SR-08-12-2015-6A
City Council
Report
City Council Regular Meeting: December 8, 2015
Agenda Item: 6.A
1 of 22
To: Mayor and City Council
From: David Martin, Director, Planning and Community Development , Planning and
Community Development
Subject: Appeal 15ENT-0321 by Alexander Gorby of Joint Design Review Body Denial
of Building Design, Colors, Materials, and La ndscape Plans for 14ARB-173
for the construction of a new 271-room hotel and 15,210 square feet of
ground floor retail/restaurant space at 710 Wilshire Boulevard.
Recommended Action
Staff recommends that the City Council uphold appeal 15ENT-0321 and approve ARB
14-173 for building, design, colors, materials, landscaping and lighting plans for a new
271-room hotel and 15, 210 square feet of ground floor retail/restaurant space at 710
Wilshire Boulevard, subject to findings and conditions contained in this staff report.
Executive Summary
The proposed project is a new 271-room hotel that includes the retention and adaptive
reuse of a City Landmark office building (Santa Monica Professional Building), a bridge
connection between the Landmark building and the new hotel building, and 15,210 sf of
ground floor retail/restaurant space. The development agreement for the proposed
project was approved on March 20, 2012 with eight design conditions.
In anticipation of the need to obtain both a Certificate of Appropriateness for alterations
to the Landmark building and Architectural Review Board approval for the new hotel
building, Section 6.1 of the development agreement between the City and Maxser and
Company (07DEV006) established the Joint Design Review Body (JDRB), a design
review body consisting of four Landmarks Commission members and three Architectural
Review Board members. The JDRB has exclusive design review jurisdiction over the
project including the rehabilitation of the Landmark building and the design of the new
hotel building. Decisions made by the JDRB are appealable only to the City Council.
The development agreement was also approved prior to the effective date of the
recently adopted zoning ordinance and, therefore, the JDRB follows the procedures and
findings established in the prior Architectural Review ordinance (Chapter 9.32 of the
zoning code in effect at the time of the project’s approval). As a result, the Council is
acting as the JDRB in its de novo review of the ARB application and must determine
whether the proposed project meets the findings required for approval of the ARB
application identified in SMMC Section 9.32.140.
2 of 22
The JDRB reviewed the project on June 30, 2014 (Attachment A), September 29, 2014
(Attachment B) and September 28, 2015 (Attachment C). On September 28, 2015, the
JDRB voted 7-0 to approve Certificate of Appropriateness 14CA-012 and voted 5-2 to
deny ARB application 14ARB173. In its review of ARB application 14ARB173 over the
course of the two prior meetings, the Board reacted positively to the landscape palette,
the revised color palette unifying the project, opening up the entrance to the paseo on
Wilshire Boulevard and 7th Street, and the effort made to give the new construction its
own architectural personality but indicated that the positive changes were still
diminished by the proposed smooth plaster finish and generic detailing of the building.
The applicant, Alexander Gorby, owner of Maxser and Company, addressed each of the
JDRB’s outstanding issues by making substantial changes to the building design and
materials including eliminating use of the smooth finish plaster and replacing with
custom-color Glass Fiber Reinforced Concrete (GFRC) without any exterior treatment.
The applicant also removed the podium level of the new construction and replaced it
with outdoor space and a storefront glazing system. Floor area was also removed from
the East elevation breaking up the building mass and resulting in the loss of four hotel
rooms from the original proposal.
In denying 14ARB173, the JDRB found that the new hotel building lacks a clear
architectural concept demonstrated by the conflicting ideas present in the materiality,
openings, and building form (Attachment D). Specifically, the Board indicated that the
curvilinear forms appeared foreign to the overall design of the new hotel building and
had concerns regarding the permanency of the fiber-reinforced polymer entry canopy.
The bridge connection between the Landmark and new hotel building also appear ed
unresolved in terms of its design and connection between the two buildings. The GFRC
panels, generic fenestration, and balcony patterns emphasize d the size and
expansiveness of the building on all elevations. In particular, the breaks in the building
mass and color differentiation on the East Elevation were not sufficient to reduce the
perceived mass of the new hotel building and its compatibility with development in the
surrounding area.
3 of 22
The applicant, Alexander Gorby, filed an appeal of the JDRB’s denial of ARB14-173 on
October 6, 2015 (Attachment E). The JDRB’s denial was primarily based on three key
issues including the lack of an architectural concept, concerns about the East elevation,
and bridge connection details. Staff believes that the applicant has sufficiently
addressed the concerns raised by the JDRB throughout the review process in addition
to the eight design conditions imposed by the Council in the approval of the
development agreement. Specifically, the design of the new hotel building provides a
complementary reference to the layers and sculptural quality of the Landmark building.
The dark blue stucco background colour contrasts with the custom grey palette of the
GFRC panels. The curvilinear architectural forms of the new hotel building occurs at
transition points from each elevation and combined with the fenestration pattern further
provide a continuous architectural theme throughout the building design. The East
elevation has been significantly improved through breaking down the buildi ng mass into
five distinct vertical bays separated by 12-foot wide openings. Variation in color and
texture further animates the elevation. The overall pedestrian orientation of the project
has also been improved through the introduction of a continuous storefront glazing
system on the 7th Street elevation that has allowed for an expanded opening into the
retail paseo and seamless transitions between the indoor hotel lobby and retail space
and adjacent outdoor dining and pedestrian zone. The 7th Street elevation is highlighted
by a prominent curved entry canopy. The only connection between the Landmark and
new hotel building is a bridge at the podium level. The bridge consists of a steel
material with glass railings and a steel trowel stucco underside. The bridge walkway
would have a terrazzo finish. The visual representation of the bridge connection is
mitigated by the transparency of the glass railing material.
As a result, staff believes that the project meets each of the required ARB findings and
recommends that the subject appeal be upheld. If the appeal is upheld, the applicant
would move forward to the plan check process in order to obtain a building permit for
the project. The Council may also deny the appeal with or without prejudice. If the
appeal is denied with prejudice, the applicant would be required to file a new ARB
application for a project design that is not substantially the same as the prior project and
seek JDRB approval of the revised ARB application. The Council’s action on the
subject appeal is final.
Background
The development agreement for the proposed project was approved by the City Council
on March 20, 2012 (Attachment F). The applicant also made courtesy presentations on
the building design to the Landmarks Commission on three separate occasions: May
11, 2009 (Attachment G), April 12, 2010 (Attachment H), and December 12, 2011
(Attachment I). The discussion on the project focused around the project’s compatibility
with the Landmark building and concerns that: 1) the project should reference but not
overly replicate the forms and proportions of the Landmark building and 2) that the new
hotel building overwhelmed the Landmark in terms of volume, mass, and height.
4 of 22
The development agreement included unique provisions that were intended to provide a
framework for JDRB review of the project including review parameters and specific
design areas to pay particular attention. These conditions also guide Council’s de novo
review of the ARB application.
Section 6.1.5 of the development agreement states that the JDRB cannot require
modifications to the building design which negate the fundamental development
standards established by the development agreement (e.g. reduction in overall height or
reduction in number of stories). The JDRB also cannot take action that has the effect of
requiring elimination of a physical connection between the Landmark building and the
new hotel building. However, the JDRB does have authority to reduce the floor area of
the project by no greater than 2%.
As part of its review of the development agreement, Council imposed the following
conditions of approval that relate to JDRB review of the project:
“The Joint Design Review Body shall pay particular attention to the following design
elements of the project:
The south elevation stair tower to ensure that it provides visual interest
The south elevation above the hotel vehicle entrance to ensure that the proposed
green wall is composed of a high quality material. The applicant shall be
required to submit details of the green wall system to be used.
The north elevation of the southernmost wing to ensure that it continues the
design detail on the remainder of the 7th Street elevation and may include
wrapping around the balconies, windows, texture, and articulation
The east elevation (alley) to ensure that it reflects the same level of detail as the
west elevation (7th Street) and references the belt line and upper level
fenestration and detail of the 7th Street elevation
The pedestrian entrance to the hotel requires greater prominence and features
that help to activate the Public Use Area identified in the plans
The retail paseo area needs to be activated with pedestrian -oriented amenities
such as outdoor dining and seating
The ground floor open space, including landscaping and any water features,
needs to engage pedestrians and should incorporate amenities such as seating
or built-in furniture as well as artistic design elements
5 of 22
The interior elevations of the new construction (facing the courtyards) to ensure
consistency and level of design detail on all elevations”
The JDRB initially reviewed the ARB application and Certificate of Appropriateness at
its June 30, 2014 meeting where the Board expressed appreciation for the depth of
historical study, which helped in a greater understanding of the layers to the historic
building.
Figure 1: Project Renderings Presented to JDRB June 30, 2014
However, the Board had concerns regarding the new construction and voted to continue
both applications with the following issues for the applicant to address:
New Construction
o The new construction is too respectful of the historic building and needs a
stronger architectural statement to stand on its own instead of fading into
background
o Experiment more with color and material palette so that they are treated
as a visual expression of the quality of the new architecture and relate
better to the coastal landscape theme
6 of 22
o Need for layers and hierarchy of variation to better complement the
historic building
o East elevation still looks too massive and is in contrast to elegant
proportions and sculptural shapes of the historic building
o Restudy proportions of how the new construction wraps around the
historic building on Wilshire Boulevard creating an opening that may be
too narrow
o Create some alignment in openings between historic and new construction
o Concrete facades separate from the building on the 6 th floor create some
odd gaps
Landscaping
o Project does a good job of breaking up public areas and creating scale in
the open spaces
o Need to link public spaces so that spatial sequence of public movement
throughout spaces is more exposed
o Extend paving colors into lobbies and into the buildings to integrate the
inside/outside relationship
Lighting and Columns
o False sense of historicism is created by the proposed sconces and
columns
o Restudy the locational consistency between columns on the new and the
historic building
The applicant responded by making the following design changes that were presented
at the September 29, 2014 meeting:
Bolder colors that are related to the terrazzo flooring;
Changes to the architectural form on the East Elevation including curvilinear
forms and deeper stepbacks to reduce the perceived mass;
Revisions to the paseo entrances on 7th Street and Wilshire Boulevard to open
up the pedestrian space;
Sconces and columns with a more simple, modern form;
Revisions to the size and proportion of the steel horizontal band below the
transom windows on Wilshire Boulevard;
Differentiation between the window systems and the building façade with colour
and depth of reveal;
Modifications to the west side planting of the podium level to allow for greater
plaza visibility creating a visual connection between the podium and street level;
and
Canopy trees to the southern edge and select locations to create more intimate
spaces and provide greater flexibility in the use of spaces.
Figure 2: Project Rendering Presented to JDRB September 29, 2014
7 of 22
At the JDRB’s September 29, 2014 meeting, the Board reacted positively to the
landscape palette, the revised colour palette unifying the project, opening up the
entrance to the paseo on Wilshire Boulevard and 7th Street, and the effort made to give
the new construction its own architectural personality but indicated that the positive
changes were still diminished by the proposed smooth finish and detailing of the
building. The JDRB highlighted the following key issues for the applicant to address:
The relationship between open spaces in the project
The building base proportions still do not relate well to the existing Landmark
The new construction should reference textures, details, proportions, and quality
of the Landmark
The overly uniform look of the sack finish, that appears like stucco, covering
large expanses of the new construction
Blue window mullions are not preferable
Hotel entry needs to be more prominent in comparison to the larger paseo
opening
Investigate other locations for the garage venting on the 7th Street elevation
Provide more variation in texture, materiality, and window opening size for the
window structure
8 of 22
Repetitive nature and significant mass of the East Elevation
The 6th Floor angled windows and roofline on the new construction are too
referential to the Landmark
The applicant responded to the JDRB’s comments by making substantial changes to
the building design and materials including replacement of all poured -in-place concrete
in the project with Glass Fiber Reinforced Concrete (GFRC) that has no exterior finish
applied to the surface and removing the podium level of the new construction and
replacing it with outdoor space and a transparent storefront glazing system on 7 th
Street. Hotel rooms have also been removed from the east elevation to break up the
building mass and emphasize the vertical bays. The revised design was presented at
the September 28, 2015 JDRB meeting and introduced:
Differentiation between the new construction and Landmark by removing the
podium from the new construction effectively bringing the new construction to the
ground level, improving the relationship with the pedestrian environment and
creating distinct breaks in the East alley elevation. The podium has been
replaced with an 18-foot high storefront glazing systems along the 7th Street
frontage, opened up entrances to the paseo on 7th Street and Wilshire Boulevard,
and more space for outdoor dining.
Entire replacement of the poured-in-place concrete on the curvilinear forms and
flat elevations with custom-colored GFRC. The GFRC would not be covered by
any exterior finish.
A simplified colour palette including light blue stucco as background to the GFRC
and also as a contrast in the center building between the two hotel towers. The
entrance canopy has a darker blue colour.
Window mullions changed from blue to clear anodized aluminum.
A fiber-reinforced polymer entrance canopy that increases the prominence of the
entrance canopy in comparison to the paseo opening and the transparent
pavilion between the two hotel towers.
Removal of the northern secondary driveway and replacement with a structural
support column that provides symmetry to the canopied hotel entrance.
Improved texture of elevations with inset balconies at varying depths and
alternating stucco and glass railings. The balconies are connected by a
continuous ribbon to provide uniformity across all four elevations.
Reduction in the overall number of hotel rooms to 271 rooms due to the creation
of a 12-foot wide break in building mass on the East Elevation.
Removal of the ziggurat glazing at the top floor of the new construction that was
intended to reference the angles of the Landmark.
Relocation or removal of structures on the roof deck to create more outdoor
terrace and dining area and further differentiating the new construction from the
Landmark.
9 of 22
At the September 28, 2015 meeting, the JDRB approved Certificate of Appropriateness
14CA012 but denied Architectural Review Board Application 14ARB173.
Discussion
Project/Site Information
The following table provides a brief summary of project data:
Zoning District / Design
Guidelines: C3C, C3
Parcel Area (SF): 52,500
Parcel Dimensions: 150’ X 350’
Existing On-Site
Improvements (Year Built):
Surface Parking Lot
City Landmark Office/Retail Building (1928)
Mature Vegetation None
Historic Resource Designated City Landmark, Santa Monica Professional Building. The
building is being retained for adaptive reuse from office to hotel.
CEQA Exempt pursuant to Section 15061 (b)(3)
Adjacent Zoning & Use: North: DP – Reed Park
South: C3C – 1-story office building
East: C3C and C4 – 3-story office building, 2-story apartments,
surface parking, and Boys & Girls Club
West: C3C and C3 – 1-story retail, 1-story office building with 3-story
parking garage
Landscape Plans Landscape plans are included in the project plans.
Transportation 325 parking spaces
The project site is comprised of 8 lots with one lot at the southeast corner of 7 th Street
and Wilshire Boulevard occupied by the Landmark structure. The entire project site is
surrounded by one- to three-story commercial and office uses to the south and west.
To the east across 7th Court alley, is the Boys and Girls Club, a two-story apartment
building, and a three-story office building. Christine Reed Park is located across
Wilshire Boulevard to the north. A two-story brick commercial building was located
immediately east of the Landmark structure but was demolished in 2015.
10 of 22
Figure 3: Proposed Site Plan
CEQA Status
The project is exempt from the provisions of the California Environmental Quality Act
(CEQA) pursuant to Section 15061 (b)(3) in that it can be seen with certainty that the
proposed project does not have the potential for causing a significant effect on the
environment in that the project involves the review of design -related issues associated
with the proposed structure(s) in terms of general architectural design, proposed
materials, colors, mechanical screening and/or landscape plans. Additionally, in
accordance with the California Environmental Quality Act (CEQA), an Environmental
11 of 22
Impact Report (EIR) was prepared to determine the environmental effects of the
proposed project and certified by the City Council on March 20, 2012. In the EIR,
mitigation measures were identified in the areas of Construction Effects (Traffic, Noise
and Air Quality), Historic Resources, Geology (Excavation), and Hazards and
Hazardous Materials (Soil Testing) to reduce potential impacts to less than significant
levels. To ensure that these measures are properly enacted, a mitigation monitoring
program is necessary and will be enforced during the construction and operation of the
project, if approved. The proposed mitigation measures are provided in the Final EIR.
Significant and unavoidable impacts were identified in the areas of Construction Effects
(Groundborne Vibration) and Transportation/Traffic.
Project Analysis
Building Design/Pedestrian Orientation
The new hotel building consists of three wings oriented around a central podium level
courtyard. On 7th Street, the ground floor is setback from the property line in a curved
form and identified by a prominent hotel entry canopy. A transparent storefront glazing
system allows for a direct relationship with the adjacent widened sidewalk and also
draws pedestrians into an enlarged opening to the paseo between the Landmark and
the new hotel building. The contemporary design of the new hotel building is
complementary to the distinctive features of the Landmark building. The design of the
new hotel building provides a sensitive backdrop to the Landmark building by providing
a significant building setback on Wilshire Boulevard, building insets on 7th Street, and
breaks in the building mass on the alley elevation that all reduce the perceived mass of
the new hotel building. The new hotel building also provides a contemporary reference
to the layers and sculptural quality of the Landmark building but is clearly differentiated
in materials, colors, and architectural elements. Specifically, the applicant has
integrated a custom gray color palette for the Glass Fiber Reinforced Concrete (GFRC)
that will be the majority of the building color. The sculptural GFRC will be contrasted
against a dark blue stucco background with a lighter blue applied to the fiber-reinforced
polymer entrance canopy. The use of color is particularly effective on the east elevation
to distinguish between each vertical bay and emphasize the breaks in the building
mass.
12 of 22
Figure 4: Project Rendering
Since the development agreement was approved, the podium level was removed from
the new hotel building thereby eliminating replication of a defining feature of the
Landmark building while also distinguishing the new hotel building’s architectural
13 of 22
presence. Structural columns and voids in the building have been brought to the
ground level creating distinct breaks in the building mass of the East Elevation. The
removal of the podium has increased the pedestrian orientation of the project by
creating new outdoor dining opportunities and improving the indoor/outdoor
relationships between the tenant spaces and sidewalk and retail paseo. The ground
floor retail and restaurant uses facing the paseo in addition to Wilshire Boulevard and
7th Street increase the project’s street presence.
DESIGN ELEMENTS PROPOSED EXTERIOR
MATERIAL, FINISH AND COLOR
Façade Exterior Wall: Clark Pacific 12118-11 GFRC; Clark Pacific 12118-10 GFRC
Exterior Wall (background): Smooth Steel Trowel Stucco, BM Custom C2-
5382 “Stockholm”
Control Joint: Sealant, To Match GFRC/Stucco
Windows Storefront: Aluminum, Clear Anodized
Guest Rooms: Aluminum, Clear Anodized
Doors Aluminum
Roof Roof Fin: Aluminum Cladding
Mechanical Screening Aluminum Louvers, Metallic Paint (Metallic Silver Colorweld 300XL)
Refuse Screening Aluminum Louvers, Metallic Paint (Metallic Silver Colorweld 300XL)
Lighting Wall sconce
Canopy/Awning/Trellis Fiber-Reinforced Polymer, BM Custom C2-5382 @ 200%
Railings Glass, Tempered (Clear)
Other Pedestrian Bridge: Steel, Painted (C2-274A)
Exterior Floor: Terrazo (Blue, White, Beige, Grey); Concrete, Presto (Mesa
Beige)
Neighborhood Compatibility
The proposed project has been designed with significant building setbacks to ensure
that the mass and scale of the project is compatible with the surrounding neighborhood
context. The project has placed more of the mass towards the southern end of the
project site thereby reducing visible mass from Wilshire Boulevard and from 7th Street
and also away from the residential neighborhood to the north. The new hotel building
14 of 22
provides a sensitive context for the Landmark building but is also compatible with the
surrounding neighborhood context, which is primarily one - to three-story buildings
punctuated by a few high-rise buildings, including the Landmark building. In this sense,
the proposed project continues an established context of generally low-scale
development mixed with higher buildings on selected sites.
Landscape and Lighting Plans
The applicant proposes a landscaping plan that consists of drought tolerant and low
water use planting material and trees. Curving patterns of terrazzo are proposed at the
ground level and podium level courtyard weaving in a theme of sand and sea that
unifies the open spaces at each level. At the ground level, concrete planters with built-
in wood seating are proposed in the retail paseo lined with tree ferns to emphasize the
entrances from Wilshire Boulevard and 7th Street. Distictis vines are planted on a green
screen wall on the south elevation of the garage entry. Planters and planting pockets
provide greening opportunities on the alley elevation.
On the podium level, the public courtyard is lined with planting along the parapet with
trees while still allowing for views into and out of the podium courtyard level. A
continuous planter wraps the central tower at the base with additional planters massed
along the curved terrazzo pattern at the perimeter of the courtyard. Canopy trees and
selective landscaping reduces the volume of the large public courtyard while providing
shade and more intimate spaces for hotel guests. Private terraces for each guest room
will consist of CMU walls with presto finish planters with a planted wire rope system with
privacy glass partition. Planting niches on the 5th and 6th levels provide hotel guests a
quiet garden environment with arbutus marina trees and underplantings of myers
asparagus, aspidistra elatior, and philodendron ‘xanadu’ in curvilinear poured -in-place
concrete planters. The roof level includes a pool and outdoor fitness area surrounded
by planters filled with sun-tolerant shrubs (golden sedum, aptenia cordifolia) and
grasses.
15 of 22
The proposed lighting is primarily recessed downlights at the paseo entries and
entryways, indirect sconces, and low level accent lighting for landscape and
architectural features such as the canopy above the bridge.
Impact on Historic Resources
The JDRB approved Certificate of Appropriateness 14CA072 for alterations to the
Landmark building on September 28, 2015. In reviewing the application for a Certificate
of Appropriateness, the JDRB made findings in accordance with provisions of SMMC
Section 9.36.140, which requires use of the Secretary of the Interior’s Standards in
evaluating any proposed alteration, restoration, or construction, in whole or in part, of or
to a Landmark or Landmark Parcel. The applicant has submitted a report prepared by
Chattel, Inc. evaluating the rehabilitation of the Landmark building for conformance with
the Secretary of the Interior’s Standards for the Treatment of Historic Properties, which
is included in the applicant’s submittal materials.
In accordance with Standard 1, the project retains the character -defining features of the
Landmark building while allowing for conversion from office to hotel use. In accordance
with Standards 2, 5, and 6, the historic character of the Landmark building will be
preserved and the distinctive materials, features, and spatial relationships will be
retained. In addition, deteriorated historic features, such as the roof tiles and waste
mold concrete will be repaired and replaced in kind only when necessary. Missing
features will be constructed based on physical and documentary evidence outlined in
the building conservation report prepared by Griswold Conservation Associates,
included in the applicant’s submittal materials. In accordance with Standards 9 and 10,
the pedestrian bridge and new storefront openings on the east and south elevations of
the Landmark building are compatible with the historic materials and features. The
bridge connection is minimal and reversible with limited impacts to historic mater ials.
The new hotel building is compatible in mass, scale, and materials and references but is
clearly differentiated from the Landmark building.
Appeal Statement
16 of 22
The applicant filed an appeal of the JDRB’s denial of ARB14-173 on October 6, 2015.
In filing the appeal, the applicant disputes the findings that were the basis of the denial
and that the project meets the findings for Architectural Approval. Specifically, the
applicant contends that in addition to the JDRB’s findings required for Architectural
Approval, the development agreement specified eight areas that the JDRB should pay
particular attention. The applicant’s appeal statement indicates that each of the eight
areas of design concern have been sufficiently addressed and that the JDRB exce eded
the limits of their review authority as guaranteed by development agreement Section
6.1.5.
The JDRB was created to be a joint ARB/Landmarks Commission design review
authority with exclusive design purview over the project, appealable only to the City
Council. The JDRB has the same purview given to the Architectural Review Board in its
review of Architectural Approval applications. In addition, the development agreement
provides the JDRB specific authority to review the eight areas of design concern and
also to reduce floor area by no more than two percent. In approving the development
agreement, Council added eight design conditions of approval to the project for the
JDRB to pay particular attention:
The south elevation stair tower to ensure that it provides visual interest
The south elevation above the hotel vehicle entrance to ensure that the proposed
green wall is composed of a high quality material. The applicant shall be
required to submit details of the green wall system to be used.
The north elevation of the southernmost wing to ensure that it continues the
design detail on the remainder of the 7th Street elevation and may include
wrapping around the balconies, windows, texture, and articulation
The east elevation (alley) to ensure that it ref lects the same level of detail as the
west elevation (7th Street) and references the belt line and upper level
fenestration and detail of the 7th Street elevation
The pedestrian entrance to the hotel requires greater prominence and features
that help to activate the Public Use Area identified in the plans
The retail paseo area needs to be activated with pedestrian -oriented amenities
such as outdoor dining and seating
The ground floor open space, including landscaping and any water features,
needs to engage pedestrians and should incorporate amenities such as seating
or built-in furniture as well as artistic design elements
The interior elevations of the new construction (facing the courtyards) to ensure
consistency and level of design detail on all elevation s
17 of 22
The applicant has provided a response as to how the project has responded to each
condition (Attachment E). These responses are summarized as follows:
South elevation stair tower visual interest: The height of the stair tower has been
reduced to be proportionate in height with the remainder of the south elevation.
Balconies and texture have also been added to the south elevation for visual
interest.
South elevation green wall detail: The green wall systems is a welded steel wire
mesh system that is used specifically for trellising and architectural screening.
The green wall system will have vines and has been positioned above the hotel
vehicle entrance at the transition point between the west and south elevations.
North elevation of the southernmost wing design detail to match 7th Street
elevation: The north elevation of the southernmost wing has been revised by
wrapping the GFRC façade from the west elevation to the courtyard so that the
courtyard elevation has similar color, material, texture, and fenestration as the 7th
Street elevation.
East elevation design detail to match 7th Street elevation: The east elevation has
been significantly revised by breaking the building mass into five distinct vertical
bays of similar proportion and detail as the 7th Street elevation. A 12-foot wide
break between each vertical bay provides relief in the building mass and
references the scale and permeability of the 7th Street elevation.
Greater prominence of pedestrian entrance: The removal of the podium level on
the new hotel building has allowed for a more prominent main entry and
improved pedestrian orientation due to the increase in outdoor open space
between the hotel building and the sidewalk on 7th Street. The expansive
storefront glazing system is highlighted by a curved entry canopy over the hotel
entrance. The terrazzo floor pattern allows for a seamless indoor/outdoor
relationship between the hotel lobby, ground floor retail space, and the adjacent
pedestrian zone that includes outdoor dining and publ ic use areas. The entrance
to the retail paseo from Wilshire Boulevard and 7 th Street has been significantly
widened and improved with landscaping and seating areas, providing a
welcoming public environment.
18 of 22
Activation of retail paseo with pedestrian-oriented amenities/Ground floor open
space needs to engage pedestrians: The retail paseo is activated with built-in
outdoor seating, bicycle parking, and dining furniture. The entrance into the retail
paseo has been revised with the curved storefront glazing system providing an
expanded entrance and additional outdoor dining space.
Interior elevation (courtyards) of the new hotel building to ensure design detail on
all elevations: The courtyard elevations of the project have been revised to
reflect the same materiality and detail as the street-facing elevations.
Specifically, the GFRC panels wrap each corner to provide a transition from the
street-facing elevations to the courtyards. Fenestration patterns, balcony
openings, and colored stucco provide continuity among all elevations with the
dark blue stucco background contrasted against the custom gray GFRC panels.
In addition to addressing the eight design conditions of the development agreement, t he
applicant has made significant design revisions to the project since the development
agreement was approved specifically in terms of ensuring the same level of design
detail on all four building elevations. As a result, staff agrees with the applicant’s
position that design revisions have been provided to satisfy the design conditions of the
development agreement.
Necessary Findings and Determinations
The City Council, in its de novo review of this appeal, must determine whether the
proposed project meets the findings required for approval of the ARB applicat ion
identified in SMMC 9.32.140 as follows:
A. The plan for the proposed building or structure is expressive of good taste, good
design, and in general contributes to the image of Santa Monica as a place of
beauty, creativity and individuality.
B. The proposed building or structure is not of inferior quality such as to cause the
nature of the local neighborhood or environment to materially depreciate in
appearance and value.
C. The proposed design of the building or structure is compatible with developments
on land in the general area.
19 of 22
D. The proposed development is in conformity with the effective guidelines and
standards adopted pursuant to this chapter and all other applicable ordinances
insofar as the location and appearance of the buildings and structures are
involved.
In its review of ARB application 14ARB173 the JDRB reacted positively to the
landscape palette, the color palette unifying the project, opening up the entrance to the
paseo on Wilshire Boulevard and 7th Street, and the effort made to give the new
construction its own architectural personality. Based on the JDRB’s denial findings, the
following are key design issues that the Council should also consider in its de novo
review of the ARB application:
Lack of clear architectural concept
Unresolved bridge connection details
Perceived mass of East Elevation
Specifically, the JDRB found that the new hotel building lacks a clear architectural
concept demonstrated by the conflicting ideas present in the materiality, openings, and
building form. The Board indicated that the curvilinear forms appeared foreign to the
overall design of the new hotel building and had concerns regarding the permanency of
the fiber-reinforced polymer entry canopy. The bridge connection between the
Landmark and new hotel building also appeared unresolved in terms of its design and
connection between the two buildings. The GFRC panels, generic fenestration, and
balcony patterns emphasized the size and expansiveness of the building on all
elevations. In particular, the breaks in the building mass and color differentiation on the
East Elevation were not sufficient to reduce the perceived mass of the new hotel
building and its compatibility with development in the surrounding area.
Staff believes that the project meets the required ARB findings as detailed in
Attachment K and therefore, recommends that the appeal be upheld. As detailed in this
report, staff believes that the key issues raised in the JDRB’s denial of the ARB
application in terms of architectural concept, the East Elevation, and the bridge
connection have been sufficiently addressed by the applicant. The architectural
elements of the new hotel building provide a contemporary reference to the layers and
20 of 22
sculptural quality of the Landmark building without creating a fa lse sense of historicism.
The new hotel building provides a complementary and sensitive backdrop to the
Landmark building by providing a significant building setback on Wilshire Boulevard,
building insets on 7th Street, and breaks in the building mass on the East elevation that
all reduce the perceived mass of the new hotel building.
The East elevation is broken up into five vertical bays that bring the building to the
ground and allow the elevation to read as distinct building masses. The custom gray
color palette for the GFRC panels contrast against a dark blue stucco background with
a lighter blue applied to the fiber-reinforced polymer entrance canopy. The use of color
is particularly effective on the East elevation to distinguish between each vertical bay
and emphasizes the breaks in the building mass.
The only connection between the Landmark and new hotel building is a bridge at the
podium level. The bridge consists of a steel material with glass railings and a steel
trowel stucco underside. The bridge walkway would have a terrazzo finish. The visual
representation of the bridge connection is mitigated by the transparency of the glass
railing material.
If the appeal is upheld, the applicant would move forward to the plan check process in
order to obtain a building permit for the project. The Council’s decision on the appeal
is final.
21 of 22
Alternative Actions
In addition to the recommended action, the City Council could consider the following
with respect to the project if supported by the evidentiary record and consistent with
applicable legal principles.
A1. Articulate revised findings and/or conditions to Approve or Deny, with or without
prejudice, the subject application.
If Council denies the appeal with prejudice, the applicant would b e required to file a new
ARB application for a project design that is not substantially the same as the prior
project and seek JDRB approval of the revised ARB application. If the appeal is denied
without prejudice, the applicant could bring the ARB application back to the JDRB for
further review.
Financial Impacts and Budget Actions
There is no immediate financial impact or budget action necessary as a result of the
recommended action.
Prepared By: Jing Yeo, Special Projects Manager
Approved
Forwarded to Council
Attachments:
A. Joint Design Review Body Meeting June 30, 2014 (Web Link)
B. Joint Design Review Body Meeting September 29, 2014 (Web Link)
C. Joint Design Review Body September 28, 2015 (Web Link)
D. Final ARB STOA 710 Wilshire Denial
22 of 22
E. 710 Wilshire Applicant JDRB Appeal Statement
F. City Council Meeting March 20, 2012 (Web Link)
G. Landmarks Commission Meeting May 11, 2009 (Web Link)
H. Landmarks Commission Meeting April 12, 2010 (Web Link)
I. Landmarks Commission Meeting December 12, 2011 (Web Link)
J. 710 Wilshire Project Plans - ARB Appeal 12-08-15
K. Attachment K - ARB Findings
L. (Staff) 710 Wilshire CC Appeal Presentation 12-8-15
710 wilshire blvd, santa monica, ca 90401
SANTA MONICA, CALIFORNIA 90401
710 WILSHIRE BLVD.
COMMERCIAL MIXED-USE HOTEL PROJECT
DA No. 07-006
APPLICANT/PROPERTY OWNER: ALEX GORBY
DRAFT JOINT DESIGN REVIEW BODY SUBMITTAL
MARCH 1, 2014
71
0
W
I
L
S
H
I
R
E
B
O
U
L
E
V
A
R
D
AL
E
X
G
O
R
B
Y
H
O
T
E
L
P
R
O
J
E
C
T
PURPOSE OF THE APPLICATION:
BLDG DESIGN, MATERIALS, COLORS,
LANDSCAPING, LIGHT PLANS;
DEFERRED: SIGNAGE (TBD)
CITY COUNCIL APPEAL HEARING
DECEMBER 8, 2015
APPEAL 15ENT-0321 OF JOINT DESIGN REVIEW BODY 14ARB-173
A000
SCOPE OF THE APPLICATION:
BLDG. DESIGN, MATERIALS, COLORS,
LANDSCAPE, LIGHTING PLANS;
DEFERRED: SIGNAGE (TBD)
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 index A001
A000 COVER SHEET
A001 SHEET INDEX
A002 BUILDING DATA
A003 LEED SCORE CARD
SV-1 ARCHITECTURAL SURVEY
RENDERINGS
R001 7TH STREET AT WILSHIRE BOULEVARD
R002 7TH STREET VIEWING NORTH
R003 PEDESTRIAN ENTRANCE TO RETAIL PASEO @ 7TH STREET
R004 HOTEL FRONTAGE ALONG 7TH STREET @ DUSK
R005 PEDESTRIAN ENTRANCE TO RETAIL PASEO AT 7TH STREET
R006 WILSHIRE BOULEVARD @ PASEO / RETAIL ENTRANCE
R007 RETAIL PASEO VIEWING WEST
R008 EAST PERSPECTIVE - 7TH COURT ALLEY
R009 BIRD’S-EYE OF RETAIL PASEO
R010 MATERIAL AND COLOR PLAN
R011 WINDOW CONFIGURATIONS AND DETAILS
DETAILS
D-01 ENTRY PODIUM SECTION
D-02 GROUND FLOOR STORE FRONT DETAIL
D-03 BALCONY TYPE ‘A’ DETAIL
D-04 BALCONY TYPE ‘B’ DETAIL
D-05 BRIDGE DETAIL
D-06 ROOF EDGE DETAIL
COLORS & MATERIALS
LANDMARK - COLORS / MATERIALS
NEW CONSTRUCTION - COLORS / MATERIALS
A201 GROUND FLOOR PLAN
A202 SECOND FLOOR PLAN
A203 THIRD FLOOR PLAN
A204 FOURTH FLOOR PLAN
A205 FIFTH FLOOR PLAN
A206 SIXTH FLOOR PLAN
A207a ROOF TERRACE (W/ PARTIAL SEVENTH FLOOR)
A207b EQUIPMENT HEIGHTS AT ROOF TERRACE
A208 ROOF PLAN
R301 NORTH ELEVATION - RENDERING
R302 NORTH ELEVATION AT PASEO - RENDERING
R303 WEST ELEVATION - RENDERING
R304 WEST ELEVATION AT PASEO - RENDERING
R305 SOUTH ELEVATION - RENDERING
R306 EAST ELEVATION - RENDERING
A401 SECTION
A402 SOUTH STAIR
LANDSCAPE
L101 – GROUND LEVEL RENDERED PLANTING AND HARDSCAPE PLAN
L102 – SECOND LEVEL RENDERED PLANTING AND HARDSCAPE PLAN
L103 – 5TH & 6TH LEVEL RENDERED PLANTING AND HARDSCAPE PLAN
L104 – 7TH LEVEL RENDERED PLANTING AND HARDSCAPE PLAN
L201 – PLANT PHOTOS
L202 – PLANT PHOTOS
L203 – PLANT PHOTOS
L204 – HARDSCAPE MATERIAL PALETTE
L301 – EXTERIOR ELEVATIONS AT PLANTING
L302 – EXTERIOR ELEVATIONS AT PLANTING
L303 – EXTERIOR ELEVATIONS AT 2 YEARS PLANT MATURITY
L304 – EXTERIOR ELEVATIONS AT 2 YEARS PLANT MATURITY
LI101 – GROUND LEVEL IRRIGATION PLAN
LI102 – SECOND LEVEL IRRIGATION PLAN
LI103 – 5TH AND 6TH LEVEL IRRIGATION PLAN
LI104 – 7TH LEVEL IRRIGATION PLAN
LI201 – IRRIGATION LEGEND
LI202 – IRRIGATION LEGEND
LI203 – IRRIGATION LEGEND
LI204 – IRRIGATION LEGEND
LI205 – IRRIGATION LEGEND
LI206 – IRRIGATION LEGEND
LI207 – IRRIGATION DETAILS
LP101 – GROUND LEVEL PLANTING PLAN
LP102 – SECOND LEVEL PLANTING PLAN
LP103 – 5TH AND 6TH LEVEL PLANTING PLAN
LP104 – 7TH LEVEL PLANTING PLAN
LP201 – PLANTING LEGEND
LP301 – PLANTING DETAILS
LIGHTING
EL-001.1 GROUND FLOOR PLAN LIGHTING LAYOUT_A
EL-001.2 GROUND FLOOR PLAN LIGHTING LAYOUT_B
EL-002.1 SECOND FLOOR PLAN LIGHTING LAYOUT_A
EL-002.2 SECOND FLOOR PLAN LIGHTING LAYOUT_B
EL-003.1 THIRD FLOOR PLAN LIGHTING LAYOUT_A
EL-003.2 THIRD FLOOR PLAN LIGHTING LAYOUT_B
EL-004.1 FOURTH FLOOR PLAN LIGHTING LAYOUT_A
EL-004.2 FOURTH FLOOR PLAN LIGHTING LAYOUT_B
EL-005.1 FIFTH FLOOR PLAN LIGHTING LAYOUT_A
EL-005.2 FIFTH FLOOR PLAN LIGHTING LAYOUT_B
EL-006.1 SIXTH FLOOR PLAN LIGHTING LAYOUT_A
EL-006.2 SIXTH FLOOR PLAN LIGHTING LAYOUT_B
EL-007.1 SEVENTH FLOOR PLAN LIGHTING LAYOUT_A
EL-007.2 SEVENTH FLOOR PLAN LIGHTING LAYOUT_B
EL-101.1 LIGHTING FIXTURE MATRIX
EL-101.2 LIGHTING FIXTURE MATRIX
EL-101.3 LIGHTING FIXTURE MATRIX
EL-101.4 LIGHTING FIXTURE MATRIX
NEIGHBORHOOD CONTEXT
- CORNER OF 7TH ST & WILSHIRE BLVD/710 WILSHIRE BLVD
- 710 WILSHIRE BLVD/718 WILSHIRE BLVD
- FRONTAGE ALONG 7TH ST
- 1213 7TH ST/1217 7TH ST
- 1221 7TH ST/1227 7TH ST
- 1233 7TH ST/1337 7TH ST
- SOUTH VIEW OF 710 WILSHIRE BLVD
- SOUTH VIEW OF 710 WILSHIRE BLVD/
SOUTH VIEW OF 718 WILSHIRE BLVD
- 7TH ST COURT VIEWING NORTH/7TH ST COURT VIEWING SOUTH
- BOYS AND GIRLS CLUB, LINCOLN BLVD VIEWING WEST
- 1218 LINCOLN BLVD VIEWING WEST
- WILSHIRE BLVD PHOTOMONTAGE CONTEXT VIEW
(LINCOLN BLVD TO 7TH ST)
- 7TH ST PHOTOMONTAGE CONTEXT VIEW
(WILSHIRE BLVD TO ARIZONA AVE)
* BELOW GRADE PARKING LEVELS AVAILABLE UPON REQUEST
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 building data A002
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401
LEED for New Construction and Major Renovation Project Scorecard
Project Name:710 Wilshire
Project Address:710 Wilshire, Santa Monica
Date:9/13/2015
Certification:SILVER
Yes Y?N? No Yes Y?N? No
18 4 2 2 SUSTAINABLE SITES 26 Points 7 1 6 MATERIALS & RESOURCES 14 Points
Y C Prereq 1 Construction Activity Pollution Prevention Required Y D Prereq 1 Storage and Collection of Recyclables Required
1 D Credit 1 Site Selection 1 1 1 1 C Credit 1.1 Building Reuse - Maintain Existing Walls, Floors and Roof 55%, 75%, 95%1 to 3
5 D Credit 2 Development Density and Community Connectivity {EB}5 1 C Credit 1.2 Building Reuse - Maintain Interior Nonstructural Elements 50%1
1 D Credit 3 Brownfield Redevelopment 1 2 C Credit 2 Construction Waste Management 50%, 75% (95%)1 to 2
6 D Credit 4.1 Alternative Transportation - Public Transportation Access (ID) {EB}6 2 C Credit 3 Materials Reuse 5%, 10% (15%)1 to 2
1 D Credit 4.2 Alternative Transportation - Bicycle Storage and Changing Rooms (ID)1 2 C Credit 4 Recycled Content 10%, 20% (30%) {EB}1 to 2
3 D Credit 4.3 Alternative Transportation - Low-Emitting and Fuel-Efficient Vehicles (ID)3 2 C Credit 5 Regional Materials 10%, 20% (30%) {EB}1 to 2
2 D Credit 4.4 Alternative Transportation - Parking Capacity (ID)2 1 C Credit 6 Rapidly Renewable Materials 2.5% (5%) {EB}1
1 C Credit 5.1 Site Development - Protect or Restore Habitat 50% (75%)1 1 C Credit 7 Certified Wood 50% (95%) {EB}1
1 D Credit 5.2 Site Development - Maximize Open Space 25% (50%)1 Yes Y?N? No
1 D Credit 6.1 Stormwater Design - Quantity Control 1 9 1 4 1 INDOOR ENVIRONMENTAL QUALITY 15 Points
1 D Credit 6.2 Stormwater Design - Quality Control 1
1 C Credit 7.1 Heat Island Effect - Nonroof 50% (100%)1 Y D Prereq 1 Minimum Indoor Air Quality Performance Required
1 D Credit 7.2 Heat Island Effect - Roof Cool Roof 75% or Green Roof 50% (100%)1 Y D Prereq 2 Environmental Tobacco Smoke (ETS) Control Required
1 D Credit 8 Light Pollution Reduction 1 1 D Credit 1 Outdoor Air Delivery Monitoring {EB}1
Yes Y?N? No 1 D Credit 2 Increased Ventilation 1
5 3 2 WATER EFFICIENCY 10 Points 1 C Credit 3.1 Construction Indoor Air Quality Management Plan - During Construction 1
1 C Credit 3.2 Construction Indoor Air Quality Management Plan - Before Occupancy 1
Y D Prereq 1 Water Use Reduction 20%Required 1 C Credit 4.1 Low-Emitting Materials - Adhesives and Sealants 1
2 2 D Credit 1 Water Efficient Landscaping 50%, 100%2 to 4 1 C Credit 4.2 Low-Emitting Materials - Paints and Coatings 1
2 D Credit 2 Innovative Wastewater Technologies 50% (100%)2 1 C Credit 4.3 Low-Emitting Materials - Flooring Systems 1
3 1 D Credit 3 Water Use Reduction 30%, 35%, 40% (45%)2 to 4 1 C Credit 4.4 Low-Emitting Materials - Composite Wood and Agrifiber Products 1
Yes Y?N? No 1 D Credit 5 Indoor Chemical and Pollutant Source Control 1
7 4 5 19 ENERGY & ATMOSPHERE 35 Points 1 D Credit 6.1 Controllability of Systems - Lighting 1
1 D Credit 6.2 Controllability of Systems - Thermal Comfort {EB}1
Y C Prereq 1 Fundamental Commissioning of Building Energy Systems Required 1 D Credit 7.1 Thermal Comfort - Design {EB}1
Y D Prereq 2 Minimum Energy Performance Required 1 D Credit 7.2 Thermal Comfort - Verification {EB}1
Y D Prereq 3 Fundamental Refrigerant Management Required 1 D Credit 8.1 Daylight and Views - Daylight 75% Of Spaces (95%) {EB}1
4 2 2 11 D Credit 1 Optimize Energy Performance 12% - 48% (50%) {EB}1 to 19 1 D Credit 8.2 Daylight and Views - Views 90% (ID) {EB}1
1 6 D Credit 2 On-Site Renewable Energy 1% - 13% (15%)1 to 7 Yes Y?N? No
2 C Credit 3 Enhanced Commissioning {EB}2 3 3 INNOVATION IN DESIGN 6 Points
2 D Credit 4 Enhanced Refrigerant Management 2
1 2 C Credit 5 Measurement and Verification {EB}3 1 C Credit 1.1 SSc7.1 (100% parking under cover)1 to 5
2 C Credit 6 Green Power 35% (70%)2 1 D Credit 1.2 SSc4.1 (double transit ridership)1
Yes Y?N? No 1 D Credit 1.3 WEc3 (40%) OR EAc6 (70%)1
2 2 REGIONAL PRIORITY 4 Points 1 D Credit 1.4 Green Cleaning Policy 1
1 D Credit 1.5 Sustainable Purchasing Policy 1
2 2 Credit 1 Regional Priority (Based on Zip Code)1 to 4
1 SS c5.2 OR WEc3 (40%)1 1 D Credit 2 LEED®Accredited Professional 1
1 EAc2 1 Yes Y?N? No
1 MRc1.1 OR WE c2 1 51 16 13 30 PROJECT TOTALS (Certification Estimates)110 Points
1 EQc8.1 1 Certified: 40-49 points Silver: 50-59 points Gold: 60-79 points Platinum: 80+ points
LEED score card - seeking LEED silver certification A003
SEEKING
LEED SILVER
CERTIFICATION
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 architectural survey SV-1
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 7th street at wilshire boulevard R001
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 7th street viewing north R002
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 pedestrian entrance to retail paseo at 7th street R003
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 hotel frontage along 7th street @ dusk R004
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 pedestrian entrance to retail paseo at 7th street R005
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 wilshire boulevard @ paseo / retail entrance R006
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 retail paseo viewing west R007
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 east perspective - 7th court alley R008
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 bird’s-eye of retail paseo R009
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401
DN
DN
50 . 0 0 . 4 0 . 55.0
DN
DN
DN
DN
DN
UP
DN
T
L
50 . 0 0 . 4 0 . 55.0
MECHANICAL
MECHANICAL
POOL
VIEWING
PLATFORM
WALK WAY
ROOF TOP
(NON-OCCUPIED)
WALK WAY
HOUSE-
KEEPINGKITCHEN
FLEXIBLE
SPACE
(840 SF)COCKTAIL
BAR
MW
VIEWING
PLATFORM
CHILLER
ROOM
WI
L
S
H
I
R
E
B
L
V
D
7TH COURT (ALLEY)
ADMIN
7TH STREET
EQUIP.-
TOILET
EXHAUST
FAN PAD
N
N
UP
DN
ROOF
SOUND-RATED ENCLOSURE HEIGHT
NOTE: SCREENING REQUIRED (SMMC 9.04.10.02.140) FOR ALL MECHANICAL
EQUIPMENT 12" ABV. ROOF PARAPET
SOLAR WATER HEATER
PANEL SYSTEM
ROOFROOF
ROOF
PHOTOVOLTAIC
PANELS
1 ALUM LOUVRE SCREEN @ 3'-6" ABV FINISHED ROOF
1
A-208
SA
N
T
A
M
O
N
I
C
A
-
C
A
L
I
F
O
R
N
I
A
,
9
0
4
0
1
71
0
W
I
L
S
H
I
R
E
B
O
U
L
E
V
A
R
D
AL
E
X
G
O
R
B
Y
H
O
T
E
L
P
R
O
J
E
C
T
material & color plan R010
NEW CONSTRUCTION COLORS / MATERIALS
1 MATERIAL: GLASS FIBER REINFORCED CONCRETE
COLOR: CLARK PACIFIC GFRC 12118-11EXTERIOR GFRC WALL
2 MATERIAL: GLASS FIBER REINFORCED CONCRETE
COLOR: CLARK PACIFIC GFRC 12118-10
4 MATERIAL: FRP (FIBER-REINFORCED POLYMER)
COLOR: BM CUSTOM C2-5382 @ 200% PODIUM
5 MATERIAL: SMOOTH STEEL TROWEL STUCCO
COLOR: BM CUSTOM C2-5382 “STOCKHOLM” EXTERIOR WALL
EXTERIOR GFRC WALL
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401
1
1 23
3
window configurations & details R011
1
2
Fixed w/ adjacent operable
2” x 2”
Aluminum frame
(TYP)
Fixed w/ adjacent operable
3 Sliding doors @ recessed balcony
8’
-
8
1
/
2
”
9’-0”
1’-7”
(TYP)
3”
3”
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
D-01710 wilshire blvd, santa monica, ca 90401
24” DEEP PLANTER
CONTINUOUS LINEAR LIGHT
5’ - 0”
MECHANICAL SPACE
CONTINUOUS DRYWALL
CEILING
entry podium section
1/2” TEMPERED GLASS
PL
GUTTER / DRAINAGE SYSTEM
FRP
(FIBER-REINFORCED POLYMER)
INTERIOR EXTERIOR
STRUCTURAL SILICONE W/
ALUMINUM STOREFRONT FRAME
(8” X 2” MULLION)
STRUCTURAL SILICONE W/
ALUMINUM STOREFRONT FRAME
(9” X 2” MULLION)
FRONT SET GLASS W/ ALUMINUM
STOREFRONT FRAME
(9” X 2” MULLION)
42”
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
D-02710 wilshire blvd, santa monica, ca 90401
15’ - 6”
55”
42”
ground fl oor store front detail
1/2” TEMPERED GLASS
GFRC
(GLASS FIBER REINFORCED
CONCRETE)
EXTERIOR TERRAZZO FINISH
INTERIOR
UPPER PODIUM LEVEL
EXTERIOR
STRUCTURAL SILICONE W/
ALUMINUM STOREFRONT FRAME
(8” X 2” MULLION)
STRUCTURAL SILICONE W/
ALUMINUM STOREFRONT FRAME
(9” X 2” MULLION)
FRONT SET GLASS W/ ALUMINUM
STOREFRONT FRAME
(9” X 2” MULLION)
CONTINUOUS DRYWALL
CEILING
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
D-03710 wilshire blvd, santa monica, ca 90401
42”
22”
7”
balcony type ‘A’ detail
1/2” TEMPERED GLASS
GFRC
(GLASS FIBER REINFORCED
CONCRETE)
SLIDING DOOR
ENCAUSTIC TILE
EXTERIOR STEEL TROWEL STUCCO
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
balcony type ‘B’ detail D-04710 wilshire blvd, santa monica, ca 90401
24”
18”
41”
1/2” TEMPERED GLASS
GFRC
(GLASS FIBER REINFORCED
CONCRETE)
SLIDING DOOR
ENCAUSTIC TILE
EXTERIOR STEEL TROWEL STUCCO
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
D-05710 wilshire blvd, santa monica, ca 90401
18” C-CHANEL
1/2” TEMPERED GLASS @ 42” (H)
13’- 8”
bridge detail
EXTERIOR STEEL TROWEL STUCCO
EXTERIOR TERRAZZO FINISH1’- 6”
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
D-06710 wilshire blvd, santa monica, ca 90401
GUTTER
BUILT-UP ROOF
CLEAR ANODIZED ALUMINIUM
20 GA
EXTERIOR STEEL TROWEL STUCCO
4”
roof edge detail
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
LANDMARK - COLORS / MATERIALS
MARITIME WHITE 963 @ 200%
Accent ashlar pattern - Waste Mold Concrete
MARITIME WHITE 963
General Exterior Wall - Waste Mold Concrete
UNIVERSAL BLACK 2118-10
Windows / Doors - Steel / Aluminum
SWISS COFFEE OC-45
Podium Band - Waste Mold Concrete
LONDON FOG 1541 @150%
Finials / Relief Ornamentation - Cast Stone Concrete
BLENDED RED
Roof / Parapet Coping - Terracotta Mission Tile
710 wilshire blvd, santa monica, ca 90401
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
NEW CONSTRUCTION - COLORS / MATERIALS
BM Custom C2-5382 @ 200%
FRP (Fibre-reinforced Polymer)
BM Custom C2-5382 “Stockholm”
Steel Trowel Stucco
Clark Pacifi c 12118-11
GFRC (Glass fi ber reinforced concrete)
Clark Pacifi c 12118-10
GFRC (Glass fi ber reinforced concrete)
Dunn Edwards DE6376 @ 50%
Steel Trowel Stucco
Clear Anodized Aluminium
Aluminium
710 wilshire blvd, santa monica, ca 90401
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401
WI
L
S
H
I
R
E
B
L
V
D
7TH COURT (ALLEY)
GRAB-N-GO
RETAIL 'B1'
MEETING ROOM 'A'
MW
BANQUET KITCHEN
RETAIL 'A1'
RETAIL 'D1'
RECEPTION
EXTERIOR TRANSFORMER PAD
MEETING ROOM 'B'
RETAIL 'C1'
MEETING ROOM
STORAGE
BA
R
RESTAURANT 'E1'
LOADING 1
LOADING DOCK
RESTAURANT 'A'
RETAIL 'B'
RETAIL 'C'
WATER METERS REFUSE AND
RECYCLING AREA
EXTERIOR LOADING
AREA 2 & 3
5'
-
0
"
RETAIL COURTYARD
PASEO
SERVICE
PASEO
DINING
COURT
DINING
VERANDA
PRE-FUNCTION
DROP-OFF
OUT IN
VEHICLE ACCESS
TO PARKING LEVEL
REFUSE AND
RECYCLING AREA
7TH STREET
SECURITY
GATE
SECURITY
GATE
DINING
COURT
DN
DN
UP
UP
UP
UP
DN
UP DN
L
T
UP
UP
UP
UP
DN
DN
FLOOR AREA
ORIGINAL 29,943 SQ. FT.
REVISED 28,539 SQ. FT.
DIFF -1,404 SQ. FT.
LOBBY
BAR
SARIS DOUBLESTACK BICYCLE
RACK SYSTEM
SECURED
BICYCLE PARKING
A-201
SA
N
T
A
M
O
N
I
C
A
-
C
A
L
I
F
O
R
N
I
A
,
9
0
4
0
1
71
0
W
I
L
S
H
I
R
E
B
O
U
L
E
V
A
R
D
AL
E
X
G
O
R
B
Y
H
O
T
E
L
P
R
O
J
E
C
T
ground floor plan A201
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401
LANDMARK BUILDING - GUEST ROOMS:11 ROOMS
LANDMARK ADDITION - GUEST ROOMS:42 ROOMS
T
L
DN
UP
DN
UP
RETAIL COURT
(BELOW)
COURTYARD
BRIDGE
MEETING
ROOM 'C'
M WWI
L
S
H
I
R
E
B
L
V
D
7TH COURT (ALLEY)
FLOOR AREA
ORIGINAL 26,313 SQ. FT.
REVISED 25,777 SQ. FT.
DIFF -536 SQ. FT.
FITNESS
A-202
SA
N
T
A
M
O
N
I
C
A
-
C
A
L
I
F
O
R
N
I
A
,
9
0
4
0
1
71
0
W
I
L
S
H
I
R
E
B
O
U
L
E
V
A
R
D
AL
E
X
G
O
R
B
Y
H
O
T
E
L
P
R
O
J
E
C
T
7TH STREET
second floor plan A202
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401
LANDMARK BUILDING - GUEST ROOMS:11 ROOMS
LANDMARK ADDITION - GUEST ROOMS:46 ROOMS
T
L
DN
UP
DN
UPWI
L
S
H
I
R
E
B
L
V
D
7TH COURT (ALLEY)
FLOOR AREA
ORIGINAL 27,201 SQ. FT.
REVISED 26,616 SQ. FT.
DIFF -585 SQ. FT.
A-203
SA
N
T
A
M
O
N
I
C
A
-
C
A
L
I
F
O
R
N
I
A
,
9
0
4
0
1
71
0
W
I
L
S
H
I
R
E
B
O
U
L
E
V
A
R
D
AL
E
X
G
O
R
B
Y
H
O
T
E
L
P
R
O
J
E
C
T
7TH STREET
third floor plan A203
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401
LANDMARK BUILDING - GUEST ROOMS:11 ROOMS
LANDMARK ADDITION - GUEST ROOMS 46 ROOMS
T
L
WI
L
S
H
I
R
E
B
L
V
D
7TH COURT (ALLEY)
DN
UP
DN
UP
FLOOR AREA
ORIGINAL 27,201 SQ. FT.
REVISED 26,793 SQ. FT.
DIFF -408 SQ. FT.
A-204
SA
N
T
A
M
O
N
I
C
A
-
C
A
L
I
F
O
R
N
I
A
,
9
0
4
0
1
71
0
W
I
L
S
H
I
R
E
B
O
U
L
E
V
A
R
D
AL
E
X
G
O
R
B
Y
H
O
T
E
L
P
R
O
J
E
C
T
7TH STREET
fourth floor plan A204
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401
LANDMARK BUILDING - GUEST ROOMS:11 ROOMS
LANDMARK ADDITION - GUEST ROOMS:44 ROOMS
L
T
WI
L
S
H
I
R
E
B
L
V
D
7TH COURT (ALLEY)
DN
UP
DN
UP
FLOOR AREA
ORIGINAL 26,418 SQ. FT.
REVISED 25,917 SQ. FT.
DIFF -501 SQ. FT.
A-205
SA
N
T
A
M
O
N
I
C
A
-
C
A
L
I
F
O
R
N
I
A
,
9
0
4
0
1
71
0
W
I
L
S
H
I
R
E
B
O
U
L
E
V
A
R
D
AL
E
X
G
O
R
B
Y
H
O
T
E
L
P
R
O
J
E
C
T
7TH STREET
fifth floor plan A205
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401
LANDMARK BUILDING - GUEST ROOMS:11 ROOMS
LANDMARK ADDITION - GUEST ROOMS:41 ROOMS
T
L
POOL
ABV.
7TH STREET
WI
L
S
H
I
R
E
B
L
V
D
7TH COURT (ALLEY)
DN
DN
UP
FLOOR AREA
ORIGINAL 23,683 SQ. FT.
REVISED 25,208 SQ. FT.
DIFF +1,525 SQ. FT.
A-206
SA
N
T
A
M
O
N
I
C
A
-
C
A
L
I
F
O
R
N
I
A
,
9
0
4
0
1
71
0
W
I
L
S
H
I
R
E
B
O
U
L
E
V
A
R
D
AL
E
X
G
O
R
B
Y
H
O
T
E
L
P
R
O
J
E
C
T
A206sixth floor plan
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401
DN
DN
EQUIP.-TOILET
EXHAUSTFAN PAD
CW
55.0 4.0 0.05.0
DN
DN
DN
DN
DN
UP
DN
T
L
55.0 4.0 0.05.0
ROOF TOP
MECHANICAL
(NON-OCCUPIED)
POOL
VIEWING
PLATFORM
WALK WAY
ROOF TOP
(NON-OCCUPIED)
WALK WAY
HOUSE-
KEEPINGKITCHEN
FLEXIBLE
SPACE
(840 SF)COCKTAIL
BAR
MW
BATHROOM/
SHOWERS
641 S.F.
VIEWING
PLATFORM
EDGE OF ROOF
ABOVE
ELECTRICAL
ROOM
COOLING
TOWERSCHILLER
ROOM
(E)ELEVATOR
EQUIPMENT ROOM
(E)UNUSED
SPACE
WI
L
S
H
I
R
E
B
L
V
D
7TH COURT (ALLEY)
ROOF TOP
(NON-OCCUPIED)
EDGE OF ROOF
ABOVE
EDGE OF ROOF
ABOVE
ADMIN
DN
A-207a
SA
N
T
A
M
O
N
I
C
A
-
C
A
L
I
F
O
R
N
I
A
,
9
0
4
0
1
71
0
W
I
L
S
H
I
R
E
B
O
U
L
E
V
A
R
D
AL
E
X
G
O
R
B
Y
H
O
T
E
L
P
R
O
J
E
C
T
7TH STREET
roof terrace ( w/ partial seventh floor ) A207a
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401
DN
DN
EQUIP.-TOILETEXHAUSTFAN PAD
CW
DN
DN
DN
DN
DN
UP
DN
T
L
7TH STREET
WI
L
S
H
I
R
E
B
L
V
D
7TH COURT (ALLEY)
SOUND-RATED ENCLOSURE HEIGHT
1 ALUM LOUVRE SCREEN @ 9'-5" ABV F.F.
2 ALUM LOUVRE SCREEN @ 15'-0" ABV F.F.
3 ALUM LOUVRE SCREEN @ 5'-6" ABV F.F.
4 MTL STUD PLASTER WALL WITH ALUM LOUVRE @ 14'-0" ABV F.F.
5 ALUM LOUVRE SCREEN @ 9'-7" ABV F.F.
1
4
2
3
4
NOTE: 7TH FLOOR PARAPET @ 48" ABV. F.F.
SCREENING REQUIRED (SMMC 9.04.10.02.140) FOR ALL MECHANICAL
EQUIPMENT 12" ABV. ROOF PARAPET
5
3
DN
A-207b
SA
N
T
A
M
O
N
I
C
A
-
C
A
L
I
F
O
R
N
I
A
,
9
0
4
0
1
71
0
W
I
L
S
H
I
R
E
B
O
U
L
E
V
A
R
D
AL
E
X
G
O
R
B
Y
H
O
T
E
L
P
R
O
J
E
C
T
equipment heights at roof terrace A207b
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401
EQUIP.-TOILETEXHAUSTFAN PAD
N
N
UP
DN
ROOF
SOUND-RATED ENCLOSURE HEIGHT
NOTE: SCREENING REQUIRED (SMMC 9.04.10.02.140) FOR ALL MECHANICAL
EQUIPMENT 12" ABV. ROOF PARAPET
SOLAR WATER HEATER
PANEL SYSTEM
ROOFROOF
ROOF
PHOTOVOLTAIC
PANELS
1 ALUM LOUVRE SCREEN @ 3'-6" ABV FINISHED ROOF
1
A-208
SA
N
T
A
M
O
N
I
C
A
-
C
A
L
I
F
O
R
N
I
A
,
9
0
4
0
1
71
0
W
I
L
S
H
I
R
E
B
O
U
L
E
V
A
R
D
AL
E
X
G
O
R
B
Y
H
O
T
E
L
P
R
O
J
E
C
T
roof plan A208
Mechanical screen reduced from
7’-6” down to 4’-6” in response to
JDRB Comment September 28,
2015
1
1
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401
RETAIL
PEDESTRIAN ENTRANCE
TO RETAIL PASEO
ENTRANCE TO
LANDMARK LOBBY
FINE DINING
RESTAURANT
north elevation along wilshire blvd.A301-M
RETAIL EXISTING PALM
TREES TO REMAIN
EXTERIOR MATERIALS
6
1 EXTERIOR CONC WALL MATERIAL: CAST-IN-PLACE CONCRETE
2 EXTERIOR CONC WALL MATERIAL: PRE-CAST CONCRETE
3 WINDOW SYSTEM MATERIAL: ALUMINUM AND GLASS
4 PODIUM PARAPET MATERIAL: GFRC
COLOR: SOFT CHAMOIS
COLOR: SOFT CHAMOIS WITH RELIEF
5 EXTERIOR MATERIAL: PLASTER COLOR: SOFT CHAMOIS
COLOR: BRUSHED ALUMINUM
COLOR: SOFT CHAMOIS
11 GREEN WALL MATERIAL: SEE LANDSCAPE COLOR: SEE LANDSCAPE
551
49
FINIAL / RELIEF
ORNAMENTATION MATERIAL: CAST STONE CONCRETE COLOR: COASTAL FOG1
ROOF MATERIAL: TERRA COTTA MISSION TILE COLOR: GLADDING MCBEAN BLENDED RED2
BELTWAY MATERIAL: WASTE MOLD CONCRETE COLOR: COASTAL FOG3
CASEMENT WINDOWS MATERIAL: STEEL SASH COLOR: BLACK FOREST GREEN4
GENERAL EXTERIOR
WALL MATERIAL: WASTE MOLD CONCRETE COLOR: MARITIME WHITE 5
PARAPET TILE COPING MATERIAL: TERRA COTTA MISSION TILE COLOR: GLADDING MCBEAN BLENDED RED6
STOREFRONT WINDOWS MATERIAL: ALUM. BRAKE MTL COLOR: UNIVERSAL BLACK10
WILSHIRE ENTRY MATERIAL: WASTE MOLD CONCRETE COLOR: CLEAR PENETRATING
SILOXANE SEALANT
11
TRANSOM MATERIAL: WOOD COLOR: IRON MOUNTAIN9
WILSHIRE ENTRY DOOR MATERIAL: ALUM. BRAKE MTL COLOR: UNIVERSAL BLACK12
PODIUM BAND MATERIAL: WASTE MOLD CONCRETE COLOR: SWISS COFFEE7
COLUMN / CAPITAL MATERIAL: WASTE MOLD CONCRETE COLOR: CLEAR PENETRATING
SILOXANE SEALANT
8
1
LANDMARK MATERIALS
2
3
4
5
6
9
7
8
10
11
12
7th street
7th court alley
3
north elevation R301
LANDMARK COLORS / MATERIALS
MATERIAL: CAST STONE CONCRETE
COLOR: BENJAMIN MOORE 1541 @ 150%
FINIALS / RELIEF
ORNAMENTATION
MATERIAL: TERRA COTTA MISSION TILE
COLOR: GLADDING MCBEAN BLENDED RED
ROOF & PODIUM TILE
COPING
MATERIAL: WASTE MOLD CONCRETE
COLOR: BENJAMIN MOORE 1541 @ 150%BELTWAY
MATERIAL: STEEL SASH
COLOR: BENJAMIN MOORE 2118-10CASEMENT WINDOWS
MATERIAL: WASTE MOLD CONCRETE
COLOR: BENJAMIN MOORE 963GENERAL EXTERIOR WALL
MATERIAL: WASTE MOLD CONCRETE
COLOR: BENJAMIN MOORE 963 @ 200%ACCENT ASHLAR PATTERN
1
2
3
4
5
6
MATERIAL: WASTE MOLD CONCRETE
COLOR: BENJAMIN MOORE OC-45PODIUM BAND
MATERIAL: WASTE MOLD CONCRETE
COLOR: CLEAR PENETRATING SILOXANE SEALANTCOLUMN / CAPITAL
MATERIAL: WOOD
COLOR: BENJAMIN MOORE 2118-10TRANSOM
MATERIAL: ALUMINUM BRAKE METAL
COLOR: BENJAMIN MOORE 2118-10STOREFRONT WINDOWS
7
8
9
10
11
12
1 MATERIAL: GLASS FIBER REINFORCED CONCRETE
COLOR: CLARK PACIFIC GFRC 12118-11EXTERIOR GFRC WALL
2 MATERIAL: GLASS FIBER REINFORCED CONCRETE
COLOR: CLARK PACIFIC GFRC 12118-10
3 MATERIAL: ALUMINUM
COLOR: CLEAR ANODIZED ALUMINUMWINDOW SYSTEM
4 MATERIAL: FRP (FIBER-REINFORCED POLYMER)
COLOR: BM CUSTOM C2-5382 @ 200% PODIUM
5 MATERIAL: SMOOTH STEEL TROWEL STUCCO
COLOR: BM CUSTOM C2-5382 “STOCKHOLM” EXTERIOR WALL
6 MATERIAL: STEEL TROWEL STUCCO
COLOR: DUNN EDWARDS DE6376 @ 50%EXTERIOR WALL
7
8
TRANSOM
CONTROL JOINT
NEW CONSTRUCTION COLORS / MATERIALS
EXTERIOR GFRC WALL
MATERIAL: WASTE MOLD CONCRETE
COLOR: CLEAR PENETRATING SILOXANE SEALANTWILSHIRE ENTRY
MATERIAL: ALUMINUM BRAKE METAL
COLOR: BENJAMIN MOORE 2118-10WILSHIRE ENTRY DOOR
MATERIAL: STRUCTURAL SILICONE W/ ALUMINUM FRAME
COLOR: BLACK W/ CLEAR ANODIZED ALUMINUM
MATERIAL: SEALANT
COLOR: TO MATCH GFRC/STUCCO
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 (new construction only)
RETAIL 24 HOUR
COFFEE SHOP
north elevation along retail paseo A302-M
PEDESTRIAN
BRIDGE
RETAIL
EXTERIOR MATERIALS
1 EXTERIOR CONC WALL MATERIAL: CAST-IN-PLACE CONCRETE
2 EXTERIOR CONC WALL MATERIAL: PRE-CAST CONCRETE
3 WINDOW SYSTEM MATERIAL: ALUMINUM AND GLASS
4 PODIUM PARAPET MATERIAL: GFRC
COLOR: SOFT CHAMOIS
COLOR: SOFT CHAMOIS WITH RELIEF
5 EXTERIOR MATERIAL: PLASTER COLOR: SOFT CHAMOIS
COLOR: BRUSHED ALUMINUM
COLOR: SOFT CHAMOIS
11 GREEN WALL MATERIAL: SEE LANDSCAPE COLOR: SEE LANDSCAPE
3 1 5 8 13136365 1
1 2 109
7th street7th court alley
north elevation at paseo R302
1 MATERIAL: GLASS FIBER REINFORCED CONCRETE
COLOR: CLARK PACIFIC GFRC 12118-11EXTERIOR GFRC WALL
2 MATERIAL: GLASS FIBER REINFORCED CONCRETE
COLOR: CLARK PACIFIC GFRC 12118-10
3 MATERIAL: ALUMINUM
COLOR: CLEAR ANODIZED ALUMINUMWINDOW SYSTEM
4 MATERIAL: FRP (FIBER-REINFORCED POLYMER)
COLOR: BM CUSTOM C2-5382 @ 200% PODIUM
5 MATERIAL: SMOOTH STEEL TROWEL STUCCO
COLOR: BM CUSTOM C2-5382 “STOCKHOLM” EXTERIOR WALL
6 MATERIAL: STEEL TROWEL STUCCO
COLOR: DUNN EDWARDS DE6376 @ 50%EXTERIOR WALL
GLASS RAIL
7
ROOF
TRANSOM
8
BRIDGE BASE
EXTERIOR WALL
MECHANICAL SCREEN
9 MATERIAL: TEMPERED GLASS
COLOR: CLEAR
10 MATERIAL: PAINTED STEEL
COLOR: BM CUSTOM C2-5382 @ 200%
11 MATERIAL: POURED IN PLACE CONCRETE
COLOR: NATURAL
MATERIAL: ALUMINUM LOUVERS
COLOR: METALLIC SILVER COLORWELD 300XL12
MATERIAL: ALUMINUM CLADDING
COLOR: ALUMINUM
NEW CONSTRUCTION COLORS / MATERIALS
EXTERIOR GFRC WALL
13 CONTROL JOINT
MATERIAL: STRUCTURAL SILICONE W/ ALUMINUM FRAME
COLOR: BLACK W/ CLEAR ANODIZED ALUMINUM
MATERIAL: SEALANT
COLOR: TO MATCH GFRC/STUCCO
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401
FINE DINING
RESTAURANT
west elevation along 7th street A303-M
24-HOUR
COFFEE SHOP
EXISTING
PALM TREE
TO REMAIN
VEHICLE
ENTRY
PEDESTRIAN
BRIDGE
11114 1413668868395521
73 45
EXTERIOR MATERIALS
1 EXTERIOR CONC WALL MATERIAL: CAST-IN-PLACE CONCRETE
2 EXTERIOR CONC WALL MATERIAL: PRE-CAST CONCRETE
3 WINDOW SYSTEM MATERIAL: ALUMINUM AND GLASS
4 PODIUM PARAPET MATERIAL: GFRC
COLOR: SOFT CHAMOIS
COLOR: SOFT CHAMOIS W/ RELIEF
5 EXTERIOR MATERIAL: PLASTER COLOR: SOFT CHAMOIS
COLOR: BRUSHED ALUMINUM
COLOR: SOFT CHAMOIS
6 GLASS RAIL MATERIAL: TEMPERED GLASS
7 FOLDING DOOR SYSTEM MATERIAL: WOOD AND GLASS
8 PERFORATED SCREEN MATERIAL: GFRC
9 OPERABLE WIND SCREEN MATERIAL: MTL AND GLASS
COLOR: GLASS
COLOR: SOFT CHAMOIS
COLOR: SOFT CHAMOIS
COLOR: SOFT CHAMOIS
GLASS
13 BRIDGE BASE MATERIAL: MTL CHANNEL COLOR: STAINLESS STL
10
612
9 3 12
1
2
3
4
5
6
7
8
9
10
12
11
wilshire blvd.
FINIAL / RELIEF
ORNAMENTATION MATERIAL: CAST STONE CONCRETE COLOR: COASTAL FOG1
ROOF MATERIAL: TERRA COTTA MISSION TILE COLOR: GLADDING MCBEAN BLENDED RED2
BELTWAY MATERIAL: WASTE MOLD CONCRETE COLOR: COASTAL FOG3
CASEMENT WINDOWS MATERIAL: STEEL SASH COLOR: BLACK FOREST GREEN4
GENERAL EXTERIOR
WALL MATERIAL: WASTE MOLD CONCRETE COLOR: MARITIME WHITE 5
PARAPET TILE COPING MATERIAL: TERRA COTTA MISSION TILE COLOR: GLADDING MCBEAN BLENDED RED6
STOREFRONT WINDOWS MATERIAL: ALUM. BRAKE MTL COLOR: UNIVERSAL BLACK10
HERALDIC SHIELD MATERIAL: WASTE MOLD CONCRETE COLOR: CLEAR PENETRATING
SILOXANE SEALANT
11
TRANSOM MATERIAL: WOOD COLOR: IRON MOUNTAIN9
MASONRY GRILL MATERIAL: CONCRETE COLOR: CLEAR PENETRATING
SILOXANE SEALANT
12
PODIUM BAND MATERIAL: WASTE MOLD CONCRETE COLOR: SWISS COFFEE7
COLUMN / CAPITAL MATERIAL: WASTE MOLD CONCRETE COLOR: CLEAR PENETRATING
SILOXANE SEALANT
8
LANDMARK MATERIALS
west elevation R303
LANDMARK COLORS / MATERIALS
MATERIAL: CAST STONE CONCRETE
COLOR: BENJAMIN MOORE 1541 @ 150%
FINIALS / RELIEF
ORNAMENTATION
MATERIAL: TERRA COTTA MISSION TILE
COLOR: GLADDING MCBEAN BLENDED REDROOF & PODIUM TILE
COPING
MATERIAL: WASTE MOLD CONCRETE
COLOR: BENJAMIN MOORE 1541 @ 150%BELTWAY
MATERIAL: STEEL SASH
COLOR: BENJAMIN MOORE 2118-10CASEMENT WINDOWS
MATERIAL: WASTE MOLD CONCRETE
COLOR: BENJAMIN MOORE 963GENERAL EXTERIOR WALL
MATERIAL: WASTE MOLD CONCRETE
COLOR: BENJAMIN MOORE 963 @ 200%ACCENT ASHLAR PATTERN
1
2
3
4
5
6
MATERIAL: WASTE MOLD CONCRETE
COLOR: BENJAMIN MOORE OC-45PODIUM BAND
MATERIAL: WASTE MOLD CONCRETE
COLOR: CLEAR PENETRATING SILOXANE SEALANTCOLUMN / CAPITAL
MATERIAL: WOOD
COLOR: BENJAMIN MOORE 2118-10TRANSOM
MATERIAL: ALUMINUM BRAKE METAL
COLOR: BENJAMIN MOORE 2118-10STOREFRONT WINDOWS
MATERIAL: WASTE MOLD CONCRETE
COLOR: CLEAR PENETRATING SILOXANE SEALANTHERALDIC SHIELD
MATERIAL: CONCRETE
COLOR: CLEAR PENETRATING SILOXANE SEALANTMASONRY GRILL
7
8
9
10
11
12
1 MATERIAL: GLASS FIBER REINFORCED CONCRETE
COLOR: CLARK PACIFIC GFRC 12118-11EXTERIOR GFRC WALL
2 MATERIAL: GLASS FIBER REINFORCED CONCRETE
COLOR: CLARK PACIFIC GFRC 12118-10
3 MATERIAL: ALUMINUM
COLOR: CLEAR ANODIZED ALUMINUMWINDOW SYSTEM
4 MATERIAL: FRP (FIBER-REINFORCED POLYMER)
COLOR: BM CUSTOM C2-5382 @ 200% PODIUM
5 MATERIAL: SMOOTH STEEL TROWEL STUCCO
COLOR: BM CUSTOM C2-5382 “STOCKHOLM” EXTERIOR WALL
6 MATERIAL: STEEL TROWEL STUCCO
COLOR: DUNN EDWARDS DE6376 @ 50%EXTERIOR WALL
GLASS RAIL
7
ROOF
TRANSOM
8
MATERIAL: STRUCTURAL SILICONE W/ ALUMINUM FRAME
COLOR: BLACK W/ CLEAR ANODIZED ALUMINUM
BRIDGE BASE
EXTERIOR WALL
MECHANICAL SCREEN
TENSILE SHADE FABRIC
9 MATERIAL: TEMPERED GLASS
COLOR: CLEAR
10 MATERIAL: PAINTED STEEL
COLOR: BM CUSTOM C2-5382 @ 200%
11 MATERIAL: POURED IN PLACE CONCRETE
COLOR: NATURAL
MATERIAL: ALUMINUM LOUVERS
COLOR: METALLIC SILVER COLORWELD 300XL
MATERIAL: MICRO-VENTILATED TEXTILE
COLOR: SOLTIS 92-2043
12
13
MATERIAL: ALUMINUM CLADDING
COLOR: ALUMINUM
NEW CONSTRUCTION COLORS / MATERIALS
EXTERIOR GFRC WALL
14 CONTROL JOINT MATERIAL: SEALANT
COLOR: TO MATCH GFRC/STUCCO
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401
west elevation along 7th street
RETAIL
(new construction only)
RETAIL COURT
GARAGE INTAKE
AIR VENT
A304-M
24-HOUR
COFFEE SHOP
EXISTING
PALM TREE
TO REMAIN
PEDESTRIAN
BRIDGE
EXTERIOR MATERIALS
1 EXTERIOR CONC WALL MATERIAL: CAST-IN-PLACE CONCRETE
2 EXTERIOR CONC WALL MATERIAL: PRE-CAST CONCRETE
3 WINDOW SYSTEM MATERIAL: ALUMINUM AND GLASS
4 PODIUM PARAPET MATERIAL: GFRC
COLOR: SOFT CHAMOIS
COLOR: SOFT CHAMOIS W/ RELIEF
5 EXTERIOR MATERIAL: PLASTER COLOR: SOFT CHAMOIS
COLOR: BRUSHED ALUMINUM
COLOR: SOFT CHAMOIS
6 GLASS RAIL MATERIAL: TEMPERED GLASS
7 FOLDING DOOR SYSTEM MATERIAL: WOOD AND GLASS
8 PERFORATED SCREEN MATERIAL: GFRC
9 OPERABLE WIND SCREEN MATERIAL: MTL AND GLASS
COLOR: GLASS
COLOR: SOFT CHAMOIS
COLOR: SOFT CHAMOIS
COLOR: SOFT CHAMOIS
GLASS
13 BRIDGE BASE MATERIAL: MTL CHANNEL COLOR: STAINLESS STL
11114 1414146868399143215
739610
661 51212
9 3 4
wilshire blvd.
west elevation at paseo R304
1 MATERIAL: GLASS FIBER REINFORCED CONCRETE
COLOR: CLARK PACIFIC GFRC 12118-11EXTERIOR GFRC WALL
2 MATERIAL: GLASS FIBER REINFORCED CONCRETE
COLOR: CLARK PACIFIC GFRC 12118-10
3 MATERIAL: ALUMINUM
COLOR: CLEAR ANODIZED ALUMINUMWINDOW SYSTEM
4 MATERIAL: FRP (FIBER-REINFORCED POLYMER)
COLOR: BM CUSTOM C2-5382 @ 200% PODIUM
5 MATERIAL: SMOOTH STEEL TROWEL STUCCO
COLOR: BM CUSTOM C2-5382 “STOCKHOLM” EXTERIOR WALL
6 MATERIAL: STEEL TROWEL STUCCO
COLOR: DUNN EDWARDS DE6376 @ 50%EXTERIOR WALL
GLASS RAIL
7
ROOF
TRANSOM
8
BRIDGE BASE
EXTERIOR WALL
MECHANICAL SCREEN
9 MATERIAL: TEMPERED GLASS
COLOR: CLEAR
10 MATERIAL: PAINTED STEEL
COLOR: BM CUSTOM C2-5382 @ 200%
11 MATERIAL: POURED IN PLACE CONCRETE
COLOR: NATURAL
MATERIAL: ALUMINUM LOUVERS
COLOR: METALLIC SILVER COLORWELD 300XL12
MATERIAL: ALUMINUM CLADDING
COLOR: ALUMINUM
NEW CONSTRUCTION COLORS / MATERIALS
EXTERIOR GFRC WALL
TENSILE SHADE FABRIC MATERIAL: MICRO-VENTILATED TEXTILE
COLOR: SOLTIS 92-204313
14 CONTROL JOINTMATERIAL: STRUCTURAL SILICONE W/ ALUMINUM FRAME
COLOR: BLACK W/ CLEAR ANODIZED ALUMINUM
MATERIAL: SEALANT
COLOR: TO MATCH GFRC/STUCCO
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401
EXTERIOR MATERIALS
5
1 EXTERIOR CONCRETE MATERIAL: CAST-IN-PLACE CONCRETE
2 EXTERIOR CONCRETE MATERIAL: PRE-CAST CONCRETE
3 WINDOW SYSTEM MATERIAL: ALUMINUM AND GLASS
4 PODIUM PARAPET MATERIAL: GFRC
COLOR: SOFT CHAMOIS
COLOR: SOFT CHAMOIS W/
RELIEF
5 EXTERIOR MATERIAL: PLASTER COLOR: SOFT CHAMOIS
COLOR: BRUSHED ALUMINUM
COLOR: SOFT CHAMOIS
6 GLASS RAIL MATERIAL: TEMPERED GLASS
9 OPERABLE WIND SCEEN MATERIAL: MTL AND GLASS
COLOR: GLASS
COLOR: SOFT CHAMOIS W/
GLASS
6 6151212
3
52389
11
EXISTING PALM TREE
TO REMAIN
ADJACENT BUILDING
OUTLINE
south elevation
7th street 7th court (alley)
A305-M
south elevation R305
1 MATERIAL: GLASS FIBER REINFORCED CONCRETE
COLOR: CLARK PACIFIC GFRC 12118-11EXTERIOR GFRC WALL
2 MATERIAL: GLASS FIBER REINFORCED CONCRETE
COLOR: CLARK PACIFIC GFRC 12118-10
3 MATERIAL: ALUMINUM
COLOR: CLEAR ANODIZED ALUMINUMWINDOW SYSTEM
4 MATERIAL: FRP (FIBER-REINFORCED POLYMER)
COLOR: BM CUSTOM C2-5382 @ 200% PODIUM
5 MATERIAL: SMOOTH STEEL TROWEL STUCCO
COLOR: BM CUSTOM C2-5382 “STOCKHOLM” EXTERIOR WALL
6 MATERIAL: STEEL TROWEL STUCCO
COLOR: DUNN EDWARDS DE6376 @ 50%EXTERIOR WALL
GLASS RAIL
7
ROOF
TRANSOM
8
EXTERIOR WALL
VINE SCREEN
9 MATERIAL: TEMPERED GLASS
COLOR: CLEAR
10
11
MATERIAL: POURED IN PLACE CONCRETE
COLOR: NATURAL
MATERIAL: SEE LANDSCAPE
COLOR: SEE LANDSCAPE
MATERIAL: ALUMINUM CLADDING
COLOR: ALUMINUM
NEW CONSTRUCTION COLORS / MATERIALS
EXTERIOR GFRC WALL
12 CONTROL JOINT
MATERIAL: STRUCTURAL SILICONE W/ ALUMINUM FRAME
COLOR: BLACK W/ CLEAR ANODIZED ALUMINUM
MATERIAL: SEALANT
COLOR: TO MATCH GFRC/STUCCO
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401
ALLEY EXIT
FROM PARKING
GARAGE
WATER METERSSCE TRANSFORMER PAD
ALCOVE
62 561098811 8 812 12 12 12211 12109106555
115113 3
1 EXTERIOR CONC WALL MATERIAL: CAST-IN-PLACE CONCRETE
2 EXTERIOR CONC WALL MATERIAL: PRE-CAST CONCRETE
3 WINDOW SYSTEM MATERIAL: ALUMINUM AND GLASS
4 PODIUM PARAPET MATERIAL: GFRC
COLOR: SOFT CHAMOIS
COLOR: SOFT CHAMOIS W/
RELIEF
5 EXTERIOR MATERIAL: PLASTER COLOR: SOFT CHAMOIS
COLOR: BRUSHED ALUMINUM
COLOR: SOFT CHAMOIS
6 GLASS RAIL MATERIAL: TEMPERED GLASS COLOR: GLASS
10 ALUM MTL LOUVERS MATERIAL: BRUSHED ALUMINUM COLOR: BRUSHED ALUMINUM
11 GREEN WALL MATERIAL: SEE LANDSCAPE COLOR: SEE LANDSCAPE
12 LOUVERED MECH SCREEN MATERIAL: ALUMINUM COLOR: BRUSHED ALUMINUM
EXTERIOR MATERIALS
11
10
3
2
12
6
5
1
wilshire blvd.
east elevation along alley A306-M
east elevation R306
1 MATERIAL: GLASS FIBER REINFORCED CONCRETE
COLOR: CLARK PACIFIC GFRC 12118-11EXTERIOR GFRC WALL
2 MATERIAL: GLASS FIBER REINFORCED CONCRETE
COLOR: CLARK PACIFIC GFRC 12118-10
3 MATERIAL: ALUMINUM
COLOR: CLEAR ANODIZED ALUMINUMWINDOW SYSTEM
4 MATERIAL: FRP (FIBER-REINFORCED POLYMER)
COLOR: BM CUSTOM C2-5382 @ 200% PODIUM
5 MATERIAL: SMOOTH STEEL TROWEL STUCCO
COLOR: BM CUSTOM C2-5382 “STOCKHOLM” EXTERIOR WALL
6 EXTERIOR WALL
GLASS RAIL
7
ROOF
TRANSOM
8
MECHANICAL SCREEN
9 MATERIAL: TEMPERED GLASS
COLOR: CLEAR
10
11
MATERIAL: ALUMINUM LOUVERS
COLOR: METALLIC SILVER COLORWELD 300XL
MATERIAL: ALUMINUM CLADDING
COLOR: ALUMINUM
NEW CONSTRUCTION COLORS / MATERIALS
EXTERIOR GFRC WALL
12 CONTROL JOINT
MATERIAL: STRUCTURAL SILICONE W/ ALUMINUM FRAME
COLOR: BLACK W/ CLEAR ANODIZED ALUMINUM
MATERIAL: SEALANT
COLOR: TO MATCH GFRC/STUCCO
EXTERIOR WALL MATERIAL: POURED IN PLACE CONCRETE
COLOR: NATURAL
MATERIAL: STEEL TROWEL STUCCO
COLOR: DUNN EDWARDS DE6376 @ 50%
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401
4'
-
0
1 2 "
9'
-
0
"
17
'
-
4
"
9'
-
0
"
9'
-
0
"
9'
-
0
"
9'
-
0
"
9'
-
3
3 4 "
19
'
-
3
"
ANG @ 118.04'
83
'
-
6
"
10
'
-
7
"
SECOND FLOOR FIN. @ 136.67'
THIRD FLOOR FIN.
FOURTH FLOOR FIN.
81
'
-
1
1
"
GROUND FLOOR FIN. @ 116.41'
+0'-0"
FIFTH FLOOR FIN.
SIXTH FLOOR FIN.
SEVENTH FLOOR FIN.
1'-8"
ROOF FIN.
20
'
-
3
"
10
'
-
7
"
10
'
-
7
"
10
'
-
7
"
10
'
-
7
"
10
'
-
4
"
9'
-
0
"
9'
-
0
"
9'
-
0
"
9'
-
0
"
P2 FIN.
-27'-10 1/2"
P3 FIN.
-37'-4 1/2"
P4 FIN.
-46'-10 1/2"
9'
-
6
"
9'
-
6
"
P1 FIN. @ 98.04'
-18'-4 1/2"
9'
-
6
"
P1/ADMIN FIN. @ 102.79
P2 FIN.
-23'-1 1/2"
P3 FIN.
-32'-7 1/2"
P4 FIN.
-42'-1 1/2"
13
'
-
7
1
/
2
"
9'
-
6
"
9'
-
6
"
9'
-
6
"
42
'
-
1
7 16
"
9'
-
0
"
18
'
-
6
"
8'
-
6
"
8'
-
6
"
8'
-
6
"
8'
-
6
"
8'
-
6
"
8'
-
6
"
19
'
-
0
"
8'
-
6
"
8'
-
6
"
19
'
-
4
"
(E) MECH. ROOM
P1 LEVEL
P2 LEVEL
P3 LEVEL
P4 LEVEL
P2 LEVEL
P3 LEVEL
P4 LEVEL
P5 LEVEL
ADMINISTRATION
7TH FLOOR ROOF
81'-10"ABV ANG
199'-11" ABV SEA LEVEL
6TH FLOOR
61'-0" ABV ANG
179'-0" ABV SEA LEVEL
POOL DECK
71'-6" ABV ANG
189'-7" ABV SEA LEVEL
5TH FLOOR TERRACE
50'-4"ABV ANG
168'-5" ABV SEA LEVEL
VEHICLE ACCESS
GUEST ROOM
GUEST ROOM
GUEST ROOM
GUEST ROOM
GUEST ROOM
HOTEL LOBBY
PODIUM COURTYARDHALLWAY
RETAIL PASEO
PEDESTRIAN BRIDGE
GUEST SUITE
GUEST SUITE
GUEST SUITE
GUEST SUITE
HALLWAY
HALLWAY
HALLWAY
HALLWAY
HALLWAY
LANDMARK LOBBY
LANDMARK NEW CONSTRUCTION
LO
N
G
I
T
U
D
I
N
A
L
S
E
C
T
I
O
N
A-401
SA
N
T
A
M
O
N
I
C
A
-
C
A
L
I
F
O
R
N
I
A
,
9
0
4
0
1
71
0
W
I
L
S
H
I
R
E
B
O
U
L
E
V
A
R
D
AL
E
X
G
O
R
B
Y
H
O
T
E
L
P
R
O
J
E
C
T
section A401
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 south stairwell A402
SOUTH STAIRWELL, 7TH
DN
1
-
4'-0" 4'-0"
8'-6"
SOUTH STAIRWELL, TYP.
1
-
4'-0" 4'-0"
8'-6"
SOUTH STAIRWELL, PODIUM LEVEL
1
-
4'-0" 4'-0"
8'-6"
SOUTH STAIRWELL, GROUND
1
-
4'-0" 4'-0"
8'-6"
SOUTH STAIRWELL SECTION12
35
4
8'
-
9
"
19
'
-
5
"
34
R
I
S
E
R
S
@
6
7 8 "
GROUND FL.
116.41'
4'
-
7
"
11
'
-
6
"
10
'
-
6
"
HS
S
4
X
6
L
O
C
A
T
I
O
N
S
10
'
-
6
"
10
'
-
6
"
11
'
-
0
"
8'
-
1
1
"
2'
-
1
0
"
10
'
-
7
"
19
R
I
S
E
R
S
@
6
11
16
"
10
'
-
7
"
19
R
I
S
E
R
S
@
6
11
16
"
10
'
-
7
"
19
R
I
S
E
R
S
@
6
11
16
"
10
'
-
7
"
19
R
I
S
E
R
S
@
6
11
16
"
11
'
-
7
2 "
20
R
I
S
E
R
S
@
6
15
16
"
3'
-
6
"
3'
-
6
"
3'
-
6
"
3'
-
6
"
3'
-
6
"
3'
-
6
"
SOUTH STAIRWELL, 7TH
DN
1
-
4'-0"4'-0"
8'-6"
SOUTH STAIRWELL, TYP.
1
-
4'-0"4'-0"
8'-6"
SOUTH STAIRWELL, PODIUM LEVEL
1
-
4'-0"4'-0"
8'-6"
SOUTH STAIRWELL, GROUND
1
-
4'-0"4'-0"
8'-6"
SOUTH STAIRWELL SECTION12
35
4
8'
-
9
"
19
'
-
5
"
34
R
I
S
E
R
S
@
6
7 8 "
GROUND FL.
116.41'
4'
-
7
"
11
'
-
6
"
10
'
-
6
"
HS
S
4
X
6
L
O
C
A
T
I
O
N
S
10
'
-
6
"
10
'
-
6
"
11
'
-
0
"
8'
-
1
1
"
2'
-
1
0
"
10
'
-
7
"
19
R
I
S
E
R
S
@
6
11
16
"
10
'
-
7
"
19
R
I
S
E
R
S
@
6
11
16
"
10
'
-
7
"
19
R
I
S
E
R
S
@
6
11
16
"
10
'
-
7
"
19
R
I
S
E
R
S
@
6
11
16
"
11
'
-
7
2 "
20
R
I
S
E
R
S
@
6
15
16
"
3'
-
6
"
3'
-
6
"
3'
-
6
"
3'
-
6
"
3'
-
6
"
3'
-
6
"
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 ground level rendered planting and hardscape plan L101
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 second level rendered planting plan L102
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 5th & 6th level rendered planting plan L103
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 7th level rendered planting plan L104
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 plant photos L201
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 plant photos L202
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 plant photos L203
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 hardscape material palette L204
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 exterior elevations at planting L301
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 L302exterior elevations at planting
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 exterior elevations @ 2 years plant maturity L303
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 L304exterior elevations @ 2 years plant maturity
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 ground level irrigation plan LI101
7 T H S T R E E T
W
I
L
S
H
I
R
E
B
O
U
L
E
V
A
R
D
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 SECOND LEVEL IRRIGATION PLAN LI102
7 T H S T R E E T
W
I
L
S
H
I
R
E
B
O
U
L
E
V
A
R
D
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 5th and 6th level irrigation plan LI103
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401
WATER METER NUMBER 6 WATER METER SIZE (Inches)
HYDRAULIC GRADE LINE (FT)WATER METER ELEVATION (FT)
ELEVATION DIFFERENCE (FT)MINMIMUM STATIC PRESSURE (PSI) 66.0
REMOTE CONTROL VALVE #F4 REMOTE CONTROL VALVE SIZE (In.) 1.00
R.C.V. DEMAND (GPM)8 TOTAL DEMAND (GPM)8
HIGHEST HEAD SERVED (FT)STATIC PRESSURE AT HIGHEST HEAD
SIZE (Inches) DESCRIPTION FLOW # LOSS
- SERVICE LINE (50 FT OF TYPE K COPPER)- 1 - PSI
- WATER METER (DISC TYPE)- 2 - PSI
1.00 BACKFLOW PREVENTER (R/P TYPE)8 3 11.50 PSI
1.00 Y-STRAINER 8 4 0.10 PSI
1.00 PRESSURE REGULATOR (WILKINS 500HLR)8 5 3.00 PSI
1.00 BFD ASSEMBLY PIPING (BRASS W/ 4 ELLS)8 6 1.40 PSI
1.00 MASTER CONTROL VALVE 8 7 2.80 PSI
1.00 FLOW SENSOR 8 8 1.00 PSI
- ISOLATION VALVES (BALL TYPE)- 9 - PSI
1.25 50 FEET OF TYPE 'K' COPPER MAINLINE 8 10 0.39 PSI
- FEET OF MAINLINE:- 11 - PSI
- FEET OF MAINLINE: - 12 - PSI
1.25 2 - 90 DEGREE ELBOWS 8 13 0.12 PSI
1.00 REMOTE CONTROL VALVE ASSEMBLY 8 14 2.80 PSI
10% LATERAL LINE LOSSES 8 15 3.00 PSI
20% FITTING LOSS (IN ADDITION TO ELBOWS SHOWN) N/A 16 0.08 PSI
0.00 ELEVATION CHANGE (P.O.C. TO HIGHEST HEAD) N/A 17 0.00 PSI
TOTAL SYSTEM PRESSURE LOSS (SUM OF #1 THRU #17)18 26.2 PSI
PRESSURE REQUIRED AT HEAD (OPERATING PRESSURE)19 30.0 PSI
TOTAL PRESSURE REQUIRED (SUM OF #18 AND #19) 20 56.2 PSI
STATIC WATER PRESSURE (FROM ABOVE)21 66.0 PSI
RESIDUAL PRESSURE (SUBTRACT #20 FROM #21)22 9.8 PSI
SET PRV OR MCV AT (#20 PLUS 10 PSI)23 N/A PSI
PRESSURE BOOST, IF REQUIRED (SET TO ACHIEVE 20 PSI RESIDUAL) 24 N/A PSI
WATER PRESSURE LOSS CALCULATIONS
PRESSURE LOSS CALCULATION IS PROVIDED FOR THIS PROJECT
BY SWEENEY & ASSOCIATES, INC. UNAUTHORIZED USE BY ANY
OTHER PERSON, COMPANY OR PROJECT IS FORBIDDEN WITHOUT
WRITTEN PERMISSION.
POC or Controller JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Total / Avg.
ETo / Month (Inches): 1.80 2.10 3.30 4.50 4.70 5.00 5.40 5.40 3.90 3.40 2.40 2.20 44.10
ETo / Day (Inches): 0.06 0.08 0.11 0.15 0.15 0.17 0.17 0.17 0.13 0.11 0.08 0.07 0.12
Irrigation Days / Week: 666666666666
Plant / Irrig. Type AKc Pr Rate IE JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Shrubs 0.40 0.72 0.90 2.5 3.2 4.6 6.5 6.6 7.2 7.5 7.5 5.6 4.7 3.5 3.1 Min./Day/Zone
Drip Tubing 3 7.5 9.7 13.8 19.4 19.7 21.6 22.6 22.6 16.9 14.2 10.4 9.2 Total Min./Day
Trees 0.80 0.45 0.90 8.0 10.4 14.7 20.7 21.0 23.0 24.1 24.1 18.0 15.2 11.1 9.8 Min./Day/Zone
Bubblers 3 24.1 31.1 44.2 62.2 62.9 69.1 72.3 72.3 53.9 45.5 33.2 29.4 Total Min./Day
Total Number of Zones: 6 3 24 15 88 28 39 19 59 57 16 04 43 9 T o t a l M i n . / D a y
Total Controller Run Time in Hours: 0.53 0.68 0.97 1.36 1.38 1.51 1.58 1.58 1.18 1.00 0.73 0.64 Total Hrs./Day
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Note: These schedules are intended only for compliance with local municipal codes and the water efficient landscape ordinance. These calculations
represent the MAXIMUM REASONABLE run times and are used to ensure that all irrigation may be completed during the specific watering window
allowed. These schedules do not include rainfall, site soil types, specicic exposures (shade versus sun), actual irrigation days, or specific slope
position. It is solely the responsibility of the irrigation contractor to program the controller as required to apply the correct amount of irrigation
water for the landscape. All smart controllers shall be programmed using the specified ET or weather sensing equipment, satellite provided ET
data, soil moisture sensors, and rain shut off devices as required. Contractor shall provide a controller schedule inside the controller cabinet prior
to final turnover of the project to the owner.
IRRIGATION CONTROLLER RUN TIMES
F
Number of Zones:
Number of Zones:
PROJECT NAME:710 WILSHIRE BOULEVARD
PROJECT ADDRESS:MIXED ‐ USE HOTEL PROJECT
SANTA MONICA, CA 90401
POINT OF CONNECTION NUMBER:6
CONTROLLER NUMBER OR LETTER:F
REFERENCE EVAPOTRANSPIRATION RATE (Eto):INCHES / YEAR
TOTAL OF HYDROZONE AREAS (HA):SQUARE FEET
TOTAL OF SPECIAL LANDSCAPE AREAS (SLA):SQUARE FEET
TOTAL LANDSCAPE AREAS (LA):SQUARE FEET
MAXIMUM APPLIED WATER ALLOWANCE:
TOTAL MAWA = (Eto) x (0.62) x [(0.7 x LA) + (0.3 x SLA)] =
ESTIMATED APPLIED WATER USED:
TOTAL EAWU = (Eto) x (0.62) x [((PF x HA)/IE) + SLA] =
HYDROZONE AREA (HA) CALCULATIONS FOR HYDROZONES:
AREA PLANT HYDROZONE IRRIGATION
HYDROZONE DESCRIPTION (SFT) FACTOR (PF) AREA (HA) EFFICIENCY (IE)
HYDROZONE #1:SHRUB AREA WITH INLINE DRIP TUBING 1,166 0.40 466 0.900
TOTAL OF ALL HYDROZONE AREAS (HA) ON THE PROJECT:1,166 466
CALCULATED AVERAGE IRRIGATION EFFICIENCY OF ALL HYDROZONE AREAS:0.900
AREA PLANT HYDROZONE IRRIGATION
SPECIAL LANDSCAPE AREA DESCRIPTION (SFT) FACTOR (PF) AREA (HA) EFFICIENCY (IE)
TOTAL SPECIAL LANDSCAPE AREAS (SLA) ON PROJECT:0
GALLONS / YEAR
14,169 THIS PROJECT USES LESS WATER
THAN THE MAXIMUM APPLIED
WATER ALLOWANCE
GALLONS / YEAR
LANDSCAPE IRRIGATION WATER ANALYSIS
44.1
1,166
0
1,166
22,317
7th level irrigation plan LI104
7 T H S T R E E T
W
I
L
S
H
I
R
E
B
O
U
L
E
V
A
R
D
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 LI201irrigation legend
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 irrigation legend LI202
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 irrigation legend LI203
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 irrigation legend LI204
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 irrigation legend LI205
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 irrigation legend LI206
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 irrigation details LI207
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 ground level planting plan LP101
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 2nd level planting plan LP102
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 5th and 6th level planting plan LP103
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 7th level planting plan LP104
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 planting legend LP201
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 planting details LP301
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
71
0
w
i
l
s
h
i
r
e
b
l
v
d
,
s
a
n
t
a
m
o
n
i
c
a
,
c
a
9
0
4
0
1
horton lees brogden lighting design Plan Ɵ ng and Planter Ligh Ɵ ng • E-10 : Low level LED landscape fi xture with control op Ɵ cs • E-80 : Wet loca Ɵ on LED linear fl exbile tapelight at planter detail Circula Ɵ on and Area Ligh Ɵ ng • E-1 : Low level high performance exterior LED step light • E-54 : Surface mounted Wet loca Ɵ on LED fl oodight • E-70 : Wet loca Ɵ on light pole • ESC-1 : Retro fi t LED lamp for exis Ɵ ng sconces on Historic façade Ingrade Ligh Ɵ ng • E-9 : Ingrade exterior LED adjustable up light • E-51 : Ingrade LED marker light • E-84a : Ingrade exterior LED uplight behind plan Ɵ ng Recessed Ligh Ɵ ng • E-52 : Recessed Wet Loca Ɵ on adjustable LED downlight with wide op Ɵ cs • E-66 : Wet loca Ɵ on recessed downlight with drop lens • E-73 : Damp loca Ɵ on wall wash fi xture • E-87 : Recessed damp loca Ɵ on adjustable LED downlight at so ffi t • PL-3 : 2.5” Diameter LED Interior/EXTERIOR pin spot fi xture Water Feature Ligh Ɵ ng • E-55 : Submersible LED fl exible tape light • E-56 : Annular underwater uplightLinear Ligh Ɵ ng • E-2 : LED linear fl exible tape light • E-63 : Wet loca Ɵ on LED tapelight in extrusion with frosted lens • E-89 : Exterior LED cove light Decora Ɵ ve Ligh Ɵ ng • E-57 : Wet loca Ɵ on decora Ɵ ve pendant • E-71 : Wet loca Ɵ on dynamic white graze uplight, DMX required
71
0
w
i
l
s
h
i
r
e
b
l
v
d
,
s
a
n
t
a
m
o
n
i
c
a
,
c
a
9
0
4
0
1
h o r r r r r t t t t t t t t t o o n n n n n n n n n n n l ee e e e e s s s s s s s s s s s b r og de de de de d d de d d de d de d d d de de d d de de d d d de de de de de de e d e n n n n n n n n n n n n n n n n n n n n n n n n n n l i g h t i horton lees brogden lighting design • • • • • • • • • • • • • • • • • • • • • Ground Level Lighting Layout_A EL-001.1
DE
S
I
G
N
S
R
E
P
R
E
S
E
N
T
E
D
B
Y
T
H
I
S
D
R
A
W
I
N
G
I
S
T
H
E
S
O
L
E
P
R
O
P
E
R
T
Y
O
F
H
O
W
A
R
D
LA
K
S
A
R
C
H
I
T
E
C
T
S
A
N
D
W
E
R
E
D
E
V
E
L
O
P
E
D
F
O
R
T
H
E
U
S
E
O
N
T
H
I
S
P
R
O
J
E
C
T
O
N
L
Y
.
TH
I
S
D
R
A
W
I
N
G
A
N
D
T
H
E
D
E
S
I
G
N
I
T
R
E
P
R
E
S
E
N
T
S
S
H
A
L
L
N
O
T
B
E
U
S
E
D
B
Y
O
R
DI
S
C
L
O
S
E
D
T
O
A
N
Y
P
E
R
S
O
N
O
R
F
I
R
M
O
U
T
S
I
D
E
T
H
E
S
C
O
P
E
O
F
T
H
I
S
P
R
O
J
E
C
T
WI
T
H
O
U
T
T
H
E
W
R
I
T
T
E
N
P
E
R
M
I
S
S
I
O
N
O
F
H
O
W
A
R
D
L
A
K
S
A
R
C
H
I
T
E
C
T
S
.
7 1 0
W
I
L
S
H
I
R
E
B
L
V
D
.
/
H
O
W
A
R
D
L
A
K
S
A
R
C
H
I
T
E
C
T
S
71
0
w
i
l
s
h
i
r
e
b
l
v
d
,
s
a
n
t
a
m
o
n
i
c
a
,
c
a
9
0
4
0
1
horton lees brogden lighting design
E-
8
9
Plan Ɵ ng and Planter Ligh Ɵ ng • E-10 : Low level LED landscape fi xture with control op Ɵ cs • E-80 : Wet loca Ɵ on LED linear fl exbile tapelight at planter detail Circula Ɵ on and Area Ligh Ɵ ng • E-1 : Low level high performance exterior LED step light • E-54 : Surface mounted Wet loca Ɵ on LED fl oodight • E-70 : Wet loca Ɵ on light pole • ESC-1 : Retro fi t LED lamp for exis Ɵ ng sconces on Historic façade Ingrade Ligh Ɵ ng • E-9 : Ingrade exterior LED adjustable up light • E-51 : Ingrade LED marker light • E-84a : Ingrade exterior LED uplight behind plan Ɵ ng Recessed Ligh Ɵ ng • E-52 : Recessed Wet Loca Ɵ on adjustable LED downlight with wide op Ɵ cs • E-66 : Wet loca Ɵ on recessed downlight with drop lens • E-73 : Damp loca Ɵ on wall wash fi xture • E-87 : Recessed damp loca Ɵ on adjustable LED downlight at so ffi t • PL-3 : 2.5” Diameter LED Interior/EXTERIOR pin spot fi xture Water Feature Ligh Ɵ ng • E-55 : Submersible LED fl exible tape light • E-56 : Annular underwater uplightLinear Ligh Ɵ ng • E-2 : LED linear fl exible tape light • E-63 : Wet loca Ɵ on LED tapelight in extrusion with frosted lens • E-89 : Exterior LED cove light Decora Ɵ ve Ligh Ɵ ng • E-57 : Wet loca Ɵ on decora Ɵ ve pendant • E-71 : Wet loca Ɵ on dynamic white graze uplight, DMX required• • • • • • • • • • • •• • • • • • • • •
71
0
w
i
l
s
h
i
r
e
b
l
v
d
,
s
a
n
t
a
m
o
n
i
c
a
,
c
a
9
0
4
0
1
h o r r r r r t t t t t t t t t o o n n n n n n n n n n n l ee e e e e s s s s s s s s s s s b r og de de de de d d de d d de d de d d d de de d d de de d d d de de de de de de e d e n n n n n n n n n n n n n n n n n n n n n n n n n n l ig h t i horton lees brogden lighting design Ground Level Lighting Layout_B EL-001.2
DE
S
I
G
N
S
R
E
P
R
E
S
E
N
T
E
D
B
Y
T
H
I
S
D
R
A
W
I
N
G
I
S
T
H
E
S
O
L
E
P
R
O
P
E
R
T
Y
O
F
H
O
W
A
R
D
LA
K
S
A
R
C
H
I
T
E
C
T
S
A
N
D
W
E
R
E
D
E
V
E
L
O
P
E
D
F
O
R
T
H
E
U
S
E
O
N
T
H
I
S
P
R
O
J
E
C
T
O
N
L
Y
.
TH
I
S
D
R
A
W
I
N
G
A
N
D
T
H
E
D
E
S
I
G
N
I
T
R
E
P
R
E
S
E
N
T
S
S
H
A
L
L
N
O
T
B
E
U
S
E
D
B
Y
O
R
DI
S
C
L
O
S
E
D
T
O
A
N
Y
P
E
R
S
O
N
O
R
F
I
R
M
O
U
T
S
I
D
E
T
H
E
S
C
O
P
E
O
F
T
H
I
S
P
R
O
J
E
C
T
WI
T
H
O
U
T
T
H
E
W
R
I
T
T
E
N
P
E
R
M
I
S
S
I
O
N
O
F
H
O
W
A
R
D
L
A
K
S
A
R
C
H
I
T
E
C
T
S
.
7 1 0
W
I
L
S
H
I
R
E
B
L
V
D
.
/
H
O
W
A
R
D
L
A
K
S
A
R
C
H
I
T
E
C
T
S
71
0
w
i
l
s
h
i
r
e
b
l
v
d
,
s
a
n
t
a
m
o
n
i
c
a
,
c
a
9
0
4
0
1
horton lees brogden lighting design Plan Ɵ ng and Planter Ligh Ɵ ng • E-10 : Low level LED landscape fi xture with control op Ɵ cs • E-80 : Wet loca Ɵ on LED linear fl exible tapelight at planter detail Circula Ɵ on and Area Ligh Ɵ ng • E-69 : Wet loca Ɵ on miniature LED steplight • E-70 : Wet loca Ɵ on light pole Recessed Ligh Ɵ ng • DL-16 : 3.25” square recessed wet listed downlight • PL-3 : 2.5” Diameter LED Interior/Exterior pin spot fi xture • E-85 : Wet loca Ɵ on adjustable LED downlightLinear Ligh Ɵ ng • E-2 : LED linear fl exible tape lightFacade Ligh Ɵ ng • E-78 : Wet located LED direct/indirect sconce Ingrade Ligh Ɵ ng • E-84 : Ingrade exterior LED adjustable fabric canopy uplight with frosted lens •
71
0
w
i
l
s
h
i
r
e
b
l
v
d
,
s
a
n
t
a
m
o
n
i
c
a
,
c
a
9
0
4
0
1
h o r r r r r t t t t t t t t t o o n n n n n n n n n n n l ee e e e e s s s s s s s s s s s b r og de de de de d d de d d de d de d d d de de d d de de d d d de de de de de de e d e n n n n n n n n n n n n n n n n n n n n n n n n n n l ig h t i horton lees brogden lighting design • • •• • • • • • Second Level Lighting Layout_A EL-002.1
DE
S
I
G
N
S
R
E
P
R
E
S
E
N
T
E
D
B
Y
T
H
I
S
D
R
A
W
I
N
G
I
S
T
H
E
S
O
L
E
P
R
O
P
E
R
T
Y
O
F
H
O
W
A
R
D
LA
K
S
A
R
C
H
I
T
E
C
T
S
A
N
D
W
E
R
E
D
E
V
E
L
O
P
E
D
F
O
R
T
H
E
U
S
E
O
N
T
H
I
S
P
R
O
J
E
C
T
O
N
L
Y
.
TH
I
S
D
R
A
W
I
N
G
A
N
D
T
H
E
D
E
S
I
G
N
I
T
R
E
P
R
E
S
E
N
T
S
S
H
A
L
L
N
O
T
B
E
U
S
E
D
B
Y
O
R
DI
S
C
L
O
S
E
D
T
O
A
N
Y
P
E
R
S
O
N
O
R
F
I
R
M
O
U
T
S
I
D
E
T
H
E
S
C
O
P
E
O
F
T
H
I
S
P
R
O
J
E
C
T
WI
T
H
O
U
T
T
H
E
W
R
I
T
T
E
N
P
E
R
M
I
S
S
I
O
N
O
F
H
O
W
A
R
D
L
A
K
S
A
R
C
H
I
T
E
C
T
S
.
7 1 0
W
I
L
S
H
I
R
E
B
L
V
D
.
/
H
O
W
A
R
D
L
A
K
S
A
R
C
H
I
T
E
C
T
S
71
0
w
i
l
s
h
i
r
e
b
l
v
d
,
s
a
n
t
a
m
o
n
i
c
a
,
c
a
9
0
4
0
1
horton lees brogden lighting design Plan Ɵ ng and Planter Ligh Ɵ ng • E-10 : Low level LED landscape fi xture with control op Ɵ cs • E-80 : Wet loca Ɵ on LED linear fl exible tapelight at planter detail Circula Ɵ on and Area Ligh Ɵ ng • E-69 : Wet loca Ɵ on miniature LED steplight • E-70 : Wet loca Ɵ on light pole Recessed Ligh Ɵ ng • DL-16 : 3.25” square recessed wet listed downlight • PL-3 : 2.5” Diameter LED Interior/Exterior pin spot fi xture • E-85 : Wet loca Ɵ on adjustable LED downlightLinear Ligh Ɵ ng • E-2 : LED linear fl exible tape lightFacade Ligh Ɵ ng • E-78 : Wet located LED direct/indirect sconce Ingrade Ligh Ɵ ng • E-84 : Ingrade exterior LED adjustable fabric canopy uplight with frosted lens • • • • • • • • • •
71
0
w
i
l
s
h
i
r
e
b
l
v
d
,
s
a
n
t
a
m
o
n
i
c
a
,
c
a
9
0
4
0
1
h o r r r r r t t t t t t t t t o o n n n n n n n n n n n l ee e e e e s s s s s s s s s s s b r og de de de de d d de d d de d de d d d de de d d de de d d d de de de de de de e d e n n n n n n n n n n n n n n n n n n n n n n n n n n l ig h t i horton lees brogden lighting design Second Level Lighting Layout_B EL-002.2
DE
S
I
G
N
S
R
E
P
R
E
S
E
N
T
E
D
B
Y
T
H
I
S
D
R
A
W
I
N
G
I
S
T
H
E
S
O
L
E
P
R
O
P
E
R
T
Y
O
F
H
O
W
A
R
D
LA
K
S
A
R
C
H
I
T
E
C
T
S
A
N
D
W
E
R
E
D
E
V
E
L
O
P
E
D
F
O
R
T
H
E
U
S
E
O
N
T
H
I
S
P
R
O
J
E
C
T
O
N
L
Y
.
TH
I
S
D
R
A
W
I
N
G
A
N
D
T
H
E
D
E
S
I
G
N
I
T
R
E
P
R
E
S
E
N
T
S
S
H
A
L
L
N
O
T
B
E
U
S
E
D
B
Y
O
R
DI
S
C
L
O
S
E
D
T
O
A
N
Y
P
E
R
S
O
N
O
R
F
I
R
M
O
U
T
S
I
D
E
T
H
E
S
C
O
P
E
O
F
T
H
I
S
P
R
O
J
E
C
T
WI
T
H
O
U
T
T
H
E
W
R
I
T
T
E
N
P
E
R
M
I
S
S
I
O
N
O
F
H
O
W
A
R
D
L
A
K
S
A
R
C
H
I
T
E
C
T
S
.
7 1 0
W
I
L
S
H
I
R
E
B
L
V
D
.
/
H
O
W
A
R
D
L
A
K
S
A
R
C
H
I
T
E
C
T
S
71
0
w
i
l
s
h
i
r
e
b
l
v
d
,
s
a
n
t
a
m
o
n
i
c
a
,
c
a
9
0
4
0
1
horton lees brogden lighting design Planter Ligh Ɵ ng • E-80 : Wet loca Ɵ on LED linear fl exible tapelight at planter detailRecessed Ligh Ɵ ng • DL-16 : 3.25” square recessed wet listed downlight • PL-3 : 2.5” Diameter LED Interior/Exterior pin spot fi xture • E-85 : Wet loca Ɵ on adjustable LED downlightLinear Ligh Ɵ ng • E-2 : LED linear fl exible tape light
71
0
w
i
l
s
h
i
r
e
b
l
v
d
,
s
a
n
t
a
m
o
n
i
c
a
,
c
a
9
0
4
0
1
h o r r r r r t t t t t t t t t o o n n n n n n n n n n n l ee e e e e s s s s s s s s s s s b r og de de de de d d de d d de d de d d d de de d d de de d d d de de de de de de e d e n n n n n n n n n n n n n n n n n n n n n n n n n n l ig h t i horton lees brogden lighting design • • • • • Third Level Lighting Layout_A EL-003.1
DE
S
I
G
N
S
R
E
P
R
E
S
E
N
T
E
D
B
Y
T
H
I
S
D
R
A
W
I
N
G
I
S
T
H
E
S
O
L
E
P
R
O
P
E
R
T
Y
O
F
H
O
W
A
R
D
LA
K
S
A
R
C
H
I
T
E
C
T
S
A
N
D
W
E
R
E
D
E
V
E
L
O
P
E
D
F
O
R
T
H
E
U
S
E
O
N
T
H
I
S
P
R
O
J
E
C
T
O
N
L
Y
.
TH
I
S
D
R
A
W
I
N
G
A
N
D
T
H
E
D
E
S
I
G
N
I
T
R
E
P
R
E
S
E
N
T
S
S
H
A
L
L
N
O
T
B
E
U
S
E
D
B
Y
O
R
DI
S
C
L
O
S
E
D
T
O
A
N
Y
P
E
R
S
O
N
O
R
F
I
R
M
O
U
T
S
I
D
E
T
H
E
S
C
O
P
E
O
F
T
H
I
S
P
R
O
J
E
C
T
WI
T
H
O
U
T
T
H
E
W
R
I
T
T
E
N
P
E
R
M
I
S
S
I
O
N
O
F
H
O
W
A
R
D
L
A
K
S
A
R
C
H
I
T
E
C
T
S
.
7 1 0
W
I
L
S
H
I
R
E
B
L
V
D
.
/
H
O
W
A
R
D
L
A
K
S
A
R
C
H
I
T
E
C
T
S
71
0
w
i
l
s
h
i
r
e
b
l
v
d
,
s
a
n
t
a
m
o
n
i
c
a
,
c
a
9
0
4
0
1
horton lees brogden lighting design
71
0
w
i
l
s
h
i
r
e
b
l
v
d
,
s
a
n
t
a
m
o
n
i
c
a
,
c
a
9
0
4
0
1
h o r r r r r t t t t t t t t t o o n n n n n n n n n n n l ee e e e e s s s s s s s s s s s b r og de de de de d d de d d de d de d d d de de d d de de d d d de de de de de de e d e n n n n n n n n n n n n n n n n n n n n n n n n n n l ig h t i horton lees brogden lighting design Planter Ligh Ɵ ng • E-80 : Wet loca Ɵ on LED linear fl exible tapelight at planter detailRecessed Ligh Ɵ ng • DL-16 : 3.25” square recessed wet listed downlight • PL-3 : 2.5” Diameter LED Interior/Exterior pin spot fi xture • E-85 : Wet loca Ɵ on adjustable LED downlightLinear Ligh Ɵ ng • E-2 : LED linear fl exible tape light • • • • • Third Level Lighting Layout_B EL-003.2
DE
S
I
G
N
S
R
E
P
R
E
S
E
N
T
E
D
B
Y
T
H
I
S
D
R
A
W
I
N
G
I
S
T
H
E
S
O
L
E
P
R
O
P
E
R
T
Y
O
F
H
O
W
A
R
D
LA
K
S
A
R
C
H
I
T
E
C
T
S
A
N
D
W
E
R
E
D
E
V
E
L
O
P
E
D
F
O
R
T
H
E
U
S
E
O
N
T
H
I
S
P
R
O
J
E
C
T
O
N
L
Y
.
TH
I
S
D
R
A
W
I
N
G
A
N
D
T
H
E
D
E
S
I
G
N
I
T
R
E
P
R
E
S
E
N
T
S
S
H
A
L
L
N
O
T
B
E
U
S
E
D
B
Y
O
R
DI
S
C
L
O
S
E
D
T
O
A
N
Y
P
E
R
S
O
N
O
R
F
I
R
M
O
U
T
S
I
D
E
T
H
E
S
C
O
P
E
O
F
T
H
I
S
P
R
O
J
E
C
T
WI
T
H
O
U
T
T
H
E
W
R
I
T
T
E
N
P
E
R
M
I
S
S
I
O
N
O
F
H
O
W
A
R
D
L
A
K
S
A
R
C
H
I
T
E
C
T
S
.
7 1 0
W
I
L
S
H
I
R
E
B
L
V
D
.
/
H
O
W
A
R
D
L
A
K
S
A
R
C
H
I
T
E
C
T
S
71
0
w
i
l
s
h
i
r
e
b
l
v
d
,
s
a
n
t
a
m
o
n
i
c
a
,
c
a
9
0
4
0
1
horton lees brogden lighting design Recessed Ligh Ɵ ng • DL-16 : 3.25” square recessed wet listed downlight • PL-3 : 2.5” Diameter LED Interior/Exterior pin spot fi xtureLinear Ligh Ɵ ng • E-2 : LED linear fl exible tape light
71
0
w
i
l
s
h
i
r
e
b
l
v
d
,
s
a
n
t
a
m
o
n
i
c
a
,
c
a
9
0
4
0
1
h o r r r r r t t t t t t t t t o o n n n n n n n n n n n l ee e e e e s s s s s s s s s s s b r og de de de de d d de d d de d de d d d de de d d de de d d d de de de de de de e d e n n n n n n n n n n n n n n n n n n n n n n n n n n l ig h t i horton lees brogden lighting design • • • Fourth Level Lighting Layout_A EL-004.1
DE
S
I
G
N
S
R
E
P
R
E
S
E
N
T
E
D
B
Y
T
H
I
S
D
R
A
W
I
N
G
I
S
T
H
E
S
O
L
E
P
R
O
P
E
R
T
Y
O
F
H
O
W
A
R
D
LA
K
S
A
R
C
H
I
T
E
C
T
S
A
N
D
W
E
R
E
D
E
V
E
L
O
P
E
D
F
O
R
T
H
E
U
S
E
O
N
T
H
I
S
P
R
O
J
E
C
T
O
N
L
Y
.
TH
I
S
D
R
A
W
I
N
G
A
N
D
T
H
E
D
E
S
I
G
N
I
T
R
E
P
R
E
S
E
N
T
S
S
H
A
L
L
N
O
T
B
E
U
S
E
D
B
Y
O
R
DI
S
C
L
O
S
E
D
T
O
A
N
Y
P
E
R
S
O
N
O
R
F
I
R
M
O
U
T
S
I
D
E
T
H
E
S
C
O
P
E
O
F
T
H
I
S
P
R
O
J
E
C
T
WI
T
H
O
U
T
T
H
E
W
R
I
T
T
E
N
P
E
R
M
I
S
S
I
O
N
O
F
H
O
W
A
R
D
L
A
K
S
A
R
C
H
I
T
E
C
T
S
.
7 1 0
W
I
L
S
H
I
R
E
B
L
V
D
.
/
H
O
W
A
R
D
L
A
K
S
A
R
C
H
I
T
E
C
T
S
71
0
w
i
l
s
h
i
r
e
b
l
v
d
,
s
a
n
t
a
m
o
n
i
c
a
,
c
a
9
0
4
0
1
horton lees brogden lighting design Recessed Ligh Ɵ ng • DL-16 : 3.25” square recessed wet listed downlight • PL-3 : 2.5” Diameter LED Interior/Exterior pin spot fi xtureLinear Ligh Ɵ ng • E-2 : LED linear fl exible tape light
71
0
w
i
l
s
h
i
r
e
b
l
v
d
,
s
a
n
t
a
m
o
n
i
c
a
,
c
a
9
0
4
0
1
h o r r r r r t t t t t t t t t o o n n n n n n n n n n n l ee e e e e s s s s s s s s s s s b r og de de de de d d de d d de d de d d d de de d d de de d d d de de de de de de e d e n n n n n n n n n n n n n n n n n n n n n n n n n n l ig h t i horton lees brogden lighting design • • • Fourth Level Lighting Layout_B EL-004.2
DE
S
I
G
N
S
R
E
P
R
E
S
E
N
T
E
D
B
Y
T
H
I
S
D
R
A
W
I
N
G
I
S
T
H
E
S
O
L
E
P
R
O
P
E
R
T
Y
O
F
H
O
W
A
R
D
LA
K
S
A
R
C
H
I
T
E
C
T
S
A
N
D
W
E
R
E
D
E
V
E
L
O
P
E
D
F
O
R
T
H
E
U
S
E
O
N
T
H
I
S
P
R
O
J
E
C
T
O
N
L
Y
.
TH
I
S
D
R
A
W
I
N
G
A
N
D
T
H
E
D
E
S
I
G
N
I
T
R
E
P
R
E
S
E
N
T
S
S
H
A
L
L
N
O
T
B
E
U
S
E
D
B
Y
O
R
DI
S
C
L
O
S
E
D
T
O
A
N
Y
P
E
R
S
O
N
O
R
F
I
R
M
O
U
T
S
I
D
E
T
H
E
S
C
O
P
E
O
F
T
H
I
S
P
R
O
J
E
C
T
WI
T
H
O
U
T
T
H
E
W
R
I
T
T
E
N
P
E
R
M
I
S
S
I
O
N
O
F
H
O
W
A
R
D
L
A
K
S
A
R
C
H
I
T
E
C
T
S
.
7 1 0
W
I
L
S
H
I
R
E
B
L
V
D
.
/
H
O
W
A
R
D
L
A
K
S
A
R
C
H
I
T
E
C
T
S
71
0
w
i
l
s
h
i
r
e
b
l
v
d
,
s
a
n
t
a
m
o
n
i
c
a
,
c
a
9
0
4
0
1
horton lees brogden lighting design Planter Ligh Ɵ ng • E-80 : Wet loca Ɵ on LED linear fl exible tapelight at planter detail Recessed Ligh Ɵ ng • DL-16 : 3.25” square recessed wet listed downlight • PL-3 : 2.5” Diameter LED Interior/Exterior pin spot fi xtureLinear Ligh Ɵ ng • E-2 : LED linear fl exible tape light
71
0
w
i
l
s
h
i
r
e
b
l
v
d
,
s
a
n
t
a
m
o
n
i
c
a
,
c
a
9
0
4
0
1
h o r r r r r t t t t t t t t t o o n n n n n n n n n n n l ee e e e e s s s s s s s s s s s b r og de de de de d d de d d de d de d d d de de d d de de d d d de de de de de de e d e n n n n n n n n n n n n n n n n n n n n n n n n n n l ig h t i horton lees brogden lighting design • • •• Fifth Level Lighting Layout_A EL-005.1
DE
S
I
G
N
S
R
E
P
R
E
S
E
N
T
E
D
B
Y
T
H
I
S
D
R
A
W
I
N
G
I
S
T
H
E
S
O
L
E
P
R
O
P
E
R
T
Y
O
F
H
O
W
A
R
D
LA
K
S
A
R
C
H
I
T
E
C
T
S
A
N
D
W
E
R
E
D
E
V
E
L
O
P
E
D
F
O
R
T
H
E
U
S
E
O
N
T
H
I
S
P
R
O
J
E
C
T
O
N
L
Y
.
TH
I
S
D
R
A
W
I
N
G
A
N
D
T
H
E
D
E
S
I
G
N
I
T
R
E
P
R
E
S
E
N
T
S
S
H
A
L
L
N
O
T
B
E
U
S
E
D
B
Y
O
R
DI
S
C
L
O
S
E
D
T
O
A
N
Y
P
E
R
S
O
N
O
R
F
I
R
M
O
U
T
S
I
D
E
T
H
E
S
C
O
P
E
O
F
T
H
I
S
P
R
O
J
E
C
T
WI
T
H
O
U
T
T
H
E
W
R
I
T
T
E
N
P
E
R
M
I
S
S
I
O
N
O
F
H
O
W
A
R
D
L
A
K
S
A
R
C
H
I
T
E
C
T
S
.
7 1 0
W
I
L
S
H
I
R
E
B
L
V
D
.
/
H
O
W
A
R
D
L
A
K
S
A
R
C
H
I
T
E
C
T
S
71
0
w
i
l
s
h
i
r
e
b
l
v
d
,
s
a
n
t
a
m
o
n
i
c
a
,
c
a
9
0
4
0
1
horton lees brogden lighting design
71
0
w
i
l
s
h
i
r
e
b
l
v
d
,
s
a
n
t
a
m
o
n
i
c
a
,
c
a
9
0
4
0
1
h o r r r r r t t t t t t t t t o o n n n n n n n n n n n l ee e e e e s s s s s s s s s s s b r og de de de de d d de d d de d de d d d de de d d de de d d d de de de de de de e d e n n n n n n n n n n n n n n n n n n n n n n n n n n l ig h t i horton lees brogden lighting design Planter Ligh Ɵ ng • E-80 : Wet loca Ɵ on LED linear fl exible tapelight at planter detail Recessed Ligh Ɵ ng • DL-16 : 3.25” square recessed wet listed downlight • PL-3 : 2.5” Diameter LED Interior/Exterior pin spot fi xtureLinear Ligh Ɵ ng • E-2 : LED linear fl exible tape light• • • • Fifth Level Lighting Layout_B EL-005.2
DE
S
I
G
N
S
R
E
P
R
E
S
E
N
T
E
D
B
Y
T
H
I
S
D
R
A
W
I
N
G
I
S
T
H
E
S
O
L
E
P
R
O
P
E
R
T
Y
O
F
H
O
W
A
R
D
LA
K
S
A
R
C
H
I
T
E
C
T
S
A
N
D
W
E
R
E
D
E
V
E
L
O
P
E
D
F
O
R
T
H
E
U
S
E
O
N
T
H
I
S
P
R
O
J
E
C
T
O
N
L
Y
.
TH
I
S
D
R
A
W
I
N
G
A
N
D
T
H
E
D
E
S
I
G
N
I
T
R
E
P
R
E
S
E
N
T
S
S
H
A
L
L
N
O
T
B
E
U
S
E
D
B
Y
O
R
DI
S
C
L
O
S
E
D
T
O
A
N
Y
P
E
R
S
O
N
O
R
F
I
R
M
O
U
T
S
I
D
E
T
H
E
S
C
O
P
E
O
F
T
H
I
S
P
R
O
J
E
C
T
WI
T
H
O
U
T
T
H
E
W
R
I
T
T
E
N
P
E
R
M
I
S
S
I
O
N
O
F
H
O
W
A
R
D
L
A
K
S
A
R
C
H
I
T
E
C
T
S
.
7 1 0
W
I
L
S
H
I
R
E
B
L
V
D
.
/
H
O
W
A
R
D
L
A
K
S
A
R
C
H
I
T
E
C
T
S
71
0
w
i
l
s
h
i
r
e
b
l
v
d
,
s
a
n
t
a
m
o
n
i
c
a
,
c
a
9
0
4
0
1
horton lees brogden lighting design Plan Ɵ ng and Planter Ligh Ɵ ng • E-80 : Wet loca Ɵ on LED linear fl exible tapelight at planter detail Recessed Ligh Ɵ ng • DL-16 : 3.25” square recessed wet listed downlight • PL-3 : 2.5” Diameter LED Interior/Exterior pin spot fi xtureLinear Ligh Ɵ ng • E-2 : LED linear fl exible tape light
71
0
w
i
l
s
h
i
r
e
b
l
v
d
,
s
a
n
t
a
m
o
n
i
c
a
,
c
a
9
0
4
0
1
h o r r r r r t t t t t t t t t o o n n n n n n n n n n n l ee e e e e s s s s s s s s s s s b r og de de de de d d de d d de d de d d d de de d d de de d d d de de de de de de e d e n n n n n n n n n n n n n n n n n n n n n n n n n n l ig h t i horton lees brogden lighting design • • • • Sixth Level Lighting Layout_A EL-006.1
DE
S
I
G
N
S
R
E
P
R
E
S
E
N
T
E
D
B
Y
T
H
I
S
D
R
A
W
I
N
G
I
S
T
H
E
S
O
L
E
P
R
O
P
E
R
T
Y
O
F
H
O
W
A
R
D
LA
K
S
A
R
C
H
I
T
E
C
T
S
A
N
D
W
E
R
E
D
E
V
E
L
O
P
E
D
F
O
R
T
H
E
U
S
E
O
N
T
H
I
S
P
R
O
J
E
C
T
O
N
L
Y
.
TH
I
S
D
R
A
W
I
N
G
A
N
D
T
H
E
D
E
S
I
G
N
I
T
R
E
P
R
E
S
E
N
T
S
S
H
A
L
L
N
O
T
B
E
U
S
E
D
B
Y
O
R
DI
S
C
L
O
S
E
D
T
O
A
N
Y
P
E
R
S
O
N
O
R
F
I
R
M
O
U
T
S
I
D
E
T
H
E
S
C
O
P
E
O
F
T
H
I
S
P
R
O
J
E
C
T
WI
T
H
O
U
T
T
H
E
W
R
I
T
T
E
N
P
E
R
M
I
S
S
I
O
N
O
F
H
O
W
A
R
D
L
A
K
S
A
R
C
H
I
T
E
C
T
S
.
7 1 0
W
I
L
S
H
I
R
E
B
L
V
D
.
/
H
O
W
A
R
D
L
A
K
S
A
R
C
H
I
T
E
C
T
S
71
0
w
i
l
s
h
i
r
e
b
l
v
d
,
s
a
n
t
a
m
o
n
i
c
a
,
c
a
9
0
4
0
1
horton lees brogden lighting design Plan Ɵ ng and Planter Ligh Ɵ ng • E-80 : Wet loca Ɵ on LED linear fl exible tapelight at planter detail Recessed Ligh Ɵ ng • DL-16 : 3.25” square recessed wet listed downlight • PL-3 : 2.5” Diameter LED Interior/Exterior pin spot fi xtureLinear Ligh Ɵ ng • E-2 : LED linear fl exible tape light • • •
71
0
w
i
l
s
h
i
r
e
b
l
v
d
,
s
a
n
t
a
m
o
n
i
c
a
,
c
a
9
0
4
0
1
h o r r r r r t t t t t t t t t o o n n n n n n n n n n n l ee e e e e s s s s s s s s s s s b r og de de de de d d de d d de d de d d d de de d d de de d d d de de de de de de e d e n n n n n n n n n n n n n n n n n n n n n n n n n n l ig h t i horton lees brogden lighting design • Sixth Level Lighting Layout_B EL-006.2
DE
S
I
G
N
S
R
E
P
R
E
S
E
N
T
E
D
B
Y
T
H
I
S
D
R
A
W
I
N
G
I
S
T
H
E
S
O
L
E
P
R
O
P
E
R
T
Y
O
F
H
O
W
A
R
D
LA
K
S
A
R
C
H
I
T
E
C
T
S
A
N
D
W
E
R
E
D
E
V
E
L
O
P
E
D
F
O
R
T
H
E
U
S
E
O
N
T
H
I
S
P
R
O
J
E
C
T
O
N
L
Y
.
TH
I
S
D
R
A
W
I
N
G
A
N
D
T
H
E
D
E
S
I
G
N
I
T
R
E
P
R
E
S
E
N
T
S
S
H
A
L
L
N
O
T
B
E
U
S
E
D
B
Y
O
R
DI
S
C
L
O
S
E
D
T
O
A
N
Y
P
E
R
S
O
N
O
R
F
I
R
M
O
U
T
S
I
D
E
T
H
E
S
C
O
P
E
O
F
T
H
I
S
P
R
O
J
E
C
T
WI
T
H
O
U
T
T
H
E
W
R
I
T
T
E
N
P
E
R
M
I
S
S
I
O
N
O
F
H
O
W
A
R
D
L
A
K
S
A
R
C
H
I
T
E
C
T
S
.
7 1 0
W
I
L
S
H
I
R
E
B
L
V
D
.
/
H
O
W
A
R
D
L
A
K
S
A
R
C
H
I
T
E
C
T
S
71
0
w
i
l
s
h
i
r
e
b
l
v
d
,
s
a
n
t
a
m
o
n
i
c
a
,
c
a
9
0
4
0
1
horton lees brogden lighting design Plan Ɵ ng and Planter Ligh Ɵ ng • E-80 : Wet loca Ɵ on LED linear fl exible tapelight at planter detail Circula Ɵ on and Area Ligh Ɵ ng • E-1 : Low level high performance exterior LED step light • E-70 : Wet loca Ɵ on light pole • E-68 : Wet loca Ɵ on theatrical RGBW LED fl ood light fi xture, DMX required • E-83 : Wet loca Ɵ on theatrical LED projec Ɵ on fi xture, DMX required Recessed Ligh Ɵ ng • E-81 : Recessed wet loca Ɵ on adjustable LED downlight at pool deck • E-82 : Recessed wet loca Ɵ on adjustable LED downlight • PL-3 : 2.5” Diameter LED Interior/Exterior pin spot fi xture Decora Ɵ ve Ligh Ɵ ng • E-88 : Decora Ɵ ve pendant at barLinear Ligh Ɵ ng • E-2 : LED linear fl exible tape light • E-13 : Wet loca Ɵ on LED Wall washer with hexcell louver, 12v • E-63 : Wet loca Ɵ on LED tapelight in extrusion with frosted lens
71
0
w
i
l
s
h
i
r
e
b
l
v
d
,
s
a
n
t
a
m
o
n
i
c
a
,
c
a
9
0
4
0
1
h o r r r r r t t t t t t t t t o o n n n n n n n n n n n l ee e e e e s s s s s s s s s s s b r og de de de de d d de d d de d de d d d de de d d de de d d d de de de de de de e d e n n n n n n n n n n n n n n n n n n n n n n n n n n l ig h t i horton lees brogden lighting design • • • • •• • • • • • • Seventh Level Lighting Layout_A EL-007.1
DE
S
I
G
N
S
R
E
P
R
E
S
E
N
T
E
D
B
Y
T
H
I
S
D
R
A
W
I
N
G
I
S
T
H
E
S
O
L
E
P
R
O
P
E
R
T
Y
O
F
H
O
W
A
R
D
LA
K
S
A
R
C
H
I
T
E
C
T
S
A
N
D
W
E
R
E
D
E
V
E
L
O
P
E
D
F
O
R
T
H
E
U
S
E
O
N
T
H
I
S
P
R
O
J
E
C
T
O
N
L
Y
.
TH
I
S
D
R
A
W
I
N
G
A
N
D
T
H
E
D
E
S
I
G
N
I
T
R
E
P
R
E
S
E
N
T
S
S
H
A
L
L
N
O
T
B
E
U
S
E
D
B
Y
O
R
DI
S
C
L
O
S
E
D
T
O
A
N
Y
P
E
R
S
O
N
O
R
F
I
R
M
O
U
T
S
I
D
E
T
H
E
S
C
O
P
E
O
F
T
H
I
S
P
R
O
J
E
C
T
WI
T
H
O
U
T
T
H
E
W
R
I
T
T
E
N
P
E
R
M
I
S
S
I
O
N
O
F
H
O
W
A
R
D
L
A
K
S
A
R
C
H
I
T
E
C
T
S
.
7 1 0
W
I
L
S
H
I
R
E
B
L
V
D
.
/
H
O
W
A
R
D
L
A
K
S
A
R
C
H
I
T
E
C
T
S
71
0
w
i
l
s
h
i
r
e
b
l
v
d
,
s
a
n
t
a
m
o
n
i
c
a
,
c
a
9
0
4
0
1
horton lees brogden lighting design Plan Ɵ ng and Planter Ligh Ɵ ng • E-80 : Wet loca Ɵ on LED linear fl exible tapelight at planter detail Circula Ɵ on and Area Ligh Ɵ ng • E-1 : Low level high performance exterior LED step light • E-70 : Wet loca Ɵ on light pole • E-68 : Wet loca Ɵ on theatrical RGBW LED fl ood light fi xture, DMX required • E-83 : Wet loca Ɵ on theatrical LED projec Ɵ on fi xture, DMX required Recessed Ligh Ɵ ng • E-81 : Recessed wet loca Ɵ on adjustable LED pinhole downlight at pool deck • E-82 : Recessed wet loca Ɵ on adjustable LED downlight • PL-3 : 2.5” Diameter LED Interior/Exterior pin spot fi xture Decora Ɵ ve Ligh Ɵ ng • E-88 : Decora Ɵ ve pendant at barLinear Ligh Ɵ ng • E-2 : LED linear fl exible tape light • E-13 : Wet loca Ɵ on LED Wall washer with hexcell louver, 12v • E-63 : Wet loca Ɵ on LED tapelight in extrusion with frosted lens• • • • • • •• • • • •
71
0
w
i
l
s
h
i
r
e
b
l
v
d
,
s
a
n
t
a
m
o
n
i
c
a
,
c
a
9
0
4
0
1
h o r r r r r t t t t t t t t t o o n n n n n n n n n n n l ee e e e e s s s s s s s s s s s b r og de de de de d d de d d de d de d d d de de d d de de d d d de de de de de de e d e n n n n n n n n n n n n n n n n n n n n n n n n n n l ig h t i horton lees brogden lighting design Seventh Level Lighting Layout_B EL-007.2
DE
S
I
G
N
S
R
E
P
R
E
S
E
N
T
E
D
B
Y
T
H
I
S
D
R
A
W
I
N
G
I
S
T
H
E
S
O
L
E
P
R
O
P
E
R
T
Y
O
F
H
O
W
A
R
D
LA
K
S
A
R
C
H
I
T
E
C
T
S
A
N
D
W
E
R
E
D
E
V
E
L
O
P
E
D
F
O
R
T
H
E
U
S
E
O
N
T
H
I
S
P
R
O
J
E
C
T
O
N
L
Y
.
TH
I
S
D
R
A
W
I
N
G
A
N
D
T
H
E
D
E
S
I
G
N
I
T
R
E
P
R
E
S
E
N
T
S
S
H
A
L
L
N
O
T
B
E
U
S
E
D
B
Y
O
R
DI
S
C
L
O
S
E
D
T
O
A
N
Y
P
E
R
S
O
N
O
R
F
I
R
M
O
U
T
S
I
D
E
T
H
E
S
C
O
P
E
O
F
T
H
I
S
P
R
O
J
E
C
T
WI
T
H
O
U
T
T
H
E
W
R
I
T
T
E
N
P
E
R
M
I
S
S
I
O
N
O
F
H
O
W
A
R
D
L
A
K
S
A
R
C
H
I
T
E
C
T
S
.
7 1 0
W
I
L
S
H
I
R
E
B
L
V
D
.
/
H
O
W
A
R
D
L
A
K
S
A
R
C
H
I
T
E
C
T
S
710 wilshire blvd, santa monica, ca 90401
hor ton lees br ogden l igh ting design
Lighting Fixture Matrix EL-101.1
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401
hor ton lees br ogden l igh ting designhor ton lees br ogden l igh ting design
Lighting Fixture Matrix EL-101.2
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401
hor ton lees br ogden l igh ting design
Lighting Fixture Matrix EL-101.3
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401
hor ton lees br ogden l igh ting design
Lighting Fixture Matrix EL-101.4
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 neighborhood context
710 WILSHIRE BLVD.
710 WILSHIRE BLVD.CORNER OF 7TH STREET & WILSHIRE BLVD.
Corner of 7th Street and Wilshire Boulevard 710 Wilshire Boulevard
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 neighborhood context
710 WILSHIRE BLVD.
718 WILSHIRE BLVD.710 WILSHIRE BLVD.
710 Wilshire Boulevard 718 Wilshire Boulevard
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 neighborhood context
710 WILSHIRE BLVD.
FRONTAGE ALONG 7TH STREET
Frontage along 7th Street Frontage along 7th Street
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 neighborhood context
710 WILSHIRE BLVD.
1213 7TH STREET 1217 7TH STREET
1213 7th Street 1217 7th Street
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 neighborhood context
710 WILSHIRE BLVD.
1227 7TH STREET1221 7TH STREET
1221 7th Street 1227 7th Street
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 neighborhood context
1337 7TH STREET1233 7TH STREET
710 WILSHIRE BLVD.
1233 7th Street 1337 7th Street
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 neighborhood context
SOUTH VIEW OF 710 WILSHIRE BLVD.
710 WILSHIRE BLVD.
South view of 710 Wilshire Boulevard South view of 710 Wilshire Boulevard
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 neighborhood context
710 WILSHIRE BLVD.
SOUTH VIEW OF 710 WILSHIRE BLVD.SOUTH VIEW OF 718 WILSHIRE BLVD.
South view of 710 Wilshire Boulevard South view of 718 Wilshire Boulevard
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 neighborhood context
710 WILSHIRE BLVD.
7TH STREET COURT VIEWING NORTH 7TH STREET COURT VIEWING SOUTH
7th Street Court viewing north 7th Street Court viewing south
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 neighborhood context
710 WILSHIRE BLVD.
1218 LINCOLN BLVD. VIEWING WESTBOYS AND GIRLS CLUB
LINCOLN BLVD. VIEWING WEST
Boy and Girls Club Lincoln Boulevard viewing west 1218 Lincoln Boulevard viewing west
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 neighborhood context
wilshire blvd. context (lincoln blvd. to 7th st.)
7t
h
s
t
.
li
n
c
o
l
n
b
l
v
d
.
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
710 wilshire blvd, santa monica, ca 90401 neighborhood context
7th street context view (wilshire blvd. to arizona ave.)
ar
i
z
o
n
a
a
v
e
.
wi
l
s
h
i
r
e
b
l
v
d
.
DESIGNS REPRESENTED BY THIS DRAWING IS THE SOLE PROPERTY OF HOWARD
LAKS ARCHITECTS AND WERE DEVELOPED FOR THE USE ON THIS PROJECT ONLY.
THIS DRAWING AND THE DESIGN IT REPRESENTS SHALL NOT BE USED BY OR
DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS PROJECT
WITHOUT THE WRITTEN PERMISSION OF HOWARD LAKS ARCHITECTS.
7 1 0 WI L S H I R E B L V D . / H O WA R D L A K S A R C H I T E C T S
Attachment K
ARB Findings
A. The plan for the proposed building or structure is expressive of good taste, good
design, and in general contributes to the image of Santa Monica as a place of
beauty, creativity and individuality. The contemporary design of the new hotel
building is complementary to the distinctive features of the Landmark building.
The design of the new hotel building provides a sensitive backdrop to the
Landmark building by providing a significant building setback on Wilshire
Boulevard and building insets on 7th Street and breaks in the building mass on
the alley elevation that all reduce the perceived mass of the new hotel building.
Further, the new hotel building provides a contemporary reference to the layers
and sculptural quality of the Landmark building but is clearly differentiated in
materials, colours, and architectural elements. Landscaping at the podium and
upper levels softens the elevations of each building and helps to transition
around each elevation and connects the alley to the podium courtyard. The
introduction of water features and seating in the retail paseo and hotel entr ance
are in keeping with the coastal color palette and landscape theme. The
continuous, curved 18-foot high storefront glazing system on 7th Street and the
large openings into the retail paseo activates the pedestrian environment with
outdoor dining areas that strengthen the indoor-outdoor relationship between
each building and the adjacent public space.
B. The proposed building or structure is not of inferior quality such as to cause the
nature of the local neighborhood or environment to materially depreciate in
appearance and value in that high quality material as detailed in the application
submittal and as presented to the Joint Design Review Body will be used.
C. The proposed design of the building or structure is compatible with developments
on land in the general area. The proposed project has been designed with
significant building setbacks to ensure that the mass and scale of the project is
compatible with the surrounding neighborhood context. The project has reduced
massing from Wilshire Boulevard and from 7th Street placing more of the mass
towards the southern end of the project site, away from the residential
neighborhood to the north. The new hotel building provides a sensitive context
for the Landmark building but is also compatible with the sur rounding
neighborhood context, which is primarily one- to three-story buildings punctuated
by a few high-rise buildings, including the Landmark building. In this sense, the
proposed project continues an established context of generally low-scale
development mixed with higher buildings on selected sites.
D. The proposed development conforms to the effective guidelines and standards
adopted pursuant to Chapter 9.32 – Architectural Review Board, and all other
applicable ordinances insofar as the location and appearance of the buildings
and structures are involved. Specifically, the location and appearance of the
buildings and structures comply with required findings set forth in Chapter 9.32,
as documented by the Joint Design Review Body, and as conditioned, the plans
will fully comply with all applicable regulations prior to the issuance of a building
permit.
710 WILSHIRE
APPEAL 15ENT-0321 OF JDRB
DENIAL OF 14ARB-173
City Council
December 8, 2015
710 Wilshire Appeal of JDRB Denial of ARB Application | City Council | December 8, 2015
PROJEC T LOCATION
252,500 sf site
710 Wilshire Appeal of JDRB Denial of ARB Application | City Council | December 8, 2015
SURROUNDING PROPERTIES
3
North
South
East
West
SITE
710 Wilshire Appeal of JDRB Denial of ARB Application | City Council | December 8, 2015
PROJEC T DESCRIPTION
¢270-room hotel including adaptive re-use of Landmark
building into hotel
¢13,087 sf of ground floor retail/restaurant
¢Ground floor public paseo
¢318 parking spaces in 4-level subterranean garage
4
710 Wilshire Appeal of JDRB Denial of ARB Application | City Council | December 8, 2015
BACKG ROUND
¢Development Agreement
—Approved March 20, 2012
—Established Joint Design Review Body
—8 design conditions
—JDRB rulings appealable to City Council
¢Joint Design Review Body
—Reviewed project on:
¢June 30, 2014
¢September 20, 2014
¢September 29, 2015
—Approved Certificate of Appropriateness
—Denied ARB Application
5
710 Wilshire Appeal of JDRB Denial of ARB Application | City Council | December 8, 2015
DEVELOPMENT AGREEMENT DESIGN CONDITIONS
¢South elevation stair tower visual interest
¢South elevation green wall details
¢North elevation of southernmost wing to ensure same
level of design detail as 7th Street elevation
¢East elevation to ensure same level of design detail as
7th Street elevation
¢More prominent hotel entry
¢Activate retail paseo area with pedestrian-oriented
amenities
¢Ground floor open space that engages pedestrians
¢Courtyard-fa cing elevations should have same level of
design detail as all other elevations
6
710 Wilshire Appeal of JDRB Denial of ARB Application | City Council | December 8, 2015
DA APPROVED PLANS –SITE PLAN
7
Ground floor space to
engage pedestrians
710 Wilshire Appeal of JDRB Denial of ARB Application | City Council | December 8, 2015
DA APPROVED PLANS -ELEVAT IONS
8
Activate public paseo and 7th
Street ground floor
Increase
prominence
of hotel entry
7th Street Elevation Design detail on
courtyard elevations
to match street-facing
Design detail to match
other elevations
East Elevation
710 Wilshire Appeal of JDRB Denial of ARB Application | City Council | December 8, 2015
DA APPROVED PLANS -ELEVAT IONS
9
Greenwall details
Visual
interest
South Elevation
710 Wilshire Appeal of JDRB Denial of ARB Application | City Council | December 8, 2015
JDRB JUNE 2014 SITE PLAN
10
710 Wilshire Appeal of JDRB Denial of ARB Application | City Council | December 8, 2015
JDRB SEPTEMBER 2014 SITE PLAN
11
710 Wilshire Appeal of JDRB Denial of ARB Application | City Council | December 8, 2015
JDRB SEPTEMBER 2015 SITE PLAN
12
710 Wilshire Appeal of JDRB Denial of ARB Application | City Council | December 8, 2015
REVISIONS –SOUTH ELEVAT ION
13
6-30-14 9-20-14
9-29-15
710 Wilshire Appeal of JDRB Denial of ARB Application | City Council | December 8, 2015
6-30-14 REVISIONS –STREET-FACING ELEVAT IONS
14
East Elevation
7th Street Elevation
710 Wilshire Appeal of JDRB Denial of ARB Application | City Council | December 8, 2015
JDRB REVIEW –JUNE 2014
¢New construction needs
stronger architectural
statement
¢Color and materials should be
visual expression of coastal
landscape theme
¢Need layers and hierarchy of
va riation to better
complement historic building
15
710 Wilshire Appeal of JDRB Denial of ARB Application | City Council | December 8, 2015
9-20-14 REVISIONS –STREET-FACING ELEVAT IONS
16
East Elevation
7th Street Elevation
710 Wilshire Appeal of JDRB Denial of ARB Application | City Council | December 8, 2015
JDRB REVIEW –SEPTEMBER 2014
¢New building should
reference tex ture, details,
proportions, and quality
of Landmark
¢Sack finish appears like
stucco and creates
uniform look over large
expanses of elevations
¢Hotel entry needs more
prominence
¢Provide more variation in
window openings
17
710 Wilshire Appeal of JDRB Denial of ARB Application | City Council | December 8, 2015
9-29-15 REVISIONS –STREET-FACING ELEVAT IONS
18
7th Street Elevation
East Elevation
710 Wilshire Appeal of JDRB Denial of ARB Application | City Council | December 8, 2015
JDRB DENIAL –SEPTEMBER 2015
¢Lack of clear architectural
concept
—Conflicting ideas present in the
materiality, openings, and
building form
¢Perceived mass of the East
Elevation
—Uniform color of GFRC panels,
generic fenestration and
balcony patterns emphasize
expansiveness of elevations
—Building mass breaks and
difference in color not
sufficient to reduce perceived
mass of new hotel building
¢Unresolved bridge connection
details
—Bridge has unresolved design
and connection details 19
710 Wilshire Appeal of JDRB Denial of ARB Application | City Council | December 8, 2015
APPEAL STAT EMENT
¢Applicant filed appeal of JDRB denial on October 6, 2015
¢Project meets finding to approve ARB application
¢Each of the eight design conditions from DA have been
addressed
¢JDRB comments have also been substantially addressed
20
710 Wilshire Appeal of JDRB Denial of ARB Application | City Council | December 8, 2015
REQUIRED ARB FINDINGS
A.The plan fo r the proposed building or structure is expressive
of good taste, good design, and in general contributes to
the image of Santa Monica as a place of beauty, creativity,
and individuality.
B.The proposed building or structure is not of inferior quality
such as to cause the nature of the local neighborhood or
environment to materially depreciate in appearance or
value.
C.The proposed design of the building or structure is
compatible with developments on land in the general area.
D.The proposed development is in conformity with the
effective guidelines and standards adopted pursuant to this
chapter and all other applicable ordinances insofar as the
location and appearance of the buildings and structures are
involved.
21
710 Wilshire Appeal of JDRB Denial of ARB Application | City Council | December 8, 2015
STA FF DESIGN REVIEW
¢Architectural concept:
contemporary reference
to layers and sculptural
quality of Landmark
—Complementary and
sensitive backdrop to
Landmark
—Significant setbacks on 7th
Street and Wilshire Blvd
¢Breaks in building mass on
East Elevation in addition
to use of color
¢Tr ansparency of bridge
connection
22
710 Wilshire Appeal of JDRB Denial of ARB Application | City Council | December 8, 2015
RECOMMENDAT ION AND ALT ERNATIVES
23
¢Recommendation
—Uphold the Appeal à Approves the ARB Application
¢May include conditions of approval
¢Alternatives
—Deny the Appeal Without Prejudice à Applicant may seek
approval of ARB application by JDRB
—Deny the Appeal With Prejudice à Applicant may seek
approval of ARB application, that is not substantially the
same project, by JDRB
710 Wilshire Appeal of JDRB Denial of ARB Application | City Council | December 8, 2015
NEIGHBORHOOD CONTEXT
24
Development pattern is primarily 1-3 story buildings with
selected high-rise structures
151’
105’
121’82’
72’55’