Loading...
SR-08-28-2012-3B0_ City of Santa Monica City Council Report City Council Meeting: August 28, 2012 Agenda Item: To: Mayor and City Council From: Edward F. King, Director of Transit Services Subject: Big Blue Bus Operations Building Improvement: Furniture Purchase Recommended Action Staff recommends that City Council authorize the City Manager to negotiate and execute a Second Modification of Contractual Services Agreement Number 9259 (CCS) in the amount of $80,000 with Interior Office Systems (IOS), a California -based company, to provide additional furniture, installation, modifications and payment of furniture storage fees for the Big Blue Bus Operations Building. This will result in a new three -year contract totaling $971,995. Executive Summary IOS provided modular furniture for the Big Blue Bus Operations Building located at 1660 7t" Street as part of the overall rehabilitation of the building that was undertaken in 2011. On August 10, 2010, Council authorized $4,275,000 for tenant improvements, furniture, design, graphic production, project management services, and temporary trailers to house staff on -site during construction. The authorization included a purchase order contract with IOS for the furniture for the Operations Building, for a total cost not to exceed $891,995. The purchase of new furniture was required to replace outdated furniture which no longer functioned efficiently and would not fit in the smaller individual employee work- stations. IOS bought back all of the old furniture, with a resulting credit to the City, which reduced the overall cost of the new furniture purchase. Replacement of the existing furniture was also part of the designer's comprehensive plan to increase natural light flow and daylight penetration into the work spaces, a component of the Leadership in Energy and Environmental Design (LEED) Certification process. The building is expected to obtain LEED Silver or Gold Certification. Project construction on 1660 7t" Street was completed in December 2011. Since that time, the department has undergone a reorganization which resulted in adjustments to several work spaces that had to be reconfigured to accommodate role changes. The BBB dispatch communication center work space has also been reconfigured due to new roles /responsibilities and upgrades in BBB operating software used to manage the system and employees. Due to facility construction delays last year, some furniture was received before construction was complete and was stored by IOS for approximately six months, at a total cost of $17,000. The purchase and installation of furniture, mobile 1 pedestals, walls for the communication center, chairs, shelves, and cabinets will cost approximately $60,000, leaving approximately $20,000 over the three -year period for any additional changes that may be required. Background As the Big Blue Bus' fleet changed and expanded to incorporate alternatively - fueled and articulated buses, modifications were needed to the Big Blue Bus Campus to allow for better handling of maintenance functions, operations and administration needs, and reorganized parking for the changing fleet. The plan was to demolish the existing Maintenance and Operations Buildings and replace them with two new buildings. However, construction costs rose unexpectedly due to outside factors such as an increase in the cost of steel, and on May _9 2006, after informing Council of the cost escalation on the proposed facility project Council directed staff to proceed with the most urgently needed Maintenance Building and defer the proposed Operations Building construction. After assessing the existing Operations building's functional deficits and studying options to improve the interior design and functioning of the building, it was determined that an interior and limited exterior remodel to the existing building would suffice to address the needs of the operations and administrative staff. On July 23 2008, staff presented the cost to design the tenant improvements of the Operations Building, and City Council approved a Professional Services Agreement with Harley Ellis Devereaux (HED) for these design services. These design services included the selection of furniture for the Operations Building. To ensure the best pricing, HED conducted a survey of qualified furniture vendors who were willing to utilize U.S. Communities and General Services Administration pricing for the furniture. Section 2.24.080 (b) of the Municipal Code allows exceptions to competitive bid procedures when competitive bid procedures have already been utilized, such as in purchasing from Federal, State, County, City or special district government agencies, or from cooperative purchasing agencies consisting of such agencies. 2 IOS, a distributor of Hayworth and Coalesse products, was recommended by Harley Ellis Devereaux on the basis of both pricing and prior experience in providing good service. IOS was approved by the building renovation committee comprised of staff from the Big Blue Bus and Public Works Architectural Services and Engineering divisions. Staff prepared a Contractual Services Agreement for IOS and on August 10, 2010, Council authorized $891,995 to IOS for the purchase and installation of furniture, pre- fabricated wall and flooring systems and miscellaneous furniture for the reconfigured space. Discussion Design for the project originally took place in 2008 -2010, and was based on a comprehensive survey of employee needs, operational needs, and space limitations that was conducted by the designer, HED. Construction took place between January and December of 2011, and staff returned to the building from temporary off -site locations in December 2011. Shortly thereafter, a departmental reorganization took place which resulted in numerous staff re- assignments and moves, and the need to make additional modifications to the building. In order to minimize costs and maximize re -use of the recently purchased furniture, staff analyzed the options for re -use of the existing space and furniture and recommended conversion of an existing meeting room to create a private office, modifications to existing furniture (i.e., cutting pieces down, trading detachable equipment, relocating furniture from one space to another, etc.), and purchase of a limited number of additional furniture items, including pre- fabricated walls, storage shelves and cabinets to complete the reconfiguration. While the City does not yet have organizational furniture purchasing standards in place, the furniture selected for this project is cost - effective, easily ordered from local suppliers, and made of recycled and low- emission materials that are compliant with commonly accepted "cradle to cradle" standards. Should future modifications be needed to the existing furniture, staff will 3 implement all possible modifications prior to simply purchasing additional furniture. Due to efficiencies associated with IOS having provided the existing furniture, and the ongoing availability of U.S. Communities and GSA pricing through IOS, staff recommends the ongoing use of IOS to provide and install new furniture as well as make modifications to existing furniture. These changes are expected to cost approximately $60,000, leaving $20,000 over the three -year period for any additional changes that may be required. Financial Impacts & Budget Actions The contract modification to be awarded to Interior Office Systems (IOS) is $80,000 for a new contract total of $971,995. Funds in the amount of $80,000 are available in the FY2012 -13 budget at account number #0410826.589000. All funds used for this contract come from funding sources specifically dedicated for transit uses. Prepared by: Joseph Stitcher, Administrative Services Officer Approved: Forwarded to Council: B Edward F. King ! Rod Gould Director of Transit S rvices City Manager 0 Reference Amended Contract No. 9259 (CCS).