Loading...
SR-01-08-2013-3CCity Council Meeting: January 8, 2013 Agenda Item: ?)_Q___1 To: Mayor and City Council From: Martin Pastucha, Director of Public Works Subject: Bid Award for Asbestos and Hazardous Materials Abatement and Construction Demolition Services at Various City Facilities Recommended Action Staff recommends that the City Council award Bid #4043 for asbestos and hazardous materials abatement and construction demolition services to Castlerock Environmental, a California -based company, in an amount not to exceed $50,000 for FY 2012 -13, with two one -year options to renew and a not to exceed amount of $150,000 over a three - year period, with future funding contingent on Council budget approval. Executive Summary The City contracts out asbestos and hazardous materials abatement and construction demolition services as part of planned facility remodels or to address emergent health and safety issues. In November 2012, the City solicited bids for such services. After reviewing the seven bids received, staff recommends Castlerock Environmental as the best bidder to provide asbestos and hazardous materials abatement and construction demolition services for a total not to exceed amount of $150,000 over a three -year period. Discussion The City contracts out asbestos and hazardous materials abatement and construction demolition services at various facilities as part of planned facility remodels as well as in response to detection of substances posing a threat to health and safety including asbestos and mold. Asbestos can be found in older ceilings, flooring, ventilation ducts, and other building components. Mold build -up may occur in water- damaged areas or sites lacking sufficient ventilation to eliminate moisture. Removal of these substances requires a contractor with Asbestos (ASB) and /or Hazardous Substance Removal (HAZ) state certifications. Associated air testing is generally performed by a second contractor or consulting firm. Contractors ensure that waste materials are properly packaged and labeled and transported in accordance with federal, state, and local regulations to licensed disposal sites and /or handling facilities. 1 Vendor Selection In November 2012, the City published Notices Inviting Bids to provide asbestos and hazardous materials abatement and construction demolition services. The bid was posted on the City's online bidding site and notices were advertised in the Santa Monica Daily Press in accordance with the City Charter and Municipal Code provisions. Seven bids were received and publicly opened on November 20, 2012 as described in Attachment A. Bids were evaluated on price, response time, warranty on work, possession of valid California ASB and HAZ certifications, and compliance with City specifications. Asbestos Instant Response is the lowest qualified bidder, but does not offer a warranty on their work. Castlerock Environmental, the second lowest qualified bidder, offers a one year warranty, which ensures there will be no call -back charges should any job not be performed to the City's satisfaction within the warranty period. Based on these criteria, Castlerock Environmental is recommended as the best bidder to provide asbestos and hazardous materials abatement and construction demolition services. The City has used Castlerock Environmental over the past four years with satisfactory results. Financial Impacts & Budget Actions The purchase order to be awarded to Castlerock Environmental is for an amount not to exceed $50,000. The purchase order will be charged to account 01274.570060 and expenditures will be transferred to the divisions incurring the maintenance services. Funds are available in individual division FY 2012 -13 operating budgets. Budget authority in subsequent years will be requested in each budget cycle for Council approval. Future funding is contingent upon Council approval. Prepared by: Kevin Nagata, Administrative Analyst Approved: Forwarded to Council: 44 Cv Martin Pastucha Rod Gould Director of Public Works City Manager Attachments: A —Bid Summary 2 ATTACHMENT BID # F4043 CLOSING DATE: 11120/2012 DESCRIPTION: PROVIDE ASBESTOS AND HAZARDOUS MATERIALS ABATEMENT SERVICES AND CONSTRUCTION DEMOLITION WORK, AS REQUIRED BY FACILITIES MAINTENANCE Asbestos Instant Response, Inc. Los Angeles, CA Castlerock Environmental, Inc. rSanta Fe Springs, CA National Demolition Contactors San. Pedro, CA - .Resource Environmental, Inc. r Cerritos, CA Item Description Unit Price Price '-1 Price Price 1 Asbestos Abatement HR $68.00 $71.87 $185.00 $75.00 Is Asbestos Abatement (After Hours/OT) HR $68.00 $107.80 $244.00 $112.50 2 Construction Demo - Non - Hazardous Materials HR $68.00 $6835 $199.00 $75.00 2a Construction Demo - Non - Hazardous Materials (After Hours /OT) HR $68.00 $103.20 $269.00 $112.50 3 Construction Demo- Hazardous Materials HR $68.00 $71.87 $199.00 $75.00 3a Construction Demo- Hazardous Materials (After Hours /OT) HR $68.00 $107.80 $269.00 $112.50 4 Mold Abatement HR $68.00 $71.87 $185.00 $75.00 4a Mold Abatement (After Hours /OT) HR $68.00 $107.80 $244.00 $112.50 Item Description - Response Response Response ; Response 5 Oays/Times Applicable for After Hours & OT OT rate per person after 8 hrshiftforall shifts sat &sun work only After B hn, Mon-I'd 4PM-7AM, Saturday time and a half, Sunday double time M- F(After SPM), Sat 6 % Discou nt/Ma rk-u p for Materials 10% 591. to 20% +/ -15% + / -15% 7 Minimum Call -Out Charge $1,400.00 $1,800.00 $1,500.00 $2,500.00 8 Overhead Margin 7.59/. 30.0% 11.0% 10.0% 9 Profit Margin 7.591. 15.0% 20.0% 5.0% 10 Additional Fees N/A SCA4M0 Procedure S Notification Fee, Expedite Fee, RCRA Lead Disposal Mobilization fee of$250 for trucks to transport material, equipment, and workers to /from location. Workers over 40 hrs time -and -a -half. Sunday, Holiday double time. Crew rates do not induce overhead margin and profit margin. 1. Crew corsisib ofl foreman and( laborer, 2. Double time not included. 11 Warranty on Service Repairs Blank (year Not applicable None 12 24/7 Services? Yes Yes Yes Yes 13 Response Time for Short- Notice Calls 2Hours 2Hours 3Hours 2Hours 14 Year Price Increase 5% 5% 0% No Renewal Option Offered 15 Year 3 Price Increase 5% 5% 0% No Renewal Option Offered 16 Payment Terms 2% Net 30 Days Net 30 Days Net 30 Days Net 30 Days 17 Vendor Comments Vendor did not indicate per person or per crew for hourly rate Vendor did not indicate per person or per crew for hourly ate Hourly Rates are per crew Hourly Rates are per crew ATTACHMENT A BID # F4043 CLOSING DATE: 11/20/2012 DESCRIPTION: PROVIDE ASBESTOS AND HAZARDOUS MATERIALS ABATEMEI Sun -cite Demolition- Montebello, CA Unlimited Environmental, Inc. ::Signal Hill, CA Vizion's West, Inc. Quail Valley, CA Item Description Unit Price Price Price 1 Asbestos Abatement HR $14.00 $595.50 $28.60 Is Asbestos Abatement (After Hours /OT) HR $21.00 $891.75 $39.90 2 Construction Demo - Non - Hazardous Materials HR $14.00 $568.15 $28.60 2a Construction Demo - Non - Hazardous Materials (After Hours /OT) HR $21.00 $818.50 $39.90 3 Construction Demo- Hazardous Materials HR $14.00 $595.50 $28.60 3a Construction Demo- Hazardous Materials (After Hours /OT) HR $21.00 $891.75 $39.90 4 Mold Abatement HR $14.00 $595.50 $28.60 4a Mold Abatement (After Hours /OT) HR $21.00 $891.75 $39.90 Item Description - Response Response Response 5 Days /Times Applicable for After Hours &OT Sat, Sun, any shift exceeding 8 him Say Sun, Holidays, or between SPmto 6AM After 4:301 Weekends 6 %Discount/Mark -up for Materials 10% to 15% + / -8 %to 10% + / -18 %to 22% 7 Minimum Call -Out Charge $1,150.00 $1,895.00 8 Overhead Margin 17.0% 15.09S mores 9 Profit Margin 17.0% 7.0% 18.0% 10 Additional Fees - Priceexcludes d'mposal,AQMD Notifications, permit fees, double time, materials needed t perform ich, equipment rental, heavy equipment tre nsportatioq administrative time, show up time, a crew is (1) supervisor and (1) laborer f., (1) Shr shift $7s.007rip Charge 11 Warranty on Service /Repairs Blank Not applicable 12 24/7 Services? Yes Yes 13 Response Time for Short- Notice Calls 2 t 3 Hours 2Hours 14 Year 2 Price Increase 0% 0% lNet Mpperson 15 Year 3 Price Increase 0% 5% 16 Payment Terms Net 30 Days Net 30 Days 17 Vendor Comments Hourly Ratesare perpemon Hourly Rates are percrew