABLE UNITS TO BE LOCATED OFFSITE AT 1828 OCEAN AVENUE. THIS SITE WAS SOLD BY THE CITY FOR RESIDENTIAL DEVELOPMENT. IT SHARES A LOT LINE WITH THE HISTORIC HOTEL CASA DEL MAR (CDM), AND THE PROJECT DESIGN THOUGHTFULLY INCORPORATES A VARIETY OF DESIGN FEATURES IN RESPONSE TO THE DESIGN OF THE ADJACENT HOTEL WHILE REMAINING IN STRICT CONFORMITY WITH THE 2015 ZONING ORDINANCE. DUE TO PROPOSITION S (PASSED BY THE VOTERS IN 1990 TO STOP BEACHFRONT HOTEL DEVELOPMENT), THE PROJECT AT 1921 IS AN ENTIRELY DISTINCT AND SEPARATE APARTMENT USE. OUTDOOR LIVING AREA SEE SHEET A29 *NOTE: OUTDOOR DINING EXCLUDED PER SMZO 9.04.090.A2 D SD PRICING S 2015 ZONING ORDINANCE WITH UPDATES - TIER 2 WITH PROVISIONS WITH COMMUNITY BENEFITS & 100% RESIDENTIAL ABOVE THE GROUND FLOOR PER TABLE 9.14.030 AND 9.21.090 100 SF/UNIT MIN TOTAL OPEN SPACE60 SF/UNIT MIN PRIVATE OPEN SPACE PROJECT SATISFIES REQUIREMENT THROUGH 100SF MIN PRIVATE DECKS REQUIRED PRIVATE O.L.A. (22 UNITS X 60 SF) = 1,320 SF PROPOSED PRIVATE O.L.A. = 5,300 SF IN ADDITION COMMON OUTDOOR LIVING AREA IS PROVIDED AS FOLLOWS:R3 ROOF TERRACE: 2,400 SFGF RESIDENT PATIO: 400 SF TOTAL NON-REQUIRED COMMON O.L.A. = +/- 2,800 SF STORIES:NO LIMIT. THE NAMES OF THE FLOORS/LEVELS ARE FOR IDENTIFICATION PURPOSES ONLY AND DO NOT REFLECT THE ZONING ORDINANCE DEFINITIONS OF “BASEMENT,” “STORY” OR “GROUND FLOOR” FLOOR LEVEL R4R3R2R1GROUND FLOORTOTAL # OF UNITS AVERAGE BEDROOM RATIO FOR 1921 MARKET-RATE UNITS = 35 BEDROOMS / 22 UNITS = 1.59 AVERAGE BEDROOM RATIO FOR 1921 AFFORDABLE UNITS = 7 BEDROOMS / 4 UNITS = 1.75 ST 00000 0 TOTAL 030014 UNIT TYPE FOR REFERENCE - AFFORDABLE RESIDENTIAL UNITS PROPOSED AT 1828 OCEAN AVENUE 1B 02000 2 2B 01000 1 3B 0 0001 1 4 AFFORDABLE UNITS (FOR 50% INCOME HOUSEHOLDS) PROVIDED OFF-SITE AT 1828 OCEAN AVE AVERAGE BEDROOMS/UNIT - AFFORDABLE MUST BE GREATER THAN OR EQ. TO MARKET-RATE PROJECT INFORMATION KoningEizen 1454 25th St, San 310.828.6131 310.828.0719 fax All designs, ideas, arrang by these drawings are the the Architect and shall ne work nor be disclosed to a use whatsoever without w Koning Eizenberg Archite and employees waives an responsibility for problems these plans, drawings, sp are followed without the p ambiguities, or conflicts w PROJECT TITLE PROJECT NO. ∆ # 1921 OCEAN 1513 SANTA MONICA, CA PROJECT INFORMATIONRESIDENTIAL AND COMMERCIAL PARKING TABULATIONSTIER 2 COMMUNITY BENEFITS PER 9.23 PROJECTDESCRIPTION: ADDRESS: ZONING DISTRICT: SETBACKS: PARCEL AREA: AVERAGE NATURALGRADE (A.N.G.): EXISTING USE: FLOOR LEVELR3 R2 R1P1REQD UNIT MIX %MIN UNITS REQDTOTAL UNITS PROVIDED PARKING REQ'S REQ'D PARKING RATIOTOTAL REQ'D STALLS GUEST PARKING 1:5 UNITS SEE SHEET A28 FOR AVERAGE UNIT SIZES PARKING PROVIDED LEVEL P1 GF/P2TOTAL STD 6 1420 COMPACT 8 1321 SHARE 0 00 TOTAL 29 27 56TOTAL PARKING STALLS PROVIDED ST 0 0 0 015% MAX00 10 1B 2 4 4 2N/A012 1.518 2B 0 3 3 120% MIN4.47 214 3B 2 1 0 015% MIN3.33 26 TOTAL 4 8 73 22 384.4 E.V. 2 02 1921 OCEAN FRONT WALK, SANTA MONICA, CA 90405 OCEANFRONT DISTRICT 47'. SEE SHEET A18 STREET FRONTAGE = 5',NO REQUIRED SIDE AND REAR YARD SETBACKS BECAUSE NOT ADJACENT TO RESIDENTIALPROJECT PROVIDES NON-REQUIRED SIDE AND REAR SETBACKS 23,258 SF; SEE SHEET A17FOR F.A.R. CALCULATION PURPOSES A 2,222 SF EASEMENT IS DEDUCTED FOR A REDUCED PARCEL AREA OF 21,036 SF DIVIDED INTO THREE EQUAL SEGMENTSSEE SHEET A18 VACANT LOT 2.0 ALLOWABLE; 1.65 PROPOSED WITH REDUCED PARCEL AREA SEE SHEET A28 PROPOSED F.A.R.: F.A.R. & PARCEL COVERAGE CALCULATIONS BICYCLE PARKING PROVIDED MAXIMUM HEIGHT PERMITTED: MAXIMUM F.A.R. PERMITTED: LEVEL GF/P2 R1TOTAL SHORT-TERM 4 (ON-SITE) 48 LONG-TERM COMM. 4 04 TOTAL 43 447 LONG-TERM RES. 35 035 LONG-TERM RESIDENTIAL = 1 / BEDROOMSHORT-TERM RESIDENTIAL = 10% OF LONG-TERM (2 MIN) LONG-TERM COMMERCIAL =1 / 3,000 SF (4 MIN) SHORT-TERM COMMERCIAL=1 / 4,000 SF (4 MIN) BICYCLE PARKING REQUIRED BICYCLE PARKING PER TABLE 9.28.140 COMMERCIAL PARKING REQUIREMENTS UNBUNDLED PARKING IS REQUIRED PER 9.28.1102 ELECTRIC VEHICLE CHARGING STATION REQUIRED (WHEN PROVIDING 50-99 TOTAL STALLS) PER 9.28.16010% OF TOTAL PARKING IS REQUIRED TO BE EV CAPABLEA PARKING PLAN FOR THE MECHANICAL LIFTS WILL BE SUBMITTED FOR MOBILITY REVIEW - SEE A27 FOR DETAIL UNIT TYPE MARKET-RATE RESIDENTIAL UNITS & PARKING REQUIREMENTS RESTAURANT 1 < 2,500 SFRESTAURANT 2 < 2,500 SF INCLUDING OUTDOOR DINING 2,000 SF @ 1/300 SF = 6.7INCLUDING OUTDOOR DINING 2,000 SF @ 1/300 SF = 6.7 55.8TOTAL REQ'D STALLS FOR PROJECT UPPER STORY SETBACKS: ADDITIONAL 5' SETBACK FOR 30% OF THE FRONT STREET FACING FACADE ABOVE THE MAXIMUM GROUND FLOOR HEIGHTSEE SHEET A30 OUTDOOR LIVING AREAS: TOTAL REQD:100 SF / UNIT PER CHAPTER 9.21.090 PRIVATE: 60 SF MIN / UNITSEE SHEET A29 RECYCLING & REFUSE: LOADING:1 PASSENGER LOADING SPACE (PER 9.28.080.D.3) IS REQ'D FOR PROJECTS WITH 2,501 - 7,500 SF OF COMMERCIAL FLOOR AREA PER 9.28.080.E.2.B. RESIDENTIAL PROJECTS WITH LESS THAN 50 UNITS ARE NOT REQUIRED TO PROVIDE A LOADING AREA. HC 3 03 (35 BEDROOMS * 1 =35)(.1 * 35 =4) (4,000 SF COMM ÷ 3,000 SF =4) (4,000 SF COMM ÷ 4,000 SF =4) TOTAL REQUIRED 47 PARCEL COVERAGE:70% ALLOWABLE; 63% PROPOSEDSEE SHEET A29 RESIDENTIAL UNIT FLOOR AREA 28,233 SFRESIDENTIAL COMMON AREAS 3,677 SFCOMMERCIAL FLOOR AREA 2,840 SF *TOTAL 34,750 SF FULL PARCEL AREA 23,258 SFFAR 1.50 PARCEL AREA LESS WEST EASEMENT 21,036 SFFAR 1.65 MAXIMUM PARCEL COVERAGE = 70% PER TABLE 9.14.030 PARCEL COVERAGE ÷ FULL PARCEL AREA 14,725 ÷ 23,258 = 63% PARCEL COVERAGE: 20,001 - 40,000 SF PER TABLE 9.21.130.BMIN: 28'W x 20'L x 10'H REQUIRED UNIT MIX FOR REFERENCEA) MARKET RATE UNITS: THREE-BEDROOM UNITS: 15% MIN TWO-BEDROOM UNITS: 20% MIN ONE BEDROOM UNITS: UNREGULATEDSTUDIO UNITS: NONE ANY FRACTIONAL HOUSING UNIT LESS THAN .5 THAT RESULTS FROM THIS UNIT MIX SHALL BE ROUNDED DOWN. ANY FRACTIONAL HOUSING UNIT EQUAL TO .5 OR MORE SHALL BE ROUNDED UP. B) AFFORDABLE HOUSING UNITS:THE AVERAGE NUMBER OF BEDROOMS FOR ALL OF THE AFFORDABLE HOUSING UNITS COMBINED SHALL BE EQUAL TO OR GREATER THAN THE AVERAGE NUMBER OF BEDROOMS PROVIDED FOR ALL OF THE MARKET RATE UNITS PURSUANT TO SUBSECTION A.2.A MECH. ASSIST 10 010 22 UNIT MULTI-FAMILY RESIDENTIAL PROJECT WITH GROUND FLOOR COMMERCIAL AND 15% VERY-LOW INCOME AFFORDABLE UNITS TO BE LOCATED OFFSITE AT 1828 OCEAN AVENUE. THIS SITE WAS SOLD BY THE CITY FOR RESIDENTIAL DEVELOPMENT. IT SHARES A LOT LINE WITH THE HISTORIC HOTEL CASA DEL MAR (CDM), AND THE PROJECT DESIGN THOUGHTFULLY INCORPORATES A VARIETY OF DESIGN FEATURES IN RESPONSE TO THE DESIGN OF THE ADJACENT HOTEL WHILE REMAINING IN STRICT CONFORMITY WITH THE 2015 ZONING ORDINANCE. DUE TO PROPOSITION S (PASSED BY THE VOTERS IN 1990 TO STOP BEACHFRONT HOTEL DEVELOPMENT), THE PROJECT AT 1921 IS AN ENTIRELY DISTINCT AND SEPARATE APARTMENT USE. OUTDOOR LIVING AREA SEE SHEET A29 *NOTE: OUTDOOR DINING EXCLUDED PER SMZO 9.04.090.A2 DESCR SD PRICING SET 2015 ZONING ORDINANCE WITH UPDATES - TIER 2 WITH PROVISIONS WITH COMMUNITY BENEFITS & 100% RESIDENTIAL ABOVE THE GROUND FLOOR PER TABLE 9.14.030 AND 9.21.090 100 SF/UNIT MIN TOTAL OPEN SPACE60 SF/UNIT MIN PRIVATE OPEN SPACE PROJECT SATISFIES REQUIREMENT THROUGH 100SF MIN PRIVATE DECKS REQUIRED PRIVATE O.L.A. (22 UNITS X 60 SF) = 1,320 SF PROPOSED PRIVATE O.L.A. = 5,300 SF IN ADDITION COMMON OUTDOOR LIVING AREA IS PROVIDED AS FOLLOWS:R3 ROOF TERRACE: 2,400 SFGF RESIDENT PATIO: 400 SF TOTAL NON-REQUIRED COMMON O.L.A. = +/- 2,800 SF STORIES:NO LIMIT. THE NAMES OF THE FLOORS/LEVELS ARE FOR IDENTIFICATION PURPOSES ONLY AND DO NOT REFLECT THE ZONING ORDINANCE DEFINITIONS OF “BASEMENT,” “STORY” OR “GROUND FLOOR” FLOOR LEVEL R4R3R2R1GROUND FLOORTOTAL # OF UNITS AVERAGE BEDROOM RATIO FOR 1921 MARKET-RATE UNITS = 35 BEDROOMS / 22 UNITS = 1.59 AVERAGE BEDROOM RATIO FOR 1921 AFFORDABLE UNITS = 7 BEDROOMS / 4 UNITS = 1.75 ST 00000 0 TOTAL 030014 UNIT TYPE FOR REFERENCE - AFFORDABLE RESIDENTIAL UNITS PROPOSED AT 1828 OCEAN AVENUE 1B 02000 2 2B 01000 1 3B 0 0001 1 4 AFFORDABLE UNITS (FOR 50% INCOME HOUSEHOLDS) PROVIDED OFF-SITE AT 1828 OCEAN AVE AVERAGE BEDROOMS/UNIT - AFFORDABLE MUST BE GREATER THAN OR EQ. TO MARKET-RATE RESIDENTIAL & COMMERCIAL PARKING TABULATIONS KoningEizen 1454 25th St, San 310.828.6131 310.828.0719 fax All designs, ideas, arrang by these drawings are the the Architect and shall ne work nor be disclosed to a use whatsoever without w Koning Eizenberg Archite and employees waives an responsibility for problems these plans, drawings, sp are followed without the p ambiguities, or conflicts w SHEET NO. PROJECT TITLE PROJECT NO. ∆ # 1921 OCEAN 1513 SANTA MONICA, CA A PROJECT INFORMATIONRESIDENTIAL AND COMMERCIAL PARKING TABULATIONSTIER 2 COMMUNITY BENEFITS PER 9.23 PROJECTDESCRIPTION: ADDRESS: ZONING DISTRICT: SETBACKS: PARCEL AREA: AVERAGE NATURAL GRADE (A.N.G.): EXISTING USE: FLOOR LEVEL R3 R2R1P1REQD UNIT MIX % MIN UNITS REQDTOTAL UNITS PROVIDEDPARKING REQ'SREQ'D PARKING RATIOTOTAL REQ'D STALLS GUEST PARKING 1:5 UNITS SEE SHEET A28 FOR AVERAGE UNIT SIZES PARKING PROVIDED LEVELP1GF/P2TOTAL STD61420 COMPACT81321 SHARE000 TOTAL2927 56TOTAL PARKING STALLS PROVIDED ST 000015% MAX 00 1 0 1B 2442N/A 012 1.5 18 2B 033120% MIN 4.47 2 14 3B 210015% MIN 3.33 2 6 TOTAL 4873 22 384.4 E.V.202 1921 OCEAN FRONT WALK, SANTA MONICA, CA 90405 OCEANFRONT DISTRICT 47'. SEE SHEET A18 STREET FRONTAGE = 5',NO REQUIRED SIDE AND REAR YARD SETBACKS BECAUSE NOT ADJACENT TO RESIDENTIAL PROJECT PROVIDES NON-REQUIRED SIDE AND REAR SETBACKS 23,258 SF; SEE SHEET A17 FOR F.A.R. CALCULATION PURPOSES A 2,222 SF EASEMENT IS DEDUCTED FOR A REDUCED PARCEL AREA OF 21,036 SF DIVIDED INTO THREE EQUAL SEGMENTSSEE SHEET A18 VACANT LOT 2.0 ALLOWABLE; 1.65 PROPOSED WITH REDUCED PARCEL AREASEE SHEET A28 PROPOSED F.A.R.: F.A.R. & PARCEL COVERAGE CALCULATIONS BICYCLE PARKING PROVIDED MAXIMUM HEIGHT PERMITTED: MAXIMUM F.A.R. PERMITTED: LEVEL GF/P2R1TOTAL SHORT-TERM 4 (ON-SITE)48 LONG-TERM COMM. 404 TOTAL 43447 LONG-TERM RES. 35035 LONG-TERM RESIDENTIAL = 1 / BEDROOM SHORT-TERM RESIDENTIAL = 10% OF LONG-TERM (2 MIN) LONG-TERM COMMERCIAL =1 / 3,000 SF (4 MIN)SHORT-TERM COMMERCIAL=1 / 4,000 SF (4 MIN) BICYCLE PARKING REQUIRED BICYCLE PARKING PER TABLE 9.28.140 COMMERCIAL PARKING REQUIREMENTS UNBUNDLED PARKING IS REQUIRED PER 9.28.110 2 ELECTRIC VEHICLE CHARGING STATION REQUIRED (WHEN PROVIDING 50-99 TOTAL STALLS) PER 9.28.160 10% OF TOTAL PARKING IS REQUIRED TO BE EV CAPABLE A PARKING PLAN FOR THE MECHANICAL LIFTS WILL BE SUBMITTED FOR MOBILITY REVIEW - SEE A27 FOR DETAIL UNIT TYPE MARKET-RATE RESIDENTIAL UNITS & PARKING REQUIREMENTS RESTAURANT 1 < 2,500 SFRESTAURANT 2 < 2,500 SF INCLUDING OUTDOOR DINING 2,000 SF @ 1/300 SF = 6.7INCLUDING OUTDOOR DINING 2,000 SF @ 1/300 SF = 6.7 55.8TOTAL REQ'D STALLS FOR PROJECT UPPER STORY SETBACKS: ADDITIONAL 5' SETBACK FOR 30% OF THE FRONT STREET FACING FACADE ABOVE THE MAXIMUM GROUND FLOOR HEIGHT SEE SHEET A30 OUTDOOR LIVING AREAS:TOTAL REQD:100 SF / UNIT PER CHAPTER 9.21.090PRIVATE: 60 SF MIN / UNITSEE SHEET A29 RECYCLING & REFUSE: LOADING:1 PASSENGER LOADING SPACE (PER 9.28.080.D.3) IS REQ'D FOR PROJECTS WITH 2,501 - 7,500 SF OF COMMERCIAL FLOOR AREA PER 9.28.080.E.2.B. RESIDENTIAL PROJECTS WITH LESS THAN 50 UNITS ARE NOT REQUIRED TO PROVIDE A LOADING AREA. HC303 (35 BEDROOMS * 1 =35) (.1 * 35 =4) (4,000 SF COMM ÷ 3,000 SF =4)(4,000 SF COMM ÷ 4,000 SF =4) TOTAL REQUIRED 47 PARCEL COVERAGE: 70% ALLOWABLE; 63% PROPOSEDSEE SHEET A29 RESIDENTIAL UNIT FLOOR AREA 28,233 SF RESIDENTIAL COMMON AREAS 3,677 SF COMMERCIAL FLOOR AREA 2,840 SF *TOTAL 34,750 SF FULL PARCEL AREA 23,258 SFFAR 1.50 PARCEL AREA LESS WEST EASEMENT 21,036 SFFAR 1.65 MAXIMUM PARCEL COVERAGE = 70% PER TABLE 9.14.030 PARCEL COVERAGE ÷ FULL PARCEL AREA 14,725 ÷ 23,258 = 63% PARCEL COVERAGE: 20,001 - 40,000 SF PER TABLE 9.21.130.B MIN: 28'W x 20'L x 10'H REQUIRED UNIT MIX FOR REFERENCE A) MARKET RATE UNITS: THREE-BEDROOM UNITS: 15% MINTWO-BEDROOM UNITS: 20% MINONE BEDROOM UNITS: UNREGULATEDSTUDIO UNITS: NONE ANY FRACTIONAL HOUSING UNIT LESS THAN .5 THAT RESULTS FROM THIS UNIT MIX SHALL BE ROUNDED DOWN. ANY FRACTIONAL HOUSING UNIT EQUAL TO .5 OR MORE SHALL BE ROUNDED UP. B) AFFORDABLE HOUSING UNITS:THE AVERAGE NUMBER OF BEDROOMS FOR ALL OF THE AFFORDABLE HOUSING UNITS COMBINED SHALL BE EQUAL TO OR GREATER THAN THE AVERAGE NUMBER OF BEDROOMS PROVIDED FOR ALL OF THE MARKET RATE UNITS PURSUANT TO SUBSECTION A.2.A MECH. ASSIST10010 22 UNIT MULTI-FAMILY RESIDENTIAL PROJECT WITH GROUND FLOOR COMMERCIAL AND 15% VERY-LOW INCOME AFFORDABLE UNITS TO BE LOCATED OFFSITE AT 1828 OCEAN AVENUE. THIS SITE WAS SOLD BY THE CITY FOR RESIDENTIAL DEVELOPMENT. IT SHARES A LOT LINE WITH THE HISTORIC HOTEL CASA DEL MAR (CDM), AND THE PROJECT DESIGN THOUGHTFULLY INCORPORATES A VARIETY OF DESIGN FEATURES IN RESPONSE TO THE DESIGN OF THE ADJACENT HOTEL WHILE REMAINING IN STRICT CONFORMITY WITH THE 2015 ZONING ORDINANCE. DUE TO PROPOSITION S (PASSED BY THE VOTERS IN 1990 TO STOP BEACHFRONT HOTEL DEVELOPMENT), THE PROJECT AT 1921 IS AN ENTIRELY DISTINCT AND SEPARATE APARTMENT USE. OUTDOOR LIVING AREA SEE SHEET A29 *NOTE: OUTDOOR DINING EXCLUDED PER SMZO 9.04.090.A2 DESCR SD PRICING SET 2015 ZONING ORDINANCE WITH UPDATES - TIER 2 WITH PROVISIONS WITH COMMUNITY BENEFITS & 100% RESIDENTIAL ABOVE THE GROUND FLOOR PER TABLE 9.14.030 AND 9.21.090 100 SF/UNIT MIN TOTAL OPEN SPACE60 SF/UNIT MIN PRIVATE OPEN SPACE PROJECT SATISFIES REQUIREMENT THROUGH 100SF MIN PRIVATE DECKS REQUIRED PRIVATE O.L.A. (22 UNITS X 60 SF) = 1,320 SFPROPOSED PRIVATE O.L.A. = 5,300 SF IN ADDITION COMMON OUTDOOR LIVING AREA IS PROVIDED AS FOLLOWS: R3 ROOF TERRACE: 2,400 SF GF RESIDENT PATIO: 400 SF TOTAL NON-REQUIRED COMMON O.L.A. = +/- 2,800 SF STORIES:NO LIMIT. THE NAMES OF THE FLOORS/LEVELS ARE FOR IDENTIFICATION PURPOSES ONLY AND DO NOT REFLECT THE ZONING ORDINANCE DEFINITIONS OF “BASEMENT,” “STORY” OR “GROUND FLOOR” FLOOR LEVELR4R3R2 R1 GROUND FLOOR TOTAL # OF UNITS AVERAGE BEDROOM RATIO FOR 1921 MARKET-RATE UNITS = 35 BEDROOMS / 22 UNITS = 1.59AVERAGE BEDROOM RATIO FOR 1921 AFFORDABLE UNITS = 7 BEDROOMS / 4 UNITS = 1.75 ST000 0 0 0 TOTAL030 0 1 4 UNIT TYPE FOR REFERENCE - AFFORDABLE RESIDENTIAL UNITS PROPOSED AT 1828 OCEAN AVENUE 1B020 0 0 2 2B010 0 0 1 3B0000 1 1 4 AFFORDABLE UNITS (FOR 50% INCOME HOUSEHOLDS) PROVIDED OFF-SITE AT 1828 OCEAN AVE AVERAGE BEDROOMS/UNIT - AFFORDABLE MUST BE GREATER THAN OR EQ. TO MARKET-RATE BICYCLE PARKING KoningEizen 1454 25th St, Sa 310.828.6131 310.828.0719 fax All designs, ideas, arran by these drawings are th the Architect and shall n work nor be disclosed to use whatsoever without Koning Eizenberg Archit and employees waives a responsibility for problem these plans, drawings, s are followed without the ambiguities, or conflicts PROJECT INFORMATIONRESIDENTIAL AND COMMERCIAL PARKING TABULATIONSTIER 2 COMMUNITY BENEFITS PER 9.23 PROJECTDESCRIPTION: ADDRESS: ZONING DISTRICT: SETBACKS: PARCEL AREA: AVERAGE NATURAL GRADE (A.N.G.): EXISTING USE: FLOOR LEVEL R3 R2R1P1REQD UNIT MIX %MIN UNITS REQDTOTAL UNITS PROVIDEDPARKING REQ'S REQ'D PARKING RATIOTOTAL REQ'D STALLS GUEST PARKING 1:5 UNITS SEE SHEET A28 FOR AVERAGE UNIT SIZES PARKING PROVIDED LEVEL P1GF/P2TOTAL STD 61420 COMPACT 81321 SHARE 000 TOTAL 2927 ST 0 00015% MAX00 1 0 1B 2 442N/A012 1.5 18 2B 0 33120% MIN4.47 2 14 3B 2 10015% MIN3.33 2 6 TOTAL 4 873 22 384.4 E.V. 202 1921 OCEAN FRONT WALK, SANTA MONICA, CA 90405 OCEANFRONT DISTRICT 47'. SEE SHEET A18 STREET FRONTAGE = 5',NO REQUIRED SIDE AND REAR YARD SETBACKS BECAUSE NOT ADJACENT TO RESIDENTIAL PROJECT PROVIDES NON-REQUIRED SIDE AND REAR SETBACKS 23,258 SF; SEE SHEET A17 FOR F.A.R. CALCULATION PURPOSES A 2,222 SF EASEMENT IS DEDUCTED FOR A REDUCED PARCEL AREA OF 21,036 SF DIVIDED INTO THREE EQUAL SEGMENTSSEE SHEET A18 VACANT LOT 2.0 ALLOWABLE; 1.65 PROPOSED WITH REDUCED PARCEL AREASEE SHEET A28 MAXIMUM HEIGHT PERMITTED: MAXIMUM F.A.R. PERMITTED: COMMERCIAL PARKING REQUIREMENTS UNIT TYPE MARKET-RATE RESIDENTIAL UNITS & PARKING REQUIREMENTS RESTAURANT 1 < 2,500 SFRESTAURANT 2 < 2,500 SF INCLUDING OUTDOOR DINING 2,000 SF @ 1/300 SF = 6.7INCLUDING OUTDOOR DINING 2,000 SF @ 1/300 SF = 6.7 55.8TOTAL REQ'D STALLS FOR PROJECT HC 303 PARCEL COVERAGE: 70% ALLOWABLE; 63% PROPOSEDSEE SHEET A29 REQUIRED UNIT MIX FOR REFERENCEA) MARKET RATE UNITS: THREE-BEDROOM UNITS: 15% MINTWO-BEDROOM UNITS: 20% MINONE BEDROOM UNITS: UNREGULATEDSTUDIO UNITS: NONE ANY FRACTIONAL HOUSING UNIT LESS THAN .5 THAT RESULTS FROM THIS UNIT MIX SHALL BE ROUNDED DOWN. ANY FRACTIONAL HOUSING UNIT EQUAL TO .5 OR MORE SHALL BE ROUNDED UP. B) AFFORDABLE HOUSING UNITS:THE AVERAGE NUMBER OF BEDROOMS FOR ALL OF THE AFFORDABLE HOUSING UNITS COMBINED SHALL BE EQUAL TO OR GREATER THAN THE AVERAGE NUMBER OF BEDROOMS PROVIDED FOR ALL OF THE MARKET RATE UNITS PURSUANT TO SUBSECTION A.2.A MECH. ASSIST 10010 22 UNIT MULTI-FAMILY RESIDENTIAL PROJECT WITH GROUND FLOOR COMMERCIAL AND 15% VERY-LOW INCOME AFFORDABLE UNITS TO BE LOCATED OFFSITE AT 1828 OCEAN AVENUE. THIS SITE WAS SOLD BY THE CITY FOR RESIDENTIAL DEVELOPMENT. IT SHARES A LOT LINE WITH THE HISTORIC HOTEL CASA DEL MAR (CDM), AND THE PROJECT DESIGN THOUGHTFULLY INCORPORATES A VARIETY OF DESIGN FEATURES IN RESPONSE TO THE DESIGN OF THE ADJACENT HOTEL WHILE REMAINING IN STRICT CONFORMITY WITH THE 2015 ZONING ORDINANCE. DUE TO PROPOSITION S (PASSED BY THE VOTERS IN 1990 TO STOP BEACHFRONT HOTEL DEVELOPMENT), THE PROJECT AT 1921 IS AN ENTIRELY DISTINCT AND SEPARATE APARTMENT USE. OUTDOOR LIVING AREA SEE SHEET A29 2015 ZONING ORDINANCE WITH UPDATES - TIER 2 WITH PROVISIONS WITH COMMUNITY BENEFITS & 100% RESIDENTIAL ABOVE THE GROUND FLOOR PER TABLE 9.14.030 AND 9.21.090 100 SF/UNIT MIN TOTAL OPEN SPACE60 SF/UNIT MIN PRIVATE OPEN SPACE PROJECT SATISFIES REQUIREMENT THROUGH 100SF MIN PRIVATE DECKS REQUIRED PRIVATE O.L.A. (22 UNITS X 60 SF) = 1,320 SFPROPOSED PRIVATE O.L.A. = 5,300 SF IN ADDITION COMMON OUTDOOR LIVING AREA IS PROVIDED AS FOLLOWS:R3 ROOF TERRACE: 2,400 SF GF RESIDENT PATIO: 400 SF TOTAL NON-REQUIRED COMMON O.L.A. = +/- 2,800 SF STORIES:NO LIMIT. THE NAMES OF THE FLOORS/LEVELS ARE FOR IDENTIFICATION PURPOSES ONLY AND DO NOT REFLECT THE ZONING ORDINANCE DEFINITIONS OF “BASEMENT,” “STORY” OR “GROUND FLOOR” FLOOR LEVELR4R3R2R1 GROUND FLOORTOTAL # OF UNITS AVERAGE BEDROOM RATIO FOR 1921 MARKET-RATE UNITS = 35 BEDROOMS / 22 UNITS = 1.59AVERAGE BEDROOM RATIO FOR 1921 AFFORDABLE UNITS = 7 BEDROOMS / 4 UNITS = 1.75 ST0000 0 0 TOTAL0300 14 UNIT TYPE FOR REFERENCE - AFFORDABLE RESIDENTIAL UNITS PROPOSED AT 1828 OCEAN AVENUE 1B0200 0 2 2B0100 0 1 3B0000 1 1 4 AFFORDABLE UNITS (FOR 50% INCOME HOUSEHOLDS) PROVIDED OFF-SITE AT 1828 OCEAN AVE AVERAGE BEDROOMS/UNIT - AFFORDABLE MUST BE GREATER THAN OR EQ. TO MARKET-RATE TIER II COMMUNITY BENEFITS PER 9.23 OUTDOOR LIVING AREA KoningEizen 1454 25th St, Sa 310.828.6131 310.828.0719 fax All designs, ideas, arran by these drawings are th the Architect and shall n work nor be disclosed to use whatsoever without Koning Eizenberg Archit and employees waives a responsibility for problem these plans, drawings, s are followed without the ambiguities, or conflicts PROJECT INFORMATIONRESIDENTIAL AND COMMERCIAL PARKING TABULATIONSTIER 2 COMMUNITY BENEFITS PER 9.23 PROJECTDESCRIPTION: ADDRESS: ZONING DISTRICT: SETBACKS: PARCEL AREA: AVERAGE NATURAL GRADE (A.N.G.): EXISTING USE: FLOOR LEVEL R3R2R1P1REQD UNIT MIX % MIN UNITS REQDTOTAL UNITS PROVIDEDPARKING REQ'SREQ'D PARKING RATIOTOTAL REQ'D STALLS GUEST PARKING 1:5 UNITS SEE SHEET A28 FOR AVERAGE UNIT SIZES PARKING PROVIDED LEVELP1GF/P2TOTAL STD61420 COMPACT81321 SHARE000 TOTAL2927 56TOTAL PARKING STALLS PROVIDED ST 000015% MAX 00 1 0 1B 2442N/A 012 1.5 18 2B 033120% MIN 4.47 2 14 3B 210015% MIN 3.33 2 6 TOTAL 4873 22 38 4.4 E.V.202 1921 OCEAN FRONT WALK, SANTA MONICA, CA 90405 OCEANFRONT DISTRICT 47'. SEE SHEET A18 STREET FRONTAGE = 5',NO REQUIRED SIDE AND REAR YARD SETBACKS BECAUSE NOT ADJACENT TO RESIDENTIAL PROJECT PROVIDES NON-REQUIRED SIDE AND REAR SETBACKS 23,258 SF; SEE SHEET A17 FOR F.A.R. CALCULATION PURPOSES A 2,222 SF EASEMENT IS DEDUCTED FOR A REDUCED PARCEL AREA OF 21,036 SF DIVIDED INTO THREE EQUAL SEGMENTSSEE SHEET A18 VACANT LOT 2.0 ALLOWABLE; 1.65 PROPOSED WITH REDUCED PARCEL AREASEE SHEET A28 MAXIMUM HEIGHT PERMITTED: MAXIMUM F.A.R. PERMITTED: COMMERCIAL PARKING REQUIREMENTS UNIT TYPE MARKET-RATE RESIDENTIAL UNITS & PARKING REQUIREMENTS RESTAURANT 1 < 2,500 SF RESTAURANT 2 < 2,500 SF INCLUDING OUTDOOR DINING 2,000 SF @ 1/300 SF = 6.7 INCLUDING OUTDOOR DINING 2,000 SF @ 1/300 SF = 6.7 55.8TOTAL REQ'D STALLS FOR PROJECT UPPER STORY ADDITIONAL 5' SETBACK FOR 30% OF THE FRONT STREET HC303 PARCEL COVERAGE: 70% ALLOWABLE; 63% PROPOSEDSEE SHEET A29 REQUIRED UNIT MIX FOR REFERENCE A) MARKET RATE UNITS: THREE-BEDROOM UNITS: 15% MINTWO-BEDROOM UNITS: 20% MINONE BEDROOM UNITS: UNREGULATEDSTUDIO UNITS: NONE ANY FRACTIONAL HOUSING UNIT LESS THAN .5 THAT RESULTS FROM THIS UNIT MIX SHALL BE ROUNDED DOWN. ANY FRACTIONAL HOUSING UNIT EQUAL TO .5 OR MORE SHALL BE ROUNDED UP. B) AFFORDABLE HOUSING UNITS:THE AVERAGE NUMBER OF BEDROOMS FOR ALL OF THE AFFORDABLE HOUSING UNITS COMBINED SHALL BE EQUAL TO OR GREATER THAN THE AVERAGE NUMBER OF BEDROOMS PROVIDED FOR ALL OF THE MARKET RATE UNITS PURSUANT TO SUBSECTION A.2.A MECH. ASSIST10010 22 UNIT MULTI-FAMILY RESIDENTIAL PROJECT WITH GROUND FLOOR COMMERCIAL AND 15% VERY-LOW INCOME AFFORDABLE UNITS TO BE LOCATED OFFSITE AT 1828 OCEAN AVENUE. THIS SITE WAS SOLD BY THE CITY FOR RESIDENTIAL DEVELOPMENT. IT SHARES A LOT LINE WITH THE HISTORIC HOTEL CASA DEL MAR (CDM), AND THE PROJECT DESIGN THOUGHTFULLY INCORPORATES A VARIETY OF DESIGN FEATURES IN RESPONSE TO THE DESIGN OF THE ADJACENT HOTEL WHILE REMAINING IN STRICT CONFORMITY WITH THE 2015 ZONING ORDINANCE. DUE TO PROPOSITION S (PASSED BY THE VOTERS IN 1990 TO STOP BEACHFRONT HOTEL DEVELOPMENT), THE PROJECT AT 1921 IS AN ENTIRELY DISTINCT AND SEPARATE APARTMENT USE. OUTDOOR LIVING AREA SEE SHEET A29 2015 ZONING ORDINANCE WITH UPDATES - TIER 2 WITH PROVISIONS WITH COMMUNITY BENEFITS & 100% RESIDENTIAL ABOVE THE GROUND FLOOR PER TABLE 9.14.030 AND 9.21.090 100 SF/UNIT MIN TOTAL OPEN SPACE 60 SF/UNIT MIN PRIVATE OPEN SPACE PROJECT SATISFIES REQUIREMENT THROUGH 100SF MIN PRIVATE DECKSREQUIRED PRIVATE O.L.A. (22 UNITS X 60 SF) = 1,320 SFPROPOSED PRIVATE O.L.A. = 5,300 SF IN ADDITION COMMON OUTDOOR LIVING AREA IS PROVIDED AS FOLLOWS: R3 ROOF TERRACE: 2,400 SF GF RESIDENT PATIO: 400 SF TOTAL NON-REQUIRED COMMON O.L.A. = +/- 2,800 SF STORIES:NO LIMIT. THE NAMES OF THE FLOORS/LEVELS ARE FOR IDENTIFICATION PURPOSES ONLY AND DO NOT REFLECT THE ZONING ORDINANCE DEFINITIONS OF “BASEMENT,” “STORY” OR “GROUND FLOOR” FLOOR LEVELR4R3R2 R1 GROUND FLOOR TOTAL # OF UNITS AVERAGE BEDROOM RATIO FOR 1921 MARKET-RATE UNITS = 35 BEDROOMS / 22 UNITS = 1.59AVERAGE BEDROOM RATIO FOR 1921 AFFORDABLE UNITS = 7 BEDROOMS / 4 UNITS = 1.75 ST000 0 0 0 TOTAL030 0 1 4 UNIT TYPE FOR REFERENCE - AFFORDABLE RESIDENTIAL UNITS PROPOSED AT 1828 OCEAN AVENUE 1B020 0 0 2 2B010 0 0 1 3B000 0 1 1 4 AFFORDABLE UNITS (FOR 50% INCOME HOUSEHOLDS) PROVIDED OFF-SITE AT 1828 OCEAN AVE AVERAGE BEDROOMS/UNIT - AFFORDABLE MUST BE GREATER THAN OR EQ. TO MARKET-RATE KoningEizenb 1454 25th St, Santa 310.828.6131 310.828.0719 fax All designs, ideas, arrangem by these drawings are the p the Architect and shall neith work nor be disclosed to an use whatsoever without wri Koning Eizenberg Architect and employees waives any responsibility for problems t these plans, drawings, spec are followed without the pro ambiguities, or conflicts whi SHEET NO. PROJECT TITLE PROJECT NO. ∆ # 1921 OCEAN F 1513 SANTA MONICA, CA A PROJECT INFORMATIONRESIDENTIAL AND COMMERCIAL PARKING TABULATIONSTIER 2 COMMUNITY BENEFITS PER 9.23 PROJECT DESCRIPTION: ADDRESS: ZONING DISTRICT: SETBACKS: PARCEL AREA: AVERAGE NATURALGRADE (A.N.G.): EXISTING USE: FLOOR LEVELR3R2R1 P1 REQD UNIT MIX % MIN UNITS REQDTOTAL UNITS PROVIDED PARKING REQ'S REQ'D PARKING RATIOTOTAL REQ'D STALLSGUEST PARKING 1:5 UNITS SEE SHEET A28 FOR AVERAGE UNIT SIZES PARKING PROVIDED LEVELP1 GF/P2 TOTAL STD6 14 20 COMPACT8 13 21 SHARE0 0 0 TOTAL2927 56TOTAL PARKING STALLS PROVIDED ST000 0 15% MAX00 10 1B244 2 N/A012 1.518 2B033 1 20% MIN4.47 214 3B210 0 15% MIN3.33 26 TOTAL487 3 22 38 4.4 E.V.2 0 2 1921 OCEAN FRONT WALK, SANTA MONICA, CA 90405 OCEANFRONT DISTRICT 47'. SEE SHEET A18 STREET FRONTAGE = 5', NO REQUIRED SIDE AND REAR YARD SETBACKS BECAUSE NOT ADJACENT TO RESIDENTIALPROJECT PROVIDES NON-REQUIRED SIDE AND REAR SETBACKS 23,258 SF; SEE SHEET A17FOR F.A.R. CALCULATION PURPOSES A 2,222 SF EASEMENT IS DEDUCTED FOR A REDUCED PARCEL AREA OF 21,036 SF DIVIDED INTO THREE EQUAL SEGMENTS SEE SHEET A18 VACANT LOT 2.0 ALLOWABLE; 1.65 PROPOSED WITH REDUCED PARCEL AREASEE SHEET A28 PROPOSED F.A.R.: F.A.R. & PARCEL COVERAGE CALCULATIONS BICYCLE PARKING PROVIDED MAXIMUM HEIGHT PERMITTED: MAXIMUM F.A.R. PERMITTED: LEVELGF/P2R1 TOTAL SHORT-TERM4 (ON-SITE)4 8 LONG-TERM COMM.40 4 TOTAL434 47 LONG-TERM RES.350 35 LONG-TERM RESIDENTIAL = 1 / BEDROOMSHORT-TERM RESIDENTIAL = 10% OF LONG-TERM (2 MIN)LONG-TERM COMMERCIAL =1 / 3,000 SF (4 MIN)SHORT-TERM COMMERCIAL=1 / 4,000 SF (4 MIN) BICYCLE PARKING REQUIRED BICYCLE PARKING PER TABLE 9.28.140 COMMERCIAL PARKING REQUIREMENTS UNBUNDLED PARKING IS REQUIRED PER 9.28.1102 ELECTRIC VEHICLE CHARGING STATION REQUIRED (WHEN PROVIDING 50-99 TOTAL STALLS) PER 9.28.16010% OF TOTAL PARKING IS REQUIRED TO BE EV CAPABLEA PARKING PLAN FOR THE MECHANICAL LIFTS WILL BE SUBMITTED FOR MOBILITY REVIEW - SEE A27 FOR DETAIL UNIT TYPE MARKET-RATE RESIDENTIAL UNITS & PARKING REQUIREMENTS RESTAURANT 1 < 2,500 SF RESTAURANT 2 < 2,500 SF INCLUDING OUTDOOR DINING 2,000 SF @ 1/300 SF = 6.7 INCLUDING OUTDOOR DINING 2,000 SF @ 1/300 SF = 6.7 55.8TOTAL REQ'D STALLS FOR PROJECT UPPER STORY SETBACKS:ADDITIONAL 5' SETBACK FOR 30% OF THE FRONT STREET FACING FACADE ABOVE THE MAXIMUM GROUND FLOOR HEIGHTSEE SHEET A30 OUTDOOR LIVING AREAS: TOTAL REQD:100 SF / UNIT PER CHAPTER 9.21.090PRIVATE: 60 SF MIN / UNIT SEE SHEET A29 RECYCLING & REFUSE: LOADING:1 PASSENGER LOADING SPACE (PER 9.28.080.D.3) IS REQ'D FOR PROJECTS WITH 2,501 - 7,500 SF OF COMMERCIAL FLOOR AREA PER 9.28.080.E.2.B. RESIDENTIAL PROJECTS WITH LESS THAN 50 UNITS ARE NOT REQUIRED TO PROVIDE A LOADING AREA. HC3 0 3 (35 BEDROOMS * 1 =35)(.1 * 35 =4)(4,000 SF COMM ÷ 3,000 SF =4)(4,000 SF COMM ÷ 4,000 SF =4) TOTAL REQUIRED 47 PARCEL COVERAGE: 70% ALLOWABLE; 63% PROPOSED SEE SHEET A29 RESIDENTIAL UNIT FLOOR AREA 28,233 SFRESIDENTIAL COMMON AREAS 3,677 SFCOMMERCIAL FLOOR AREA 2,840 SF *TOTAL 34,750 SF FULL PARCEL AREA 23,258 SF FAR 1.50 PARCEL AREA LESS WEST EASEMENT 21,036 SF FAR 1.65 MAXIMUM PARCEL COVERAGE = 70% PER TABLE 9.14.030 PARCEL COVERAGE ÷ FULL PARCEL AREA14,725 ÷ 23,258 = 63% PARCEL COVERAGE: 20,001 - 40,000 SF PER TABLE 9.21.130.B MIN: 28'W x 20'L x 10'H REQUIRED UNIT MIX FOR REFERENCEA) MARKET RATE UNITS: THREE-BEDROOM UNITS: 15% MINTWO-BEDROOM UNITS: 20% MIN ONE BEDROOM UNITS: UNREGULATED STUDIO UNITS: NONE ANY FRACTIONAL HOUSING UNIT LESS THAN .5 THAT RESULTS FROM THIS UNIT MIX SHALL BE ROUNDED DOWN. ANY FRACTIONAL HOUSING UNIT EQUAL TO .5 OR MORE SHALL BE ROUNDED UP. B) AFFORDABLE HOUSING UNITS: THE AVERAGE NUMBER OF BEDROOMS FOR ALL OF THE AFFORDABLE HOUSING UNITS COMBINED SHALL BE EQUAL TO OR GREATER THAN THE AVERAGE NUMBER OF BEDROOMS PROVIDED FOR ALL OF THE MARKET RATE UNITS PURSUANT TO SUBSECTION A.2.A MECH. ASSIST10 0 10 22 UNIT MULTI-FAMILY RESIDENTIAL PROJECT WITH GROUND FLOOR COMMERCIAL AND 15% VERY-LOW INCOME AFFORDABLE UNITS TO BE LOCATED OFFSITE AT 1828 OCEAN AVENUE. THIS SITE WAS SOLD BY THE CITY FOR RESIDENTIAL DEVELOPMENT. IT SHARES A LOT LINE WITH THE HISTORIC HOTEL CASA DEL MAR (CDM), AND THE PROJECT DESIGN THOUGHTFULLY INCORPORATES A VARIETY OF DESIGN FEATURES IN RESPONSE TO THE DESIGN OF THE ADJACENT HOTEL WHILE REMAINING IN STRICT CONFORMITY WITH THE 2015 ZONING ORDINANCE. DUE TO PROPOSITION S (PASSED BY THE VOTERS IN 1990 TO STOP BEACHFRONT HOTEL DEVELOPMENT), THE PROJECT AT 1921 IS AN ENTIRELY DISTINCT AND SEPARATE APARTMENT USE. OUTDOOR LIVING AREA SEE SHEET A29 *NOTE: OUTDOOR DINING EXCLUDED PER SMZO 9.04.090.A2 DESCRIP SD PRICING SET 2015 ZONING ORDINANCE WITH UPDATES - TIER 2 WITH PROVISIONS WITH COMMUNITY BENEFITS & 100% RESIDENTIAL ABOVE THE GROUND FLOOR PER TABLE 9.14.030 AND 9.21.090 100 SF/UNIT MIN TOTAL OPEN SPACE 60 SF/UNIT MIN PRIVATE OPEN SPACE PROJECT SATISFIES REQUIREMENT THROUGH 100SF MIN PRIVATE DECKSREQUIRED PRIVATE O.L.A. (22 UNITS X 60 SF) = 1,320 SFPROPOSED PRIVATE O.L.A. = 5,300 SF IN ADDITION COMMON OUTDOOR LIVING AREA IS PROVIDED AS FOLLOWS: R3 ROOF TERRACE: 2,400 SFGF RESIDENT PATIO: 400 SF TOTAL NON-REQUIRED COMMON O.L.A. = +/- 2,800 SF STORIES:NO LIMIT. THE NAMES OF THE FLOORS/LEVELS ARE FOR IDENTIFICATION PURPOSES ONLY AND DO NOT REFLECT THE ZONING ORDINANCE DEFINITIONS OF “BASEMENT,” “STORY” OR “GROUND FLOOR” FLOOR LEVELR4 R3 R2R1GROUND FLOORTOTAL # OF UNITS AVERAGE BEDROOM RATIO FOR 1921 MARKET-RATE UNITS = 35 BEDROOMS / 22 UNITS = 1.59 AVERAGE BEDROOM RATIO FOR 1921 AFFORDABLE UNITS = 7 BEDROOMS / 4 UNITS = 1.75 ST0 0 0 000 TOTAL0 3 0 014 UNIT TYPE FOR REFERENCE - AFFORDABLE RESIDENTIAL UNITS PROPOSED AT 1828 OCEAN AVENUE 1B0 2 0 002 2B0 1 0 001 3B0 0 0 011 4 AFFORDABLE UNITS (FOR 50% INCOME HOUSEHOLDS) PROVIDED OFF-SITE AT 1828 OCEAN AVE AVERAGE BEDROOMS/UNIT - AFFORDABLE MUST BE GREATER THAN OR EQ. TO MARKET-RATE F.A.R. & PARCEL COVERAGE CALCULATIONS OWNER NXT2 BEACH, LLC A CALIFORNIA LIMITED LIABILITY COMPANY ARCHITECT KONING EIZENBERG ARCHITECTURE 1454 25TH STREET SANTA MONICA, CA 90404 CONTACT: HANK KONING, TROY FOSLER T: 310.828.6131 E: hkoning@kearch.com tfosler@kearch.com PROJECT CONTACTS PROJECT INFORMATION HISTORIC PRESERVATION CONSULTANT CHATTEL, INC. 13417 VENTURA BLVD SHERMAN OAKS, CA 91423 SHEET INDEX ARCHITECTURE: A1 COVER A2 PROJECT INFORMATION A3 OCEAN WAY RENDERING A4 OCEAN WAY CORNER RENDERING A5 BAY STREET RENDERING A6 CRESCENT BAY PARK RENDERING A7 BAY STREET RENDERING A8 OCEAN FRONT WALK RENDERING A9 OCEAN FRONT WALK RENDERING A10 NORTH COURTYARD RENDERING A11 OCEAN FRONT WALK DEVELOPMENT A12 SITE AERIAL & ZONING MAP A13 SITE CONTEXT PHOTOS A14 OCEAN WAY CONTEXT ELEVATIONS A15 BAY STREET CONTEXT ELEVATIONS A16 OCEAN FRONT WALK CONTEXT ELEVATIONS A17 TOPOGRAPHIC SURVEY A18 SEGMENTED AVERAGE NATURAL GRADE A19 SITE / PLOT PLAN A20 GROUND FLOOR / P2 FLOOR PLAN A21 P1 FLOOR PLAN A22 R1 FLOOR PLAN A23 R2 FLOOR PLAN A24 R3 FLOOR PLAN A25 ROOF PLAN A26 SITE ACCESS DIAGRAM A27 ENLARGED RAMP PLANS / SECTIONS A28 F.A.R. CALCULATIONS A29 OUTDOOR LIVING AREA & PARCEL COVERAGE CALCULATIONS A30 UPPER STORY STEP-BACK CALCULATIONS A31 MATERIAL & PROJECT PRECEDENTS A32 OCEAN WAY CONTEXT ELEVATION A33 OCEAN WAY ELEVATION A34 BAY STREET CONTEXT ELEVATION A35 BAY STREET ELEVATION A36 OCEAN FRONT WALK CONTEXT ELEVATION A37 OCEAN FRONT WALK ELEVATION A38 COURTYARD ELEVATION A39 BUILDING SECTION 1 A40 BUILDING SECTION 2 A41 BUILDING SECTION 3 LANDSCAPE: L1 OVERALL SITE PLAN L2 PLAN - STREETSCAPE L3 ELEVATIONS - STREETSCAPE L4 SECTIONS - BAY STREET L5 PLAN - OCEAN FRONT WALK L6 ELEVATION - OCEAN FRONT WALK L7 PLAN - ENTRY COURTYARDS L8 PLAN - ROOF TERRACE L9 PLAN - ROOF TERRACE A3 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405 DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com OCEAN WAY RENDERING A4 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405 DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com OCEAN WAY CORNER RENDERING A5 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405 DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com BAY STREET RENDERING A6 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405 DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com CRESCENT BAY PARK RENDERING A7 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405 DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com BAY STREET ROUNDABOUT RENDERING A8 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405 DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com OCEAN FRONT WALK RENDERING A9 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405 DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com OCEAN FRONT WALK RENDERING A10 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405 DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com NORTH COURTYARD RENDERING CASA DEL MAR HOTEL CDM PATIO A11 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405 DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com The proposed project has been sited in alignment with historic development all along the boardwalk to the north, despite the fact that this particular lot juts westward 20 feet closer to the beach than do the other properties to the north. Also, the project will provide a private entry court that has been located on the north side, which purposefully provides generous separation between the project and CDM. These two accommodating features (i.e., “beachfront” and side yards) of the project, combined with the veering of the boardwalk path seaward, enhance the sight lines of CDM from Ocean Front Walk from the south while sacrificing greater ocean views for the project residents (and corresponding to a sizeable decrease in value to the developer). OCEAN FRONT WALK DEVELOPMENT A12 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405 DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com SITE SITE AERIAL IMAGEZONING MAP ZONING LEGEND SITE AERIAL AND ZONING MAP XA9.30 SITE AERIAL & ZONING MAP A13 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405 DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com BAY STREET OCEAN WAYOCEANAVE.OCEANFRONTWALKBIKEPATH1921 OCEAN FRONT WALK (E) MULTI-FAMILY APARTMENT (E)RESTAURANT (E) MULTI-FAMILY APARTMENT(E) MULTI-FAMILY APARTMENT(E) HOTEL CASA DEL MAR (E) CRESCENT BAY PARK(E) PARKING LOT (E)BAYSIDEHOTEL1 2 3 4 5 6 7 8 9 10 1112 14 13 15 16 1. APPROACH FROM OCEAN FRONT WALK 2. WALKWAY BETWEEN SHUTTERS HOTEL AND CASA DEL MAR HOTEL 3. ADJACENT CASA DEL MAR HOTEL ALONG OCEAN FRONT WALK 4. LOOKING TOWARDS THE OCEAN FRONT EDGE OF SITE 5. VIEW OF THE BIKE PATH ALONG THE BEACH 6. EXISTING SITE 7. LOOKING TOWARDS OCEAN FRONT WALK 8. PARKING LOT DIAGONALLY ACROSS BAY ST.9. END OF BAY ST.10. CRESCENT BAY PARK ACROSS BAY ST. 11. CORNER OF BAY ST. AND OCEAN WAY 12. VIEW TOWARDS THE BEACH FROM BAY ST.13. MULTI-FAMILY APARTMENT ACROSS OCEAN WAY 14. VIEW ALONG OCEAN WAY 15. ADJACENT CASA DEL MAR HOTEL ALONG OCEAN WAY 16. PICO BLVD. BETWEEN CASA DEL MAR AND SHUTTERS HOTELS SITE CONTEXT PHOTOS XA9.32 NEIGHBORHOOD FIGURE GROUND MAP SITE CONTEXT PHOTOS A14 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405 DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com OCEAN WAY CONTEXT ELEVATIONS EXISTING ELEVATION ACROSS BAY ST. LOOKING SOUTH EXISTING ELEVATION ACROSS OCEAN WAY LOOKING EAST NEIGHBORING STREET ELEVATIONS XA9.33 BAY ST.PROPOSED BUILDING HOTEL CASA DEL MAR (EXISTING)PICO BLVD.CRESCENT BAY PARK SHUTTERS HOTEL P.L.P.L. PROJECT SITE ROOF NOT SHOWN IN PERSPECTIVE PROPOSED ELEVATION ALONG OCEAN WAY LOOKING WEST EXISTING ELEVATION ALONG OCEAN WAY LOOKING WEST 0 10'5'20' A15 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405 DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com BAY STREET CONTEXT ELEVATIONS P.L.P.L. (E) SIDEWALK PROPOSED BUILDING OCEAN WAY 3-STORY RESIDENTIAL BUILDING (EXISTING)OCEAN AVE.TRAFFIC ISLANDBEACH + OCEAN FRONT WALK P.L.P.L. (E) SIDEWALK PROJECT SITE SITE AND CONTEXT ELEVATIONS XA9.35 PROPOSED ELEVATION ALONG BAY ST. LOOKING NORTH EXISTING ELEVATION ALONG BAY ST. LOOKING NORTH 0 10'5'20' EXISTING ELEVATION ACROSS BAY ST. LOOKING SOUTH A16 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405 DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com OCEAN FRONT WALK CONTEXT ELEVATIONS P.L.P.L. SHUTTERS ON THE BEACH HOTEL (EXISTING)59'-9"HOTEL CASA DEL MAR (EXISTING)PROPOSED BUILDING BAY STREET CRESCENT BAY PARK P.L.P.L. PROJECT SITE ROOF NOT SHOWN IN PERSPECTIVE SHUTTERS HOTEL BEYOND EXISTING PALM TREES ON OCEAN FRONT WALK OMITTED FOR CLARITY (E) APARTMENT BLDG BEYOND SITE AND CONTEXT ELEVATIONS XA9.34 PROPOSED ELEVATION ALONG OCEAN FRONT LOOKING EAST EXISTING ELEVATION ALONG OCEAN FRONT LOOKING EAST 0 10'5'20' A17 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405 DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com TOPOGRAPHIC SURVEY Koni 1454 2 310.82 310.82 All design by these the Archi work nor use what Koning E and empl responsib these pla are follow ambiguiti SHEET NO PROJECT PROJECT ∆ # 1921 1513 SANTA 2013 SURV SD P THIS SU REFERE TIME O PRIOR THESE ESTABL NATUR CALCUL 2. 1. A18 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405 DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com SEGMENTED AVERAGE NATURAL GRADE BAY STREET OCEAN WAYP.L. 196.06'P.L. 120.00'P.L.120.00'P.L. 191.56' HEIGHT = 47' MAX **NO SIDE YARD REQUIRED****5' STREET FRONTAGE SETBACK****NOREARYARDREQUIRED**MID-POINT @ P.L. (E)WALKWAY EASEMENT, 2,222 SFDEDUCTED FROM PARCEL AREA FOR FAR CALCULATION (E) PLANTING (E) HOTEL CASA DEL MAR 14.20' 1 XA0.23 (E) ROOF OVERHANG SETBACK5'-0" STREETFRONTAGE34.60' 13.66' 13.26' 13.46' 13.77'36.89' 31.96' 13.58'REAR PLFRONT PLEASEMENT 18'-6" SANG 1 EQ SANG 2 EQ SANG 3 EQ **5' STREET FRONTAGE SETBACK**EQEQGRADE POINT CALCULATIONOCEAN WAY GRADE POINT TAKEN DIRECTLY FROM PSOMAS TOPOGRAPHIC SURVEY ESTABLISHED BY JUNE 2013 AERIAL PHOTOGRAPHY. SEE SHEET A17MID-POINT AT SETBACK = 27.4' SANG METHODOLOGY &PARCEL AREA PLAN XA0.22 NOTES: 1. CBC GRADE PLANE & SEGMENTED AVERAGE NATURAL GRADE FOR PLANNING PURPOSES DO NOT COINCIDE WITH EACH OTHER. EACH HAVE UNIQUE CALCULATION METHODS. THEREFORE CBC FIRST FLOOR DESIGNATIONS MAY DIFFER FROM PLANNING CODE. 2. FOR CALCULATING CBC GRADE PLANE:GRADE PLANE REFERENCE POINTS REPRESENT THE AVERAGE FINISHED GRADE ELEVATION ADJOINING THE BUILDING AT EXTERIOR WALLS. GRADE PLANE SPOT ELEVATIONS 1 - 4 AVERAGE TO 24.12' ABOVE PROJECT SEA LEVEL 0 5'2.5'10' SANG METHODOLOGY PROJECT HEIGHTS ARE ESTABLISHED USING SITE GRADING AT TIME THE APPLICATION WAS DEEMED COMPLETE. SEE A0.21 GROUND FLOOR / P213.5' P1- W25.5' R1 - W36.8' R2 - W46.8' R3 - W56.8' ROOF - E74.3' P.L.P.L. PROPOSED LEVEL HEIGHTS FOR PLANNING PURPOSES FROM S.A.N.G. 147'-0"FROM S.A.N.G. 247'-0"FROM S.A.N.G. 347'-0"(E) CASA DEL MAR HOTEL BEYOND 5'-0" OCEAN FRONT WALK OCEAN WAY 47'-0" ABOVE S.A.N.G. 47'-0" ABOVE S.A.N.G 47'-0" ABOVE S.A.N.G. S.A.N.G. 1 S.A.N.G. 3 S.A.N.G. 2 34.60' FOR MEASUREMENT PURPOSES:LINE OF 'EXISTING' GRADE AS IT EXISTED ON 10/2/15 WHEN THE DRP WAS DEEMED COMPLETE PER PSOMAS TOPOGRAPHIC SURVEY (SEE SHEET A17.(i.e., PRIOR TO WHEN STABILIZATION OF THE PUBLIC SIDEWALK RAISED THE EXISTING GRADE). STREET FRONTAGE SETBACK @ FRONT PROPERTY LINE SANG 3 EQ SANG 2 EQ SANG 1 EQ 17'-6"10'-0"10'-0"11'-3"12'-0"FOR INFORMATIONAL PURPOSES: LINE OF HIGHER EXISTING GRADE AS IT EXISTS TODAY (i.e., AFTER SIDEWALK STABILIZATION AND SHORING RAISED THE GRADE OF THE PROJECT SITE IN 2016MID-POINT @ P.L. 14.20' GRADE POINT CALCULATIONOCEAN WAY GRADE POINT TAKEN DIRECTLY FROM PSOMAS TOPOGRAPHIC SURVEY ESTABLISHED BY JUNE 2013 AERIAL PHOTOGRAPHY. SEE SHEET A17MID-POINT AT SETBACK = 27.4' SETBACK 5'-0" WESTERN 18’-6” EASEMENT This surface area of 2222sf shall be reserved for on-going use by the public for pedestrian travel as occurs today. GROUND FLOOR / P213.5' P1 - W25.5' R1 - W36.8' R2 - W46.8' R3 - W56.8' ROOF - E74.3' P.L. PROPOSED LEVEL HEIGHTS FOR PLANNING PURPOSES FROM S.A.N.G. 247'-0"FROM S.A.N.G. 347'-0"5'-0" OCEAN WAY 47'-0" ABOVE S.A.N.G 47'-0" ABOVE S.A.N.G. S.A.N.G. 3 34.60' FOR MEASUREMENT PURPOSES:LINE OF 'EXISTING' GRADE AS IT EXISTED ON 10/2/15 WHEN THE DRP WAS DEEMED COMPLETE PER PSOMAS TOPOGRAPHIC SURVEY (SEE SHEET A17. (i.e., PRIOR TO WHEN STABILIZATION OF THE PUBLIC SIDEWALK RAISED THE EXISTING GRADE). STREET FRONTAGE SETBACK @ FRONT PROPERTY LINE SANG 3 EQ G 2 17'-6"10'-0"10'-0"11'-3"12'-0"FOR INFORMATIONAL PURPOSES: LINE OF HIGHER EXISTING GRADE AS IT EXISTS TODAY (i.e., AFTER SIDEWALK STABILIZATION AND SHORING RAISED THE GRADE OF THE PROJECT SITE IN 2016 GRADE POINT CALCULATIONOCEAN WAY GRADE POINT TAKEN DIRECTLY FROM PSOMAS TOPOGRAPHIC SURVEY ESTABLISHED BY JUNE 2013 AERIAL PHOTOGRAPHY. SEE SHEET A17MID-POINT AT SETBACK = 27.4' SETBACK 5'-0" ENLARGED SECTION AT OCEAN WAY GROUND FLOOR / P213.5' P1 - W25.5' R1 - W36.8' R2 - W46.8' R3 - W56.8' ROOF - E74.3' P.L. PROPOSED LEVEL HEIGHTS FOR PLANNING PURPOSES FROM S.A.N.G. 347'-0"5'-0" OCEAN WAY 47'-0" ABOVE S.A.N.G . S.A.N.G. 3 34.60' MEASUREMENT PURPOSES:OF 'EXISTING' GRADE AS IT EXISTED ON 10/2/15 N THE DRP WAS DEEMED COMPLETE PER MAS TOPOGRAPHIC SURVEY (SEE SHEET A17. PRIOR TO WHEN STABILIZATION OF THE PUBLIC WALK RAISED THE EXISTING GRADE). STREET FRONTAGE SETBACK @ FRONT PROPERTY LINE SANG 3 EQ 17'-6"10'-0"10'-0"11'-3"12'-0"INFORMATIONAL PURPOSES: OF HIGHER EXISTING GRADE AS IT EXISTS TODAY AFTER SIDEWALK STABILIZATION AND SHORING ED THE GRADE OF THE PROJECT SITE IN 2016 GRADE POINT CALCULATIONOCEAN WAY GRADE POINT TAKEN DIRECTLY FROM PSOMAS TOPOGRAPHIC SURVEY ESTABLISHED BY JUNE 2013 AERIAL PHOTOGRAPHY. SEE SHEET A17MID-POINT AT SETBACK = 27.4' SETBACK 5'-0" S.A.N.G. METHODOLOGY: PER SMZO 9.04.050(A)(2), BECAUSE OF THE SLOPING PROJECT SITE, PROJECT HEIGHT LIMITS MUST BE ESTABLISHED IN THREE EQUAL SEGMENTS. FOR PURPOSES OF S.A.N.G., THE THREE MAXIMUM HEIGHT SEGMENTS HAVE BEEN CALCULATED FROM GRADE AS IT EXISTED ON THE DATE THE DRP APPLICATION WAS DEEMED COMPLETE AND AS CONFIRMED BY PSOMAS LAND SURVEYOR (SEE PSOMAS TOPO SURVEY/SHEET A17) -- EVEN THOUGH EXISTING GRADE IS NOW HIGHER DUE TO STABILIZATION OF THE PUBLIC SIDEWALK PERFORMED IN 2016 AFTER THE DRP APPLICATION WAS DEEMED COMPLETE. A19 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405 DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com BAY STREET OCEAN WAY(E) CASA DEL MAR HOTEL OCEANFRONT DISTRICT PER SMZO (E) RESIDENTIAL R4 DISTRICT PER SMZO P.L. 196.06'P.L. 120.00'P.L. 120.09'P.L. 191.56'OCEAN FRONT WALK(E) SIDEWALK EDGE OF (E) SIDEWALK NO SIDE YARD REQUIRED(NOT ADJACENT TO RESIDENTIAL) NO SIDE YARD REQUIRED (NOT ADJACENT TO RESIDENTIAL)5' STREET FRONTAGE SETBACK(NOT ADJACENT TO RESIDENTIAL)NO REAR YARD REQUIRED(E) SIDEWALK GRATING (E) PARKING METER TYP. STREET SIGN (E) BOLLARD STAIR PENTHOUSE 58.3 67.5 PV PANELS SPA POOL CONDENSER UNITS TYP MECH. ENCLOSURE TREE PROTECTION ZONE, TYP. RADIUS = 10'-0" + CANOPY 6'-0" TALL FENCE & GATE TRELLIS 19'-6"10'-0"10'-0"20'-0" VEHICULAR ENTRY 20'-0"5'-0"74'-11" (E) PARKING METER TYP. (E) BOLLARD (E) SHRUBS TREE PROTECTION ZONE TYP. , RADIUS = 10'-0" + CANOPY (E) STREET PARKING TYP. RECONFIGURED POOL FENCE, 5'-0" MIN. HEIGHT 6'-0" TALL FENCE PRIVATE DECK SETBACK5'-0" STREETFRONTAGE31.93' 36.76' 13.79' 13.22' (E) CURB CUT TO BE REMOVED CLCL (E) SHRUBS (E) SHRUBS (E) PALM TREES, WASHINGTONIA ROBUSTA R.D. R.D. OPEN TO BELOW OPEN TO BELOW R.D. NEW TRANSFORMER ELEV PENTHOUSE TRELLIS . 30" MAX PROJECTION INTO SETBACK 5' STREET FRONTAGE SETBACK R.D. MECH. ENCLOSURE (N) STREET TREE (TYP. OF 3)15'-0"15'-0" R.D. R.D. MECH. ENCLOSURE R.D. R.D. PRIVATE DECK PRIVATE DECK 70.8 TRELLIS TRELLISTRELLIS TRELLISTRELLIS TRELLIS TRELLIS WESTERN EASEMENT 18'-6" 8'-0" 8' WIDE SEWER EASEMENT TO BE GRANTED TO THE CITY OF SANTA MONICA, CENTERED ON EXISTING SEWER PIPE STREET PARKING:OCEAN WAY 4 EXISTING; 4 PROPOSED BAY ST. 6 EXISTING; 6 PROPOSED PV PANELS PV PANELS (N) CURB CUT SOLAR HOT WATER GREASE EXHAUST VENT DOMESTIC HOT WATER GARAGE EXHAUSTFAN TABL ABOV RO EL ST ME ME 9.21.1 PH SO All des by thes the Arc work n use wh Koning and em respon these p are foll ambigu SHEET PROJEC PROJEC ∆ # 1921 151 SANTA SITE 1" = 10'-0"1SITE / PLOT PLAN 0 5'2.5'10' SD BAY STREET OCEAN WAY(E) RESIDENTIAL R4 DISTRICT PER SMZO P.L. 196.06'P.L. 120.00'P.L. 120.09'P.L. 191.56'OCEAN FRONT WALK(E) SIDEWALK EDGE OF (E) SIDEWALK NO SIDE YARD REQUIRED (NOT ADJACENT TO RESIDENTIAL) NO SIDE YARD REQUIRED (NOT ADJACENT TO RESIDENTIAL)5' STREET FRONTAGE SETBACK(NOT ADJACENT TO RESIDENTIAL)NO REAR YARD REQUIRED(E) SIDEWALK GRATING (E) PARKING METER TYP. STREET SIGN (E) BOLLARD STAIR PENTHOUSE 58.3 67.5 PV PANELS SPA POOL CONDENSER UNITS TYP MECH. ENCLOSURE TREE PROTECTION ZONE, TYP. RADIUS = 10'-0" + CANOPY 6'-0" TALL FENCE & GATE TRELLIS 19'-6"10'-0"VEHICULAR ENTRY 20'-0"5'-0"74'-11" (E) PARKING METER TYP. (E) BOLLARD (E) SHRUBS TREE PROTECTION ZONE TYP. , RADIUS = 10'-0" + CANOPY (E) STREET PARKING TYP. RECONFIGURED POOL FENCE, 5'-0" MIN. HEIGHT 6'-0" TALL FENCE PRIVATE DECK SETBACK5'-0" STREETFRONTAGE31.93' 36.76' 13.79' 13.22' (E) CURB CUT TO BE REMOVED CL(E) SHRUBS (E) SHRUBS (E) PALM TREES, WASHINGTONIA ROBUSTA R.D. R.D. OPEN TO BELOW OPEN TO BELOW R.D. NEW TRANSFORMER ELEV PENTHOUSE TRELLIS . 30" MAX PROJECTION INTO SETBACK 5' STREET FRONTAGE SETBACK R.D. MECH. ENCLOSURE (N) STREET TREE (TYP. OF 3)15'-0"R.D. R.D. MECH. ENCLOSURE R.D. R.D. PRIVATE DECK PRIVATE DECK 70.8 TRELLIS TRELLISTRELLIS TRELLISTRELLIS TRELLIS TRELLIS 8'-0" MONICA, CENTERED ON EXISTING SEWER PIPE STREET PARKING:OCEAN WAY 4 EXISTING; 4 PROPOSEDBAY ST. 6 EXISTING; 6 PROPOSED PV PANELS PV PANELS (N) CURB CUT SOLAR HOT WATER GREASE EXHAUST VENT DOMESTIC HOT WATER GARAGE EXHAUSTFAN TABLE 9.21.060 - ALLOWA ABOVE THE HEIGHT LIMIT ROOFTOP FEATURES ELEVATOR SHAFTS - 1 STAIR PENTHOUSES 1 MECHANICAL ENCLOS MECHANICAL EQUIPME 9.21.150 - SOLAR ENERGY PHOTOVOLTAIC SOLAR SOLAR THERMAL | WA SHEET NO. PROJECT TITLE PROJECT NO. ∆ # 1921 OCEAN F 1513 SANTA MONICA, CA 9 SITE PLAN A 1" = 10'-0"1SITE / PLOT PLAN 0 5'2.5'10' DESCRIPT SD PRICING SET 0 2'1'4' 0 4'2'8' 0 8'4'16' 0 10'5'20' SITE / PLOT PLAN A20 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405 DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com 4 5 7 8 A D F I B 1 2 6 H E G 3 C BAY STREET S.A.N.G. 2S.A.N.G. 3OCEAN FRONT WALKP.L. (E) CASA DEL MAR HOTEL P.L. (4) ON-SITE SHORT-TERM BIKE SPACES S.A.N.G. 1S.A.N.G. 2SEWAGE EJECTOR BELOW SLAB GREASE INTERCEPTOR BELOW SLAB SUMP BELOW SLAB 760 SF PATIO 2 RESIDENTIAL LOBBY 480 SF COMMON RESTROOM AREA 50/50 TO EACH CAFE (31) LONG TERM BIKES EXISTING CDM BELOW GRADE MECHANICAL ROOM ELEVMECH 400 SF PATIO 1 CAFE WASTE PATH SURF BD RACKSHWR UP PET SALON STORAGE/JAN. 5% SLOPE GREASE INTERCEPTOR BELOW SLAB MECH BACKFLOW PREVENTERS GAS METERS EXIT 25'-0" 22'-1" RESIDENT PATIO 13.5 11.7 10.5 EXHAUST DUCTABOVE RAIN WATER COLLECTION TANK BELOW SLAB 7'-0"28'-3"32'-2"30'-7"31'-5"27'-7"16'-9"5'-0"18'-2"4'-1"23'-8"8'-4"21'-8"5'-10"28'-8"20'-0"5'-0"14'-7"5'-0"6'-8"11'-6"LESS THAN 20 STALLS SINGLE RAMP PERMITTED PARKING RAMP 4 5.0 % CAFE 1 AREA INTERIOR 1,360 SFPATIO 1 400 SF50% COMMON 240 SFTOTAL2,000 SF CAFE 2 AREA INTERIOR 1,000 SF PATIO 2 760 SF 50% COMMON 240 SF TOTAL 2,000 SF PARKING RAMP 3 1'-6"WEST EASEMENT 18'-6" 18'-0"18'-0" 15'-0"15'-0"32'-0"INTAKE DUCT FOR CAFE ELEV 24'-0" RESI STND 12 RESI STND 13 RESI STND 14 RESI STND 15 RESI STND 21 RESI STND 20 RESI STND 19 RESI STND 18 RESI STND 17 RESI STND 16 RESI STND 22 RESI STND 23 RESI STND 24 RESI CMP 25 RESI CMP 26 RESI CMP 27 RESI CMP 28 RESI CMP 30 RESI STND 29 RESI CMP 31 RESI CMP 32 RESI CMP 33 RESI CMP 34 RESI CMP 35 RESI CMP 36 RESI CMP 37 RESI CMP 38 (4) XL LONG TERM BIKES 3'-6"MPOE 41'-4" 38'-5" 21'-8" 26'-5" 8'-6"18'-6"28'-4"44'-0"14'-3"18'-6" 23'-11"42'-3"29'-2"8'-6"18'-0"7'-6"15'-0"9'-0"18'-0"4'-0"HC 5'-0" HC VAN 8'-0" KoningEizenbergArc 1454 25th St, Santa Monica 310.828.6131 info@ 310.828.0719 fax www. All designs, ideas, arrangements and pl by these drawings are the property and the Architect and shall neither be used work nor be disclosed to any other pers use whatsoever without written permiss Koning Eizenberg Architecture and/or it and employees waives any and all liabil responsibility for problems that may occ these plans, drawings, specifications, a are followed without the professional's g ambiguities, or conflicts which are alleg SHEET NO. PROJECT TITLE PROJECT NO. ∆ # 1921 OCEAN FRON 1513 SANTA MONICA, CA 90405 A2 DESCRIPTION SD PRICING SET BAY STREET S.A.N.G. 2S.A.N.G. 3S.A.N.G. 1S.A.N.G. 2INTAKE DUCT FOR CAFE 8'-6"18'-0"6"4'-0"2'-0"2'-0"STANDARD PARKING STALL BAY STREET S.A.N.G. 2S.A.N.G. 3(4) ON-SITE SHORT-TERM BIKE SPACES S.A.N.G. 1S.A.N.G. 2SEWAGE EJECTOR BELOW SLAB SUMP BELOW SLAB 400 SF PATIO 1 GREASE INTERCEPTOR BELOW SLAB ME EXIT 13.5 10.5RAIN WATER COLLECTION TANK BELOW SLAB 20'-0"5'-0" CAFE 1 AREA INTERIOR 1,360 SF PATIO 1 400 SF 50% COMMON 240 SFTOTAL2,000 SF PARKING RAMP 3 1'-6"INTAKE DUCT FOR CAFE 24'-0" RESI STND 12 RESI STND 13 RESI STND 14 RESI STND 16 RESI CMP 27 RESI CMP 28 RESI CMP RESI STN RESI CMP (4) XL LONG TERM BIKES 3'-6"MPOE28'-4"42'-3"8'-6"18'-0"7'-6"15'-0"6"4'-0"2'-0"2'-0"STANDARD PARKING STALL COMPACT PARKING STALL GROUND FLOOR / P2 BAY STREET S.A.N.G. 2S.A.N.G. 3P.L. (4) ON-SITE SHORT-TERM BIKE SPACES S.A.N.G. 1S.A.N.G. 2SEWAGE EJECTOR BELOW SLAB SUMP BELOW SLAB LOBBY 480 SF COMMON RESTROOM AREA 50/50 TO EACH CAFE ELEVMECH 400 SF PATIO 1 CAFE WASTE PATH GREASE INTERCEPTOR BELOW SLAB MECHEXIT 25'-0" 22'-1" 13.5 10.5 EXHAUST DUCTABOVE RAIN WATER COLLECTION TANK BELOW SLAB 5'-0"18'-2"4'-1"23'-8"8'-4"21'-8"20'-0"5'-0" LESS THAN 20 STALLS SINGLE RAMP PERMITTED CAFE 1 AREA INTERIOR 1,360 SFPATIO 1 400 SF50% COMMON 240 SFTOTAL2,000 SF 50% COMMON 240 SFTOTAL2,000 SF PARKING RAMP 3 1'-6"18'-0"18'-0" 15'-0"15'-0" INTAKE DUCT FOR CAFE ELEV 24'-0" RESI STND 12 RESI STND 13 RESI STND 14 RESI STND 15 RESI STND 19 RESI STND 18 RESI STND 17 RESI STND 16 RESI STND 24 RESI CMP 25 RESI CMP 26 RESI CMP 27 RESI CMP 28 RESI CMP 30 RESI STND 29 RESI CMP 31 RESI CMP 32 RESI CMP 33 RESI CMP 34 (4) XL LONG TERM BIKES 3'-6"MPOE 38'-5" 21'-8" 26'-5"28'-4"14'-3"18'-6"42'-3"29'- 8'-6"18'-0"7'-6"15'-0"9'-0"18'-0"6"4'-0"2'-0"2'-0"STANDARD PARKING STALL COMPACT PARKING STALL HC PARKING STALL HC 5'-0" HC VAN 8'-0" 1 GROUND FLOOR / P2 FLOOR PLAN 0 4'2'8' GROUND FLOOR/P2 FLOOR PLAN 0 2'1'4' 0 4'2'8' 0 8'4'16' 0 10'5'20' 0 2'1'4' 0 4'2'8' 0 8'4'16' 0 10'5'20' A39 A40 A41 A21 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405 DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com 4 5 7 8 A D F I B 1 2 6 H E G 3 C 957 SF 1 BED P101 A6.00 1286 SF 2 BED P103 A6.02 DECK DECK COMMERCIAL& GUESTPARKING P.L. P.L.OCEAN FRONT WALKDRIVEWAY 20'-0" DN UP HVOHVO ELEC PASSENGER LOADING DECK EXISTING CDM BELOW GRADE MECHANICAL ROOM TXF ABV NEW STREET TREE (TYP OF 3) (E) CASA DEL MAR HOTEL S.A.N.G. 2S.A.N.G. 3S.A.N.G. 1S.A.N.G. 2BAY STREET 20'-0"25'-1"20 SF RESITRASH 815 SF 1 BED P102 A6.01 DECK 13'-0"18'-0"20'-0"DROP CEILING FOR PLANTING ABOVE DROP CEILING FOR RAMP ABOVE 325 SF LOBBY 51'-3" EXHAUST DUCTFROM BELOW 7'-0"28'-3"32'-2"30'-7"31'-5"27'-7"16'-9"5'-0"18'-2"4'-1"23'-8"8'-4"21'-8"5'-10"28'-8"5'-0"5'-0" 5'-0"5'-0"16.0 %10.0 %10.0 % PARKING RAMP 2 PARKING RAMP 3 20.0 %10.0 % 5 MECHANICAL CAR STACKERS PERF SCREEN17'-7"11'-6"6'-8"PARKING RAMP 1 8'-2" OVERHEAD CLEARANCE 18'-0" LINE OF EXISTING SIDEWALK25'-8"ELEV 8'-0"1'-6"1'-6"18'-0" COMM 25'-0"15'-0" O.H. GATE EXHAUST SHAFT ABOVE PERF FENCE 25'-0" MIN 29'-10" COMM STND 3 COMM STND 2 RESI HC VAN 1 COMM STND 1 COMM HC VAN 4 GUEST HC 1 COMM STND 7 COMM STND 6 COMM STND 5 COMM STND 8 COMM STND 9 GUEST STND 2 GUEST CMP 3 GUEST CMP 5 GUEST CMP 4 COMM CMP 10 COMM CMP 11 COMM CMP 12 COMM CMP 13 RESI MECH 2/3 RESI MECH 4/5 RESI MECH 6/7 RESI MECH 8/9 RESI MECH 10/11 PERF FENCE O.H. GATE - TO REMAIN OPEN DURING CAFE HOURS 1'-9"TYP STCKR9'-4"TYP 18'-0" RESIDENTIAL 22'-0" KoningEizenbergArc 1454 25th St, Santa Monica 310.828.6131 info@ 310.828.0719 fax www. All designs, ideas, arrangements and pl by these drawings are the property and the Architect and shall neither be used work nor be disclosed to any other pers use whatsoever without written permiss Koning Eizenberg Architecture and/or it and employees waives any and all liabil responsibility for problems that may occ these plans, drawings, specifications, a are followed without the professional's g ambiguities, or conflicts which are alleg SHEET NO. PROJECT TITLE PROJECT NO. ∆ # 1921 OCEAN FRON 1513 SANTA MONICA, CA 90405 A2 DESCRIPTION SD PRICING SET 0 2'1'4' 0 4'2'8' 0 8'4'16' 0 10'5'20' 0 2'1'4' 0 4'2'8' 0 8'4'16' 0 10'5'20' P1 FLOOR PLAN A39 A40 A41SEE A27 FOR DETAIL A22 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405 DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com R1 FLOOR PLAN OPEN TO ABOVE 1825 SF 2 BED R107 920 SF 1 BED R104 1329 SF 2 BED R103 1029 SF 1 BED R101 OPEN TO ABOVE DECK DECK DECK DECK PRIVATE DECK P.L. P.L.OCEAN WAYUP 1436 SF 2 BED R106 UP 570 SF REFUSE &RECYCLE FDC (E) CASA DEL MAR HOTEL S.A.N.G. 2S.A.N.G. 3S.A.N.G. 1S.A.N.G. 2(4) ON-SITE SHORT-TERM BIKE SPACES 813 SF 1 BED R102 957 SF 1 BED R105 40 SF RESI TRASH DECK NEW STREET TREE (TYP OF 3) BAY STREET 25 SF ELEC 60 SF STRG / PGK 710 SF LOBBY UP GREEN WALL GREEN WALL GREEN WALL 43'-4"87'-8"29'-5" MAIL 152'-7" LINE OF EXISTING SIDEWALK32'-10"18'-4"28'-5"11'-6"6'-8"ELEV 22'-0"28'-0"NOTE: MAINTENANCE STAFF WILL BE RESPONSIBLE TO COLLECT ALL TRASH & RECYCLING WITH THEIR CONTAINERS FROM THE RESIDENTIAL TRASH AREAS AND TAKE MATERIAL TO THE LARGER CONTAINERS PROVIDED BY THE CITY HVOHVO HVO KoningEizenbergArc 1454 25th St, Santa Monica 310.828.6131 info@ 310.828.0719 fax www. All designs, ideas, arrangements and pl by these drawings are the property and the Architect and shall neither be used work nor be disclosed to any other pers use whatsoever without written permiss Koning Eizenberg Architecture and/or it and employees waives any and all liabil responsibility for problems that may occ these plans, drawings, specifications, a are followed without the professional's g ambiguities, or conflicts which are alleg SHEET NO. PROJECT TITLE PROJECT NO. ∆ # 1921 OCEAN FRON 1513 SANTA MONICA, CA 90405 A2 DESCRIPTION SD PRICING SET 0 2'1'4' 0 4'2'8' 0 8'4'16' 0 10'5'20' 0 2'1'4' 0 4'2'8' 0 8'4'16' 0 10'5'20' A39 A40 A41 A23 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405 DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com R2 FLOOR PLAN OPEN TO BELOW OPEN TO BELOW DECKDECK DECK DECK P.L. P.L. DECK UP 1205 SF 2 BED R207 A6.26 891 SF 1 BED R204 A6.23 1720 SF 2 BED R203 A6.22 1014 SF 1 BED R201 A6.20 S.A.N.G. 2S.A.N.G. 3S.A.N.G. 1S.A.N.G. 2(E) CASA DEL MAR HOTEL 40 SF RESI TRASH DECK DECK 816 SF 1 BED R202 A6.21 DECK DECK 1708 SF 3 BED R206 A6.25 1608 SF 2 BED R205 A6.24 912 SF 1 BED R123 A6.23 80 SF STORAGE /MAINTENANCE LANDSCAPED BALCONY. GRAVEL AND PLANTING TYP 159'-8"25'-8"16'-9"11'-6"106'-3"5'-10"32'-10"28'-5"ELEV KoningEizenbergArc 1454 25th St, Santa Monica 310.828.6131 info@ 310.828.0719 fax www. All designs, ideas, arrangements and pl by these drawings are the property and the Architect and shall neither be used work nor be disclosed to any other pers use whatsoever without written permiss Koning Eizenberg Architecture and/or it and employees waives any and all liabil responsibility for problems that may occ these plans, drawings, specifications, a are followed without the professional's g ambiguities, or conflicts which are alleg SHEET NO. PROJECT TITLE PROJECT NO. ∆ # 1921 OCEAN FRON 1513 SANTA MONICA, CA 90405 A2 DESCRIPTION SD PRICING SET 0 2'1'4' 0 4'2'8' 0 8'4'16' 0 10'5'20' 0 2'1'4' 0 4'2'8' 0 8'4'16' 0 10'5'20' A39 A40 A41 A24 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405 DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com R3 FLOOR PLAN UP DECKDECK P.L. P.L. 959 SF 1 BED R302 A6.31 S.A.N.G. 2S.A.N.G. 3S.A.N.G. 1S.A.N.G. 2(E) CASA DEL MAR HOTEL 40 SF RESITRASH OPEN TO BELOW DECK 55 SF BATH 40 SF STRG 3' dSPA POOL +30" 920 SF 1 BED R301 A6.30 2009 SF 3 BED R303 A6.32 1813 SF 3 BED R305 A6.34 DECK OPEN TO BELOW DECK LANDSCAPED BALCONY. GRAVEL AND PLANTING TYP TRELLIS ABV TRELLIS TRELLIS 159'-8" 75 SF STRG BBQ SINK 42'-2"11'-6"6'-8"5' POOL FENCE ELEV KoningEizenbergArc 1454 25th St, Santa Monica 310.828.6131 info@ 310.828.0719 fax www. All designs, ideas, arrangements and pl by these drawings are the property and the Architect and shall neither be used work nor be disclosed to any other pers use whatsoever without written permiss Koning Eizenberg Architecture and/or it and employees waives any and all liabil responsibility for problems that may occ these plans, drawings, specifications, a are followed without the professional's g ambiguities, or conflicts which are alleg SHEET NO. PROJECT TITLE PROJECT NO. ∆ # 1921 OCEAN FRON 1513 SANTA MONICA, CA 90405 A2 DESCRIPTION SD PRICING SET 0 2'1'4' 0 4'2'8' 0 8'4'16' 0 10'5'20' 0 2'1'4' 0 4'2'8' 0 8'4'16' 0 10'5'20' A39 A40 A41 A25 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405 DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com ROOF PLAN CONDENSER UNITS TYP., MECH ENCLOSURE PV PANELS STAIR PENTHOUSE ROOF 47'-0"ABV S.A.N.G 2 SOLAR HOT WATER S.A.N.G. 2S.A.N.G. 3S.A.N.G. 1S.A.N.G. 2(E) CASA DEL MAR HOTEL ROOF DECK 47'-0" ABV S.A.N.G 3 ELEVATOR PENTHOUSE MECH ENCLOSURE GARAGE EXHAUST VENT GREASE EXHAUST VENT DOMESTIC HOT WATER PV PANELS PV PANELS PV PANELS 109'-6" GARAGE EXHAUSTFAN 108'-4"6'-8"CONDENSER UNITS ROOF 47'-0"ABV S.A.N.G 3 REQUIRED PV SYSTEM PER 8.106.080 2W/ SF OF BUILDING FOOTPRINT REQUIRED, MIN. PARCEL COVERAGE = 14,725 SF * 2W = 29,450 W42'-2"11'-6"TRELLIS, TYP KoningEizenbergArc 1454 25th St, Santa Monica 310.828.6131 info@ 310.828.0719 fax www. All designs, ideas, arrangements and pl by these drawings are the property and the Architect and shall neither be used work nor be disclosed to any other pers use whatsoever without written permiss Koning Eizenberg Architecture and/or it and employees waives any and all liabil responsibility for problems that may occ these plans, drawings, specifications, a are followed without the professional's g ambiguities, or conflicts which are alleg SHEET NO. PROJECT TITLE PROJECT NO. ∆ # 1921 OCEAN FRON 1513 SANTA MONICA, CA 90405 A2 DESCRIPTION SD PRICING SET 0 2'1'4' 0 4'2'8' 0 8'4'16' 0 10'5'20' 0 2'1'4' 0 4'2'8' 0 8'4'16' 0 10'5'20' A39 A40 A41 A26 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405 DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com CAFE1 CAFE2 LOADING @ P1 LEVEL P1 LEVEL ENTRANCE & EXIT@ P1 LEVEL ABOVEFROM BAY STREET LOADING @ P2 LEVEL REFUSE & RECYCLE @ R1 LEVEL PICK UP AT R1 ADJACENT TO CDM LIFT TO R1 -OCEAN WAY STREET LEVEL PARKING LOADING TRASH NOTE: MAINTENANCE STAFF WILL BE RESPONSIBLE TO COLLECT ALL TRASH & RECYCLING WITH THEIR CONTAINERS FROM THE RESIDENTIAL TRASH AREAS AND TAKE MATERIAL TO THE LARGER CONTAINERS PROVIDED BY THE CITY KoningEizenbergArc 1454 25th St, Santa Monica 310.828.6131 info@ 310.828.0719 fax www. All designs, ideas, arrangements and pl by these drawings are the property and the Architect and shall neither be used work nor be disclosed to any other pers use whatsoever without written permiss Koning Eizenberg Architecture and/or it and employees waives any and all liabil responsibility for problems that may occ these plans, drawings, specifications, a are followed without the professional's g ambiguities, or conflicts which are alleg SHEET NO. PROJECT TITLE PROJECT NO. ∆ # 1921 OCEAN FRON 1513 SANTA MONICA, CA 90405 A2 DESCRIPTION SITE ACCESS DIAGRAM A27 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405 DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com 5 B 6 WALK WAY 14'-7"5'-0"37'-0" 13.50'11.67'5.0 % 5.0 %6" CURB NOTE: THIS RAMP SERVES LESS THAN 20 PARKING STALLS GROUND FLOOR / P213.5' P1 - W25.5' R1 - W36.8' 5 R134.8' P121.5' 6 10.0 % 16.0 % 10.0 %11'-2"8'-0"5.0 % 25.50'25.00' 21.17'20.67' 13.50' 11.67'CLR7'-6" MINCLR7'-6" MIN5 B 6 20'-0"5'-0"5'-0" 16.0 %10.0 %10.0 % 25.50'25.00'21.17'20.67' 4 5 I H 4 A6.70 26.50' BAY STREET 13% SLOPE HVOHVO (N) SIDEWALK(E) SIDEWALK24.00' 23.92'26.54'2%4'-0"25.50'25.50' APPOX FLAT5.0126.65.8 SLOPES SHALL BE BLENDED TO ACHIEVE MINIMAL BREAK-OVER AND DEPARTURE ANGLES. TRANSITIONS TO COMPLY WITH CoSM. STNDS.16'-0"GROUND FLOOR / P213.5' P1 - W25.5' R1 - W36.8' I R134.8' P121.5' H BAY STREETCLR8'-2" MIN9'-9"P.L. 5 F 6 H G 20'-0"5'-0" 10.0 %20.0 % MAX 10.0 % 14.00'19.00'13.50'19.50' 5'-0" GROUND FLOOR / P213.5' P1 - W25.5' 5 P121.5' 6 10.0 %2 0.0 % M AX 10.0 % 13.50'14.00' 19.00' 19.50'CLR7'-4" MIN5'-0"5'-0" Koning Eizenberg Architecture and/or it and employees waives any and all liabil responsibility for problems that may occ these plans, drawings, specifications, a are followed without the professional's g ambiguities, or conflicts which are alleg SHEET NO. PROJECT TITLE PROJECT NO. ∆ # 1921 OCEAN FRON 1513 SANTA MONICA, CA 90405 ENLARGED PARKIN RAMP A6 DESCRIPTION 1/8" = 1'-0"6RAMP 4 PLAN 1/8" = 1'-0"7RAMP 2&4 SECTION 1/8" = 1'-0"5RAMP 2 PLAN 1/8" = 1'-0"3RAMP 1 PLAN 1/8" = 1'-0"4RAMP 1 SECTION 1/8" = 1'-0"1RAMP 3 PLAN 1/8" = 1'-0"2RAMP 3 SECTION 0 4'2'8'0 4'2'8'0 4'2'8' 0 4'2'8'0 4'2'8' 0 4'2'8'0 4'2'8' ENLARGED RAMP PLANS / SECTIONS RAMP 1 PLANRAMP 1 SECTION RAMP 3 PLANRAMP 3 SECTION RAMP 2 PLANRAMP 4 PLANRAMP 2 & 4 SECTION MECHANICAL STACKER DETAIL A28 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405 DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com 1360 SFCAFE 1 656 SFELEV. LOBBY 1000 SFCAFE 2 480 SFCAFE COMMON NOTE: OUTDOOR DINING EXCLUDED FROM FAR PER 9.04.090 107 SFPET SALON 56 SFELEV. MECH 87 SFSTORAGE / JAN. MECH ROOM IN GARAGE EXCLUDED FROM FAR 983 SF1 BED 1309 SF2 BED 365 SFELEV. LOBBY 272 SFELEC. 45 SFRESI TRASH 843 SF1 BED 1085 SF1 BED 2002 SF2 BED 1048 SF1 BED 1356 SF2 BED 1457 SF2 BED 1150 SFOPEN CORRIDOR801 SFRESI LOBBY 566 SFREFUSE & RECYCLE 846 SF1 BED 992 SF1 BED 47 SFRESI TRASH 86 SFPACKAGING 26 SFELEC. 1764 SF3 BED 1072 SF1 BED 1400 SF2 BED 1803 SF2 BED 982 SF1 BED 1626 SF2 BED 1156 SFOPEN CORRIDOR847 SF1 BED 47 SFRESI TRASH 83 SFSTORAGE 952 SF1 BED 1826 SF3 BED 45 SFSTORAGE 2009 SF3 BED981 SF1 BED SPA 1089 SFOPEN CORRIDOR 45 SFRESI TRASH 137 SFRESI BATH 1050 SF1 BED KoningEizenbergArchitecture1454 25th St, Santa Monica, CA 90404 310.828.6131 info@kearch.com310.828.0719 fax www.kearch.com All designs, ideas, arrangements and plans indicated by these drawings are the property and copyright of the Architect and shall neither be used on any other work nor be disclosed to any other person for any use whatsoever without written permission. Koning Eizenberg Architecture and/or its principals and employees waives any and all liability or responsibility for problems that may occur when these plans, drawings, specifications, and/or designs are followed without the professional's guidance with ambiguities, or conflicts which are alleged. SHEET NO. PROJECT TITLE PROJECT NO. ∆ # 1921 OCEAN FRONT WALK 1513 SANTA MONICA, CA 90405 F.A.R. AREACALCULATIONS A0.41GROUND FLOOR / P2 AREA SCHEDULE (F.A.R.) AREA NAME QTY AREA GROUND FLOOR / P2 CAFE 1 1 1,360 SF CAFE 2 1 1,000 SF CAFE COMMON 1 480 SF ELEV. LOBBY 1 656 SF ELEV. MECH 1 56 SF PET SALON 1 107 SF STORAGE / JAN. 1 87 SF 3,747 SF P1 - W 1 BED 2 1,826 SF 2 BED 1 1,309 SF ELEC.1 272 SF ELEV. LOBBY 1 365 SF RESI TRASH 1 45 SF 3,817 SF R1 - W 1 BED 4 3,971 SF 2 BED 3 4,815 SF CLOSED COORIDOR 1 205 SF ELEC.1 26 SF PACKAGING 1 86 SF REFUSE & RECYCLE 1 566 SF RESI LOBBY 1 801 SF RESI TRASH 1 47 SF 10,516 SF R2 - W 1 BED 4 3,853 SF 2 BED 3 4,829 SF 3 BED 1 1,764 SF RESI TRASH 1 47 SF STORAGE 1 83 SF 10,576 SF R3 - W 1 BED 2 2,031 SF 3 BED 2 3,835 SF RESI BATH 1 137 SF RESI TRASH 1 45 SF STORAGE 1 45 SF 6,093 SF Grand total 34,750 SF P1 R1 R2 R3 RESIDENTIAL UNIT FLOOR AREA 28,233 SFRESIDENTIAL COMMON AREAS 3,677 SFCOMMERCIAL FLOOR AREA 2,840 SF *TOTAL 34,750 SF FULL PARCEL AREA 23,258 SFFAR 1.50 PARCEL AREA LESS WEST EASEMENT 21,036 SFFAR 1.65 F.A.R. CALCULATION RESIDENTIAL UNIT FLOOR AREA UNIT TYPE QTY TOTAL AREA 1 BED 12 11,681 SF 2 BED 7 10,953 SF 3 BED 3 5,599 SF 28,233 SF AVG. UNIT SIZE 970 SF TOTAL 1,560 SF FLOOR AREAS PER 9.04.080 22 1,870 SF FAR CALCULATION 1 *NOTE: OUTDOOR DINING EXCLUDED PER SMZO 9.04.090.A2 DESCRIPTION DATE SD PRICING SET 5.10.18 1360 SFCAFE 1 656 SFELEV. LOBBY 1000 SFCAFE 2 480 SFCAFE COMMON NOTE: OUTDOOR DINING EXCLUDED FROM FAR PER 9.04.090 107 SFPET SALON 56 SFELEV. MECH 87 SFSTORAGE / JAN. MECH ROOM IN GARAGE EXCLUDED FROM FAR 983 SF1 BED 1309 SF2 BED 365 SF ELEV. LOBBY 272 SFELEC. 45 SFRESI TRASH 843 SF 1 BED 1085 SF1 BED 2002 SF 2 BED 1048 SF1 BED 1356 SF2 BED 1457 SF2 BED 1150 SF OPEN CORRIDOR801 SF RESI LOBBY 566 SFREFUSE & RECYCLE 846 SF1 BED 992 SF1 BED 47 SF RESI TRASH 86 SFPACKAGING 26 SFELEC. 1764 SF3 BED 1072 SF1 BED 1400 SF2 BED 1803 SF2 BED 982 SF1 BED 1626 SF2 BED 1156 SFOPEN CORRIDOR847 SF1 BED 47 SFRESI TRASH 83 SFSTORAGE 952 SF1 BED 1826 SF3 BED 45 SFSTORAGE 2009 SF3 BED981 SF1 BED SPA 1089 SFOPEN CORRIDOR 45 SFRESI TRASH 137 SFRESI BATH 1050 SF 1 BED KoningEizenbergArchitecture 1454 25th St, Santa Monica, CA 90404 310.828.6131 info@kearch.com310.828.0719 fax www.kearch.com All designs, ideas, arrangements and plans indicated by these drawings are the property and copyright of the Architect and shall neither be used on any other work nor be disclosed to any other person for any use whatsoever without written permission. Koning Eizenberg Architecture and/or its principals and employees waives any and all liability or responsibility for problems that may occur when these plans, drawings, specifications, and/or designs are followed without the professional's guidance with ambiguities, or conflicts which are alleged. SHEET NO. PROJECT TITLE PROJECT NO. ∆ # 1921 OCEAN FRONT WALK 1513 SANTA MONICA, CA 90405 A0.41GROUND FLOOR / P2 AREA SCHEDULE (F.A.R.) AREA NAME QTY AREA GROUND FLOOR / P2 CAFE 1 1 1,360 SF CAFE 2 1 1,000 SF CAFE COMMON 1 480 SF ELEV. LOBBY 1 656 SF ELEV. MECH 1 56 SF PET SALON 1 107 SF STORAGE / JAN. 1 87 SF 3,747 SF P1 - W 1 BED 2 1,826 SF 2 BED 1 1,309 SF ELEC.1 272 SF ELEV. LOBBY 1 365 SF RESI TRASH 1 45 SF 3,817 SF R1 - W 1 BED 4 3,971 SF 2 BED 3 4,815 SF CLOSED COORIDOR 1 205 SF ELEC.1 26 SF PACKAGING 1 86 SF REFUSE & RECYCLE 1 566 SF RESI LOBBY 1 801 SF RESI TRASH 1 47 SF 10,516 SF R2 - W 1 BED 4 3,853 SF 2 BED 3 4,829 SF 3 BED 1 1,764 SF RESI TRASH 1 47 SF STORAGE 1 83 SF 10,576 SF R3 - W 1 BED 2 2,031 SF 3 BED 2 3,835 SF RESI BATH 1 137 SF RESI TRASH 1 45 SF STORAGE 1 45 SF 6,093 SF Grand total 34,750 SF P1 R1 R2 R3 RESIDENTIAL UNIT FLOOR AREA 28,233 SFRESIDENTIAL COMMON AREAS 3,677 SF COMMERCIAL FLOOR AREA 2,840 SF *TOTAL 34,750 SF FULL PARCEL AREA 23,258 SFFAR 1.50 PARCEL AREA LESS WEST EASEMENT 21,036 SFFAR 1.65 F.A.R. CALCULATION RESIDENTIAL UNIT FLOOR AREA UNIT TYPE QTY TOTAL AREA 1 BED 12 11,681 SF 2 BED 7 10,953 SF 3 BED 3 5,599 SF 28,233 SF AVG. UNIT SIZE 970 SF TOTAL 1,560 SF FLOOR AREAS PER 9.04.080 22 1,870 SF *NOTE: OUTDOOR DINING EXCLUDED PER SMZO 9.04.090.A2 DESCRIPTION DATE SD PRICING SET 5.10.18 F.A.R. CALCULATIONS A29 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405 DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com COMMON PARCEL COVERAGE PRIVATE Calculating... LEGEND 402 SF NON-REQUIRED COMMON TERRACE 15'-11"25'-6"GF COMMON:400 SFGF PRIVATE:0 SF 125 SFDECK 209 SFDECK 115 SFDECK 123 SFDECK 13'-6"7'-11"10'-2"18'-4" 8'-11"13'-11"13'-0"9'-1" GF COMMON:0 SFGF PRIVATE:570 SF 234 SFDECK 123 SFDECK 77 SFDECK 586 SFDECK 168 SFDECK 230 SFDECK169 SFDECK 164 SFDECK 259 SFDECK 25'-2"13'-4"8'-11" 9'-1" 9'-1"17'-3"5'-2"12'-4"16'-5"16'-8"18'-3"12'-0"8'-9"9'-2"15'-11"16'-5" 25'-8"20'-4"GF COMMON:0 SFGF PRIVATE:2,010 SF 125 SFDECK 209 SFDECK 101 SFDECK 76 SFDECK 158 SFDECK 153 SFDECK 163 SFDECK 152 SFDECK 234 SFDECK 7'-2"14'-4"16'-7"10'-3" 8'-11"25'-3"13'-11"8'-11" 18'-5"10'-2"4'-0"13'-4"17'-0"15'-10"12'-10"9'-3"8'-2"8'-0"GF COMMON:0 SFGF PRIVATE:1,370 SF 14725 SFPARCEL COVERAGE 571 SFDECK 154 SFDECK147 SFDECK 158 SFDECK 148 SFDECK 2379 SFCOMMON TERRACE 55'-7"41'-2"12'-6"13'-9"39'-5"6'-11"16'-3"16'-6"7'-7"7'-8"15'-9" 9'-4"14'-11"GF COMMON:2,400 SFGF PRIVATE:1,180 SF 256 SFDECK16'-0"16'-3" GF COMMON:0 SFGF PRIVATE:250 SF KoningEizenbergArchitecture1454 25th St, Santa Monica, CA 90404 310.828.6131 info@kearch.com310.828.0719 fax www.kearch.com All designs, ideas, arrangements and plans indicated by these drawings are the property and copyright of the Architect and shall neither be used on any other work nor be disclosed to any other person for any use whatsoever without written permission. Koning Eizenberg Architecture and/or its principals and employees waives any and all liability or responsibility for problems that may occur when these plans, drawings, specifications, and/or designs are followed without the professional's guidance with ambiguities, or conflicts which are alleged. SHEET NO. PROJECT TITLE PROJECT NO. ∆ # 1921 OCEAN FRONT WALK 1513 SANTA MONICA, CA 90405 OPEN SPACE & PARCELCOVERAGE CALCS A0.42GROUND FLOOR / P2 P1 R1 R2 R3 MAXIMUM PARCEL COVERAGE = 70% PER TABLE 9.14.030 PARCEL COVERAGE ÷ FULL PARCEL AREA 14,725 ÷ 23,258 = 63% OUTDOOR LIVING AREA OPEN SPACE, PARCEL COVERAGE CALC 1 ROOF - W DESCRIPTION DATE SD PRICING SET 5.10.18 PARCEL COVERAGE PER TABLE 9.14.030 AND 9.21.090 100 SF/UNIT MIN TOTAL OPEN SPACE 60 SF/UNIT MIN PRIVATE OPEN SPACE PROJECT SATISFIES REQUIREMENT THROUGH 100SF MIN PRIVATE DECKS REQUIRED PRIVATE O.L.A. (22 UNITS X 60 SF) = 1,320 SFPROPOSED PRIVATE O.L.A. = 5,300 SF IN ADDITION COMMON OUTDOOR LIVING AREA IS PROVIDED AS FOLLOWS: R3 ROOF TERRACE: 2,400 SFGF RESIDENT PATIO: 400 SF TOTAL NON-REQUIRED COMMON O.L.A. = +/- 2,800 SF COMMON PARCEL COVERAGE PRIVATE LEGEND 402 SF NON-REQUIRED COMMON TERRACE 15'-11"25'-6"GF COMMON:400 SFGF PRIVATE:0 SF 125 SFDECK 209 SFDECK 115 SFDECK 123 SF DECK 13'-6"7'-11"10'-2"18'-4" 8'-11"13'-11"13'-0"9'-1" GF COMMON:0 SFGF PRIVATE:570 SF 234 SFDECK 123 SF DECK 77 SFDECK 586 SFDECK 168 SFDECK 230 SFDECK169 SFDECK 164 SFDECK 259 SFDECK 25'-2"13'-4"8'-11" 9'-1" 9'-1"17'-3"5'-2"12'-4"16'-5"16'-8"18'-3"12'-0"8'-9"9'-2"15'-11"16'-5" 25'-8"20'-4"GF COMMON:0 SF GF PRIVATE:2,010 SF 125 SFDECK 209 SFDECK 101 SFDECK 76 SFDECK 158 SFDECK 153 SFDECK 163 SFDECK 152 SFDECK 234 SFDECK 7'-2"14'-4"16'-7"10'-3" 8'-11"25'-3"13'-11"8'-11" 18'-5"10'-2"4'-0"13'-4"17'-0"15'-10"12'-10"9'-3"8'-2"8'-0"GF COMMON:0 SFGF PRIVATE:1,370 SF 14725 SFPARCEL COVERAGE 571 SF DECK 154 SFDECK147 SFDECK 158 SFDECK 148 SFDECK 2379 SF COMMON TERRACE 55'-7"41'-2"12'-6"13'-9"39'-5"6'-11"16'-3"16'-6"7'-7"7'-8"15'-9" 9'-4"14'-11"GF COMMON:2,400 SFGF PRIVATE:1,180 SF 256 SFDECK16'-0"16'-3" GF COMMON:0 SF GF PRIVATE:250 SF KoningEizenbergArchitecture1454 25th St, Santa Monica, CA 90404 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com All designs, ideas, arrangements and plans indicated by these drawings are the property and copyright of the Architect and shall neither be used on any other work nor be disclosed to any other person for any use whatsoever without written permission. Koning Eizenberg Architecture and/or its principals and employees waives any and all liability or responsibility for problems that may occur when these plans, drawings, specifications, and/or designs are followed without the professional's guidance with ambiguities, or conflicts which are alleged. SHEET NO. PROJECT TITLE PROJECT NO. ∆ # 1921 OCEAN FRONT WALK 1513 SANTA MONICA, CA 90405 OPEN SPACE & PARCEL A0.42GROUND FLOOR / P2 P1 R1 R2 R3 MAXIMUM PARCEL COVERAGE = 70% PER TABLE 9.14.030 PARCEL COVERAGE ÷ FULL PARCEL AREA14,725 ÷ 23,258 = 63% OUTDOOR LIVING AREA ROOF - W DESCRIPTION DATE SD PRICING SET 5.10.18 PARCEL COVERAGE PER TABLE 9.14.030 AND 9.21.090 100 SF/UNIT MIN TOTAL OPEN SPACE 60 SF/UNIT MIN PRIVATE OPEN SPACE PROJECT SATISFIES REQUIREMENT THROUGH 100SF MIN PRIVATE DECKSREQUIRED PRIVATE O.L.A. (22 UNITS X 60 SF) = 1,320 SFPROPOSED PRIVATE O.L.A. = 5,300 SF IN ADDITION COMMON OUTDOOR LIVING AREA IS PROVIDED AS FOLLOWS: R3 ROOF TERRACE: 2,400 SF GF RESIDENT PATIO: 400 SF TOTAL NON-REQUIRED COMMON O.L.A. = +/- 2,800 SF OUTDOOR LIVING AREA & PARCEL COVERAGE CALCULATIONS A30 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405 DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com UPPER STORY STEP-BACK CALCULATIONSS.A.N.G. 2S.A.N.G. 3S.A.N.G. 1S.A.N.G. 25'-0" MINSTREET FRONTAGE SETBACK THIS LEVEL AT GROUND FLOOR OR BELOW. NO UPPER STORY STEP BACK REQ'D S.A.N.G. 2S.A.N.G. 3S.A.N.G. 1S.A.N.G. 25'-0" MINSTREET FRONTAGE SETBACK AVG UPPER STORY STEPBACK - BAY ST=365SF / 46.5' (SANG1 FRONTAGE) = 7.8' OK SANG 2,3 AT GROUND FLOOR OR BELOW. NO UPPER STORY STEPBACK REQ'D 365 SF S.A.N.G. 2S.A.N.G. 3S.A.N.G. 1S.A.N.G. 25'-0" MINSTREET FRONTAGE SETBACK 5'-0" MIN STREET FRONTAGE SETBACK AVG UPPER STORY STEPBACK - BAY ST =843SF / 109.5' (SANG1,2 FRONTAGE) = 7.7' OK SANG 3 AT GROUND FLOOR. NO UPPER STORY STEPBACK REQ'D 843 SF S.A.N.G. 2S.A.N.G. 3S.A.N.G. 1S.A.N.G. 25'-0" MINSTREET FRONTAGE SETBACK 5'-0" MIN STREET FRONTAGE SETBACK AVG UPPER STORY STEPBACK - BAY ST=1164SF / 164.5' (SANG1,2,3 FRONTAGE) = 7' OK AVG UPPER STORY STEPBACK - OCEAN WAY=931SF / 115' (SANG 3 FRONTAGE) = 8' OK 1164 SF 931 SFS.A.N.G. 2S.A.N.G. 3S.A.N.G. 1S.A.N.G. 25'-0" MINSTREET FRONTAGE SETBACK 5'-0" MIN STREET FRONTAGE SETBACK AVG UPPER STORY STEPBACK - BAY ST =1,014 SF / 126' (SANG2,3 FRONTAGE) = 8' OK AVG UPPER STORY STEPBACK - OCEAN WAY =1,107 SF / 115' (SANG 3 FRONTAGE) = 9.6' OK 1,014 SF 1,107 SF5'-0" MINSTREET FRONTAGE SETBACK 5'-0" MIN STREET FRONTAGE SETBACK REAR YARD - NO REQ'D SETBACK120'-0"36'-0"5'-0" 180 SF SETBACK AREA REQUIRED - OCEAN WAY 58'-10"5'-0"294 SF SETBACK AREA REQUIRED - BAY STREET KoningEizenbergArchitecture 1454 25th St, Santa Monica, CA 90404 310.828.6131 info@kearch.com310.828.0719 fax www.kearch.com All designs, ideas, arrangements and plans indicated by these drawings are the property and copyright of the Architect and shall neither be used on any other work nor be disclosed to any other person for any use whatsoever without written permission. Koning Eizenberg Architecture and/or its principals and employees waives any and all liability or responsibility for problems that may occur when these plans, drawings, specifications, and/or designs are followed without the professional's guidance with ambiguities, or conflicts which are alleged. SHEET NO. PROJECT TITLE PROJECT NO. ∆ # 1921 OCEAN FRONT WALK 1513 SANTA MONICA, CA 90405 SETBACK DIAGRAM A0.43 DESCRIPTION DATE GROUND FLOOR / P2 P1 - W R1 - W R2 - W R3 - W PER TABLE 9.14.030 AT LEAST THIRTY PERCENT OF THE BUILDING ELEVATION ABOVE THE MAXIMUM GROUND FLOOR HEIGHT SHALL PROVIDE ADDITIONAL FIVE-FOOT AVERAGE SETBACK FROM THE MINIMUM REQUIRED FRONT YARD SETBACK. SETBACK CODE DIAGRAM STREET FRONTAGE SETBACK 5'-0"5'-0"STREET FRONTAGE SETBACK 5'-0"5'-0"5'-0"STREET FRONTAGE SETBACK STREET FRONTAGE SETBACK THIS LEVEL AT GROUND FLOOR OR BELOW. NO UPPER STORY STEP BACK REQ'D 5'-0"5'-0"STREET FRONTAGE SETBACK STREET FRONTAGE SETBACK AVG UPPER STORY STEPBACK - PICO BLVD=3117SF / 203' = 15.4' STEPBACK - OCEAN AVENUE=2084SF / 207' = 10' 3117SF STREET FRONTAGE SETBACK STREET FRONTAGE SETBACK AVG UPPER STORY STEPBACK - OCEAN AVENUE =1905SF / 207' = 9.2' STORY STEPBACK RRACE 0' = 14' 1905 SF STREET FRONTAGE SETBACK 5'-0" STREET FRONTAGE SETBACK RY STEPBACK - PICO BLVD 14.5' AVG UPPER STORY STEPBACK - OCEAN AVENUE =2339SF / 207' = 11.3' STORY STEPBACK RRACE 0' = 18.9' 2339 SF 5'-0" STREET FRONTAGE SETBACK5'-0" F SETBACK REQUIRED BLVD SHEET NO. PROJECT TITLE PROJECT NO. ∆ # 1828 OCEAN AVENUE 1512 SANTA MONICA, CA 90405 A0.43 DESCRIPTION DATE R1 R2 R4 PER TABLE 9.14.030 AT LEAST THIRTY PERCENT OF THE BUILDING ELEVATION ABOVE THE MAXIMUM GROUND FLOOR HEIGHT SHALL PROVIDE ADDITIONAL FIVE-FOOT AVERAGE SETBACK FROM THE MINIMUM REQUIRED FRONT YARD SETBACK. SETBACK CODE DIAGRAM MINIMUM UPPER STORY SETBACKS A31 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405 DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com CO- WD- GL-1 AL-1 AL-2 MAT ST-1 ST-2 GL-3 GL-4 PLW CP-1 ST-3 GL-2 RL-1 ST-4 CT-1 AL-3 WF- AL-4 METAL PANEL BOARD FORMED CONC. WOOD SIDING Ko 14 31 31 All by t the wor use Kon and res the are am SHE PRO PRO ∆ # 192 15 SAN MATERIAL & PROJECT PRECEDENTS CO-1 C WD-1 V GL-1 T AL-1 A AL-2 S MATERIA ST-1 P ST-2 S GL-3 C GL-4 A PLW G CP-1 A ST-3 W GL-2 C RL-1 R ST-4 P CT-1 E AL-3 P WF-1 W AL-4 A METAL PANEL BOARD FORMED CONC. WOOD SIDING Koni 1454 310.82 310.82 All desig by these the Archi work nor use what Koning E and emp responsi these pla are follow ambiguit SHEET NO PROJECT PROJECT ∆ # 1921 1513 SANTA MATE A32 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405 DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com BAY ST.PROPOSED BUILDING HOTEL CASA DEL MAR (EXISTING)PICO BLVD.CRESCENT BAY PARK SHUTTERS HOTEL P.L.P.L. PROJECT SITE ROOF NOT SHOWN IN PERSPECTIVE PROPOSED ELEVATION ALONG OCEAN WAY LOOKING WEST EXISTING ELEVATION ALONG OCEAN WAY LOOKING WEST 0 10'5'20' P.L.P.L. BAY ST.PROPOSED BUILDING HOTEL CASA DEL MAR (EXISTING)PICO BLVD.CRESCENT BAY PARK SHUTTERS HOTEL ROOF NOT SHOWN IN PERSPECTIVE PROPOSED ELEVATION ALONG OCEAN WAY LOOKING WEST OCEAN WAY CONTEXT ELEVATION A33 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405 DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com GROUND FLOOR / P213.5' R2 - W46.8' R3 - W56.8' ROOF - W67.5' ADFIB P.L.P.L. BAY STREET S.A.N.G. 347'-0" MAX FROM S.A.N.G. 347'-0"3'-6" MAXPARAPET(E) CASA DEL MAR HOTEL R134.8' P121.5'6'-6"H EG C STAIR & ELEV PENTHOUSE MECH. ENCLOSURE TRELLIS STAIR PENTHOUSE OVERHEAD DOOR AT TRASH ROOMFINISH TO MATCH ADJACENT CONC. WALL10'-9"10'-0"11'-11"13'-4"8'-0"OUTLINE OF SUBTERRANEAN GARAGE CO-1 COLORED BOARD-FORMED CONCRETE WD-1 VERT WD SLAT RAINSCREEN (FSC IPE) GL-1 THERM BRKN ALUM GLAZING SYSTEM AL-1 ALUMINUM SLAT SCREEN AL-2 SOLID ALUMINUM (WHITE) MATERIAL LEGEND ST-1 PAINTED STEEL CHANNEL (WHITE) ST-2 SOLID CAST STEEL PANEL (PATINA) GL-3 CUSTOM STEEL GLAZING (DARK GREY) GL-4 ALUM FOLDING WALL SYSTEM PLW GREEN WALL SYSTEM CP-1 ACRYLIC CEMENT PLASTER (WHITE) ST-3 WROUGHT IRON PANEL (PATINA) GL-2 CANTILEVERED GLASS GUARDRAIL RL-1 ROPE NET RAILING/FENCING ST-4 PAINTED STEEL ARBOR (DARK GREY) CT-1 ENCAUSTIC CEMENT TILE AL-3 PERFORATED ALUMINUM (DARK GREY) WF-1 WOVEN FABRIC SLIDING SHADE AL-4 ALUMINUM SLAT VENT PANEL TABLE 9.21.060 - ALLOWABLE PROJECTIONS ABOVE THE HEIGHT LIMIT ROOFTOP FEATURES & TRELLISES - 10'ELEVATOR SHAFTS - 18'STAIR PENTHOUSES 14' MECHANICAL ENCLOSURES - 12' MECHANICAL EQUIPMENT - 12' 9.21.150 - SOLAR ENERGY SYSTEMS PHOTOVOLTAIC SOLAR ENERGY - 5' SOLAR THERMAL | WATER PANELS - 7' SHEET NO. PROJECT TITLE PROJECT NO. ∆ # 1921 OCEAN FRONT WALK 1513 SANTA MONICA, CA 90405 BUILDING ELEVATION - EAST A3.00 1/8" = 1'-0"1EAST ELEVATION 0 4'2'8' DESCRIPTION DATE SD PRICING SET 5.10.18 OCEAN WAY ELEVATION A CO-1 COLORED BOARD-FORMED CONCRETE WD-1 VERT WD SLAT RAINSCREEN (FSC IPE) GL-1 THERM BRKN ALUM GLAZING SYSTEM AL-1 ALUMINUM SLAT SCREEN AL-2 SOLID ALUMINUM (WHITE) MATERIAL LEGEND ST-1 PAINTED STEEL CHANNEL (WHITE) ST-2 SOLID CAST STEEL PANEL (PATINA) GL-3 CUSTOM STEEL GLAZING (DARK GREY) GL-4 ALUM FOLDING WALL SYSTEM PLW GREEN WALL SYSTEM CP-1 ACRYLIC CEMENT PLASTER (WHITE) ST-3 WROUGHT IRON PANEL (PATINA) GL-2 CANTILEVERED GLASS GUARDRAIL RL-1 ROPE NET RAILING/FENCING ST-4 PAINTED STEEL ARBOR (DARK GREY) CT-1 ENCAUSTIC CEMENT TILE AL-3 PERFORATED ALUMINUM (DARK GREY) WF-1 WOVEN FABRIC SLIDING SHADE AL-4 ALUMINUM SLAT VENT PANEL TABLE 9.21.060 - ALLOWABLE PROJECTIONS ABOVE THE HEIGHT LIMIT ROOFTOP FEATURES & TRELLISES - 10'ELEVATOR SHAFTS - 18'STAIR PENTHOUSES 14' MECHANICAL ENCLOSURES - 12' MECHANICAL EQUIPMENT - 12' 9.21.150 - SOLAR ENERGY SYSTEMS PHOTOVOLTAIC SOLAR ENERGY - 5' SOLAR THERMAL | WATER PANELS - 7' KoningEizenbergArchitecture 1454 25th St, Santa Monica, CA 90404 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com All designs, ideas, arrangements and plans indicated by these drawings are the property and copyright of the Architect and shall neither be used on any other work nor be disclosed to any other person for any use whatsoever without written permission. Koning Eizenberg Architecture and/or its principals and employees waives any and all liability or responsibility for problems that may occur when these plans, drawings, specifications, and/or designs are followed without the professional's guidance with ambiguities, or conflicts which are alleged. 0 2'1'4' 0 4'2'8' 0 8'4'16' 0 10'5'20' S.A.N.G. METHODOLOGY: PER SMZO 9.04.050(A)(2), BECAUSE OF THE SLOPING PROJECT SITE, PROJECT HEIGHT LIMITS MUST BE ESTABLISHED IN THREE EQUAL SEGMENTS A34 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405 DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com P.L.P.L. (E) SIDEWALK PROPOSED BUILDING OCEAN WAY 3-STORY RESIDENTIAL BUILDING (EXISTING)OCEAN AVE.TRAFFIC ISLANDBEACH + OCEAN FRONT WALK P.L.P.L. (E) SIDEWALK PROJECT SITE SITE AND CONTEXT ELEVATIONS XA9.35 PROPOSED ELEVATION ALONG BAY ST. LOOKING NORTH EXISTING ELEVATION ALONG BAY ST. LOOKING NORTH 0 10'5'20' P.L.P.L. (E) SIDEWALK PROPOSED BUILDING OCEAN WAY 3-STORY RESIDENTIAL BUILDING (EXISTING)OCEAN AVE.TRAFFIC ISLANDBEACH + OCEAN FRONT WALK PROPOSED ELEVATION ALONG BAY ST. LOOKING NORTH BAY STREET CONTEXT ELEVATION A35 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405 DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com BAY STREET ELEVATION GROUND FLOOR / P213.5' P1 - W25.5' R1 - W36.8' R2 - W46.8' R3 - W56.8' ROOF - W67.5' ROOF - E74.3' 4 5 7 81 P.L. P.L.6'-9"10'-9"10'-0"10'-0"11'-3"12'-0"OCEAN WAY 47'-0" ABOVE S.A.N.G. 47'-0" ABOVE S.A.N.G 47'-0" ABOVE S.A.N.G. S.A.N.G. 1 S.A.N.G. 3 S.A.N.G. 2 FROM S.A.N.G 347'-0" MAXFROM S.A.N.G 247'-0" MAXFROM S.A.N.G 147'-0" MAXPARAPET3'-6" MAX2 63 PARKING ENTRANCE (E) CASA DEL MAR HOTEL BEYOND STAIR PENTHOUSE MECH. ENCLOSURE TRELLIS MECH.ENCLOSURE STAIR PENTHOUSE OUTLINE OF SUBTERRANEAN GARAGE3'-6"6'-2"3'-6"4'-8"3'-6"12'-0"CO-1 COLORED BOARD-FORMED CONCRETE WD-1 VERT WD SLAT RAINSCREEN (FSC IPE) GL-1 THERM BRKN ALUM GLAZING SYSTEM AL-1 ALUMINUM SLAT SCREEN AL-2 SOLID ALUMINUM (WHITE) MATERIAL LEGEND ST-1 PAINTED STEEL CHANNEL (WHITE) ST-2 SOLID CAST STEEL PANEL (PATINA) GL-3 CUSTOM STEEL GLAZING (DARK GREY) GL-4 ALUM FOLDING WALL SYSTEM PLW GREEN WALL SYSTEM CP-1 ACRYLIC CEMENT PLASTER (WHITE) ST-3 WROUGHT IRON PANEL (PATINA) GL-2 CANTILEVERED GLASS GUARDRAIL RL-1 ROPE NET RAILING/FENCING ST-4 PAINTED STEEL ARBOR (DARK GREY) CT-1 ENCAUSTIC CEMENT TILE AL-3 PERFORATED ALUMINUM (DARK GREY) WF-1 WOVEN FABRIC SLIDING SHADE AL-4 ALUMINUM SLAT VENT PANEL TABLE 9.21.060 - ALLOWABLE PROJECTIONS ABOVE THE HEIGHT LIMIT ROOFTOP FEATURES & TRELLISES - 10'ELEVATOR SHAFTS - 18'STAIR PENTHOUSES 14' MECHANICAL ENCLOSURES - 12' MECHANICAL EQUIPMENT - 12' 9.21.150 - SOLAR ENERGY SYSTEMS PHOTOVOLTAIC SOLAR ENERGY - 5'SOLAR THERMAL | WATER PANELS - 7' Koning Eizenberg Architecture and/or its principals and employees waives any and all liability or responsibility for problems that may occur when these plans, drawings, specifications, and/or designs are followed without the professional's guidance with ambiguities, or conflicts which are alleged. SHEET NO. PROJECT TITLE PROJECT NO. ∆ # 1921 OCEAN FRONT WALK 1513 SANTA MONICA, CA 90405 BUILDING ELEVATION - SOUTH A3.01 1/8" = 1'-0"1SOUTH ELEVATION 0 4'2'8' DESCRIPTION DATE SD PRICING SET 5.10.1 OCEAN FRONT WALK BEYOND A CO-1 COLORED BOARD-FORMED CONCRETE WD-1 VERT WD SLAT RAINSCREEN (FSC IPE) GL-1 THERM BRKN ALUM GLAZING SYSTEM AL-1 ALUMINUM SLAT SCREEN AL-2 SOLID ALUMINUM (WHITE) MATERIAL LEGEND ST-1 PAINTED STEEL CHANNEL (WHITE) ST-2 SOLID CAST STEEL PANEL (PATINA) GL-3 CUSTOM STEEL GLAZING (DARK GREY) GL-4 ALUM FOLDING WALL SYSTEM PLW GREEN WALL SYSTEM CP-1 ACRYLIC CEMENT PLASTER (WHITE) ST-3 WROUGHT IRON PANEL (PATINA) GL-2 CANTILEVERED GLASS GUARDRAIL RL-1 ROPE NET RAILING/FENCING ST-4 PAINTED STEEL ARBOR (DARK GREY) CT-1 ENCAUSTIC CEMENT TILE AL-3 PERFORATED ALUMINUM (DARK GREY) WF-1 WOVEN FABRIC SLIDING SHADE AL-4 ALUMINUM SLAT VENT PANEL TABLE 9.21.060 - ALLOWABLE PROJECTIONS ABOVE THE HEIGHT LIMIT ROOFTOP FEATURES & TRELLISES - 10'ELEVATOR SHAFTS - 18'STAIR PENTHOUSES 14' MECHANICAL ENCLOSURES - 12' MECHANICAL EQUIPMENT - 12' 9.21.150 - SOLAR ENERGY SYSTEMS PHOTOVOLTAIC SOLAR ENERGY - 5' SOLAR THERMAL | WATER PANELS - 7' KoningEizenbergArchitecture 1454 25th St, Santa Monica, CA 90404 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com All designs, ideas, arrangements and plans indicated by these drawings are the property and copyright of the Architect and shall neither be used on any other work nor be disclosed to any other person for any use whatsoever without written permission. Koning Eizenberg Architecture and/or its principals and employees waives any and all liability or responsibility for problems that may occur when these plans, drawings, specifications, and/or designs are followed without the professional's guidance with ambiguities, or conflicts which are alleged. 0 2'1'4' 0 4'2'8' 0 8'4'16' 0 10'5'20' S.A.N.G. METHODOLOGY: PER SMZO 9.04.050(A)(2), BECAUSE OF THE SLOPING PROJECT SITE, PROJECT HEIGHT LIMITS MUST BE ESTABLISHED IN THREE EQUAL SEGMENTS A36 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405 DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com P.L.P.L. SHUTTERS ON THE BEACH HOTEL (EXISTING)59'-9"HOTEL CASA DEL MAR (EXISTING)PROPOSED BUILDING BAY STREET CRESCENT BAY PARK P.L.P.L. PROJECT SITE ROOF NOT SHOWN IN PERSPECTIVE SHUTTERS HOTEL BEYOND EXISTING PALM TREES ON OCEAN FRONT WALK OMITTED FOR CLARITY (E) APARTMENT BLDG BEYOND SITE AND CONTEXT ELEVATIONS XA9.34 PROPOSED ELEVATION ALONG OCEAN FRONT LOOKING EAST EXISTING ELEVATION ALONG OCEAN FRONT LOOKING EAST 0 10'5'20' P.L.P.L. SHUTTERS ON THE BEACH HOTEL (EXISTING)59'-9"HOTEL CASA DEL MAR (EXISTING)PROPOSED BUILDING BAY STREET CRESCENT BAY PARK ROOF NOT SHOWN IN PERSPECTIVE SHUTTERS HOTEL BEYOND ROOF NOT SHOWN IN PERSPECTIVE PROPOSED ELEVATION ALONG OCEAN FRONT LOOKING EAST OCEAN FRONT WALK CONTEXT ELEVATION A37 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405 DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com OCEAN FRONT WALK ELEVATION GROUND FLOOR / P213.5' P1 - W25.5' R1 - W36.8' R2 - W46.8' R3 - W56.8' A D F I P.L.P.L. B (E) CASA DEL MAR HOTEL BAY STREET47'-0" MAX FRON S.A.N.G. 147'-0"S.A.N.G. 1 S.A.N.G. 2 47'-0" MAX FROM S.A.N.G. 247'-0"S.A.N.G. 3 47'-0" MAX FROM S.A.N.G. 347'-0"3'-6" MAXPARAPETHEGC STAIR PENTHOUSE ELEV. OVERRUN & MECH.ENCLOSURE TRELLIS MECH.ENCLOSURE MECH.ENCLOSURE STAIR PENTHOUSE & TRELLIS 10'-0"10'-0"11'-3"12'-0"CO-1 COLORED BOARD-FORMED CONCRETE WD-1 VERT WD SLAT RAINSCREEN (FSC IPE) GL-1 THERM BRKN ALUM GLAZING SYSTEM AL-1 ALUMINUM SLAT SCREEN AL-2 SOLID ALUMINUM (WHITE) MATERIAL LEGEND ST-1 PAINTED STEEL CHANNEL (WHITE) ST-2 SOLID CAST STEEL PANEL (PATINA) GL-3 CUSTOM STEEL GLAZING (DARK GREY) GL-4 ALUM FOLDING WALL SYSTEM PLW GREEN WALL SYSTEM CP-1 ACRYLIC CEMENT PLASTER (WHITE) ST-3 WROUGHT IRON PANEL (PATINA) GL-2 CANTILEVERED GLASS GUARDRAIL RL-1 ROPE NET RAILING/FENCING ST-4 PAINTED STEEL ARBOR (DARK GREY) CT-1 ENCAUSTIC CEMENT TILE AL-3 PERFORATED ALUMINUM (DARK GREY) WF-1 WOVEN FABRIC SLIDING SHADE AL-4 ALUMINUM SLAT VENT PANEL TABLE 9.21.060 - ALLOWABLE PROJECTIONS ABOVE THE HEIGHT LIMIT ROOFTOP FEATURES & TRELLISES - 10' | 25%ELEVATOR SHAFTS - 18' | 15%STAIR PENTHOUSES 14' | 25%MECHANICAL ENCLOSURES - 12' | 25%MECHANICAL EQUIPMENT - 12' | 30% 9.21.150 - SOLAR ENERGY SYSTEMS PHOTOVOLTAIC SOLAR ENERGY - 5'SOLAR THERMAL | WATER PANELS - 7' SHEET NO. PROJECT TITLE PROJECT NO. ∆ # 1921 OCEAN FRONT WALK 1513 SANTA MONICA, CA 90405 BUILDING ELEVATION - WEST A3.02 1/8" = 1'-0"1WEST ELEVATION 0 4'2'8' DESCRIPTION DATE SD PRICING SET 5.10.18 0 2'1'4' 0 4'2'8' 0 8'4'16' 0 10'5'20' A CO-1 COLORED BOARD-FORMED CONCRETE WD-1 VERT WD SLAT RAINSCREEN (FSC IPE) GL-1 THERM BRKN ALUM GLAZING SYSTEM AL-1 ALUMINUM SLAT SCREEN AL-2 SOLID ALUMINUM (WHITE) MATERIAL LEGEND ST-1 PAINTED STEEL CHANNEL (WHITE) ST-2 SOLID CAST STEEL PANEL (PATINA) GL-3 CUSTOM STEEL GLAZING (DARK GREY) GL-4 ALUM FOLDING WALL SYSTEM PLW GREEN WALL SYSTEM CP-1 ACRYLIC CEMENT PLASTER (WHITE) ST-3 WROUGHT IRON PANEL (PATINA) GL-2 CANTILEVERED GLASS GUARDRAIL RL-1 ROPE NET RAILING/FENCING ST-4 PAINTED STEEL ARBOR (DARK GREY) CT-1 ENCAUSTIC CEMENT TILE AL-3 PERFORATED ALUMINUM (DARK GREY) WF-1 WOVEN FABRIC SLIDING SHADE AL-4 ALUMINUM SLAT VENT PANEL TABLE 9.21.060 - ALLOWABLE PROJECTIONS ABOVE THE HEIGHT LIMIT ROOFTOP FEATURES & TRELLISES - 10'ELEVATOR SHAFTS - 18'STAIR PENTHOUSES 14' MECHANICAL ENCLOSURES - 12' MECHANICAL EQUIPMENT - 12' 9.21.150 - SOLAR ENERGY SYSTEMS PHOTOVOLTAIC SOLAR ENERGY - 5' SOLAR THERMAL | WATER PANELS - 7' KoningEizenbergArchitecture 1454 25th St, Santa Monica, CA 90404 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com All designs, ideas, arrangements and plans indicated by these drawings are the property and copyright of the Architect and shall neither be used on any other work nor be disclosed to any other person for any use whatsoever without written permission. Koning Eizenberg Architecture and/or its principals and employees waives any and all liability or responsibility for problems that may occur when these plans, drawings, specifications, and/or designs are followed without the professional's guidance with ambiguities, or conflicts which are alleged. S.A.N.G. METHODOLOGY: PER SMZO 9.04.050(A)(2), BECAUSE OF THE SLOPING PROJECT SITE, PROJECT HEIGHT LIMITS MUST BE ESTABLISHED IN THREE EQUAL SEGMENTS A38 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405 DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com COURTYARD ELEVATION GROUND FLOOR / P213.5' R2 - W46.8' R3 - W56.8' ROOF - E74.3' 4578 1 R134.8' P121.5' R464.3' 2 47'-0" ABOVE S.A.N.G. 47'-0" ABOVE S.A.N.G 47'-0" ABOVE S.A.N.G. S.A.N.G. 1 S.A.N.G. 3 S.A.N.G. 2FROM S.A.N.G 347'-0" MAXFROM S.A.N.G 247'-0" MAXFROM S.A.N.G 147'-0" MAXP.L. P.L. 6 3 ENTRANCE STAIR PENTHOUSE TRELLIS ELEV. OVERRUN & MECH.ENCLOSURE MECH.ENCLOSURE STAIR PENTHOUSE BEYOND OUTLINE OF SUBTERRANEAN GARAGE3'-6" MAXPARAPETCO-1 COLORED BOARD-FORMED CONCRETE WD-1 VERT WD SLAT RAINSCREEN (FSC IPE) GL-1 THERM BRKN ALUM GLAZING SYSTEM AL-1 ALUMINUM SLAT SCREEN AL-2 SOLID ALUMINUM (WHITE) MATERIAL LEGEND ST-1 PAINTED STEEL CHANNEL (WHITE) ST-2 SOLID CAST STEEL PANEL (PATINA) GL-3 CUSTOM STEEL GLAZING (DARK GREY) GL-4 ALUM FOLDING WALL SYSTEM PLW GREEN WALL SYSTEM CP-1 ACRYLIC CEMENT PLASTER (WHITE) ST-3 WROUGHT IRON PANEL (PATINA) GL-2 CANTILEVERED GLASS GUARDRAIL RL-1 ROPE NET RAILING/FENCING ST-4 PAINTED STEEL ARBOR (DARK GREY) CT-1 ENCAUSTIC CEMENT TILE AL-3 PERFORATED ALUMINUM (DARK GREY) WF-1 WOVEN FABRIC SLIDING SHADE AL-4 ALUMINUM SLAT VENT PANEL TABLE 9.21.060 - ALLOWABLE PROJECTIONS ABOVE THE HEIGHT LIMIT ROOFTOP FEATURES & TRELLISES - 10' | 25%ELEVATOR SHAFTS - 18' | 15%STAIR PENTHOUSES 14' | 25%MECHANICAL ENCLOSURES - 12' | 25%MECHANICAL EQUIPMENT - 12' | 30% 9.21.150 - SOLAR ENERGY SYSTEMS PHOTOVOLTAIC SOLAR ENERGY - 5'SOLAR THERMAL | WATER PANELS - 7' and employees waives any and all liability or responsibility for problems that may occur when these plans, drawings, specifications, and/or designs are followed without the professional's guidance with ambiguities, or conflicts which are alleged. SHEET NO. PROJECT TITLE PROJECT NO. ∆ # 1921 OCEAN FRONT WALK 1513 SANTA MONICA, CA 90405 BUILDING ELEVATION - NORTH A3.03 1/8" = 1'-0"1NORTH ELEVATION 0 4'2'8' DESCRIPTION DATE SD PRICING SET 5.10.18 OCEAN FRONT WALK BEYOND OCEAN WAY A CO-1 COLORED BOARD-FORMED CONCRETE WD-1 VERT WD SLAT RAINSCREEN (FSC IPE) GL-1 THERM BRKN ALUM GLAZING SYSTEM AL-1 ALUMINUM SLAT SCREEN AL-2 SOLID ALUMINUM (WHITE) MATERIAL LEGEND ST-1 PAINTED STEEL CHANNEL (WHITE) ST-2 SOLID CAST STEEL PANEL (PATINA) GL-3 CUSTOM STEEL GLAZING (DARK GREY) GL-4 ALUM FOLDING WALL SYSTEM PLW GREEN WALL SYSTEM CP-1 ACRYLIC CEMENT PLASTER (WHITE) ST-3 WROUGHT IRON PANEL (PATINA) GL-2 CANTILEVERED GLASS GUARDRAIL RL-1 ROPE NET RAILING/FENCING ST-4 PAINTED STEEL ARBOR (DARK GREY) CT-1 ENCAUSTIC CEMENT TILE AL-3 PERFORATED ALUMINUM (DARK GREY) WF-1 WOVEN FABRIC SLIDING SHADE AL-4 ALUMINUM SLAT VENT PANEL TABLE 9.21.060 - ALLOWABLE PROJECTIONS ABOVE THE HEIGHT LIMIT ROOFTOP FEATURES & TRELLISES - 10'ELEVATOR SHAFTS - 18'STAIR PENTHOUSES 14' MECHANICAL ENCLOSURES - 12' MECHANICAL EQUIPMENT - 12' 9.21.150 - SOLAR ENERGY SYSTEMS PHOTOVOLTAIC SOLAR ENERGY - 5' SOLAR THERMAL | WATER PANELS - 7' KoningEizenbergArchitecture 1454 25th St, Santa Monica, CA 90404 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com All designs, ideas, arrangements and plans indicated by these drawings are the property and copyright of the Architect and shall neither be used on any other work nor be disclosed to any other person for any use whatsoever without written permission. Koning Eizenberg Architecture and/or its principals and employees waives any and all liability or responsibility for problems that may occur when these plans, drawings, specifications, and/or designs are followed without the professional's guidance with ambiguities, or conflicts which are alleged. 0 2'1'4' 0 4'2'8' 0 8'4'16' 0 10'5'20' S.A.N.G. METHODOLOGY: PER SMZO 9.04.050(A)(2), BECAUSE OF THE SLOPING PROJECT SITE, PROJECT HEIGHT LIMITS MUST BE ESTABLISHED IN THREE EQUAL SEGMENTS A39 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405 DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com GROUND FLOOR / P213.5' P1 - W25.5' R1 - W36.8' R2 - W46.8' R3 - W56.8' 4 5 7 81263 3'-3"47'-0" ABOVE S.A.N.G. 47'-0" ABOVE S.A.N.G 47'-0" ABOVE S.A.N.G. S.A.N.G. 1 S.A.N.G. 3 S.A.N.G. 2 OCEAN FRONT WALK (E) WALKWAY ROOF EAST70.80'14'-0"10'-0"10'-0"11'-3"12'-0"OCEAN WAY 47'-0" MAX FROM S.A.N.G. 347'-0"(E) CASA DEL MAR HOTEL BEYOND MECH ENCLOSURE STAIR PENTHOUSE 3'-6" MAXPARAPET12'-6"10'-0"11'-3"12'-0"10'-9"10'-0"10'-0"11'-3"14'-0"10'-0"11'-11"7'-0"13'-2"3'-6"MECH ENCLOSURE CONDENSER UNIT PLANTER TRELLIS (E) ABANDONED PUMP STATION FOUNDATION (E) CASA DEL MAR HOTEL BEYOND P.L.P.L.12'-0"15'-4"9'-0"MECH STACKERS IN THIS ZONEMECH STACKERS IN THIS ZONE TABLE 9.21.060 - ALLOWABLE PROJE ABOVE THE HEIGHT LIMIT ROOFTOP FEATURES & TRELLISE ELEVATOR SHAFTS - 18'STAIR PENTHOUSES 14' MECHANICAL ENCLOSURES - 12' MECHANICAL EQUIPMENT - 12' 9.21.150 - SOLAR ENERGY SYSTEMS PHOTOVOLTAIC SOLAR ENERGY SOLAR THERMAL | WATER PANEL Koning Eizenberg Architecture and/or its princ and employees waives any and all liability or responsibility for problems that may occur whe these plans, drawings, specifications, and/or d are followed without the professional's guidanc ambiguities, or conflicts which are alleged. SHEET NO. PROJECT TITLE PROJECT NO. ∆ # 1921 OCEAN FRONT W 1513 SANTA MONICA, CA 90405 BUILDING SECTIONS A4.0 1/8" = 1'-0"1SECTION 1 0 4'2'8' DESCRIPTION SD PRICING SET BUILDING SECTION 1 A CO-1 COLORED BOARD-FORMED CONCRETE WD-1 VERT WD SLAT RAINSCREEN (FSC IPE) GL-1 THERM BRKN ALUM GLAZING SYSTEM AL-1 ALUMINUM SLAT SCREEN AL-2 SOLID ALUMINUM (WHITE) MATERIAL LEGEND ST-1 PAINTED STEEL CHANNEL (WHITE) ST-2 SOLID CAST STEEL PANEL (PATINA) GL-3 CUSTOM STEEL GLAZING (DARK GREY) GL-4 ALUM FOLDING WALL SYSTEM PLW GREEN WALL SYSTEM CP-1 ACRYLIC CEMENT PLASTER (WHITE) ST-3 WROUGHT IRON PANEL (PATINA) GL-2 CANTILEVERED GLASS GUARDRAIL RL-1 ROPE NET RAILING/FENCING ST-4 PAINTED STEEL ARBOR (DARK GREY) CT-1 ENCAUSTIC CEMENT TILE AL-3 PERFORATED ALUMINUM (DARK GREY) WF-1 WOVEN FABRIC SLIDING SHADE AL-4 ALUMINUM SLAT VENT PANEL TABLE 9.21.060 - ALLOWABLE PROJECTIONS ABOVE THE HEIGHT LIMIT ROOFTOP FEATURES & TRELLISES - 10'ELEVATOR SHAFTS - 18'STAIR PENTHOUSES 14' MECHANICAL ENCLOSURES - 12' MECHANICAL EQUIPMENT - 12' 9.21.150 - SOLAR ENERGY SYSTEMS PHOTOVOLTAIC SOLAR ENERGY - 5' SOLAR THERMAL | WATER PANELS - 7' KoningEizenbergArchitecture 1454 25th St, Santa Monica, CA 90404 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com All designs, ideas, arrangements and plans indicated by these drawings are the property and copyright of the Architect and shall neither be used on any other work nor be disclosed to any other person for any use whatsoever without written permission. Koning Eizenberg Architecture and/or its principals and employees waives any and all liability or responsibility for problems that may occur when these plans, drawings, specifications, and/or designs are followed without the professional's guidance with ambiguities, or conflicts which are alleged. 0 2'1'4' 0 4'2'8' 0 8'4'16' 0 10'5'20' S.A.N.G. METHODOLOGY: PER SMZO 9.04.050(A)(2), BECAUSE OF THE SLOPING PROJECT SITE, PROJECT HEIGHT LIMITS MUST BE ESTABLISHED IN THREE EQUAL SEGMENTS A40 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405 DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com GROUND FLOOR / P213.5' P1 - W25.5' R1 - W36.8' R2 - W46.8' R3 - W56.8' 4 5 7 81 R134.8' 2 63 ROOF EAST70.80' OCEAN FRONT WALK 47'-0" ABOVE S.A.N.G. 47'-0" ABOVE S.A.N.G 47'-0" ABOVE S.A.N.G. S.A.N.G. 1 S.A.N.G. 3 S.A.N.G. 2 (E) WALKWAY (E) CASA DEL MAR HOTEL BEYOND 14'-0"10'-0"10'-0"11'-3"12'-0"OCEAN WAY 47'-0" MAX FROM S.A.N.G. 347'-0"MECH ENCLOSURE 12'-6"10'-0"11'-3"12'-0"14'-0"10'-0"10'-0"16'-1"9'-0"MECH ENCLOSURE 1'-2"3'-4"11"GUARDRAIL BEYOND PATIO P.L.P.L. (E) CASA DEL MAR HOTEL BEYOND 3'-6" MAXPARAPETTABLE 9.21.060 - ALLOWABLE PROJ ABOVE THE HEIGHT LIMIT ROOFTOP FEATURES & TRELLISE ELEVATOR SHAFTS - 18' | 15%STAIR PENTHOUSES 14' | 25% MECHANICAL ENCLOSURES - 12' MECHANICAL EQUIPMENT - 12' | 3 9.21.150 - SOLAR ENERGY SYSTEMS PHOTOVOLTAIC SOLAR ENERGY SOLAR THERMAL | WATER PANE Koning Eizenberg Architecture and/or its prin and employees waives any and all liability or responsibility for problems that may occur wh these plans, drawings, specifications, and/or are followed without the professional's guidan ambiguities, or conflicts which are alleged. SHEET NO. PROJECT TITLE PROJECT NO. ∆ # 1921 OCEAN FRONT W 1513 SANTA MONICA, CA 90405 BUILDING SECTIONS A4.0 0 4'2'8' 1/8" = 1'-0"1SECTION 3 DESCRIPTION SD PRICING SET BUILDING SECTION 2 A CO-1 COLORED BOARD-FORMED CONCRETE WD-1 VERT WD SLAT RAINSCREEN (FSC IPE) GL-1 THERM BRKN ALUM GLAZING SYSTEM AL-1 ALUMINUM SLAT SCREEN AL-2 SOLID ALUMINUM (WHITE) MATERIAL LEGEND ST-1 PAINTED STEEL CHANNEL (WHITE) ST-2 SOLID CAST STEEL PANEL (PATINA) GL-3 CUSTOM STEEL GLAZING (DARK GREY) GL-4 ALUM FOLDING WALL SYSTEM PLW GREEN WALL SYSTEM CP-1 ACRYLIC CEMENT PLASTER (WHITE) ST-3 WROUGHT IRON PANEL (PATINA) GL-2 CANTILEVERED GLASS GUARDRAIL RL-1 ROPE NET RAILING/FENCING ST-4 PAINTED STEEL ARBOR (DARK GREY) CT-1 ENCAUSTIC CEMENT TILE AL-3 PERFORATED ALUMINUM (DARK GREY) WF-1 WOVEN FABRIC SLIDING SHADE AL-4 ALUMINUM SLAT VENT PANEL TABLE 9.21.060 - ALLOWABLE PROJECTIONS ABOVE THE HEIGHT LIMIT ROOFTOP FEATURES & TRELLISES - 10'ELEVATOR SHAFTS - 18'STAIR PENTHOUSES 14' MECHANICAL ENCLOSURES - 12' MECHANICAL EQUIPMENT - 12' 9.21.150 - SOLAR ENERGY SYSTEMS PHOTOVOLTAIC SOLAR ENERGY - 5' SOLAR THERMAL | WATER PANELS - 7' KoningEizenbergArchitecture 1454 25th St, Santa Monica, CA 90404 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com All designs, ideas, arrangements and plans indicated by these drawings are the property and copyright of the Architect and shall neither be used on any other work nor be disclosed to any other person for any use whatsoever without written permission. Koning Eizenberg Architecture and/or its principals and employees waives any and all liability or responsibility for problems that may occur when these plans, drawings, specifications, and/or designs are followed without the professional's guidance with ambiguities, or conflicts which are alleged. 0 2'1'4' 0 4'2'8' 0 8'4'16' 0 10'5'20' S.A.N.G. METHODOLOGY: PER SMZO 9.04.050(A)(2), BECAUSE OF THE SLOPING PROJECT SITE, PROJECT HEIGHT LIMITS MUST BE ESTABLISHED IN THREE EQUAL SEGMENTS A41 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405 DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com GROUND FLOOR / P213.5' P1 - W25.5' R1 - W36.8' R2 - W46.8' R3 - W56.8' ROOF - W67.5' ADFIBHEGC (E) CASA DEL MAR HOTEL P.L. P.L. BOTTOM OF SLOPING POOL SLAB MECH ENCLOSURE STAIR PENTHOUSE 10'-9"10'-0"10'-0"11'-3"12'-0"10'-9"10'-0"10'-0"11'-3"12'-0"S.A.N.G. 33'-6" MAXPARAPET47'-0" MAX FROM S.A.N.G. 347'-0"(E) ABANDONED PUMP STATION FOUNDATION PARKING RAMP DN 2 BED 2 BED 1 BED 1 BED 1 BED PRIVATE PATIO PRIVATE PATIO OPEN CORRIDOR RESIDENTIAL PARKING COMMERCIAL / GUEST / RESIDENTIAL PARKING ELEC BUILDING SECTION 3 A CO-1 COLORED BOARD-FORMED CONCRETE WD-1 VERT WD SLAT RAINSCREEN (FSC IPE) GL-1 THERM BRKN ALUM GLAZING SYSTEM AL-1 ALUMINUM SLAT SCREEN AL-2 SOLID ALUMINUM (WHITE) MATERIAL LEGEND ST-1 PAINTED STEEL CHANNEL (WHITE) ST-2 SOLID CAST STEEL PANEL (PATINA) GL-3 CUSTOM STEEL GLAZING (DARK GREY) GL-4 ALUM FOLDING WALL SYSTEM PLW GREEN WALL SYSTEM CP-1 ACRYLIC CEMENT PLASTER (WHITE) ST-3 WROUGHT IRON PANEL (PATINA) GL-2 CANTILEVERED GLASS GUARDRAIL RL-1 ROPE NET RAILING/FENCING ST-4 PAINTED STEEL ARBOR (DARK GREY) CT-1 ENCAUSTIC CEMENT TILE AL-3 PERFORATED ALUMINUM (DARK GREY) WF-1 WOVEN FABRIC SLIDING SHADE AL-4 ALUMINUM SLAT VENT PANEL TABLE 9.21.060 - ALLOWABLE PROJECTIONS ABOVE THE HEIGHT LIMIT ROOFTOP FEATURES & TRELLISES - 10'ELEVATOR SHAFTS - 18'STAIR PENTHOUSES 14' MECHANICAL ENCLOSURES - 12' MECHANICAL EQUIPMENT - 12' 9.21.150 - SOLAR ENERGY SYSTEMS PHOTOVOLTAIC SOLAR ENERGY - 5' SOLAR THERMAL | WATER PANELS - 7' KoningEizenbergArchitecture 1454 25th St, Santa Monica, CA 90404 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com All designs, ideas, arrangements and plans indicated by these drawings are the property and copyright of the Architect and shall neither be used on any other work nor be disclosed to any other person for any use whatsoever without written permission. Koning Eizenberg Architecture and/or its principals and employees waives any and all liability or responsibility for problems that may occur when these plans, drawings, specifications, and/or designs are followed without the professional's guidance with ambiguities, or conflicts which are alleged. 0 2'1'4' 0 4'2'8' 0 8'4'16' 0 10'5'20' S.A.N.G. METHODOLOGY: PER SMZO 9.04.050(A)(2), BECAUSE OF THE SLOPING PROJECT SITE, PROJECT HEIGHT LIMITS MUST BE ESTABLISHED IN THREE EQUAL SEGMENTS L1 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com OVERALL SITE PLAN OCEAN WAY(E) SIDEWALKBAY STREET CASA DEL MAR (E) (E) (E) (E) TRANSFORMER BIKE PARKING, TYP. PAVING FOR ROLLING TRASH BINS (E) SIDEWALK GRATES, TYP. MAIN ENTRY N NEW STREET TREES IN DECOMPOSED GRANITE SIDEWALK CUTOUTS BOULDER BENCHES, TYP. ACACIA ANEURA TREES AT DINING TERRACEOCEAN FRONT WALK0’4’8’16’ DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 L2 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com LANDSCAPE PLAN - STREETSCAPEOCEAN WAYCASA DEL MAR Festuca glauca Opuntia ‘Santa Rosa’Washingtonia filifera Stachys byzantina Leymus ‘Blue Prince’ BAY STREET N PROPOSED WASHINGTONIA FILIFERA, TYP OF 4 (TO MATCH HISTORIC TREES AT ADJACENT CRESCENT BAY PARK) BOULDER BENCHES, TYP. (E) SIDEWALKOCEAN FRONT WALKNOT TO SCALE DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 L3 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com LANDSCAPE ELEVATIONS - STREETSCAPE PROPOSED WASHINGTONIA FILIFERA, TYP OF 4 PROPOSED MELALEUCA NESOPHILA BAY STREET ELEVATION OCEAN AVE ELEVATION MOUNDED, DROUGHT RESISTANT PLANTING 0’4’8’16’ 0’4’8’16’ DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 L4 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com A B C SECTION ‘A“ AT BAY STREET SECTION ‘B“ AT BAY STREET SECTION ‘C“ AT BAY STREET P.L. P.L. P.L. 7’-0” PATIO +5'-4" 7’-9” 5'-6” LANDSCAPE SECTIONS - BAY STREET N 0’4’8’16’ PATIO +4'-3" DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 L5 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com LANDSCAPE PLAN - OCEAN FRONT WALK Festuca glauca Acacia aneura Leymus ‘Blue Prince’ Stachys byzantina White Bouganvillea OCEAN WAYCASA DEL MAR OCEAN FRONT WALKBAY STREET OCEAN WAYBAY STREET ACACIA ANEURA, TYP. OF 3 VINE WALL N(E) SIDEWALKOCEAN FRONT WALKNOT TO SCALE DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 L6 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com LANDSCAPE ELEVATION - OCEAN FRONT WALK PROPOSED ACACIA ANEURA, TYP. OF 3 PROPOSED WASHINGTONIA FILIFERA, TYP. OF 4 PROPOSED MELALEUCA NESOPHILA, TYP. OF 4 0’4’8’16’ DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 L7 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com OCEAN WAYCASA DEL MAR BAY STREET LANDSCAPE PLAN - ENTRY COURTYARDS Farfugium japonicum Vine Cables Copa de Oro Vine OCEAN WAYCASA DEL MAR BAY STREET RAISED PLANTERS WITH VINE CABLES, TYP. N(E) SIDEWALKOCEAN FRONT WALKNOT TO SCALE DEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 L8 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com OCEAN WAYBAY STREET CASA DEL MAR PRIVATE TERRACE PRIVATE TERRACE PRIVATE BALCONY, TYP RAISED SPA POOL MELALEUCA NESOPHILA TREE, TYP OF 5 (E) SIDEWALKOCEAN FRONT WALKGRAVEL SURROUND 0’4’8’16’ N LANDSCAPE PLAN - ROOF TERRACEDEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 L9 1921 OCEAN FRONT WALK SANTA MONICA, CA 90405KoningEizenbergArchitecture 1454 25TH STREET, SANTA MONICA, CA 90405 310.828.6131 info@kearch.com 310.828.0719 fax www.kearch.com CASA DEL MAR BAY STREET Melaleuca nesophila Melaleuca nesophila Flower Senecio mandraliscaePotted Grasses Fire Table and Seating Dining Trellis LANDSCAPE PLAN - ROOF TERRACE CHAISE LOUNGES AND UMBRELLAS GRAVEL SURROUND OUTDOOR DINING AREA WITH BBQ AND SEATING BELOW TRELLIS MELALEUCA NESOPHILA, TYP. OF 3 FIRE TABLE, TYP. OF 2 RAISED SPA POOL Raised Spa Pool N NOT TO SCALE OCEAN FRONT WALKDEVELOPMENT REVIEW PERMIT ON APPEAL MARCH 8TH 2019 City of Santa Monica City Planning Division CITY COUNCIL STATEMENT OF OFFICIAL ACTION PROJECT INFORMATION CASE NUMBER: Appeal 18ENT-0312 LOCATION: 1921 Ocean Front Walk APPLICANT: Koning Eizenberg Architecture PROPERTY OWNER: NXT2 BEACH, LLC CASE PLANNER: Russell Bunim, AICP, Acting Senior Planner REQUEST: Appeal of the Planning Commission’s approval of Development Review Permit 15ENT-0297 for a new four-story mixed-use residential and commercial building with 22 residential units, 4,000 square-feet of ground floor commercial tenant space, and 56 parking spaces located in a subterranean parking garage. The 22 residential units are intended for use by persons as their permanent place of residence and shall not be used as Corporate Housing or Lodging for persons who intend their occupancy to be temporary. Consistent with Proposition S, this project is not an expansion of any hotel use and there shall be no hotel amenities from the adjacent hotel (e.g., housekeeping, valet, food/room service) provided at the Project. As volunteered by the applicant, in the event that the applicant elects to meet its Tier 2 affordable housing production program obligation on site, the developer shall coordinate with the City’s Housing Division and an agency to facilitate support services for the households occupying the affordable units, and make every effort to coordinate and complement the services of other similar providers for affordable residents of 50% income households or greater in the neighboring area. The support services shall be in place prior to the issuance of certificate of occupancy of the affordable units if provided on site. 2 18ENT-0312 Statement of Official Action AFFORDABLE HOUSING: Four 50% income deed-restricted affordable units (2 one-bedroom, 1 two-bedroom, and 1 three-bedroom) located off-site at 1828 Ocean Avenue. CEQA STATUS: An Environmental Impact Report was prepared to analyze the potential environmental effects of the 1921 Ocean Front Walk Projects and the 1828 Ocean Avenue Project. The EIR analyzes the impacts of each project individually and cumulatively. A Notice of Preparation (NOP) was published on September 13, 2016 for a 30- day comment period. On April 10, 2018, a Notice of Completion and Public Availability of the Draft EIR was published, commencing a 45-day public comment period for the Draft EIR. The Final EIR was published on August 30, 2018, and certified by the Planning Commission on October 3, 2018. CITY COUNCIL ACTION April 23, 2019 Determination Date Appeal granted based on the following findings. X Appeal Denied; Application approved based on the following findings and subject to the conditions below. Other. EFFECTIVE DATES OF ACTIONS IF NOT APPEALED: April 23, 2019 EXPIRATION DATE OF ANY PERMITS GRANTED: October 22, 2022 LENGTH OF ANY POSSIBLE EXTENSION OF EXPIRATION DATES * : 12 months * Any request for an extension of the expiration date must be received in the City Planning Division prior to expiration of this permit. Each and all of the findings and determinations are based on the competent and substantial evidence, both oral and written, contained in the entire record relating to the Project. All summaries of information contained herein or in the findings are based on the substantial evidence in the record. The absence of any particular fact from any such summary is not an indication that a particular finding is not based in part on that fact. 3 18ENT-0312 Statement of Official Action FINDINGS DEVELOPMENT REVIEW PERMIT FINDINGS A. The physical location, size, massing, setbacks, pedestrian orientation, and placement of proposed structures on the site and the location of proposed uses within the project are consistent with applicable standards and are both compatible and relate harmoniously to surrounding sites and neighborhoods in that the proposed project includes a mixed-use commercial and residential building that complies with the Oceanfront (OF) and Beach Overlay (BCH) Districts development standards. Specifically, the physical size and massing of the project fits in the context of the surrounding neighborhood; it complies with the height limitation in the Zoning Ordinance using segmented average natural grade (SANG) for measuring height and is smaller in scale compared to Hotel Casa del Mar immediately adjacent to the north. The project complies with the street frontage setbacks on Ocean Way and Bay Street and is further setback on Ocean Front Walk in order to accommodate outdoor dining for the commercial tenant spaces. Lastly, the proposed commercial and residential land uses relate harmoniously to the existing residential development along Ocean Way and the mix of uses along Ocean Front Walk. The building is not subject to the commercial boulevard active commercial uses development standards; however, the project does provide active commercial uses and incorporates a pedestrian oriented ground floor surrounding the property on Ocean Way, Bay Street, and Ocean Front Walk. B. The rights-of-way can accommodate autos, bicycles, pedestrians, and multi-modal transportation methods, including adequate parking and access, in that the project will provide 56 parking spaces in a two-level subterranean garage with vehicle access from Bay Street. Furthermore, the project includes pedestrian entrances to the residential units from Ocean Way and Ocean Front Walk and pedestrian access to the commercial tenant spaces from Ocean Front Walk. Eight (4 commercial and 4 residential) short-term bicycle spaces are located along the building frontages on Ocean Front Walk and Ocean Way. 39 (4 commercial and 35 residential) long-term bicycle spaces are being provided. C. The health and safety services (police, fire, etc.) and public infrastructure (e.g. utilities) are sufficient to accommodate the new development, in that the proposed development is located in an urbanized area that is already adequately served by existing City infrastructure. No new safety services or public infrastructure will be required for this project. D. The project is generally consistent with the Municipal Code, General Plan, and any applicable Specific Plan, in that the project is located in the Oceanfront District land use designation in the 2010 LUCE. The development parameters in the LUCE are implemented in the Zoning Ordinance for Tier 2 projects. The proposed project complies with all of the development standards outlined in the Zoning Ordinance. The proposed development is also consistent with the goals, objectives, and policies in the LUCE. Specifically, Policy D18.2 seeks to respect the scale and character of the district’s existing residential areas in the design and construction of new buildings. 4 18ENT-0312 Statement of Official Action The proposed building complies with the building height volume that steps down toward Santa Monica Beach consistent with the height and mass of surrounding buildings. Additionally, the proposed project complies with LUCE goals and policies in that it is a mixed-use building with two small (maximum 2,000 square- feet) ground floor cafés facing Ocean Front Walk with residential as the proposed use on the upper floors. The Oceanfront District designation is intended to maintain and enhance the Oceanfront District as an important visitor serving destination with lodging, restaurants, shopping and recreation, as well as to protect the existing residential enclaves in the area. The unique character and scale of the area is maintained, centering on the landmark Santa Monica Pier. New residential and commercial uses are consistent with the character of existing buildings. As little change is expected to occur within this District, many of the existing uses remain, including residential, local and visitor-serving uses such as restaurants, hotels, beach clubs, and public facilities. Existing hotels may remodel and rebuild, not to exceed existing floor area and building footprint, in accordance with Proposition S. Future uses protect the residential enclaves, maintaining the existing character of the Oceanfront District, and support its function as a local and regional recreational amenity. The proposed project complies with these goals and policies in that the mixed-use residential and commercial building is designed with an inviting and activated ground floor (restaurants are a maximum 2,000 square-feet consistent with Proposition S), includes a variety of housing unit types and affordability, and formed in a manner that is sensitive to the context of the adjacent properties and surrounding neighborhood. E. Based on environmental review, the proposed project has no potentially significant environmental impacts or any potentially significant environmental impacts have been reduced to less than significant levels because of mitigation measures incorporated in the project. In accordance with CEQA, an EIR was prepared to analyze the potential environmental effects of the 1921 Ocean Front Walk Project and the 1828 Ocean Avenue Project. While the Projects would require two separate development review permits, both projects are analyzed together in the EIR as required by CEQA. Under CEQA, an agency cannot "piecemeal" the environmental review for a project. Per CEQA, a "project" is defined as the "whole of the action." An EIR must include an analysis of the environmental effects of the project, which includes a future expansion or other action if: (1) it is a reasonably foreseeable consequence of the initial project; and (2) the future expansion or action will be significant in that it will likely change the scope or nature of the initial project or its environmental effects. In the case of the 1828 Ocean Avenue Project and 1921 Ocean Front Walk Project, the affordable housing requirement for the Ocean Front Walk Project may be provided off-site at 1828 Ocean Avenue (affordable housing Scenario A). The EIR clearly provides an analysis of each site independently while also evaluating the potential for combined effects given the proximity of the Project Sites. In accordance with Section 15082 of the CEQA Guidelines, a Notice of Preparation (NOP) was published on September 13, 2016 for a 30-day comment period which 5 18ENT-0312 Statement of Official Action indicated the City’s intent to prepare an EIR for both projects. The NOP was distributed to Federal, State, Regional, and City agencies, neighborhood groups, and occupants and owners within a 1,000-foot radius of the project sites and was published on the City’s Planning and Community Development website. Additionally, a public scoping meeting was held on October 20, 2016, to present the projects and receive comments on the scope of the EIR. On April 10, 2018, a Notice of Completion and Public Availability of the Draft EIR was published, commencing a 45-day public comment period for the Draft EIR. The environmental issues studied in detail in the Draft EIR include:  Aesthetics  Air Quality  Construction Effects  Cultural Resources  Energy  Geology and Soils  Greenhouse Gas Emissions  Hazards and Hazardous Materials  Hydrology and Water Quality  Land Use and Planning  Neighborhood Effects  Noise and Vibration  Population and Housing  Fire Protection  Police Protection  Transportation/Traffic  Utilities – Wastewater and Water Supply Other issue areas such as Agricultural/Forestry Resources, Biological Resources, Mineral Resources, Neighborhood Effects, Recreation, and Solid Waste were determined to be less than significant in the Initial Study (Appendix A of the EIR). The Final EIR, which was published in August 2018, contains all comments and responses to comments received during the comment period as well as minor changes to the Draft EIR. The Draft EIR was available for a 45-day public review period, during which a total of 9 comment letters were received. Most of the comment letters were from members of the public and 2 were from commenting agencies. Comments were raised regarding the mass/scale of the buildings, traffic impacts of the projects, and concerns regarding short-term rentals of the residential units. Responses to all comments received are included in the Final EIR. Significant Impacts Based on the analysis provided in the EIR, there are no significant and unavoidable impacts associated with the 1921 Ocean Front Walk Project or the 1828 Ocean Avenue Project (individually and on a cumulative basis). 6 18ENT-0312 Statement of Official Action Alternatives Studied Although there were no significant environmental impacts identified. In accordance with CEQA, the EIR studied five alternatives to the projects, which are intended to reduce the environmental impacts of the projects:  Alternative 1 – No Project/No Build (Existing Conditions)  Alternative 2 – Projects with Less than 7,500 square feet  Alternative 3 – Tier 1 Development with On-Site Affordable Housing  Alternative 4 – Tier 2 Development with Reduced FAR and Reduced Density  Alternative 5 – Tier 1 Development with Reduced Density Environmentally Superior Alternative In general, the environmentally superior alternative as defined by CEQA should minimize adverse impacts to the project site and its surrounding environment. Of the alternatives considered, the "No Project/No Build Alternative” does not create any new impacts; therefore, it is environmentally superior to the project, which proposes to change existing conditions. However, the No Project/No Build Alternative does not meet any of the project objectives. CEQA Guidelines section 15126.6 states that if the environmentally superior alternative is the No Project/No Build Alternative, the EIR shall also identify an environmentally superior alternative from among the other alternatives. The remaining alternatives were reviewed in accordance with the State CEQA Guidelines requirement to identify an environmentally superior Alternative other than the No Project/No Build Alternative. Of the remaining Alternatives, Alternative 2, with 4,999 sf of cultural use and 2,500 sf restaurant at the 1921 Ocean Front Walk Site, would be the environmentally superior alternative. However, Alternative 2 would not meet the project objectives. Further, while Alternative 2 would incrementally reduce environmental impacts but it would not be supportive of City goals and policies to accommodate housing needs and sustainable development patterns to reduce vehicle miles traveled. The project as proposed would provide a higher level of community benefits and greater support for the goals and policies related to the provision of in-fill housing development in high quality transit areas. F. The project promotes the general welfare of the community in that it allows for the redevelopment of existing, underutilized property with a mixed-use project that is compliant with the LUCE vision for the area. The proposed project provides 22 residential units and features space for a neighborhood serving ground-floor commercial use. Further, the project would provide community benefits including four residential units (15% of the project off-site at 1828 Ocean Avenue) affordable to 50% income level households, a specified market-rate unit mix of no more than 15% studios, at least 20% two-bedrooms, and at least 15% three bedrooms, an average number of bedrooms for the market-rate units of at least 1.2, enhanced development impact fees (i.e. Transportation Impact Fee, Parks & Recreation Impact Fee) 14% above the base fee, and enhanced Transportation Demand Management elements such as 75% transportation allowance and free bike valet for the commercial uses if vehicle valet is provided. 7 18ENT-0312 Statement of Official Action G. The project has no unacceptable adverse effects on public health or safety in that the project is a mixed-use project consisting of residential uses and is designed to accommodate neighborhood-serving commercial uses. The commercial uses are located along Ocean Front Walk, which is adjacent to Santa Monica Beach and other commercial uses. The project complies with all development standards in the Zoning Ordinance and conditions of approval for project operations ensure that the project will not adversely affect public health or safety. H. The project provides Community Benefits consistent with Chapter 9.23 of the Zoning Ordinance in that it provides 50% more affordable housing units than would be required by the City’s Affordable Housing Production Program, a minimum unit mix, a minimum average number of bedrooms, and enhanced development fees 14% above the base fee for the Transportation Impact Fee and Parks and Recreation Impact Fee (i.e. Open Space). As a result, the project would provide community benefits including four residential units (15% of the project located 0ff- site at 1828 Ocean Avenue) affordable to 50% income level households, a specified market-rate unit mix of no more than 15% studios, at least 20% two- bedrooms, and at least 15% three bedrooms, an average number of bedrooms for the market-rate units of at least 1.2, enhanced development impact fees (i.e. Transportation Impact Fee, Parks & Recreation Impact Fee) 14% above the base fee, and enhanced Transportation Demand Management elements such as 75% transportation allowance and free bike valet for the commercial uses if vehicle valet is provided. MITIGATION MEASURES AND CONDITIONS OF APPROVAL SECTION A – MITIGATION MEASURES 1. MM-ARCH-1. Prior to the issuance of a demolition permit, the Applicant shall retain a qualified Archaeologist who meets the Secretary of the Interior’s Professional Qualifications Standards (qualified Archaeologist) to oversee an archaeological monitor who shall be present during construction excavations such as clearing/grubbing, grading, trenching, or any other construction excavation activity associated with the Project. The frequency of monitoring shall be based on the rate of excavation and grading activities, the materials being excavated (younger sediments vs. older sediments), and the depth of excavation, and if found, the abundance and type of archaeological resources encountered. Full-time monitoring may be reduced to part- time inspections, or ceased entirely, if determined adequate by the qualified Archaeologist. Prior to commencement of excavation activities, an Archaeological Sensitivity Training shall be given for construction personnel. The training session, shall be carried out by the qualified Archaeologist, will focus on how to identify archaeological resources that may be encountered during earthmoving activities, and the procedures to be followed in such an event. 2. MM-ARCH-2. In the event that historic (e.g., bottles, foundations, refuse dumps/privies, etc.) or prehistoric (e.g., hearths, burials, stone tools, shell and faunal bone remains, etc.) archaeological resources are unearthed, ground-disturbing activities shall be halted or diverted away from the vicinity of the find so that the find can be evaluated. An appropriate buffer area shall be established by the qualified Archaeologist around the 8 18ENT-0312 Statement of Official Action find where construction activities shall not be allowed to continue. Work shall be allowed to continue outside of the buffer area. All archaeological resources unearthed by Project construction activities shall be evaluated by the qualified Archaeologist. If the resources are prehistoric or Native American in origin, the Applicant shall retain a Native American representative from a Gabrielino Tribe who shall be present to monitor further construction excavations and shall coordinate with the City and Qualified Archaeologist regarding the treatment and curation of any prehistoric archaeological resources. If a resource is determined by the qualified Archaeologist to constitute a “historical resource” pursuant to CEQA Guidelines Section 15064.5(a) or a “unique archaeological resource” pursuant to Public Resources Code Section 21083.2(g), the qualified Archaeologist shall coordinate with the Applicant and the City to develop a formal treatment plan that would serve to reduce impacts to the resources. The treatment plan established for the resources shall be in accordance with CEQA Guidelines Section 15064.5(f) for historical resources and Public Resources Code Sections 21083.2(b) for unique archaeological resources. Preservation in place (i.e., avoidance) is the preferred manner of treatment. If preservation in place is not feasible, treatment may include implementation of archaeological data recovery excavations to remove the resource along with subsequent laboratory processing and analysis. Any archaeological material collected shall be curated at a public, non-profit institution with a research interest in the materials, such as the Fowler Museum, if such an institution agrees to accept the material. If no institution accepts the archaeological material, they shall be donated to a local school or historical society in the area for educational purposes. 3. MM-ARCH-3: Prior to the release of the grading bond that is required for a grading permit to guarantee that grading will be completed in conformity with the approved building plans and terms of the grading permit, the qualified Archaeologist shall prepare a final report and appropriate California Department of Parks and Recreation Site Forms at the conclusion of archaeological monitoring. The report shall include a description of resources unearthed, if any, treatment of the resources, results of the artifact processing, analysis, and research, and evaluation of the resources with respect to the California Register of Historical Resources and CEQA. The report and the Site Forms shall be submitted by the Project applicant to the City, the South Central Coastal Information Center, and representatives of other appropriate or concerned agencies to signify the satisfactory completion of the development and required mitigation measures. 4. MM-ARCH-4: If human remains are encountered unexpectedly during implementation of the Project, State Health and Safety Code Section 7050.5 requires that no further disturbance shall occur until the County Coroner has made the necessary findings as to origin and disposition pursuant to PRC Section 5097.98. If the remains are determined to be of Native American descent, the coroner has 24 hours to notify the NAHC. The NAHC shall then identify the person(s) thought to be the Most Likely Descendent (MLD). The MLD may, with the permission of the land owner, or his or her authorized representative, inspect the site of the discovery of the Native American remains and may recommend to the owner or the person responsible for the excavation work means for treating or disposing, with appropriate dignity, the human remains and any associated grave goods. The MLD shall complete their inspection and make their recommendation within 48 hours of being granted access by the land owner to inspect 9 18ENT-0312 Statement of Official Action the discovery. The recommendation may include the scientific removal and nondestructive analysis of human remains and items associated with Native American burials. Upon the discovery of the Native American remains, the landowner shall ensure that the immediate vicinity, according to generally accepted cultural or archaeological standards or practices, where the Native American human remains are located, is not damaged or disturbed by further development activity until the landowner has discussed and conferred, as prescribed in this mitigation measure, with the MLD regarding their recommendations, if applicable, taking into account the possibility of multiple human remains. The landowner shall discuss and confer with the descendants all reasonable options regarding the descendants' preferences for treatment. Whenever the NAHC is unable to identify a MLD, or the MLD identified fails to make a recommendation, or the landowner or his or her authorized representative rejects the recommendation of the descendants and the mediation provided for in Subdivision (k) of Section 5097.94, if invoked, fails to provide measures acceptable to the landowner, the landowner or his or her authorized representative shall inter the human remains and items associated with Native American human remains with appropriate dignity on the property in a location not subject to further and future subsurface disturbance. 5. MM-PALEO-1: Prior to the issuance of a demolition permit, the Applicant shall retain a qualified Paleontologist to develop and implement a paleontological monitoring program for construction excavations that would encounter older Quaternary alluvial sediments (associated with sediments below six feet deep across either of the Project Sites). The qualified Paleontologist hold a pregrading/excavation meeting for construction personnel to discuss the monitoring program and how to identify paleontological resources that may be encountered during earthmoving activities, and the procedures to be followed in such an event. A qualified Paleontologist is defined as a paleontologist meeting the criteria established by the Society for Vertebrate Paleontology. The qualified Paleontologist shall supervise a paleontological monitor who shall be present at such times as required by the Paleontologist during construction excavations into older alluvial sediments. Monitoring shall consist of visually inspecting fresh exposures of rock for larger fossil remains and, where appropriate, collecting wet or dry screened sediment samples of promising horizons for smaller fossil remains. The frequency of monitoring inspections shall be determined by the qualified Paleontologist and shall be based on the rate of excavation and grading activities, the materials being excavated, and the depth of excavation, and if found, the abundance and type of fossils encountered. Full- time monitoring can be reduced to part-time inspections, or ceased entirely, if determined adequate by the qualified Paleontologist. 6. MM-PALEO-2: If a potential fossil is found, the paleontological monitor shall be allowed to temporarily divert or redirect grading and excavation activities in the area of the exposed fossil to facilitate evaluation of the discovery. An appropriate buffer area shall be established by the qualified Paleontologist around the find where construction activities shall not be allowed to continue. Work shall be allowed to continue outside of the buffer area. At the qualified Paleontologist’s discretion, and to reduce any construction delay, the grading and excavation contractor shall assist in removing rock/sediment samples for initial processing and evaluation. If preservation in place is not feasible, the qualified Paleontologist shall implement a paleontological salvage program to remove the resources from their location. Any fossils encountered and 10 18ENT-0312 Statement of Official Action recovered shall be prepared to the point of identification and catalogued before they are submitted to their final repository. Any fossils collected shall be curated at a public, non- profit institution with a research interest in the materials, such as the Natural History Museum of Los Angeles County, if such an institution agrees to accept the fossils. If no institution accepts the fossil collection, they shall be donated to a local school in the area for educational purposes. Accompanying notes, maps, and photographs shall also be filed at the repository and/or school. 7. MM-PALEO-3: Prior to the release of the grading bond that is required for a grading permit to guarantee that grading will be completed in conformity with the approved building plans and terms of the grading permit, the qualified Paleontologist shall prepare a report summarizing the results of the monitoring and salvaging efforts, the methodology used in these efforts, as well as a description of the fossils collected and their significance. The report shall be submitted by the Applicant to the City, the Natural History Museum of Los Angeles County, and representatives of other appropriate or concerned agencies to signify the satisfactory completion of the Project and required mitigation measures. 8. MM-NOISE-1: Construction Noise Management Plan. A Construction Noise Management Plan shall be prepared by the applicant and approved by the City. The Plan shall address noise impacts and outline measures that would be used to reduce impacts. Measures shall include: • To the extent that they exceed the applicable construction noise limits, construction activities shall be restricted to between the hours of 10 a.m. and 3 p.m. Monday through Friday, in accordance with Section 4.12.110(d) of the SMMC. • The construction contractor(s) shall ensure that construction equipment is properly maintained and in working order per manufacturer specifications and that all construction equipment is equipped with manufacturer-approved mufflers and baffles. • The construction contractor(s) shall place noise-generating construction equipment and locate construction staging areas away from sensitive uses, to the extent practical to the satisfaction of the Department of Building and Safety. All stationary construction equipment will be located and oriented so that emitted noise is directed away from sensitive receptors nearest the Project Sites. • Heavily loaded trucks shall be shall be routed away from residential streets, conforming to the City’s recommended haul route corridors. • Construction activities shall be scheduled so as to avoid operating several pieces of high noise-generating equipment simultaneously, to the extent practical. • The construction contractor(s) shall implement noise attenuation measures, which may include temporary noise barriers and/or noise blankets placed between noise- generating construction equipment and activities and the off-site noise sensitive receptors to the satisfaction of the City’s Department of Building and Safety. 11 18ENT-0312 Statement of Official Action 9. MM-NOISE-2: Construction Vibration. The applicant and its contractor(s) shall implement the following vibration-reduction measures: • The construction contractor(s) shall restrict the use of large bulldozers and other similarly large vibration-generating equipment, so that the vibration-generating portion of the equipment (i.e., the motor, engine, power plant, or similar) remains at the minimum applicable distances shown on Table 4.13- 15 of the EIR as measured to guest rooms of Hotel Casa Del Mar, and the residential structures designed for long-term human occupancy along Ocean Way, unless it can be demonstrated to the satisfaction of the City based on in-situ measurements (prior to initiation of full- scale demolition/excavation) that vibration levels can be kept below the threshold of 80 VdB at vibration sensitive receptor locations where sleeping occurs through any combination of revised setbacks, alternative construction equipment, alternative construction methods, alternative sequencing of activities, or limitations of hours (between 10:00 AM and 3:00 PM) during which such activity can occur. The vibration measurements, if undertaken, shall be performed by a qualified acoustician, approved by the City at the contractor/Applicant’s sole cost. • In order to protect the character defining features of the historic Hotel Casa Del Mar, the following mitigation measure shall be implemented at the Ocean Front Walk Project: To avoid or minimize potential construction vibration damage to finish materials on the Hotel Casa Del Mar, the condition of such materials shall be documented by a qualified preservation consultant, prior to initiation of construction. During construction, the contractor shall install and maintain at least two continuously operational automated vibrational monitors on the Hotel Casa Del Mar building. The monitors must be capable of being programmed with two predetermined vibratory velocities levels: a first-level alarm equivalent to a 0.45 inches per second at the face of the building and a regulatory alarm level equivalent to 0.5 inches per second at the face of the building. The monitoring system must produce real-time specific alarms (via text message and/or email to on-site personnel) when velocities exceed either of the predetermined levels. In the event of a first-level alarm, feasible steps to reduce vibratory levels shall be undertaken, including but not limited to halting/staggering concurrent activities and utilizing lower-vibratory techniques. In the event of an exceedance of the regulatory level, work in the vicinity shall be halted and the Hotel Casa Del Mar building visually inspected for damage. Results of the inspection must be logged. In the event damage occurs to historic finish materials due to construction vibration, such materials shall be repaired in consultation with a qualified preservation consultant, and if warranted, in a manner that meets the Secretary of the Interior’s Standards. 10. MM-TRAF-1. The applicant shall prepare, implement, and maintain a Construction Traffic Mitigation Plan (Plan) for review and approval prior to issuance of a building permit to address traffic during construction and shall be designed to: • Prevent traffic impacts on the surrounding street network; 12 18ENT-0312 Statement of Official Action • Minimize parking impacts both to public parking and access to private parking to the greatest extent practicable; • Ensure safety for both those constructing the Project and the surrounding community; • Prevent substantial truck traffic through residential neighborhoods; and • Provide for coordination with adjacent or nearby construction projects The Plan shall be subject to review and approval by the following City departments: Public Works, Fire, Planning and Community Development, and Police, to ensure that the Plan has been designed in accordance with this mitigation measure and meets City standards. This review shall occur prior to issuance of grading or building permits. It shall, at a minimum include the following: Ongoing Requirements throughout the Duration of Construction. • A detailed Plan for work zones shall be maintained. At a minimum, this shall include parking and travel lane configurations; warning, regulatory, guide, and directional signage; and area sidewalks, bicycle lanes, and parking lanes. The Plan shall include specific information regarding the Projects’ construction activities that may disrupt normal pedestrian and traffic flow, and the measures to address these disruptions. Further, the Plan shall address, in addition to normal traffic and pedestrian conditions, conditions regarding beach accessibility and parking, for pedestrians and automobiles, and avoidance of conflicts with loading activities at the hotels that are adjacent to the Project Sites. Such plans shall be reviewed and approved by the Strategic and Transportation Planning Division prior to commencement of construction and implemented in accordance with this approval. • Work within the public right-of-way shall be performed between 9:00 AM and 4:00 PM. This work includes dirt and demolition material hauling and construction material delivery. Work within the public right-of-way outside of these hours shall only be allowed after the issuance of an after-hours construction permit. • Streets and equipment shall be cleaned in accordance with established Public Works Department requirements. • Trucks shall only travel on a City-approved construction route. Truck queuing/staging shall not be allowed on Santa Monica streets. Limited queuing may occur on the construction site itself. • Materials and equipment shall be minimally visible to the public; the preferred location for materials is to be onsite, with a minimum amount of materials within a work area in the public right-of-way, subject to a current Use of Public Property Permit. 13 18ENT-0312 Statement of Official Action • Any requests for work before or after normal construction hours within the public right-of-way shall be subject to review and approval through the After Hours Permit process administered by the Building and Safety Division. • Provision of off-street parking for construction workers, which may include the use of a remote location with shuttle transport to the site, if determined necessary by the City of Santa Monica. Project Coordination Elements That Shall Be Implemented Prior to Commencement of Construction. • The applicant shall advise the traveling public of impending construction activities (e.g., information signs, portable message signs, media listing/notification, and implementation of an approved Plan). • The applicant shall obtain a Use of Public Property Permit, Excavation Permit, Sewer Permit, or Oversize Load Permit, as well as any Caltrans permits required, for any construction work requiring encroachment into public rights-of-way, detours, or any other work within the public right-of-way. • The applicant shall provide timely notification of construction schedules to all affected agencies (e.g., MTA. Big Blue Bus, Police Department, Fire Department, Public Works Department, and Planning and Community Development Department) and to all owners and residential and commercial tenants of property within a radius of 500 feet. • The applicant shall coordinate construction work with affected agencies in advance of start of work. Approvals may take up to two weeks per each submittal. Coordination with MTA regarding construction activities that may impact Metro bus lines or result in closures lasting over six months shall be initiated at least 30 days in advance of construction activities. • The applicant shall obtain Strategic and Transportation Planning Division approval of any haul routes for earth, concrete, or construction materials and equipment hauling. SECTION B – CONDITIONS OF APPROVAL Project Specific Conditions 1. Recommendation for the Architectural Review Board to consider the following design- related points raised during the Planning Commission’s review of the development review permit for the project:  The pedestrian oriented design of the ground floor commercial tenant spaces.  The relationship of the building along Bay Street and the connectivity to the public sidewalk.  Additional study of the stair element at the building’s southeast corner is needed. 14 18ENT-0312 Statement of Official Action  Consider modifying the “sails” (planar elements at balconies along the Bay Street elevation) so they create a visual sense of movement as the features are placed on the building down the slope (west).  Consider modifying the proportions the building so they better relate to the proportions of Casa Del Mar to the north.  Study how to better integrate the west façade more fully into the rest of the building.  Consider an art installation that commemorates the history of the nearby beach area known as the Inkwell and the history of the Z-Boys in Ocean Park [this is also provided as a recommendation to the City’s Arts Commission]. 2. The 22 residential units shall not be used for “Corporate Housing” as defined in SMMC Section 9.51.020(A)(2), or successor thereto, nor as “Lodging” as defined in SMMC Section 9.51.030(B)(15), or successor thereto. 3. Pursuant to SMMC Section 9.23.030(D) the project shall provide the following community benefits: a. Affordable Housing: Pursuant to Santa Monica Municipal Code (SMMC) Chapter 9.64, the project is subject to the City's Affordable Housing Production Program which requires the proposed 22-unit housing project to provide one of the following: 1) five percent of the total units of the project for 30% income households, 2) ten percent of the total units of the project for 50% income households, or 3) twenty percent of the total units of the project for 80% income households. Pursuant to SMMC Section 9.23.030(A)(1), the applicant is required to provide at least 50% more affordable housing units than would be required pursuant to Section 9.64.050. The applicant has elected to provide ten percent of the total units of the project for 50% income households. Additionally, in a Tier 2 project, the applicant will be providing a community benefit for 50% over the amount required. b. Unit Mix: Pursuant to SMMC Section 9.23.030(A)(2), the project is required to have a varied unit mix of at least 15% three-bedroom units, at least 20% two- bedroom units, and no more than 15% studio units with average number of bedrooms greater than 1.2. The average number of bedrooms of the affordable units shall be equal to or greater than the market rate units. c. Affordable Housing Commercial Linkage Fee: Pursuant to SMMC Section 9.23.030(A)(3), no building permit shall be issued for the project until the applicant pays an Affordable Housing Commercial Linkage Fee of 14 percent above the base fee applicable at the time of issuance of the building permit for that portion of the commercial floor area above the maximum Tier 1 floor area allowed by the Zoning Ordinance. d. Transportation Impact Fee: Pursuant to SMMC Section 9.23.030(B), no building permit shall be issued for the project until the applicant pays a Transportation Impact Fee of 14 percent above the base fee applicable at the time of issuance 15 18ENT-0312 Statement of Official Action of the building permit for that portion of the floor area above the maximum Tier 1 floor area allowed by the Zoning Ordinance. e. Parks and Recreation Development Impact Fee: Pursuant to SMMC Section 9.23.030(C), no building permit shall be issued for the project until the applicant pays a Parks and Recreation Development Impact Fee of 14 percent above the base fee applicable at the time of issuance of the building permit for that portion of the floor area above the maximum Tier 1 floor area allowed by the Zoning Ordinance. f. Transportation Demand Management: The applicant shall include the TDM measures required by SMMC Section 9.23.030(D) in the project’s TDM Plan. g. Pursuant to SMMC Section 9.64.090, the Parks and Recreation Development Impact Fee described in SMMC Chapter 9.67, the Transportation Impact Fee described in SMMC Chapter 9.66, and the Child Care Linkage Fee described in SMMC Chapter 9.65 shall be waived for required affordable housing units. Prioritization of potential occupants of the on-site or off-site affordable housing unit(s) shall be in accordance with the Affordable Housing Production Program Ordinance Guidelines. Developer hereby acknowledges that in approving a Development Review Permit for the Project, the City is modifying development standards otherwise applicable to the Project such as increasing the Floor Area Ratio and Building Height, and other property development standards. In exchange for such forms of assistance from the City, which constitute direct financial contributions to the Developer, Developer will enter into a contract with the City prior to issuance of a building permit which among other conditions will require Developer to provide and maintain four units off site that are available to and occupied by Fifty Percent Income Households at Affordable Rent, as defined by Santa Monica Municipal Code Chapter 9.64; although Developer shall have the right to elect to provide the four units on-site in Developer’s sole an absolute discretion. The Developer agrees and acknowledges that this contract will provide forms of assistance to the Developer within the meaning of Civil Code Section 1954.52(b) and Chapter 4.3 of the State Planning and Zoning Laws, Government Code Section 65915 et seq. Administrative 4. The approval of this permit shall expire if the rights granted are not exercised within three and a half years (for projects in the Coastal Zone) from the permit’s effective date. Exercise of rights shall mean issuance of a building permit to commence construction. 5. In the event permittee violates or fails to comply with any conditions of approval of this permit, no further permits, licenses, approvals or Certificates of Occupancy shall be issued until such violation has been fully remedied. 6. Within ten days of City Planning Division transmittal of the Statement of Official Action, project applicant shall sign and return a copy of the Statement of Official Action prepared by the City Planning Division, agreeing to the conditions of approval and acknowledging that failure to comply with such conditions shall constitute grounds for potential 16 18ENT-0312 Statement of Official Action revocation of the permit approval. By signing same, applicant shall not thereby waive any legal rights applicant may possess regarding said conditions. The signed Statement shall be returned to the City Planning Division. Failure to comply with this condition shall constitute grounds for potential permit revocation. 7. Within thirty (30) days after final approval of the project, a sign shall be posted on site stating the date and nature of the approval. The sign shall be posted in accordance with the Zoning Administrator guidelines and shall remain in place until a building permit is issued for the project. The sign shall be removed promptly when a building permit is issued for the project or upon expiration of the Development Review Permit. Indemnity 8. Applicant shall defend, indemnify, and hold harmless the City and its boards, commissions, agents, officers, and employees (collectively, "City") from any claims, actions, or proceedings (individually referenced as "Claim" and collectively referenced as "Claims") against the City to attack, set aside, void, or annul, the approval of this Development Review Permit concerning the Applicant's proposed project, or any Claims brought against the City due to the acts or omissions in any connected to the Applicant's project. City shall promptly notify the applicant of any Claim and shall cooperate fully in the defense. Nothing contained in this paragraph prohibits the City from participating in the defense of any Claims, if both of the following occur: (1) The City bears its own attorney's fees and costs. (2) The City defends the action in good faith. Applicant shall not be required to pay or perform any settlement unless the settlement is approved by the Applicant. In the event any such action is commenced to attack, set aside, void or annul all, or any, provisions of any approvals granted for the Project, or is commenced for any other reason against the City for the act or omissions relating to the Applicant's project, within fourteen (14) days following notice of such action from the City, the Applicant shall file with the City a performance bond or irrevocable letter of credit, or other form of security satisfactory to the City ("the Security") in a form satisfactory to the City, and in the amount of $100,000 to ensure applicant's performance of its defense, indemnity and hold harmless obligations to City. The Security amount shall not limit the Applicant's obligations to the City hereunder. The failure of the Applicant to provide the Security shall be deemed an express acknowledgment and agreement by the Applicant that the City shall have the authority and right, without consent of the Applicant, to revoke the approvals granted hereunder. Conformance with Approved Plans 9. This approval is for those plans dated March 8, 2019, a copy of which shall be maintained in the files of the City Planning Division. Project development shall be consistent with such plans, except as otherwise specified in these conditions of approval. 17 18ENT-0312 Statement of Official Action 10. Minor amendments to the plans shall be subject to approval by the Director of Planning. A significant change in the approved concept shall be subject to Planning Commission Review. Construction shall be in conformance with the plans submitted or as modified by the Planning Commission, Architectural Review Board, or Director of Planning. 11. Project plans shall be subject to complete Code Compliance review when the building plans are submitted for plan check and shall comply with all applicable provisions of Article IX of the Municipal Code and all other pertinent ordinances and General Plan policies of the City of Santa Monica prior to building permit issuance. Fees 12. As required by California Government Code Section 66020, the project applicant is hereby notified that the 90-day period has begun as of the date of the approval of this application, in which the applicant may protest any fees, dedications, reservations, or other exactions imposed by the City as part of the approval or as a condition of approval of this development. The fees, dedications, reservations, or other exactions are described in the approved plans, conditions of approval, and/or adopted city fee schedule. 13. No building permit shall be issued for the project until the developer complies with the requirements of Chapter 9.30 of the Santa Monica Municipal Code, Private Developer Cultural Arts Requirement. 14. No building permit shall be issued for the project until the developer complies with the requirements of Chapter 9.65 of the Santa Monica Municipal Code, the Child Care Linkage Program. 15. No building permit shall be issued for the project until the developer complies with the requirements of Chapter 9.66 of the Santa Monica Municipal Code, the Transportation Impact Fee Program. 16. No building permit shall be issued for the project until the developer complies with the requirements of Chapter 9.53, the Transportation Demand Management Fee. Mitigation Monitoring Program 17. Pursuant to the requirements of Public Resources Code Section 21081.6, the City Planning Division will coordinate a monitoring and reporting program regarding any required changes to the project made in conjunction with project approval and any conditions of approval, including those conditions intended to mitigate or avoid significant effects on the environment. This program shall include, but is not limited to, ensuring that the City Planning Division itself and other City divisions and departments such as the Building and Safety Division, the Department of Environmental and Public Works, the Fire Department, the Police Department, the Planning and Community Development Department and the Finance Department are aware of project requirements which must be satisfied prior to issuance of a Building Permit, Certificate of Occupancy, or other permit, and that other responsible agencies are also informed of conditions relating to their responsibilities. Project owner shall demonstrate compliance 18 18ENT-0312 Statement of Official Action with conditions of approval in a written report submitted to the Planning Director and Building Officer prior to issuance of a Building Permit or Certificate of Occupancy, and, as applicable, provide periodic reports regarding compliance with such conditions. Cultural Resources 18. If any archaeological remains are uncovered during excavation or construction, work in the affected area shall be suspended and a recognized specialist shall be contacted to conduct a survey of the affected area at project's owner's expense. A determination shall then be made by the Director of Planning to determine the significance of the survey findings and appropriate actions and requirements, if any, to address such findings. Rent Control 19. Pursuant to SMMC Section 4.24.030, prior to receipt of the final permit necessary to demolish, convert, or otherwise remove a controlled rental units from the housing market, the owner of the property shall first secure a removal permit under Section 1803(t), an exemption determination, an approval of a vested rights claim from the Rent Control Board, or have withdrawn the controlled rental units pursuant to the provisions of the Ellis Act. Project Operations 20. The operation shall at all times be conducted in a manner not detrimental to surrounding properties or residents by reason of lights, noise, activities, parking or other actions. 21. No exterior activity such as trash disposal, disposal of bottles or noise generating trash, deliveries or other maintenance activity generating noise audible from the exterior of the building shall occur during the hours of 11:00pm to 7:00am daily. In addition, there shall be no outdoor cleaning of the property with pressurized or mechanical equipment during the hours of 9:00pm to 7:00am daily. Trash containers shall be secured with locks. Final Design 22. Plans for final design, landscaping, screening, trash enclosures, and signage shall be subject to review and approval by the Architectural Review Board. 23. Landscaping plans shall comply with Subchapter 9.26.040 (Landscaping Standards) of the Zoning Ordinance including use of water-conserving landscaping materials, landscape maintenance and other standards contained in the Subchapter. 24. Refuse areas, storage areas and mechanical equipment shall be screened in accordance with SMMC Sections 9.21.100, 9.21.130 and 9.21.140. Refuse areas shall be of a size adequate to meet on-site need, including recycling. The Architectural Review Board in its review shall pay particular attention to the screening of such areas and equipment. Any rooftop mechanical equipment shall be minimized in height and area, and shall be located in such a way as to minimize noise and visual impacts to surrounding properties. Unless otherwise approved by the Architectural Review Board, rooftop mechanical equipment shall be located at least five feet from the edge of the 19 18ENT-0312 Statement of Official Action roof. Except for solar hot water heaters, no residential water heaters shall be located on the roof. 25. No gas or electric meters shall be located within the required front or street side yard setback areas. The Architectural Review Board in its review shall pay particular attention to the location and screening of such meters. 26. Prior to consideration of the project by the Architectural Review Board, the applicant shall review disabled access requirements with the Building and Safety Division and make any necessary changes in the project design to achieve compliance with such requirements. The Architectural Review Board, in its review, shall pay particular attention to the aesthetic, landscaping, and setback impacts of any ramps or other features necessitated by accessibility requirements. 27. As appropriate, the Architectural Review Board shall require the use of anti-graffiti materials on surfaces likely to attract graffiti. Construction Plan Requirements 28. During demolition, excavation, and construction, this project shall comply with SCAQMD Rule 403 to minimize fugitive dust and associated particulate emission, including but not limited to the following:  All material excavated or graded shall be sufficiently watered to prevent excessive amounts of dust. Watering shall occur at least three times daily with complete coverage, preferably at the start of the day, in the late morning, and after work is done for the day.  All grading, earth moving, or excavation activities shall cease during periods of high winds (i.e., greater than 20 mph measured as instantaneous wind gusts) so as to prevent excessive amounts of dust.  All material transported on and off-site shall be securely covered to prevent excessive amounts of dust.  Soils stockpiles shall be covered.  Onsite vehicle speeds shall be limited to 15 mph.  Wheel washers shall be installed where vehicles enter and exit the construction site onto paved roads or wash off trucks and any equipment leaving the site each trip.  An appointed construction relations officer shall act as a community liaison concerning onsite construction activity including resolution of issues related to PM10 generation.  Streets shall be swept at the end of the day using SCAQMD Rule 1186 certified street sweepers or roadway washing trucks if visible soil is carried onto adjacent public paved roads (recommend water sweepers with reclaimed water).  All active portions the construction site shall be sufficiently watered three times a day to prevent excessive amounts of dust. 29. Final building plans submitted for approval of a building permit shall include on the plans a list of all permanent mechanical equipment to be placed indoors which may be heard outdoors. 20 18ENT-0312 Statement of Official Action 30. Kitchen facilities including, but not limited to, restaurants, caterers, school cafeterias, hotels, hospitals, and other commercial cooking facilities must conduct operations in a manner which avoids causing grease blockages to the City sewer. a. A grease interceptor must be installed for all projects with kitchen facilities as described above unless a variance is granted through City of Santa Monica Water Resources Protection. The minimum capacity of the interceptor will be determined using Chapter 10 of the latest California Plumbing Code. Contributory sources shall include wastewater from kitchen area including pot sinks, pre-rinse sinks, dishwashers, floor drains, and mat washing areas. Show the location of the grease interceptor on the plumbing plans that clearly indicates what drain fixtures will connect to the interceptor. b. All grease interceptors, regardless of size, shall be equipped with a standard final-stage sample box. Construction Period 31. Immediately after demolition and during construction, a security fence, the height of which shall be the maximum permitted by the Zoning Ordinance, shall be maintained around the perimeter of the lot. The lot shall be kept clear of all trash, weeds, etc. 32. Vehicles hauling dirt or other construction debris from the site shall cover any open load with a tarpaulin or other secure covering to minimize dust emissions. Immediately after commencing dirt removal from the site, the general contractor shall provide the City of Santa Monica with written certification that all trucks leaving the site are covered in accordance with this condition of approval. 33. Developer shall prepare a notice, subject to the review by the Director of Planning and Community Development, that lists all construction mitigation requirements, permitted hours of construction, and identifies a contact person at City Hall as well as the developer who will respond to complaints related to the proposed construction. The notice shall be mailed to property owners and residents within a 200-foot radius from the subject site at least five (5) days prior to the start of construction. 34. A sign shall be posted on the property in a manner consistent with the public hearing sign requirements which shall identify the address and phone number of the owner and/or applicant for the purposes of responding to questions and complaints during the construction period. Said sign shall also indicate the hours of permissible construction work. 35. A copy of these conditions shall be posted in an easily visible and accessible location at all times during construction at the project site. The pages shall be laminated or otherwise protected to ensure durability of the copy. Standard Conditions 36. Lofts or mezzanines shall not exceed 33.3% of the room below unless compliance with the district's limits on number of stories can be maintained. 21 18ENT-0312 Statement of Official Action 37. Mechanical equipment shall not be located on the side of any building which is adjacent to a residential building on the adjoining lot, unless otherwise permitted by applicable regulations. Roof locations may be used when the mechanical equipment is installed within a sound-rated parapet enclosure. 38. Final approval of any mechanical equipment installation will require a noise test in compliance with SMMC Section 4.12.040. Equipment for the test shall be provided by the owner or contractor and the test shall be conducted by the owner or contractor. A copy of the noise test results on mechanical equipment shall be submitted to the Community Noise Officer for review to ensure that noise levels do not exceed maximum allowable levels for the applicable noise zone. 39. Construction period signage shall be subject to the approval of the Architectural Review Board. 40. The property owner shall insure any graffiti on the site is promptly removed through compliance with the City’s graffiti removal program. MOBILITY DIVISION 41. Developer shall comply with SMMC Chapter 9.53, Transportation Demand Management, including payment of the Developer Annual TDM Fee pursuant to Section 9.53.110. 42. Final auto parking, bicycle parking and loading layouts specifications shall be subject to the review and approval of the Mobility Division: 43. Where a driveway, garage, parking space or loading zone intersects with the public right- of-way at the alley or sidewalk, hazardous visual obstruction triangles shall be provided in accordance with SMMC Section 9.21.180. 44. Slopes of all driveways and ramps used for ingress or egress of parking facilities shall be designed in accordance with the standards established by the Mobility Manager but shall not exceed a twenty percent slope. 45. Bicycle parking provided in the Project shall meet the requirements of SMMC Section 9.28.140. PUBLIC LANDSCAPE 46. Street trees shall be maintained, relocated or provided as required in a manner consistent with the City’s Urban Forest Master Plan, per the specifications of the Public Landscape Division of the Community & Cultural Services Department and the City’s Tree Code (SMMC Chapter 7.40). No street trees shall be removed without the approval of the Public Landscape Division. 47. Prior to the issuance of a demolition permit all street trees that are adjacent to or will be impacted by the demolition or construction access shall have tree protection zones 22 18ENT-0312 Statement of Official Action established in accordance with the Urban Forest Master Plan. All tree protection zones shall remain in place until demolition and/or construction has been completed. 48. Replace or plant new street trees in accordance with Urban Forest Master Plan and in consultation with City Arborist. OFFICE OF SUSTAINABILITY AND THE ENVIRONMENT 49. Developer is hereby informed of the availability for free enrollment in the Savings By Design incentive program where available through Southern California Edison. If Developer elects to enroll in the program, enrollment shall occur prior to submittal of plans for Architectural Review and an incentive agreement shall be executed with Southern California Edison prior to issuance of a building permit. 50. The project shall comply with requirements in section 8.106 of the Santa Monica Municipal code, which adopts by reference the California Green Building Standards Code and which adds local amendments to that Code. In addition, the project shall meet the landscape water conservation and construction and demolition waste diversion requirements specified in Section 8.108 of the Santa Monica Municipal Code. PUBLIC WORKS DEPARTMENT (PWD) General Conditions 51. Developer shall be responsible for the payment of the following Public Works Department (PWD) permit fees prior to issuance of a building permit: a. Water Services b. Wastewater Capital Facility c. Water Demand Mitigation d. Fire Service Connection e. Tieback Encroachment f. Encroachment of on-site improvements into public right-of-way g. Construction and Demolition Waste Management – If the valuation of a project is at least $50,000 or if the total square feet of the project is equal to or greater than 1000 square feet, then the owner or contractor is required to complete and submit a Waste Management Plan. All demolition projects are required to submit a Waste Management Plan. A performance deposit is collected for all Waste Management Plans equal to 3% of the project value, not to exceed $30,000. All demolition only permits require a $1,000 deposit or $1.00 per square foot, whichever is the greater of the two. Some of these fees shall be reimbursed to developer in accordance with the City’s standard practice should Developer not proceed with development of the Project. In order to receive a refund of the Construction and Demolition performance deposit, the owner or contractor must provide receipts of recycling 70% of all materials listed on the Waste Management Plan. 23 18ENT-0312 Statement of Official Action 52. Any construction related work or use of the public right-of-way will be required to obtain the approval of the City of Santa Monica, including but not limited to: Use of Public Property Permits, Sewer Permits, Excavation Permits, Alley Closure Permits, Street Closure Permits, and Temporary Traffic Control Plans. 53. Plans and specifications for all offsite improvements shall be prepared by a Registered Civil Engineer licensed in the State of California for approval by the City Engineer prior to issuance of a building permit. 54. Immediately after demolition and during construction, a security fence, the height of which shall be the maximum permitted by the Zoning Ordinance, shall be maintained around the perimeter of the lot. The lot shall be kept clear of all trash, weeds, etc. 55. Upon commencement of construction, a sign shall be posted on the property in a manner consistent with the public hearing sign requirements, which shall identify the address and phone number of the owner, developer and contractor for the purposes of responding to questions and complaints during the construction period. Said sign shall also indicate the hours of permissible construction work. 56. Prior to the demolition of any existing structure, the applicant shall submit a report from an industrial hygienist to be reviewed and approved as to content and form by the Building & Safety Division. The report shall consist of a hazardous materials survey for the structure proposed for demolition. The report shall include a section on asbestos and in accordance with the South Coast AQMD Rule 1403, the asbestos survey shall be performed by a state Certified Asbestos Consultant (CAC). The report shall include a section on lead, which shall be performed by a state Certified Lead Inspector/Assessor. Additional hazardous materials to be considered by the industrial hygienist shall include: mercury (in thermostats, switches, fluorescent light), polychlorinated biphenyls (PCBs) (including light Ballast), and fuels, pesticides, and batteries. Water Resources 57. Connections to the sewer or storm drains require a sewer permit from the PWD - Civil Engineering Division. Connections to storm drains owned by Los Angeles County require a permit from the L.A. County Department of Public Works. 58. Parking areas and structures and other facilities generating wastewater with potential oil and grease content are required to pretreat the wastewater before discharging to the City storm drain or sewer system. Pretreatment will require that a clarifier or oil/water separator be installed and maintained on site. 59. If the project involves dewatering, developer/contractor shall contact the LA Regional Water Quality Control Board (RWQCB) to obtain an NPDES Permit for discharge of groundwater from construction dewatering to surface water. For more information refer to: http://www.waterboards.ca.gov/losangeles/ and search for Order # R4-2003-0111. 60. Prior to the issuance of the first building permit, the applicant shall submit a sewer study that shows that the City’s sewer system can accommodate the entire development. If 24 18ENT-0312 Statement of Official Action the study does not show to the satisfaction of the City that the City’s sewer system can accommodate the entire development, prior to issuance of the first building permit, the Developer shall be responsible to upgrade any downstream deficiencies, to the satisfaction of the Water Resources Manager, if calculations show that the project will cause such mains to receive greater demand than can be accommodated. Improvement plans shall be submitted to the Engineering Division. All reports and plans shall also be approved by the Water Resources Engineer. 61. Prior to the issuance of the first building permit, the applicant shall submit a water study that shows that the City’s water system can accommodate the entire development for fire flows and all potable needs. Developer shall be responsible to upgrade any water flow/pressure deficiencies, to the satisfaction of the Water Resources Manager, if calculations show that the project will cause such mains to receive greater demand than can be accommodated. Improvement plans shall be submitted to the Engineering Division. All reports and plans shall also be approved by the Water Resources Engineer. 62. Commercial or residential units are required to either have an individual water meter or a master meter with sub-meters. 63. All existing sanitary sewer “house connections” to be abandoned, shall be removed and capped at the “Y” connections. 64. The fire services and domestic services 3-inches or greater must be above ground, on the applicant’s site, readily accessible for testing. 65. Developer is required to meet state cross-connection and potable water sanitation guidelines. Refer to requirements and comply with the cross-connections guidelines available at: http://www.lapublichealth.org/eh/progs/envirp/ehcross.htm. Prior to issuance of a Certificate of Occupancy, a cross-connection inspection shall be completed. 66. Ultra-low flow plumbing fixtures are required on all new development and remodeling where plumbing is to be added, including dual flush toilets, 1.0 gallon urinals and low flow shower heads. 25 18ENT-0312 Statement of Official Action Urban Water Runoff Mitigation 67. To mitigate storm water and surface runoff from the project site, an Urban Runoff Mitigation Plan shall be required by the PWD pursuant to Municipal Code Chapter 7.10. Prior to submittal of landscape plans for Architectural Review Board approval, the applicant shall contact PWD to determine applicable requirements, such as: a. The site must comply with SMMC Chapter 7.10 Urban Runoff Pollution Ordinance for the construction phase and post construction activities; b. Non-storm water runoff, sediment and construction waste from the construction site and parking areas is prohibited from leaving the site; c. Any sediments or materials which are tracked off-site must be removed the same day they are tracked off-site; d. Excavated soil must be located on the site and soil piles should be covered and otherwise protected so that sediments are not tracked into the street or adjoining properties; e. No runoff from the construction site shall be allowed to leave the site; and f. Drainage control measures shall be required depending on the extent of grading and topography of the site. g. Development sites that result in land disturbance of one acre or more are required by the State Water Resources Control Board (SWRCB) to submit a Storm Water Pollution Prevention Plan (SWPPP). Effective September 2, 2011, only individuals who have been certified by the Board as a “Qualified SWPPP Developer” are qualified to develop and/or revise SWPPPs. A copy of the SWPPP shall also be submitted to the PWD. 68. Prior to implementing any temporary construction dewatering or permanent groundwater seepage pumping, a permit is required from the City Water Resources Protection Program (WRPP). Please contact the WRPP for permit requirements at least two weeks in advance of planned dewatering or seepage pumping. They can be reached at (310) 458-8235. Public Streets & Rights-of-Way 69. Prior to the issuance of a Certificate of Occupancy for the Project, all required offsite improvements, such as AC pavement rehabilitation, replacement of sidewalk, curbs and gutters, installation of street trees, lighting, etc. shall be designed and installed to the satisfaction of the Public Works Department and Public Landscape Division. 70. All off-site improvements required by the Public Works Department shall be installed. Plans and specifications for off-site improvements shall be prepared by a registered civil engineer and approved by the City Engineer. 26 18ENT-0312 Statement of Official Action 71. Unless otherwise approved by the PWD, all sidewalks shall be kept clear and passable during the grading and construction phase of the project. 72. Sidewalks, curbs, gutters, paving and driveways which need replacing or removal as a result of the project or needed improvement prior to the project, as determined by the PWD shall be reconstructed to the satisfaction of the PWD. Design, materials and workmanship shall match the adjacent elements including architectural concrete, pavers, tree wells, art elements, special landscaping, etc. 73. Street and alley sections adjacent to the development shall be replaced as determined by the PWD. This typically requires full reconstruction of the street or alley in accordance with City of Santa Monica standards for the full adjacent length of the property. Utilities 74. No Excavation Permit shall be issued without a Telecommunications Investigation by the City of Santa Monica Information Systems Department. The telecommunications investigation shall provide a list of recommendations to be incorporated into the project design including, but not limited to measures associated with joint trench opportunities, location of tie-back and other underground installations, telecommunications conduit size and specifications, fiber optic cable specifications, telecommunications vault size and placement and specifications, interior riser conduit and fiber optic cable, and adjacent public right of way enhancements. Developer shall install two Telecommunications Vaults in either the street, alley and/or sidewalk locations dedicated solely for City of Santa Monica use. Developer shall provide two unique, telecommunication conduit routes and fiber optic cables from building Telecommunications Room to Telecommunications Vaults in street, alley and/or sidewalk. Developer will be responsible for paying for the connection of each Telecommunications Vault to the existing City of Santa Monica fiber optic network, or the extension of conduit and fiber optic cable for a maximum of 1km terminating in a new Telecommunications Vault for future interconnection with City network. The final telecommunications design plans for the project site shall be submitted to and approved by the City of Santa Monica Information Systems Department prior to approval of project. a. Project shall comply with City of Santa Monica Telecommunications Guidelines b. Project shall comply with City of Santa Monica Right-of-Way Management Ordinance No. 2129CCS, Section 3 (part), adopted 7/13/04 75. Prior to submittal of plan check application, make arrangements with all affected utility companies and indicate points of connection for all services on the site plan drawing. Pay for undergrounding of all overhead utilities within and along the development frontages. Existing and proposed overhead utilities need to be relocated underground. 76. Location of Southern California Edison electrical transformer and switch equipment/structures must be clearly shown on the development site plan and other appropriate plans within the project limits. The SCE structures serving the proposed development shall not be located in the public right-of-way. 27 18ENT-0312 Statement of Official Action Resource Recovery and Recycling 77. Development plans must show the refuse and recycling (RR) area dimensions to demonstrate adequate and easily accessible area. If the RR area is completely enclosed, then lighting, ventilation and floor drain connected to sewer will be required. Section 9.21.130 of the SMMC has dimensional requirements for various sizes and types of projects. Developments that place the RR area in subterranean garages must also provide a bin staging area on their property for the bins to be placed for collection. 78. Contact Resource Recovery and Recycling RRR division to obtain dimensions of the refuse recycling enclosure. 79. Prior to issuance of a building permit, submit a Waste Management Plan, a map of the enclosure and staging area with dimensions and a recycling plan to the RRR Division for its approval. The State of California AB 341 requires any multi-family building housing 5 units or more to have a recycling program in place for its tenants. All commercial businesses generating 4 cubic yards of trash per week must also have a recycling program in place for its employees and clients/customers. Show compliance with these requirements on the building plans. Visit the Resource Recovery and Recycling (RRR) website or contact the RRR Division for requirements of the Waste Management Plan and to obtain the minimum dimensions of the refuse recycling enclosure. The recycling plan shall include:  List of materials such as white paper, computer paper, metal cans, and glass to be recycled;  Location of recycling bins;  Designated recycling coordinator;  Nature and extent of internal and external pick-up service;  Pick-up schedule; and  Plan to inform tenants/ occupants of service. 80. For temporary excavation and shoring that includes tiebacks into the public right- of- way, a Tieback Agreement, prepared by the City Attorney, will be required. 81. Nothing contained in these Conditions of Approval shall prevent Developer from seeking relief pursuant to any Application for Alternative Materials and Methods of Design and Construction or any other relief as otherwise may be permitted and available under the Building Code, Fire Code, or any other provision of the SMMC. Construction Period Mitigation 82. A construction period mitigation plan shall be prepared by the applicant for approval by the following City departments prior to issuance of a building permit: Public Works, Fire, Planning and Community Development, and Police. The approved mitigation plan shall 28 18ENT-0312 Statement of Official Action be posted on the site for the duration of the project construction and shall be produced upon request. As applicable, this plan shall: a. Specify the names, addresses, telephone numbers and business license numbers of all contractors and subcontractors as well as the developer and architect; b. Describe how demolition of any existing structures is to be accomplished; c. Indicate where any cranes are to be located for erection/construction; d. Describe how much of the public street, alleyway, or sidewalk is proposed to be used in conjunction with construction; e. Set forth the extent and nature of any pile-driving operations; f. Describe the length and number of any tiebacks which must extend under the property of other persons; g. Specify the nature and extent of any dewatering and its effect on any adjacent buildings; h. Describe anticipated construction-related truck routes, number of truck trips, hours of hauling and parking location; i. Specify the nature and extent of any helicopter hauling; j. State whether any construction activity beyond normally permitted hours is proposed; k. Describe any proposed construction noise mitigation measures, including measures to limit the duration of idling construction trucks; l. Describe construction-period security measures including any fencing, lighting, and security personnel; m. Provide a grading and drainage plan; n. Provide a construction-period parking plan which shall minimize use of public streets for parking; o. List a designated on-site construction manager; p. Provide a construction materials recycling plan which seeks to maximize the reuse/recycling of construction waste; q. Provide a plan regarding use of recycled and low-environmental-impact materials in building construction; and r. Provide a construction period water runoff control plan. 83. Construction Conditions: a. Construction Phasing: If the two sites are constructed concurrently, the excavation of one Project Site would be completed before the excavation of the second site would be commenced. b. Construction Equipment: Construction equipment operating at the Project Sites will be subject to a number of requirements, which will be included in applicable bid documents and successful contractor(s) must demonstrate the ability to supply such equipment. Construction measures will include the following:  The Project shall utilize off-road diesel-powered construction equipment that meets or exceeds the CARB and USEPA Tier 4 interim off-road emissions standards for equipment rated at 50 hp or greater during Project construction. All equipment rated at 50 hp or greater will be outfitted with Best Available Control Technology (BACT) devices including a CARB 29 18ENT-0312 Statement of Official Action certified Level 3 Diesel Particulate Filter or equivalent. Implementation of this feature will minimize diesel particulate matter and NOX emissions during construction activities. A copy of each unit’s certified tier specification or model year specification and CARB or SCAQMD operating permit (if applicable) shall be available upon request at the time of mobilization of each applicable unit of equipment.  Equipment such as tower cranes and welders shall be electric or alternative fueled (i.e., non-diesel). To the extent possible, pole power will be made available for use with electric tools, equipment, lighting, etc.  Alternative-fueled generators shall be used when commercial models that have the power supply requirements to meet the construction needs of the Project are readily available from local suppliers/vendors.  The two Project Sites will not simultaneously engage in on-road heavy- duty haul truck or concrete truck activities on any given day of construction throughout the entire duration of construction. During each day of demolition, excavation, or concrete pouring activities, when on-road heavy-duty demolition or soil haul trucks or concrete trucks are operating for one of the two Project Sites, no on-road heavy-duty demolition or soil haul trucks or concrete trucks may be used to transport demolition debris, excavated soil, or concrete to or from the other Project Site. c. Control of VOCs: The Projects will utilize low-emitting materials pursuant to the requirements of the California Green Building Standards (CALGreen) Code. Indoor coatings will be limited to 50 grams per liter of VOCs or less. VOTE: Appeal 18ENT-0312 Ayes: Nays: Abstain: Absent: 30 18ENT-0312 Statement of Official Action NOTICE If this is a final decision not subject to further appeal under the City of Santa Monica Comprehensive Land Use and Zoning Ordinance, the time within which judicial review of this decision must be sought is governed by Code of Civil Procedure Section 1094.6, which provision has been adopted by the City pursuant to Municipal Code Section 1.16.010. I hereby certify that this Statement of Official Action accurately reflects the final determination of the Planning Commission of the City of Santa Monica. ________________________________ _____________________________ Denise Anderson-Warren, City Clerk Date Acknowledgement by Permit Holder I hereby agree to the above conditions of approval and acknowledge that failure to comply with such conditions shall constitute grounds for potential revocation of the permit approval. Print Name and Title Date Applicant’s Signature 1 Vernice Hankins From:Adeline McNeil <adelinemcneil93@gmail.com> Sent:Thursday, April 18, 2019 8:35 AM To:councilmtgitems Subject:Permit 15ENT-0297 Complaint Hello, I would like to appeal the planning commission’s approval of development review permit 15ENT-0297. I am against the construction of this building. It destroys the natural beauty of Santa Monica and the construction noise is a nuisance to residents and visitors. Please reconsider this building. Thank you, Adeline McNeil Item 6-B 04/23/19 1 of 27 Item 6-B 04/23/19 1 Vernice Hankins From:Laura Ziko <lauraziko@gmail.com> Sent:Thursday, April 18, 2019 8:36 AM To:councilmtgitems Subject:15ENT-0297 Hello, I would like to appeal the planning commission’s approval of development review permit 15ENT-0297. I am against the construction of this building. It destroys the natural beauty of Santa Monica and the construction noise is a nuisance to residents and visitors. Please reconsider this building. Thank you, Laura Item 6-B 04/23/19 2 of 27 Item 6-B 04/23/19 1 Vernice Hankins From:Courtney Shaw <rosie34posie34@gmail.com> Sent:Thursday, April 18, 2019 8:36 AM To:councilmtgitems Subject:Permit 15ENT-0297 Complaint Hello,     I would like to appeal the planning commission’s approval of development review permit 15ENT‐0297. I am against the  construction of this building. It destroys the natural beauty of Santa Monica and the construction noise is a nuisance to  residents and visitors.     Please reconsider this building.     Thank you.  Item 6-B 04/23/19 3 of 27 Item 6-B 04/23/19 1 Vernice Hankins From:Courtney Shaw <courtneyshaw3@outlook.com> Sent:Thursday, April 18, 2019 8:36 AM To:councilmtgitems Subject:Permit 15ENT-0297 Complaint Hello,    I would like to appeal the planning commission’s approval of development review permit 15ENT‐0297. I am against the  construction of this building. It destroys the natural beauty of Santa Monica and the construction noise is a nuisance to  residents and visitors.    Please reconsider this building.    Thank you,  Courtney Shaw    Item 6-B 04/23/19 4 of 27 Item 6-B 04/23/19 1 Vernice Hankins From:Jaime Palmer <palmer.jaime@yahoo.com> Sent:Thursday, April 18, 2019 8:37 AM To:councilmtgitems Subject:Permit 15ENT-0297 Complaint Hi, I would like to appeal the planning commission’s approval of development review permit 15ENT-0297. I am against the construction of this building. It destroys the natural beauty of Santa Monica and the construction noise is a nuisance to residents and visitors. Please reconsider this building. Thank you, Jaime Jaime Palmer palmer.jaime@yahoo.com Item 6-B 04/23/19 5 of 27 Item 6-B 04/23/19 1 Vernice Hankins From:C Shaw <cshaw93@gmail.com> Sent:Thursday, April 18, 2019 8:42 AM To:councilmtgitems Subject:Appeal 18ENT-0312 Hello, I would like to appeal the planning commission’s approval of development review permit 15ENT-0297. I am against the construction of this building. It destroys the natural beauty of Santa Monica and the construction noise is a nuisance to residents and visitors. Please PLEASE reconsider this building. Thank you. Item 6-B 04/23/19 6 of 27 Item 6-B 04/23/19 1 Vernice Hankins From:Brittany Shaw <brittanyshaw03@gmail.com> Sent:Thursday, April 18, 2019 8:43 AM To:councilmtgitems Subject:Appeal 18ENT-0312 Hello City Clerk, I would like to voice my appeal to the planning commission's approval of the development review permit 15ENT-0297. I am against the construction of this building. As a resident of Santa Monica who lives right by the property, the building will completely obstruct my apartment views for which I moved to Santa Monica specifically for. The noise will also be a huge nuisance Please let me know if there's any additional information I can provide to help stop this construction. Thank you! Brittany Item 6-B 04/23/19 7 of 27 Item 6-B 04/23/19 1 Vernice Hankins From:Dagny Waldorf <dagnywaldorf@gmail.com> Sent:Thursday, April 18, 2019 9:12 AM To:councilmtgitems Subject:Appeal 18ENT-0312 Dear City Clerk, I would like appeal to the planning commission's approval of the development review permit 15ENT-0297. I am completely AGAINST this construction of the new building at the lot next to Hotel Casa del Mar, right in front of 1930 Ocean Ave : 1828 Ocean Ave / 1921 Ocean Front Walk as it will block the views fro 1930 Ocean Ave. I live right across the street from the property and I am very much opposed to this. I moved to this apartment for the view of the beach and this building will block it entirely. I have young children and the construction will be intolerable. Please do not allow this to happen! Best regards, Dagny Item 6-B 04/23/19 8 of 27 Item 6-B 04/23/19 1 Vernice Hankins From:Courtney Shaw <courtney@dgdigital.com> Sent:Thursday, April 18, 2019 9:16 AM To:councilmtgitems Subject:Appeal 18ENT-0312, 18ENT-0390, 18ENT-0391, 18ENT-0392 Hello,    I would like to appeal the planning commissions approval of development review permit 15ENT‐0297. I am  completely against the construction of this building at 1921 Ocean Front Walk EIR / 1828 Ocean Ave: the lot  next to Hotel Casa del Mar, right in front of 1930 Ocean Ave. It will block the views of all residents at 1930  Ocean Ave and ruin the natural beauty of Santa Monica. Please reconsider this decision for the sake of the  city.    Thank you.        Item 6-B 04/23/19 9 of 27 Item 6-B 04/23/19 (310) 451-3669 April 19, 2019 VIA E-MAIL Santa Monica City Council 1685 Main Street, Room 102 Santa Monica, CA 90401 Re: Appeal from Planning Commission Approval of 22 Unit Mixed-Use Housing Project Appellants: Unite Here Local 11, et al. Hearing Date: April 23, 2019 Agenda Item 6.B Application No. 15ENT-0297 Appeal No. 18ENT-0312 Property Address: 1921 Ocean Front Walk Our Client: NXT2 Beach, LLC Our File No. 2095.3 Dear Councilmembers: This letter is submitted on behalf of NXT2 Beach, LLC, the owner of 1921 Ocean Front Walk. The Planning Commission approved the above-referenced 22-unit mixed- use rental housing project by a 5-1 vote on October 3, 2018. City Staff is recommending its re-approval on appeal. The project complies with all of the City’s development standards, the land is vacant, the land was sold to our client by the City, the project complies with Proposition S, and the project has been pending since September 1, 2015. The project does not propose any studio apartments and instead contains a mix of apartments including family-sized 2- and 3-bedroom units. The project provides the Tier 2 community benefits as specified in the Zoning Ordinance (i.e., 50% more affordable housing units than would otherwise be required; off-site affordable units owned in part and operated by a qualified affordable housing provider; an average of greater than 1.2 bedrooms per unit; the average number of bedrooms in the affordable units equal to the average number of market-rate bedrooms; an affordable housing mitigation fee for the restaurants 14% above the based fee; a transportation impact fee 14% above the base fee; an open space fee 14% above the based fee; and a public transit subsidy equivalent to 75% of the cost of a monthly kutcher@hlkklaw.com Item 6-B 04/23/19 10 of 27 Item 6-B 04/23/19 Santa Monica City Council April 19, 2019 Page 2 regional transit pass). Moreover, this project has volunteered to provide very low affordable units at 50% income levels rather than extremely low affordable units at 30% income levels, resulting in an obligation to build and deed-restrict twice as many affordable units (15% of the project, rather than 7.5%). This project epitomizes the LUCE’s vision, objectives and policies for new housing and thus should be approved. The project will provide new housing, including new affordable housing, without the loss of any existing housing. Legally, it would be a violation of State law (i.e., the Housing Accountability Act and the Vesting Tentative Map Statute) and contrary to the Zoning Ordinance for the City Council to deny this project or reduce its density. This letter urges the City Council to deny the appeal and approve the project as approved by the Planning Commission and as recommended by City Staff. I. BACKGROUND A. The Property. The project site bookends the historic boardwalk (once called the “Promenade” and now known as Ocean Front Walk). The site is a little more than one half acre in size. The site sits vacant, fenced off and unused. The site is adjacent to Hotel Casa del Mar Hotel (north), faces the beach to the west, and is bordered by Ocean Way to the east and Bay Street (and Crescent Bay Park beyond that) to the south. Casa del Mar is a historic resource listed on the National Register of Historic Places. And per the EIR, Crescent Bay Park “appears potentially eligible as a City Landmark.” (FEIR, p. 4.4-4.) Our client purchased this property from the City of Santa Monica in 2012. (It is our understanding that the proceeds from the sale went to the City’s affordable housing fund.) At the time of purchase, this site had been vacant for many years. The site was purchased for housing development. However, in deference to the Zoning Ordinance Update that was then underway, our client agreed to delay pursuing City entitlements for this site until after the City completed its Zoning Ordinance Update process. Our client’s objective in waiting was to pursue a project in compliance with the new Zoning Ordinance. Item 6-B 04/23/19 11 of 27 Item 6-B 04/23/19 Santa Monica City Council April 19, 2019 Page 3 B. The Project. The project consists of 22 rental housing units and approximately 2,840 square feet of ground floor commercial/restaurant uses fronting on Ocean Front Walk (plus approximately 1,160 square feet of outdoor dining area facing the boardwalk), with on-site parking beneath the uses. Consistent with Proposition S (which prohibits restaurants in excess of 2000 sf), each of the restaurants is 2,000 sf, including outdoor dining. This is a “four-sided” project. The beach is to the west, and Bay Street (and Crescent Bay Park) are to the south. Ocean Way is to the east, and Hotel Casa del Mar is to the north. The project is consistent in all respects with the City’s Zoning Ordinance, including with respect to height, density, uses, unit mix, setbacks, open space and parking. No variances, waivers, modifications or other zoning relief are being requested. This is confirmed by the Staff Report, which states: The project complies with all development standards applicable to the site and is within the established maximums to qualify as a Tier 2 project (No limitation of stories and 47 feet high / 2.0 FAR) with off-site affordable housing provided. (Staff Report at p. 7.) Unlike most of the recent housing projects, this project (and the sister project at 1828 Ocean Avenue) has been subject to a full Environmental Impact Report (“EIR”). The EIR concluded that the project, with the mitigation measures identified in the EIR and included in Staff’s recommended Statement of Official Action (“STOA”), will have no significant adverse environmental impacts. (FEIR at p. ES-5 (“the Projects would not result in any impacts that would remain significant following implementation of mitigation measures”).)1 The EIR was certified unanimously by the Planning Commission, and no appeal was filed. Moreover, to ensure a design respectful of its historic surroundings (which include Hotel Casa del Mar), the project does not seek to maximize the site’s development potential under the City’s Zoning Ordinance. Per the Zoning Ordinance, a 2.0 FAR is allowed, yet the project’s FAR is only 1.65--approximately 20% less than the allowable FAR. This reduction was provided by our client and its design team in 1 In retrospect, this project (and the 1828 Ocean Avenue project also studied in the same EIR) would have qualified for a Mitigated Negative Declaration (“MND”). (See State CEQA Guidelines Section 15070.) Item 6-B 04/23/19 12 of 27 Item 6-B 04/23/19 Santa Monica City Council April 19, 2019 Page 4 response to design and massing comments from the ARB and the City’s historic resource consultant. II. PROJECT DESIGN AND REFINEMENTS Local Santa Monica-based architects Koning Eizenberg Associates (“KEA”) have designed this project, working in consultation with historic preservation architect and consultant Robert Chattel of Chattel Inc. given the project’s proximity to the historic Casa del Mar. The project experienced numerous design iterations to arrive at the massing and design approved by the Planning Commission. Per the certified EIR: “The changes that have been made address design issues and neighborhood context, including increased setbacks, stepbacks and open space, while also reducing building massing and residential floor area.” (FEIR at p. ii.) September 2015 DRP Submittal Item 6-B 04/23/19 13 of 27 Item 6-B 04/23/19 Santa Monica City Council April 19, 2019 Page 5 July 2017 ARB Float-up August 2018 Planning Commission Submittal As ultimately approved by the Commission, the design reflects input received from City Staff, the ARB, the City’s EIR historic preservation consultant (Margarita Jerabek of ESA Consulting) and the Planning Commission. Project refinements since this project’s initial submittal include:  A reduction of floor area by more than 10,000 square feet, with a corresponding reduction in FAR from 1.93 down to 1.65. Item 6-B 04/23/19 14 of 27 Item 6-B 04/23/19 Santa Monica City Council April 19, 2019 Page 6  Increased stepbacks and open space facing Ocean Front Walk that will expand scenic views of Casa del Mar from the beach and for pedestrians traveling along Ocean Front Walk.  Reduced massing, and increased setbacks, open space and landscaping between Casa del Mar and the proposed project, where no setback is required by Code.  Overall refinement and development of the architectural language of the project, including the bluff-inspired base and contemporary beach-inspired residential design.  Refinement of the Bay Street elevation to include not less than a 5-foot landscaping buffer along the public sidewalk that incorporates large rocks and trees, and an addition of private decks for the residential units to improve the pedestrian experience of those traveling along Bay Street.  Modifications of and careful attention to fenestration, scale, materials, colors and textures.  Special attention to the western façade’s glazing, including residential character, sustainability features, glare reduction, controls on heat-gain, etc.  Refinement of the western and norther façades to better integrate the project’s overall design.  Elimination of the top floor facing Ocean Way and reductions of portions of the building below the maximum allowable height. Additionally, the Planning Commission directed the ARB to pay particular attention to the following:  The pedestrian oriented design of the ground floor commercial tenant spaces.  The relationship of the building along Bay Street and the connectivity to the public sidewalk.  Additional study of the stair element at the building's southeast corner is needed. Item 6-B 04/23/19 15 of 27 Item 6-B 04/23/19 Santa Monica City Council April 19, 2019 Page 7  Consider modifying the "sails" (planar elements at balconies along the Bay Street elevation) so they create a visual sense of movement as the features are placed on the building down the slope (west).  Consider modifying the proportions the building so they better relate to the proportions of Casa Del Mar to the north.  Study how to better integrate the west façade more fully into the rest of the building.  Consider an art installation that commemorates the history of the nearby beach area known as the Inkwell and the history of the Z-8oys in Ocean Park [this is also provided as a recommendation to the City's Arts Commission]. III. HISTORIC PRESERVATION As noted above, Robert Chattel has worked in collaboration with KEA to ensure the project respects the adjacent historic Casa del Mar as well as Crescent Bay Park. Mr. Chattel has documented his work in two conformance review reports, both of which are part of this project’s administrative record. In his initial report, Mr. Chattel indicated that the purpose of his collaboration on the project’s design was “to reduce the building mass from obscuring key views of Casa del Mar, as well as to guide general design modifications which draw inspiration from the historic resource.” For the ARB hearing, Mr. Chattel concluded that “the current design skillfully addresses compatibility concerns, maintains key views and avoids adverse impacts to the historic resource.” In light of project refinements undertaken after release of the DEIR, Mr. Chattel prepared his second report addressing the refinements. He confirms: These [project] refinements are intended to highlight references to the historic beachside character of Ocean Front Walk, maintain design compatibility with Casa del Mar, and better reflect the significance and context of this bookend site along the boardwalk … The important separation buffer of additional open space directly adjacent to the hotel further strengthens the EIR finding of no significant impact … [R]educed massing at both the south and east elevations better reveals portions of the distinctive Item 6-B 04/23/19 16 of 27 Item 6-B 04/23/19 Santa Monica City Council April 19, 2019 Page 8 roof shape and architectural details of the top floor of Casa Del Mar, especially when viewed from Crescent Bay Park … As a whole, these design refinements act as contemporary interpretations of the historic Ocean Front Walk casual beachside character, while furthering compatibility with Casa Del Mar. Mr. Chattel’s second report concludes: [T]he refined proposed project continues to conform to the Secretary’s Standards as it relates to new construction, as the proposed project responds well to its key location at the southern end of the beachside boardwalk, and continues to sustain prominence of Casa Del Mar while supporting the historic character of Crescent Bay Park and Ocean Front Walk. The Final EIR (at page 4.4-13) also confirms that the project, as refined throughout the review process, fully satisfies the pertinent design standards used by trained professionals when reviewing proposed projects in close proximity to existing (and potential) historic resources. The City’s certified Final EIR addresses this point at length in Appendix M: The refinements to the Ocean Front Walk Project would include a reduction in building area and the removal of one floor in the northern portion of the site along Ocean Way thereby resulting in a reduction of perceived massing along Ocean Way. The Ocean Front Walk Project would also include increased setbacks and open space along Ocean Front Walk that would expand and improve scenic views of the Hotel Casa del Mar for pedestrians traveling northbound on Ocean Front Walk. The proposed revisions to the western and northern facades of the new building would better integrate the overall design into the character of the neighborhood. The Ocean Way façade of the Ocean Front Walk Project would consist of solid panels interspersed with open decks thereby reducing the perceptible mass of the new construction. The Project as refined would appear to step down towards Hotel Casa del Mar and would improve the transition from the new building to the Hotel Casa del Mar. Item 6-B 04/23/19 17 of 27 Item 6-B 04/23/19 Santa Monica City Council April 19, 2019 Page 9 The colors and textures of the materials proposed for the Project would be compatible and would not visually compete with the warm brick and contrasting masonry trim of the Hotel Casa del Mar. The Ocean Front Walk Project would sit more comfortably on its graded site and would step down towards Ocean Front Walk, revealing more of the distinctive roof shape and massing of the Hotel Casa del Mar including the architectural details of the Hotel Casa del Mar’s top floor, distinctive arched windows and cornice as seen from Crescent Bay Park looking north. Likewise, along Ocean Front Walk, the Ocean Front Walk Project would be pulled further away from the southeast corner of the Hotel Casa del Mar and would step back further from the historic building, thereby improving the transition between the old and the new and allowing for better views of the Hotel Casa del Mar from Ocean Front Walk and the beach. In conclusion, the Project[ ] would be differentiated from the nearby historical resources by [its] contemporary style but would be compatible with the massing, size, scale and architectural features of the adjacent historical resources to protect their historic integrity, as required by Standard 9 [of the Secretary of the Interior’s Standards for Rehabilitation] . . . Thus, the Project[ ] would not have significant impacts on nearby historical resources . . . (FEIR, App. M at pp. M-7 through M-8.) IV. THE STATE HOUSING ACCOUNTABILITY ACT, THE VESTING TENTATIVE MAP STATUTES AND THE ZONING ORDINANCE ALL COMPEL CITY APPROVAL OF THE PROJECT Not only is this a well-conceived and well-designed mixed-use rental housing project that the Council should want to approve for beneficial policy reasons, and thereby affirm the Planning Commission decision, but there are also legal obligations under both State and local law to approve this project. A. The State Housing Accountability Act. As the City Attorney and City Staff have regularly advised the Planning Commission and the City Council, and as the Staff Report confirms, the State Housing Item 6-B 04/23/19 18 of 27 Item 6-B 04/23/19 Santa Monica City Council April 19, 2019 Page 10 Accountability Act (Gov’t Code § 65589.5) limits the City’s discretion to deny or reduce the density of a housing project--such as this project--that satisfies the City’s objective development standards. (Staff Report at p. 11.) The City may only deny or reduce the density of such a project if it finds, based on a preponderance of the evidence that the project will cause a specific, quantifiable, direct and unavoidable adverse impact upon public health or safety based on objective, identified written public health or safety standards policies, or conditions as they existed on the date the application was deemed complete. (Gov’t Code § 65589.5(j)(1)(A).) Moreover, the State Legislature has amended the HAA to further tighten controls on the ability of local governments to deny housing projects. This was summarized for the City Council last summer in an Information Item dated August 10, 2018: Increasing Local Accountability for Housing Production The Housing Accountability Act (codified as Government Code Section 65589.5) ("HAA") was enacted in 1982 to establish clear thresholds for the approval and denial of housing projects that meet objective standards. The Legislature intended to significantly curb the capability of local jurisdictions to deny, reduce density or render infeasible housing developments. Since the HAA went into effect, some local jurisdictions have either not followed the requirements of the act or interpreted its provisions in ways different than intended. In an effort to address localities that have acted in bad faith in disapproving housing projects, two bills clarify and tighten the regulations of the Housing Accountability Act. AB 678 (Bocanegra) / SB 167 (Skinner) Keeping with the spirit of the 2017 legislative session that sought to address California’s critical housing shortage in several different ways, these two identical bills establish much tighter controls on the ability of local jurisdictions to deny housing projects. In particular, these bills modify the Housing Accountability Act ("HAA") to do the following: • Revise the definition of "housing development project" to include projects where at least 2/3 of the floor area is residential Item 6-B 04/23/19 19 of 27 Item 6-B 04/23/19 Santa Monica City Council April 19, 2019 Page 11 • Establish a “preponderance of evidence” test for judicial review instead of the prior, more deferential “substantial evidence” standard[2] • Require local jurisdictions to provide written documentation to an applicant if a project is not consistent with objective standards within 30 days of submittal for projects that have less than 150 units and within 60 days of submittal for projects that have more than 150 units • Clarify the standard for determining actions that have the effect of lowering density [i.e., impose conditions “that have a substantial adverse effect on the viability or affordability of a housing development”] • Allow a court to compel a local jurisdiction to approve a housing project and if the locality fails to comply, authorizes the court to fine the locality at least $10,000 per housing unit if it determines that the locality acted in bad faith With respect to this project at 1921 Ocean Front Walk, the Staff Report confirms that this project falls within the HAA’s protections: The Planning Commission approved the project because no oral or written evidence was presented at the public hearing, identifying “specific, adverse impacts” as defined in the Housing Accountability Act. (Staff Report at p. 13.) Therefore, if after consideration of all written and oral evidence presented to the City Council at the public hearing for the Project, the Council desires to either disapprove or impose a condition that that Project be developed at a lower density, Council must make the above referenced findings and direct staff to incorporate such findings and/or conditions 2 It should be noted that Government Code Section 65589.6 provides: “In any action taken to challenge the validity of a decision by a city . . . to disapprove a project or approve a project upon the condition that it be developed at a lower density pursuant to [Government Code] Section 65589.5, the city . . . shall bear the burden of proof that its decision has conformed to all of the conditions specified in Section 65589.5.” Item 6-B 04/23/19 20 of 27 Item 6-B 04/23/19 Santa Monica City Council April 19, 2019 Page 12 into the STOA. The term “lower density” includes any conditions that have the same effect or impact on the ability of the project to provide housing. (Staff Report at p. 12.) In this regard, the administrative record includes the Final EIR prepared and certified by the City, which confirms that the project will not cause any such adverse public health or safety impacts following implementation of the identified mitigation measures: As indicated in Chapter 4, Environmental Impact Analysis, of this EIR., the Projects would not result in any impacts that would remain significant following implementation of mitigation measures. (FEIR at p. ES-5.) Furthermore, the administrative record contains no evidence of any such impact. Accordingly, the HAA requires the City Council to approve this project without reducing its density or imposing conditions that would have a substantial adverse effect on its viability. B. The Vesting Tentative Map Statutes. On March 20, 2019, the Planning Commission approved Vesting Tentative Tract Map No. 74471 for an air space subdivision of this project. (16ENT-0159.) Pursuant to both State and local law, “When a local agency approves or conditionally approves a vesting tentative map, that approval shall confer a vested right to proceed with development” (Gov’t Code § 66498.1(b) and Subdivision Ordinance § 9.54.030(F)(5)) and the project is to be reviewed in accordance with the ordinances, policies, and standards that were in effect at the time the vesting tentative map was deemed complete. (Gov’t Code § 66474.2 & 66498.1(b) and Subdivision Ordinance § 9.54.030(F)(5).) The approval of the vesting tentative map is now final. (See Subdivision Ordinance § 9.54.070.) Accordingly, our client has a vested right to proceed with this project, and this project must be reviewed pursuant to the ordinances, standards and policies that were in effect on the date the vesting map application was deemed complete, which was October 27, 2016. As noted in the City’s deemed complete letter, the “proposed project consist[s] of a proposed mixed-use residential building with ground floor commercial, residential units above, and subterranean parking below ground.” Without the applicant’s consent, the City may not impose new ordinances, policies or standards on the project that were not in effect on October 27, 2016. This Item 6-B 04/23/19 21 of 27 Item 6-B 04/23/19 Santa Monica City Council April 19, 2019 Page 13 protects the applicant from having new criteria imposed on this project. As noted in the Staff Report, this project meets the requirements of the Zoning Ordinance. (Staff Report at p. 10 (“[T]he project complies with all development standards of the OF District.”).) Accordingly, the applicant is entitled to approval of this project consistent with the Zoning Ordinance. C. The Zoning Ordinance. The City’s Land Use and Circulation Element of its General Plan (“LUCE”) and its Zoning Ordinance establish a predictable project review process for Tier 1 and Tier 2 projects based upon established development and design standards. This project review process is intended to facilitate an expansion of the City’s housing supply, including its supply of affordable housing.3 The Zoning Ordinance is the City’s primary means for implementing the LUCE. Under the Zoning Ordinance, any project that exceeds the Zoning Ordinance’s Tier 1 maximum limits or 10,000 square feet of new floor area must obtain a DRP. (SMMC § 9.40.020 (A).) Because this project exceeds the Tier 1 maximum limits and 10,000 square feet of floor area, it requires a Development Review Permit (“DRP”) as a Tier 2 project with community benefits as codified in Chapter 9.23 of the Zoning Ordinance. Under the Zoning Ordinance, the City Council “shall approve” a DRP when the required findings “can be made.” (Zoning Ordinance § 9.40.050.) Here, the Staff Report confirms that all of the required findings can be made. (Staff Report at p. 12 (“[S]taff has recommended approval of the Project based upon its determination that the Project met all of the findings for a Development Review Permit”).) Accordingly, the City Council is legally obliged to approve this project. As the August 10, 2018 City Council Information Item states: “Since the zoning ordinance establishes clear development standards for Tier 1 and Tier 2 projects, the effect is that in nearly all cases, the [City] will not have the discretion to deny a housing project unless findings regarding adverse impacts to health and safety can be made.” (City Council Information Item, supra at 8.) Indeed, the evidence in the record supporting these findings is uncontradicted. This evidence includes the Final EIR, which confirms that this project will not have any 3 Under the heading “Review of Proposed Projects,” the LUCE provides: “Development proposals that confirm with stated goals and policies of the LUCE are the implementation tools that have the most direct influence on the City’s ability to achieve complete communities, housing opportunities, and integrated transportation and land use. Exacting review is the primary method by which the City ensures that individual projects achieve the vision, goals, and standards of the community.” (LUCE at p. 5.0-12.) Item 6-B 04/23/19 22 of 27 Item 6-B 04/23/19 Santa Monica City Council April 19, 2019 Page 14 significant adverse impacts on the environment. Moreover, this evidence includes the extensive project design refinements made in response to input from the ARB, City Staff, the Planning Commission and others. These refinements include the applicant’s voluntary reductions in both massing and density. The proposed floor area is now nearly 20% below what is allowed. There is no evidentiary basis for the City Council to deny this project or further reduce its density. Thus, the Zoning Ordinance requires the City Council to approve this project without reducing its density. V. PROJECT AND COMMUNITY BENEFITS This project includes all of the community benefits required by the Zoning Ordinance including affordable housing. A. Affordable Housing. As a community benefit, the project will provide four very low income (50% AMI) deed-restricted affordable units. These four units will be provided off-site at 1828 Ocean Avenue, which the City Council will also be considering on April 23rd. Consistent with the Zoning Ordinance, the site at 1828 Ocean Avenue is well within a quarter-mile of the project site. (SMMC § 9.64.060(D).) As the City Council is aware, nearly all Tier 2 project applicants are electing the Zoning Ordinance’s 7.5% extremely low (30% AMI) income unit option. By selecting the very low (50% AMI) income option, this applicant is providing twice the percentage of affordable units (15% compared to 7.5%) and twice the number of affordable units (4 units versus 2). Moreover, only because the affordable units are off-site, the affordable housing units will be operated by a non-profit affordable housing provider. (Zoning Ordinance § 9.23.030(A)(1)(c).) This unique community benefit ensures that the very-low income residents will have access to supportive services that would not otherwise be available from a typical for-profit apartment owner, including programs designed to assist tenants with staying in place whenever challenges arise. Additionally, the applicant has agreed to provide an on-site resident meeting room for use by the affordable housing provider when counseling tenants of the affordable units. Item 6-B 04/23/19 23 of 27 Item 6-B 04/23/19 Santa Monica City Council April 19, 2019 Page 15 B. Family-Sized Apartments. Consistent with the LUCE’s goals for a range of new housing, including apartments for families, the project includes family-sized apartments.4 More than 45% of the market-rate units are two- and three-bedroom units. And 50% of the deed-restricted affordable apartments will be two- and three-bedroom units. Overall, the project provides units with 1.59 average bedrooms, substantially more than the Zoning Ordinance’s requirement of 1.2 average bedrooms. C. Development Fees. This project is also paying substantial development fees to the City. These include a Parks and Recreation Development Impact Fee ($136,677.96), a Cultural Arts Fee ($69,520.00), a Child Care Linkage Fee ($24,514.90), an Affordable Housing/Commercial Linkage Fee ($43,326.38), and a Transportation Impact Fee ($224,753.01). D. Other Community Benefits. The project also includes other meaningful project and community benefits including solar panels, EV charging stations, EV stubouts, abundant and user-friendly bicycle facilities, pedestrian-oriented/visitor-oriented restaurants, sustainable design features, and massing/design with sensitivity to adjacent historic resources. VI. UNITE HERE’S APPEAL LACKS MERIT The Staff Report does an excellent job in addressing Unite Here, et al.’s arguments asserted in their appeal. (Staff Report at pp. 13-17.) It is self-evident that those arguments are not motivated by genuine concerns about this housing project, nor are they supported by law or any evidence in the record. Briefly: 1. The artificial claim that the City’s Zoning Ordinance contains a purported “major loophole” in its regulation of multi-family housing is a policy argument that is irrelevant to this quasi-judicial hearing on this particular project. We do not agree with that contention. The definitions of the terms multi-family use, corporate rental housing, and lodging are thorough and complete; they are a paragraph of more each, with 44 LUCE Goal H4 states: “Provide increased opportunities to stimulate a variety of housing choices.” LUCE Policy H4.1 is to “[e]ncourage the production of both rental and ownership housing. (LUCE at p. 3.3-12.) Item 6-B 04/23/19 24 of 27 Item 6-B 04/23/19 Santa Monica City Council April 19, 2019 Page 16 examples of such uses provided in each of the definitions. (See Zoning Ordinance §§ 9.51.020(A)(1)(d), 9.51.020(A)(2) & 9.51.030(B)(15).) Moreover, even if the City Council were to share the appellants’ concerns with the wording of the Zoning Ordinance, the City Council cannot essentially amend the City’s Zoning Ordinance by way of a project condition. The project’s proposed uses are permitted uses under the Zoning Ordinance; the applicant is not seeking any discretionary permit as to use of the property. A development review permit challenged in this appeal is a quasi-judicial permit relating to building mass (see Zoning Ordinance § 9.40.010); the City Council cannot use the quasi-judicial processing of a development review appeal to change existing law (i.e., legislate) by project condition as to an allowed use. Put simply, multi-family housing as defined in the Code is allowed by right in the Oceanfront Zoning District. (See Zoning Ordinance Table 9.14.020.) This DRP appeal is not the proper forum to debate whether to amend the Zoning Code’s definition of multi-family housing. And as noted above, the Planning Commission has approved a vesting tentative air space map for this project, which means that the City cannot impose new ordinances, policies or standards that were not in effect on October 27, 2016, when the vesting tentative map application was deemed complete for processing. 2. Appellants ask for a condition that “runs with the land” banning lodging and corporate housing uses in the project Appellants ignore that Staff’s proposed STOA bans lodging uses (see Condition No. 2) and that all of the project conditions run with the land as a matter of law (and thus are binding on all future owners of the property). (See Zoning Ordinance § 9.48.010(B).) 3. Appellants’ unsubstantiated claim that the project “is an extension of the Casa del Mar/Shutters hotel complex” is specious. This will be a separate and distinct apartment building with no lodging use and no expansion of the nearby Casa del Mar or Shutters hotels. The applicant has not applied for any permits to expand the hotels, nor would that be possible in light of Proposition S. Moreover, as a show of good faith, the applicant has agreed on the record that: “Consistent with Proposition S, this project is not an expansion of any hotel use and there shall be no hotel amenities from the adjacent hotel (e.g., housekeeping, valet, food/room service) provided at the Project.” This agreement is documented in the STOA’s project description. 4. The appellants’ criticism of the Final EIR also lacks merit. Consistent with State CEQA Guidelines Section 15088, the Final EIR responded to each of appellants’ arguments and explained why they are unfounded. Appellants’ disagreement with the Final EIR’s conclusions does not render it inadequate legally. (See State CEQA Guidelines § 15151.) Furthermore, the time to appeal the EIR certification has passed (see Zoning Ordinance §§ 9.37.040 & 9.62.020), and the time to file suit challenging the certified EIR has also passed. (State CEQA Guidelines § 15112.) Item 6-B 04/23/19 25 of 27 Item 6-B 04/23/19 Santa Monica City Council April 19, 2019 Page 17 5. Appellants wrongly claim that the Coastal Act requires the project’s ground floor commercial/restaurant space to be limited to commercial spaces that “could be rented out at a reduced or complementary rate for public events, et cetera.” The Coastal Act does not compel such uses in this project’s ground floor commercial space. In fact, it was staff for the Coastal Commission that urged the applicant to include a second restaurant in this project. Moreover, to the extent the Coastal Commission has a basis for regulating use of this project’s ground floor space, that agency will do so when it considers the project’s Coastal Development Permit application. (Such a coastal development permit application cannot be filed with the Coastal Commission until after ARB approval of the design.) The City Council’s role is to enforce the Zoning Ordinance, which allows as permitted uses all of the applicant’s proposed ground floor uses. VII. CONCLUSION This is a housing project that meets all of the City’s objective development standards for a Tier 2 project, has no adverse environmental impacts, has a fully certified EIR, has no unmitigable health or safety impacts, is 20% below the maximum allowable FAR, and is wholly consistent with the LUCE and Zoning Ordinance’s governing housing regulations and policies. For all of these reasons, the City Council should deny the appeal and approve this project as recommended by City Staff. Sincerely, Kenneth L. Kutcher cc: David Martin Roxanne Tanemori Russell Bunim Lane Dilg Yibin Shen Heidi von Tongeln NXT2 Beach, LLC Hank Koning Robert Chattel F:\WPDATA\2095\2095.3\Cor\CC.3002g.KLK.docx Item 6-B 04/23/19 26 of 27 Item 6-B 04/23/19 Board Members, Cont. Kiersten Elliott Santa Monica College Sara Escobar HULU Jeffrey Fritz Coldwell Banker Annie Goeke Earth Rights Institute Stephanie Harris Carlthorp School Jeff Jarow PAR Commercial Real Estate Kevin Kozal Harding Larmore Kutcher & Kozal Robert Kull The Lobster Julia Ladd Macerich/Santa Monica Place Marcel Loh Providence St John’s Health Center John Loyacono Bank of America Brian MacMahon Expert Dojo Jennifer McElyea Watt Investment Partners Susan Gabriel Potter Bob Gabriel Insurance Evan Pozarny Muselli Commercial Realtors Julie Reback Spencer Cedars Sinai Ali Sahabi Optimum Seismic Heather Somaini Lionsgate John Warfel Metropolitan Pacific David Woodbury Arthur Murray Dance Center Chair Jeff Klocke Pacific Park on the Santa Monica Pier Past Chair West Hooker-Poletti Caffe Bella Chair Elect Laura McIver Shutters Hotel on the Beach Treasurer Len Lanzi Los Angeles Venture Association Vice Chairman Colby Goff Rustic Canyon Family of Restaurants Vice Chairman Richard Chacker Perry’s Café and Bike Rentals Vice Chairman Dave Rand Armbruster Goldsmith & Delvac Vice Chairman Ellis O’Connor MSD Hospitality LLC Vice Chairman Peter Trinh Avery, Craftsman Bar & Kitchen Board Members Daniel Abramson RAND Corporation Alisha Auringer LAcarGuy Judy Barker Barker Hangar Josh Bradburn Charles Schwab & Co. Ted Braun UCLA Health Gauri Brienda Gauri Brienda Consultancy Bettina Duval BRDBND April 23, 2019 Santa Monica City Council 1686 Main Street, Room 209 Santa Monica, CA 90401 RE: Appeals 18ENT-0390, 18ENT-0391 and 18ENT-0392 - DENY Dear Mayor Davis and Council Members, The Santa Monica Chamber of Commerce expresses our strong support for the two mixed-use housing projects proposed for 1921 Ocean Front Walk and 1828 Ocean Avenue. As such, we urge you to deny the aforementioned appeals and uphold the Planning Commission’s decisions on these projects. These projects will help provide the housing that we need in Santa Monica by creating 105 new rental units within walking distance of the Downtown Santa Monica Expo Line station. Importantly, 16 of the new units would be deed-restricted, very-low income affordable units and managed by a nonprofit affordable housing provider. Half of these units would be family-sized units (i.e. two- and three-bedroom units) with access to a plethora of amenities. These are exactly the kind of housing projects that the LUCE envisions, and that this Commission has prioritized. In addition to providing a variety of housing opportunities, the projects would provide ground-floor restaurant/retail space, enhancing the pedestrian activity in this area. The 1921 Ocean Front Walk project proposes to include two ground-floor restaurants with indoor and outdoor seating along the boardwalk. The 1828 Ocean Avenue project would include a ground-floor corner café. In addition to creating employment opportunities, this provides walkable dining and refreshment options to area workers and visitors, the projects’ tenants and surrounding neighbors. Finally, the projects are sustainably designed to use 10% less energy than California’s Energy Code requires and will include solar panels. The projects will also have electric vehicle charging stations and bicycle parking spaces to encourage sustainable modes of transportation. In summary, the proposed projects provide vital housing, affordable housing, pedestrian oriented ground-floor uses, and are sustainably designed. For these reasons, we urge you to approve the 1921 Ocean Front Walk and 1828 Ocean Avenue projects. On behalf of the Santa Monica Chamber of Commerce, we thank you for considering our comments. Sincerely, Laurel Rosen President/CEO Item 6-B 04/23/19 27 of 27 Item 6-B 04/23/19