SR 04-12-2016 3N City Council Report City Council Meeting: April 12, 2016 Agenda Item: 3.M To: Mayor and City Council From: Martin Pastucha, Director, Public Works, Architecture Services Subject: Big Blue Bus Fuel and Wash Design Modification Recommended Action Staff recommends that the City Council authorize the City Manager to negotiate and execute a first modification to professional services agreement No. 10019 (CCS), in the amount of $112,419 (includes a 10% contingency) with RNL Interplan, Inc., a California- based company, for design services to expand the Big Blue Bus CNG fueling system. This will result in a three year amended agreement with a new total amount not to exceed $229,701, with future year funding contingent on Council budget approval. Executive Summary The Big Blue Bus (BBB) is undertaking the Fuel and Wash Upgrade Project to replace existing wash equipment that has reached the end of its cost effective life. On January 27, 2015, Council authorized staff to execute Professional Services Agreement No. 10019 with RNL Interplan, Inc. to provide design services for this project in an amount not to exceed $117,282. Since the original request, the BBB has expanded its bus fleet Rail and increase ridership. The expansion of the BBB fleet necessitates a modification to the agreement to revise the BBB fueling system to accommodate another pump and fueling lane to be able to fuel the fleet within required timeframes. The modification is in an amount not to exceed $112,419, and for a new total amount not to exceed $229,701. Background The existing Big Blue Bus (BBB) fuel and wash apparatus was installed in 2002. The facility is open seven days a week and services approximately 165 buses per night. The wash apparatus has reached the end of its cost effective useful life and the BBB is undertaking the Fuel and Wash Upgrade project to replace the existing bus wash apparatus including all brushes, motors, mechanisms, rollers, pumps, holding tanks and filters. The existing Liquefied-Compressed Natural Gas (LCNG) system at BBB has been 1 of 4 evolving since it was placed into service. Originally built to fuel Liquefied Natural Gas (LNG) buses and Compressed Natural Gas (CNG) service vehicles, the system included two 30,000 gallon LNG tanks, two offload pumps, two submergible LNG pumps, two LNG dispensers, multiple valves, sensors, lines and miscellaneous hardware. In 2009, BBB transitioned from purchasing LNG buses to CNG buses. The first ten CNG powered buses were delivered in 2010. As a result of the transition to CNG buses, it was necessary to expand the capacity to convert LNG to CNG. In 2011 the LCNG system underwent major upgrades including the installation of two CNG compressor pump skids, two warming towers, three additional CNG storage tanks, new odorant injection system, two transit type dispensers, two 3600 PSI type dispensers and all support valves, sensors, piping and miscellaneous hardware. In 2013, BBB retired its last diesel buses and migrated to a completely all natural gas fleet. The current fleet is comprised of 125 CNG powered transit buses and 75 LNG powered transit buses for a total of 200 buses. This shift to natural gas has resulted in the fueling system operating at full capacity during nightly bus wash and fueling operations. It is anticipated that by the year 2019, BBB will expand its bus fleet to 225 buses, in addition to the busses recently added. , which is launching in creates the urgency to provide sufficient fueling for the expanding City bus fleet. Discussion Vendor Selection On October 8, 2014, the City published an RFP for design services to upgrade the BBB fuel and wash building in order to modernize the existing bus wash apparatus including all brushes, and components as well as to replace finishes in office spaces and nline bidding website and notices were advertised in the Santa Monica Daily Press in accordance with the City Charter and Municipal Code provisions. A total of 52 prospective firms downloaded the RFP and five firms attended a non-mandatory pre-proposal job walk. Two proposals were received and publicly opened on November 12, 2014. 2 of 4 City staff from Public Works and the Big Blue Bus evaluated proposals based on criteria listed in the RFP including price, experience, qualifications, and references. Staff selected RNL Interplan, Inc. as the best qualified firm. RNL Interplan, Inc. has broad experience in similar projects including design of the Norwalk Transportation & Public Services Facility and design of the Chula Vista Corporate Yard. Additionally, RNL Interplan, Inc. offers specific expertise relevant to this project due to their experience designing the BBB Maintenance Yard Master Plan and original Fuel and Wash Facility. On January 27, 2015, Council authorized staff to execute a professional services agreement to provide design services for the BBB Fuel and Wash Upgrade Project with RNL Interplan, Inc. in an amount not to exceed $117,282. In response to the expanding of bus fleet and the need for increased fueling capacity, it is now necessary to increase the LNG to CNG conversion and dispensing capability. Because RNL Interplan, the firm that designed the original fuel and wash facility, is adding the fueling station scope of work at the same facility to this highly qualified firm, and to modifying the existing agreement to provide these additional services given the urgency for BBB to keep up with their fueling requirements for busses coming online to accommodate the Expo Light Rail opening. The modification amount is not to exceed $112,419 (includes a 10% contingency) for a new total amount not to exceed $229,701. The scope of work includes two additional LNG to CNG compressor apparatus to increase fueling capabilities sufficient for the new fleet, one additional CNG dispenser and by-pass fueling lane an odorant injection system and all associated components , and hardware. Financial Impacts and Budget Actions The agreement modification to be awarded to RNL Interplan, Inc. is $112,419, for an amended agreement total not to exceed $229,701. Funds are available in the FY 2015- 16 Capital Improvement Program budget in account in account C410826.589000. 3 of 4 Prepared By: Erin Hamant, Administrative Analyst Approved Forwarded to Council Attachments: A. January 27, 2015 Staff Report (web link) 4 of 4