Loading...
SR-10-28-2014-3ETo: Mayor and City Council From: Martin Pastucha, Director of Public Works Subject: Award Construction Management Contract for the FY 2013 -14 Water Main Replacement Project Recommended Action Staff recommends that the City Council: 1. Authorize the City Manager to negotiate and execute a contract with SA Associates, a California -based company, in an amount not to exceed $356,400 (including a 10% contingency) for construction management and inspection services for the FY 2013 -14 Water Main Replacement Project. 2. Authorize the Director of Public Works to issue any necessary change orders to complete additional work within contract authority. Executive Summary The Annual Water Main Replacement Project will replace and construct approximately 11,500 feet of water distribution pipelines at various locations to ensure an adequate and reliable supply of water to customers. Staff recommends SA Associates to provide construction management and inspection services during construction of the Annual Water Main Replacement Project in an amount not to exceed $356,400. Construction commenced in September 2014 and is scheduled to be completed in summer of 2015. Background On June 24 2014, Council approved a construction award contract for the FY 2013 -14 Water Main Replacement Project to Environmental Assessment and Remediation Management, Inc. dba EAR Engineering, Construction and Support Services in the amount of $4,132,341. This project will construct improvements and replace approximately 11,500 feet of aged water main distribution pipelines at various locations throughout the City based on a long -term replacement /upgrade plan for water mains due to age, condition, and capacity demands. This project will also relocate water and treated urban runoff water mains for the future Colorado Esplanade project. 0 Discussion Water main construction projects require full time inspections and construction management services to administer the contract. The annual water main project entails work both during the day and at night. There is a need to hire a consultant to supplement and aid the City with full time daily and nightly inspections for this project. Construction management services include: conduct weekly progress meetings; coordination between inspector, designer, and contractor; record management and document control; review and process requests for information; and interpretation of contract documents, submittals, contract schedule, change order proposals, maintenance of field logs, as -built verification, and labor compliance. The role of an inspector entails quality control, observing excavations, traffic control, daily reports, water outages, public outreach and coordination of construction activities. The proposed Water Main Replacement project consists of three segments as outlined below. Segment 1 would construct approximately 2,000 linear feet of new 12 -inch diameter water main along Olympic Boulevard between 26th Street and Stewart Avenue. The new water main would complete a loop, improving pressure along the segment and would provide five new fire hydrants along the future EXPO Light Rail Bergamot Station as part of the agreement with Los Angeles County Metropolitan Transit Authority. Segment 2 would replace old cast iron water mains and construct approximately 8,300 linear feet of new Polyvinyl chloride (PVC) type water mains; replace and construct new valves; and renew residential and commercial water meters. Pipelines in Project 2 were installed in the 1920's and the 1940's are reaching the end of their 100 -year useful lifespan. Segement 2 includes the following locations: • Olympic Boulevard from 12th Court to Lincoln Boulevard • Lincoln Court from Olympic Boulevard to Colorado Avenue • Olympic Boulevard (north side) from 17th Street to 19th Street • Olympic Boulevard (south side) from 17th Street to 20th Street 2 ® 17th Court from Olympic Boulevard to 1 -10 Freeway ® 18th Court from Olympic Boulevard to 1 -10 Freeway ® Pennsylvania Avenue from 20th Street to 22nd Street ® Euclid Court from California Avenue to Wilshire Boulevard ® 16th Court from Broadway to Santa Monica Boulevard ® 20th Court from Wilshire Boulevard to Arizona Avenue ® Ocean Avenue from California Avenue to Wilshire Boulevard (southbound parking lane) Segment 3 would relocate approximately 1,200 linear feet of treated urban runoff water main and 200 feet of water main to facilitate the tight construction schedule for the future Colorado Esplanade project. Construction Schedule Construction work began September 2, 2014 and completion is estimated by February 2015. Construction Management Selection In May 2014, the City requested Statements of Qualifications for construction management and inspection services for upcoming construction projects throughout the City. The request for Statements of Qualifications was advertised on the City's online bidding website. Fifteen firms submitted Statements of Qualifications for this project which were reviewed and rated by Public Works staff. Selection criteria included technical competence, staffing capability, project approach, past performance, dispute resolution, quality control, cost control, management services, customer service and the ability to meet required time frames. The top firms were invited to interview with Public Works staff in July 2014: GK & Associates, SA Associates, and Willdan Engineering. SA Associates is recommended as the best firm to provide construction management and inspection services based on their competitive prices and their direct experience working on water main projects for the City of Santa Monica. Services provided by SA Associates would include construction management, and continuous inspection of the 3 contractor's work. Staff contacted reference agencies and all respondents reported that SA Associates provided exceptional construction management and inspection services. Financial Impacts and Budget Actions The contract to be awarded to SA Associates is for an amount not to exceed $356,400. Funds are available in the FY 2014 -15 Capital Improvement Program budget in account C250136.589000. Prepared By: Carlos Rosales, Civil Engineering Associate Approved: Martin Pastucha Director of Public Works Forwarded to Council: Rod Gould City Manager Reference: Contract No. 9986 (CCS)