Loading...
SR 11-01-2016 3A Ci ty Council Report City Council Meeting : November 1, 2016 Agenda Item: 3.A 1 of 3 To: Mayor and City Council From: Susan Cline, Director , Public Works, Architecture Services Subject: Airport Administrative Building Green Roof Construction Contract Recommended Action Staff recommends that the City Council: 1. Award Bid #2385 to Terra Form Inc., a California -based company , for the installation of new landscape, hardscape and site furniture on the City -leased observation deck area rooftop of the Airport Administra tive B uilding ; 2. Authorize the City Manager to negotiate and execute a con tract with Terra Form Inc., in an amount not to exceed $215,600 (including a 10% contingency); and 3. Authorize the Director of Public Works to issue any necessary change orders to complete additional work within contract authority. Executive Summary The Santa Monica Airport Division seeks to install new landscape, hardscape and site furniture on the first floor rooftop of the Ai rport Administration building , located at 3223 Donald Douglas Loop South . The sod roof installed in the 1980s was removed in 201 2 after a waterproofing repair project was performed to resolve water intrusion issues. The new Airport Administrative Building Green Roof top p roject seeks to renovate the first floor roof top area by upgrading hardscape and landscaping . Staff recommends Te rra Form Inc. as the best and lowest bidder for construction services for the Airport Administrative Building Green Roof top project in an amount not to exceed $215,600 . Background In the 1980s, t he City -owned f irst floor rooftop deck area featured a cons tructed sod roof top at the south east end of the Airport Administrative Building, located at 3223 Donald Douglas Loop South . In 2012, t he sod was removed to install a new waterproofing membrane in order to resolve ongoing water intrusion issues . After the installation of the membrane , the soil was backfilled and covered with mulch to prevent soil erosion and weed growth . The rooftop deck is accessible to the public and adjacent to the Airport observation deck . This recreational space is frequented by visit ors and tenants . 2 of 3 Discussion The City seeks to update the first floor deck area of the Airport Administrative Building with new landscap e and hardscape . This green roof top project would renovate the existing pedestrian walk way . H ardscape and drought toler ant landscape would be installed in the planter areas over the recently installed water proofing membrane . Renovations would improve the overall experience for visitors by enhancing the seating amenities and by making the area compliant with the Americans with Disabilities Act (ADA). The Airport Administrative Building Green Roof project supports the City’s sustainability goals and is in alignment with City Council’s direction to enhance the airport’s connection to the community. Contractor Selection In July 2016, the City published Notices Inviting Bids to renovate the landscape and hardscape on the existing roof top of the City -owned area at the Airport Administrative B uilding in accordance with City specifications. The bid was posted on the City's on -li ne bidding site, and notices were advertised in the Santa Monica Daily Press in accordance with City Charter and Municipal Code provisions. Thirty -four vendors downloaded the bid and three prospective bidders attended a pre -bid job walk. Two bids were rece ived and publicly opened on August 17, 2016. The bid results are as follows: Bidder Total Bid Amount Terra Form Inc. $196 ,000 Custom Design Construction $218,000 Bids were evaluated based on the criteria in SMMC 2.24.072, including price, p revious experience, ability to deliver, quality of product, and compliance with City specifications. Based on these criteria, Terra Form Inc., the lowest bidder, is recommended as the best bidder. Staff contacted references provided by Terra Form Inc. for prior project experience on the Hollydale Regional Park in the City of South Gate and for the City of Santa Monica Airport Demonstration Gardens which were installed in 2011. All respondents reported work was completed in a timely and cost -efficient mann er while maintaining consistent quality. Staff also verified with the Contractors State License Board that Terra Form Inc . has a license that is current, active, and in good standing 3 of 3 and verified the firm is registered with the California Department of Ind ustrial Relations (DIR). Schedule Construction work is tentatively schedule d to begin in December 2016 and is anticipated to be completed in spring 2017. Financial Impacts and Budget Actions The contract to be awarded to Terra Form Inc. is for an amou nt not to exceed $215,600 (includes a 10% contingency). Funds are available in the FY 2016 -17 Capital Improvement Program budget in account C339085.589000 . Prepared By: Tom Afschar, Architect Approved Forwarded to Council Reference:    Contract  No. 10384  (CCS)