Loading...
SR 04-26-2016 3G City Council Report City Council Meeting: April 26, 2016 Agenda Item: 3.G To: Mayor and City Council From: Martin Pastucha, Director, Public Works, Civil Engineering Subject: Award Construction Contract for Beach Parking Lot 4S Access Improvements and Paving Recommended Action Staff recommends that the City Council: 1. Award Bid# SP2426 to Sully-Miller Contracting Company, a California-based company, for the Beach Parking Lot 4S Access Improvements and Paving project. 2. Authorize the City Manager to negotiate and execute a contract with Sully-Miller Contracting Company, in an amount not to exceed $776,704 (including a 10% contingency). 3. Authorize the Director of Public Works to issue any necessary change orders to complete additional work within contract authority. Executive Summary This project would re-pave the southern-half of Beach Parking Lot 4S, located adjacent to Ocean Avenue between Strand Street and Wadsworth Avenue, and implement access and circulation improvements to reduce pedestrian, bicycle and vehicle conflicts. The project would also provide bicyclists with a visibly improved route connecting Ocean Avenue to the Beach Trail. Staff recommends that Sully-Miller Contracting Company complete the paving, striping , circulation and signage improvements for Beach Parking Lot 4S in an amount not to exceed $776,704 (including a 10% contingency). Background The Civil Engineering Division completed a survey of City-owned surface parking lots in December 2011. Beach Parking Lot 4S was identified as a high priority project because of its deteriorated condition. On May 22, 2012 (Attachment A), City Council approved a first modification to Contract No. 9481 (CCS) with Excel Paving Company to resurface the northern-half of Beach 1 of 5 Parking Lot 4S and improve striping and signage for the Beach Trail This work was . completed in 2012-13. Paving of the southern-half was deferred to accommodate construction of the new restroom at 2400 Ocean Front Walk located at the southern- , end of Lot 4S. Discussion As part of the construction of the new restroom at 2400 Ocean Front Walk, modifications were made to the Beach Trail connection adjacent to the new restroom. Community members raised safety concerns about the changes and highlighted the pedestrian/bicycle/automobile conflicts that occur in this section of Lot 4S. Staff from Community and Cultural Services, Planning and Community Development, Public the modifications and made suggestions for some changes. Staff worked with Alta Planning + Design on the Beach Trail improvement project in 2012-13 and asked the firm to review the modifications to the Beach Trail connection and make recommendations. As part of that review, it became apparent that there were several points of conflict in this section of Lot 4S, including the pedestrian/bicycle/automobile conflicts at the entry and exit at Hollister Avenue, the entry and exit to the short-term parking area, and the location of the traffic aisle nearest to the Beach Trail connection. Staff recommended hiring Alta Planning + Design on a sole source basis to address these circulation issues and to incorporate permanent solutions in the parking lot repair project that was on hold pending the completion of the 2400 Ocean Front Walk restrooms. After a very comprehensive concept development and analysis process, Alta Planning + Design recommended the following improvements: Adding an uphill bike lane and downhill sharrows . Creating a large shared promenade/plaza for bicycles and pedestrians that is separated from vehicles for safer access to and from the bike path. Expanding the short-term parking to include this entire section of the lot, eliminating obstacles (bollard and spikes) and confusion about where to enter 2 of 5 and exit. Moving the vehicle exit lane away from the bike path connection and using paint and trees to create visual cues to turn onto the exit driveway. Removing the northwest planter from the bike path connection and adding a concrete apron. Adding 2 new pay machines in the long term lot. These improvements, which have been incorporated into the project, were presented to the Ocean Park Association on March 9, 2015 and were favorably received. Contractor Selection On March 14, 2016, the City published Notices Inviting Bids to furnish and deliver Beach Parking Lot 4S Access Improvements and Paving, in accordance with the City -line bidding site, and notices were advertised in the Santa Monica Daily Press in accordance with City Charter and Municipal Code provisions. 1,410 vendors were notified, and 48 vendors downloaded the bid. Seven (7) bids were received and publicly opened on April 4, 2016. Bid results are as follows: Base Bid & Bidder Base BidAdditive Alt. Bid Sully-Miller Contracting$ 706,094$ 736,894 Commercial Paving & Coating$ 731,049$ 738,837 All American Asphalt$ 756,000$ 756,000 Shawnan$ 759,000$ 803,000 Western Paving & Coating $ 799,592 $ 817,192 KTB Construction $ 868,239 $ 899,523 Excel Paving (dba PALP) $ 873,523 $ 881,223 Bids were evaluated based on the criteria in SMMC2.24.072, including competitive price, quality of work and experience with similar projects. 3 of 5 Sully-Miller is recommended as the best and lowest bidder for a total amount not to exceed $776,704. This figure includes the $706,094 base bid and a 10% contingency of $70,610. Sully-Miller provided over twenty references for recently completed projects, and a similar number for on-going projects. Staff contacted references for five representative projects from the cities of Torrance, Long Beach, West Hollywood, Cerritos, and La Mirada. All references reported that the work performed by Sully-Miller was completed in a timely and cost-effective manner while maintaining consistent quality. In 2013 and 2015 Sully-Miller successfully completed the Lincoln Boulevard Resurfacing Project, and the Annual Paving Project respectively, for the City of Santa Monica. Both project were completed on time and under budget with excellent quality and no significant issues. licenses are current, active, and in good standing. Based on these criteria, Sully-Miller Contracting is recommended as the best bidder for Beach Parking Lot 4S Access Improvements and Paving, in accordance with City scope of work. Construction Schedule Construction is anticipated to begin in May 2016 and be completed by July 2016. The project includes phasing that was developed in coordination with Parking Operations and Beach Administration staff to ensure the public will continue to enjoy access to the improvements in four phases over a period of two months. Financial Impacts and Budget Actions The contract to be awarded to Sully-Miller Contracting is for an amount not to exceed $776,704 (including a 10% contingency). Funds are available in the FY 2015-16 Capital 4 of 5 Improvement Program budget in account C110649.589000 . Prepared By: Allan Sheth, Civil Engineering Associate Approved Forwarded to Council Attachments: A. May 22, 2012 Staff Report B. Written comments 5 of 5 Add to 3-G 04/26/2016 Vernice Hankins From:Council Mailbox Sent:Monday, April 25, 2016 2:59 PM To:Tony Vazquez; Ted Winterer; Pam OConnor; Sue Himmelrich; Gleam Davis; Terry OÔDay; Kevin McKeown Fwd Cc:councilmtgitems Subject:FW: In support of 3G: Beach Parking Lot 4S Access Improvements and Paving Council PleaseseethebelowemailregardingBeachParkingLot4SAccessImprovement&Paving. Thanks, Stephanie OriginalMessage From:MikeFeinstein\[mailto:mfeinstein@feinstein.org\] Sent:Sunday,April24,20163:46PM To:CouncilMailbox<Council.Mailbox@SMGOV.NET> Cc:MartinPastucha<Martin.Pastucha@SMGOV.NET>;RickCole<Rick.Cole@SMGOV.NET>;ElainePolachek <Elaine.Polachek@SMGOV.NET>;JudithMeister<Judith.Meister@SMGOV.NET> :BeachParkingLot4SAccessImprovementsandPaving Subject:Insupportof3G DearCouncilmembersandCityStaff Iamwritingtoexpressmyfullsupportforitem#3GonǒĻƭķğǤ͸ƭagenda. http://santamonicacityca.iqm2.com/Citizens/FileOpen.aspx?Type=30&ID=8069&MeetingID=1061 Asmanyofyouknow,IliveonHollisterAve.,ontheblockadjacenttotheproposedimprovements.Iwasamongthose communitymemberswhofirstbroughtsafetyconcernstoCityStaffaboutthepedestrian/bicycle/automobileconflicts. Thesolutionproposedin3Gisamajorpublicpolicyandpublicworkstriumph. Itinvolves"creatingalargesharedpromenade/plazaforbicyclesandpedestrians,thatisseparatedfromvehiclesfor saferaccesstoandfromthebikeƦğƷŷͼͲͻƒƚǝźƓŭthevehicleexitlaneawayfromthebikepathconnectionandusing paintandtreestocreatevisualcuestoturnontotheexitķƩźǝĻǞğǤͼandͻğķķźƓŭanuphillbikelaneanddownhill sharrows." ignforthenewplazaanditwillbe Icannotoverstatethesignificanceoftheseimprovements.Ihaveseenthedes beautiful.Whiletheplazamaybeofmodestsize,wearegainingaqualitynewpublicspacerightnexttothebeach,on landworthafortune,byvirtueofintelligenceandcreativityΓandweareimprovingsafetyandcirculationinthe process. TheseimprovementsshouldbeseenasalegacyachievementbyJudithMeister.Withoutherhardwork,receptivityand diplomacy,theimprovementsmaynothavehappened.Judithputinthetimeonsitetomeetwithcommunity members,heartheirconcerns,andworkwithmanyotherCityStaffmemberstocomeupwiththecreative,practical approachinthestaffreport. 1 Add to 3-G 04/26/2016 Theseproposedimprovementsshouldalsobeseeninalargercontext,asaspartofanetworkofbeachadjacent pedestrianorientedpublicspacesǞĻ͸ǝĻcreatedintheSouthBeachareaoverthelastthirtyyears,byreclaimingareas fromasphalt. ThenewplazawillbeadjacenttoΓandsynergisticwiththeexistingplazaonthenorthsideofthepublicrestrooms (thatopenedin2013atthebaseofHollisterAve.nexttothebeachbikepath.) ThencomestĻƩƩǤ͸ƭCafetothesouth,withitscomfortableoutdoorseatingandbikerentalsareas. ThencomestheBeachGreen(http://www.smgov.net/Departments/CCS/content.aspx?id=32744),theSouthBeachPark (http://www.smgov.net/Departments/CCS/content.aspx?id=32769)andthenexttĻƩƩǤ͸ƭatthebaseofOceanParkBl., withitsownbeautifulplazaandoutdoorseatingarea.Togethertheseformadefactolinearparkontheinlandsideof thebeachbikepath,runningfromOceanPark.Bl.toHollisterAve. Mostpeoplehavenoideatheseimprovementsarecoming,butwillbeabsolutelythrilledwhentheyseethembuilt. ThankyoutoalloftheCityStaffmemberswhoworkedonthis. TotheCouncilmember,Iheartilyencourageyoursupport. Mike 2 wĻŅĻƩĻƓĭĻʹ /ƚƓƷƩğĭƷ bƚ͵ ЊЉЋВЌΛ//{Μ