Loading...
SR-04-30-2013-3BCity Council Meeting: April 30, 2013 Agenda Item: S -B To: Mayor and City Council From: Martin Pastucha, Director of Public Works Subject: Award Construction Contract for Santa Monica Airport Runway, Taxiway and Parking Lot Improvements Recommended Action Staff recommends that the City Council: 1. Authorize the City Manager to negotiate and execute a contract with PALP Inc., dba Excel Paving Company, a California -based company, in an amount not to exceed $672,525 (includes a 10% contingency) for the Santa Monica Airport Runway, Taxiway and Parking Lot Improvements. 2. Authorize the issuance of an after -hours construction permit to remove rubber deposits from the runway between the hours of 9 PM and 6 AM for a period of four nights, contingent on satisfying notification requirements as contained in Santa Monica Municipal Code 4.12.110. 3. Authorize the Director of Public Works to issue any necessary change orders to complete additional work within budget authority. Executive Summary The Santa Monica Airport Runway, Taxiway and Parking Lot Improvements project would remove the build -up of rubber deposits from aircraft tires from the runway surface, repair damaged pavement sections of the taxiways north and south of the runway, refresh and update pavement markings along the runway and taxiways, and resurface the tenant parking lot serving the Santa Monica Arts Studio (3026 Airport Avenue) and the Ruskin Theater Group (3000 Airport Avenue) buildings. In January 2013, the City solicited bids for airport construction services. Two bids were received and opened on March 12, 2013. Staff recommends PALP Inc., dba Excel Paving Company, the best bidder, for construction of the project at a cost not to exceed $672,525. The issuance of an after -hours construction permit is recommended to allow removal of rubber deposits from the runway surface and to refresh the runway markings. The rubber removal and runway restriping would occur over a period of four nights, between 1 the hours of 9 PM and 6 AM, during which time the runway would be closed to aircraft landing and take -off. Discussion The Santa Monica Airport Runway, Taxiway and Parking Lot Improvements project would remove the build -up of rubber deposits from aircraft tires from the runway surface, a maintenance activity that is typically necessary on a biennial basis to ensure safe operation of the airfield; repair damaged pavement sections of the taxiways north and south of the runway; refresh and update pavement markings along the runway and taxiways; and resurface the tenant parking lot serving the Santa Monica Arts Studio (3026 Airport Avenue) and the Ruskin Theater Group (3000 Airport Avenue) buildings. The runway rubber removal and restriping work requires closure of the runway and would be performed at night between the hours of 9 PM and 6 AM, over a period of four nights. An after -hours construction permit would be issued to the Contractor for this project, contingent on satisfying notification requirements as contained in Santa Monica Municipal Code 4.12.110, which includes notification to persons occupying property within a perimeter of 500 feet of the proposed construction activity. The equipment for the rubber removal process utilizes high - pressure water and is designed to fully recover all the wastewater and rubber debris for disposal at an approved treatment facility. Contractor Selection On January 15 and 16, 2013, the City published a Notice Inviting Bids in the Santa Monica Daily Press and on the City's online bidding site. The City Clerk's office received two sealed bids, which were publicly opened by the Deputy City Clerk on March 12, 2013. Bid results are as follows: PALP, dba Excel Paving Co. Sully - Miller Contracting Co. Location Bid Amount Long Beach, CA $ 611,386 Brea, CA $ 670,728 2 Bids were reviewed by Public Works staff and evaluated based on understanding of the project's scope, direct experience on similar projects, approach to the work, technical competence, qualifications of the proposed staff, and the ability to meet the desired time frames. Excel Paving, located in Long Beach, CA, is recommended as the best bidder based on the evaluation criteria. The references provided by Excel Paving include recent projects for the cities of Los Angeles, Long Beach and Santa Monica. Reference agencies contacted reported the contractor's work was completed in a timely and cost - efficient manner while maintaining consistent quality. Recently Excel Paving successfully completed the City's Annual Paving and Sidewalk Repair project and the Ocean Park Boulevard Complete Green Street project. The Contractor's State License Board also verified that Excel Paving's and its subcontractors' licenses are current, active, and in good standing. Construction Management and Public Outreach Construction management and public outreach for this project would be provided by staff. Construction management would include inspecting the contractor's work during construction, verifying and controlling field changes and unforeseen conditions, monitoring and mitigating impacts as a result of the construction activities, attending contractor's safety meetings, attending periodic progress meetings, and maintaining all necessary inspection documentation relevant to the work conducted during construction. Public outreach would include notifications distributed to adjacent properties and the surrounding community on the scope of the project, potential impacts including night work, and schedule of additional periodic updates, weekly updates on the City's "Know Before You Go" (aka KBUG) website and in the Santa Monica Daily Press. 3 Construction Schedule Work is anticipated to begin the week of June 3, 2013 and be completed by July 31, 2013. Financial Impacts & Budget Actions The contract to be awarded to PALP Inc., dba Excel Paving Company, is for an amount not to exceed $672,525 (including a 10% contingency). Funds are available in the FY2012 -14 Capital Improvement Program budget in the following accounts: Account FY2012 -13 FY2013 -14 FY2012 -14 M330638.589000 Airfield Pavement Rehab M330642.589000 Parking Lot Pavement Total Funds Available $ 455,950 $ 83,906 $ 539,856 $ 132,669 $ 0 $ 132,669 $ 588,619 $ 83,906 $ 672,525 Prepared by: Allan Sheth, Civil Engineering Associate Approved: " S� Martin Pastucha Director of Public Works to Forwarded to Council: Rod Gould City Manager Reference Contract No. 9733 (CCS)