Loading...
SR-01-22-2013-3P0 City of Santa Monied City Council Report City Council Meeting: January 22, 2013 Agenda Item: 13F To: Mayor and City Council From: Martin Pastucha, Director of Public Works Subject: Bid Award for Roofing System Replacements at Fairview Library, Fire Station #3 and the Woodlawn Cemetery Maintenance Building Recommended Action Staff recommends that the City Council award Bid #4045 for replacement of roofing systems at the locations listed to the following vendors: 1. Cabral Roofing & Waterproofing, a California -based company, to replace roofing systems at Fairview Library and the Woodlawn Cemetery Maintenance Building, in the amount of $96,658 (includes a 15% contingency). 2. Eberhard, a California -based company, to replace the roofing system at Fire Station #3, in the amount of $43,217 (includes a 15% contingency). Executive Summary The City contracts out roofing system replacements for facilities with deteriorating or damaged roofs where leaks cannot be adequately patched or repaired. In November 2012, the City solicited bids to replace roofing systems at Fairview Library, Fire Station #3 and the Woodlawn Cemetery Maintenance Building. After reviewing the three bids received, staff recommends Cabral Roofing & Waterproofing as the best bidder to replace roofing systems at Fairview Library and the Woodlawn Cemetery Maintenance Building for a total not to exceed amount of $96,658; and Eberhard as the best bidder to replace the roofing system at Fire Station #3 for a total not to exceed amount of $43,217. Discussion The City contracts out roofing system replacements at facilities where leaks cannot be adequately patched or repaired due to roof deterioration or damage. The citywide Facilities Assessment Study performed by Faithful +Gould in FY 2010 -11 recommended roof replacement at Fire Station #3 in 2013; staff concurs with this recommendation. Roofing membrane leaks at heating, ventilation & air conditioning (HVAC) equipment 1 penetrations and planned HVAC equipment modifications at Fairview Library and Woodlawn Cemetery cannot be properly addressed without replacing the roofing system membranes. While less expensive in the short run, temporary patches and repairs generally only last a year or two. Deferring roof replacements would put the facilities at greater risk for water leaks, potentially leaving the City responsible for expensive repairs to remediate resultant property damage. Vendor Selection In November 2012, the City published Notices Inviting Bids to provide roofing system replacements at Fairview Library, Fire Station #3 and the Woodlawn Cemetery Maintenance Building. The bid was posted on the City's online bidding site and notices were advertised in the Santa Monica Daily Press in accordance with the City Charter and Municipal Code provisions. Three bids were received and publicly opened on November 26, 2012 as described in Attachment A. Bids were evaluated on price, warranty, possession of a valid C -39 Roofing California state contractor's license, and compliance with City specifications. Cabral Roofing & Waterproofing was the lowest bidder for Fairview Library and the Woodlawn Cemetery Maintenance Building. Eberhard was the lowest bidder for Fire Station #3. Both contractors have provided similar services at City facilities and have a good standing relationship with the City. References listed in the bid package were contacted and all respondents reported that work performed by Cabral Roofing & Waterproofing and Eberhard were completed in a timely and cost- effective manner while maintaining consistent quality. Staff also verified with the California Contractors State License Board that Cabral Roofing & Waterproofing's and Eberhard's license is current, active, and in good standing. Based on these criteria, Cabral Roofing & Waterproofing is recommended as the best bidder to provide roofing system replacements at Fairview Library and the Woodlawn Cemetery Maintenance Building; and Eberhard is recommended as the best bidder to provide roofing system replacement at Fire Station #3. 2 The recommended contractors would provide and install mechanically attached Sarnafil S327 -60 mil polyvinyl chloride (PVC) EnergySmart white reflective roof membranes with 20 -year warranties at: 1) Fairview Library: 2101 Ocean Park Blvd.; 9,300- square -foot roof o Recommended vendor: Cabral Roofing & Waterproofing o Bid Amount: $56,892 + $8,534 (15% contingency) _ $65,426 purchase order 2) Fire Station #3: 1302 19th Street; 6,200- square -foot roof o Recommended vendor: Eberhard o Bid Amount: $37,580 + $5,637 (15% contingency) _ $43,217 purchase order 3) Woodlawn Cemetery Maintenance Building: 1847 14th Street; 4,400- square -foot roof o Recommended vendor: Cabral Roofing & Waterproofing o Bid Amount: $27,158 + $4,078 (15% contingency) _ $31,232 purchase order A 15% contingency is requested due to the high probability of additional roof repairs associated with HVAC unit and enclosure modifications. The scope of repairs cannot be precisely determined until HVAC equipment and roofing materials have been removed. Splitting the bid award between Cabral Roofing & Waterproofing and Eberhard would save the City $14,494 (excluding contingency) versus awarding all three jobs to a single contractor. If approved, it is anticipated that replacements would be scheduled in spring 2013. 3 Financial Impacts & Budget Actions The purchase order to be awarded to Cabral Roofing & Waterproofing is for an amount not to exceed $96,658. The purchase order to be awarded to Eberhard is for an amount not to exceed $43,217. The total award amount will not exceed $139,875. Funds are available in the FY 2012 -13 Capital Improvement Program budget in account M010085.589000. Prepared by: Kevin Nagata, Administrative Analyst Approved: k A�Dd�z __ Martin Pastucha Director of Public Works Attachments: A —Bid Summary V Forwarded to Council: Rod Gould City Manager ATTACHMENT A Bid No.: F4045 Closing Date: 11/26/12 Description: Provide and install mechanically attached PVC roofing systems, as required by Facilities Maintenance. Best Contracting Services Gardena, CA Cabral Roofing &Waterproofing Montebello, CA Eberhard Van Nuys, CA Description Price Price Price Location #1- Fairview Library Materials $28,700.00 $33,909.00 $16,301.00 Tax (9.25 %) $2,047.00 $1,981.00 $1,507.00 Labor $30,160.00 $21,002.00 $43,244.00 Other $9,093.00 $0.00 $0.00 Total $70,000.00 $56,892.00 $61,052.00 Estimated Days to Complete (ARO) 15 Days 5 Days 11 Days Location #2 ='Fire Station #3 Materials $21,900.00 $27,886.00 $11,181.00 Tax (9.25%) $1,524.00 $1,707.00 $1,034.00 Labor $29,000.00 $22,481.00 $25,365.00 Other $1,576.00 $0.00 $0.00 Total $54,000.00 $52,074.00 $37,580.00 Estimated Days to Complete (ARO) 12 Days 6 Days 7 Days Location #3 - Woodlawn Cemetery Materials $14,500.00 $16,575.00 $10,140.00 Tax (9.25%) $1,544.00 $1,007.00 $938.00 Labor $24,600.00 $9,576.00 $27,627.00 Other $2,356.00 $0.00 $0.00 Total $43,000.00 $27,158.00 $38,705.00 Estimated Days to Complete (ARO) 10 Days 3 Days 9 Days General Additional fees Vendor did not describe their "other costs" indicated in their cost proposal. "Vendor indicated multiple exclusions ail acceptable to the City. Please refer to hardcopy of bid submittal. $275 per 1/2" Plywood sheet (if needed), $40 per Ln Ft of 2x4 or 2x6 (if needed ), permits cost to be waived. Brand /Specification Quoted Sarnafil Sarnafil Sarnafil Warranty 20 Yr Mfr Warranty, 2 Yr Contractor Warranty 20 Yr Mfr Warranty, 2 Yr Contractor Warranty 20 Yr Mfr Warranty, 2 Yr Contractor Warranty Payment Terms Net 30 Days Net 30 Days Net 30 Days