SR-06-24-1980-6E17S JUN 2 4 1980 Santa Monica, California June 17, 1980 CORRECTED AS INDICATED, PG. 2,3,4, June 20, 1980 To: Mayor and City Council From: City Staff Subject: Award of Contract=- 1979-80 Street Resurfacing Project -- Introduction This report recommends the City Council award a contract for the repair and resurfacing of various streets to the lowest bidder, Sully- Miller Contracting Co., in the amount of $577,500. Background Various streets are to be reconstructed and resurfaced as follows: Broadway and Colorado between Ocean Avenue and Lincoln Boulevard; 2nd and 4th Streets between Broadway and Colorado; Main Street at Colorado (May 13, 1980, Item 6N) and Bay to Pier; Pico between 6th and Lincoln; Ocean Avenue at Montana and Montana between 3rd Street and 4th Court. The street reconstruction planned is to recycle the top 3/4 inch of asphalt concrete. This process effectively fills the cracks in the dried -out pavement and levels the irregular areas with only 1/2 of the addition of new pavement, which includes a saving of 56,000 gallons of oil and an approximate saving of $135,000. The intersection of Main Street with Colorado Avenue is to be reconstructed by eliminating the "Y" to 3rd Street. This change is required to remove the potential hazards at this intersection as approved by the City Council on 17 May 13, 1980 (Item 6 -N). JUN 2 4 1980 To: Mayor and City Council -2- June 17, 1980 In the reconstruction of Broadway, Colorado, 2nd and 4th Streets, concrete gutters are to be installed. The gutter construction will be funded by assessments to the adjacent property owners (as previously approved by City Council). The balance of the project will be financed with available Gas Tax funds, Redevelopment funds, and General Funds (for the Ocean Avenue improvement at Palisades Park). Bids for the reconstruction and resurfacing were opened after 3:00 p.m., Friday, June 13, 1980, and publicly read by the Deputy City Clerk. Plans and specifications were issued to ten contractors. Three bids were received as follows: Sully- Miller Contracting Co . ................... $ 577,500 Security Paving Co., Inc . ...................... $ 811,630 Damon Construction Co., Inc . ................... $ 894,863 City Engineer's Estimate ..................... $ 728,600 The prices on this proposal are very reasonable. It is therefore requested that additional street improvements including 28th Street between Pico Blvd. and Ocean Park Blvd.,.and Main Street between Pico Blvd. and the South City Limits, be added to this contract. Twenty- Eighth Street has become one of the few north -south crosstown streets since the opening of Steward Street between Colorado and Exposition. Main Street needs reconstruction due to the many utility cuts, including storm drain construction, that have caused failures in the roadway. This additional work can be done by change order to increase the contract by approximately $170,000. To: Mayor and City Council -3- June 17, 1980 ESTIMATE OF FUNDS REQUIRED Engineering ............................. $ 15,000 Construction Contract ................... 747,500 Inspection and Contingencies ............ 126,500 TOTAL $ 889,000 SOURCE OF FUNDS Redevelopment Funds ..................... $ 207,000 Assessments (Gutter and Defective Sidewalk) 120,000 General Funds. Ocean Avenue at Montana .. 20,000 1979 -80 Budgeted: County Gas Tax, Acct. No. 45- 500- 421 - 000 -923 85,000 Gutter, Acct. 421 - 635 .................... 35,000 Defective Sidewalks, Acct. 421 -635 ...... 250,000 Broken Curbs -- W.O. 14056 .............. 17,000 State Gas Tax 2106 and 2107 Acct. 421 -635 155,000 TOTAL $ 889,000 No Coastal Commission permit is necessary for this project as there are no street widenings. Recommendation It is recommended the contract be awarded to Sully- Miller Contracting Co., the lowest responsible bidder, in the amount of $577,500, a Change Order be issued to add the reconstruction of 28th Street and Main Street in the * Figures corrected June 20, 1980. To: Mayor and City Council -4- June 17, 1980 estimated amount of $170,000, and an additional amount of $126,500* be appropriated for inspection and contingencies to complete the project. Prepared by: Stan Scholl Doug McAteer Toivo Marjanen * Fiqure corrected June 20, 1980 6. E. 1 JUN 2 4 1980 Santa Monica, California June 17, 1980 To: Mayor and City Council From: City Staff Subject: Award of Contract-1979-80 Street Resurfacing Project -- Introduction This report recommends the City Council award a contract for the repair and resurfacing of various streets to the lowest bidder, Sully- Miller Contracting Co., in the amount of $577,500. Background Various streets are to be reconstructed and resurfaced as follows: Broadway and Colorado between Ocean Avenue and Lincoln Boulevard; 2nd and 4th Streets between Broadway and Colorado; Main Street at Colorado (May 13, 1980, Item 6N) and Bay to Pier; Pico between 6th and Lincoln; Ocean Avenue at Montana and Montana between 3rd Street and 4th Court. The street reconstruction planned is to recycle the top 3J4 inch of asphalt concrete. This process effectively fills the cracks in the dried -out pavement and levels the irregular areas with only 112 of the addition of new pavement, which includes a saving of 56,000 gallons of oil and an approximate saving of $135,000. The intersection of Main Street with Colorado Avenue is to be reconstructed by eliminating the "Y" to 3rd Street. This change is required to remove the potential hazards at this intersection as approved by the City Council on .E. 17 May 13, 1980 (Item 6 -N). JUN 2 4 1980 To: Mayor and City Council -2- June 17, 1980 In the reconstruction of Broadway, Colorado, 2nd and 4th Streets, concrete gutters are to be installed. The gutter construction will be funded by assessments to the adjacent property owners (as previously approved by City Council). The balance of the project will be financed with available Gas Tax funds, Redevelopment funds, and General Funds (for the Ocean Avenue improvement at Palisades Park). Bids for the reconstruction and resurfacing were opened after 3:00 p.m., Friday, June 13, 1980, and publicly read by the Deputy City Clerk. Plans and specifications were issued to ten contractors. Three bids were received as follows: Sully- Miller Contracting Co . ................... $ 577,500 Security Paving Co., Inc. $ 811,630 Damon Construction Co., Inc . ................... $ 894,863 City Engineer's Estimate $ 728,600 The prices on this proposal are very reasonable. It is therefore requested that additional street improvements including 28th Street between Pico Blvd. and Ocean Park Blvd., and Main Street between Pico Blvd. and the South City Limits, be added to this contract. Twenty- Eighth Street has become one of the few north -south crosstown streets since the opening of Steward Street between Colorado and Exposition. Main Street needs reconstruction due to the many utility cuts, including storm drain construction, that have caused failures in the roadway. To: Mayor and City Council -3- June 17, 1980 ESTIMATE OF FUNDS REQUIRED Engineering ............................. $ 15,000 Construction Contract ................... 577,500 Inspection and Contingencies ............ 93,500 TOTAL $ 686,000 SOURCE OF FUNDS Redevelopment Funds ..................... $ 207,000 Assessments (Gutter and Defective Sidewalk) 120,000 General Funds. Ocean Avenue at Montana .. 20,000 1979 -80 Budgeted: County Gas Tax, Acct. No. 45- 500 - 421 - 000 -923 85,000 Gutter, Acct. 421 - 635 .................... 35,000 Defective Sidewalks, Acct. 421 -635 ...... 250,000 Broken Curbs -- W.O. 14056 .............. 17,000 State Gas Tax 2106 and 2107 Acct. 421 -635 155,000 TOTAL $ 889,000 No Coastal Commission permit is necessary for this project as there are no street widenings. Recommendation It is recommended the contract be awarded to Sully- Miller Contracting Co., the lowest responsible bidder, in the amount of $577,500, a Change Order be issued to add the reconstruction of 28th Street and Main Street in the To: Mayor and City Council -4- June 17, 1980 estimated amount of $170,000, and an additional amount of $125,000 be appropriated for inspection and contingencies to complete the project. Prepared by: Stan Scholl Doug McAteer Toivo Marjanen Reference: Contract No. 3518 (CCS)