sr-072412-7d (2)9 City of City Council Report Santa Monica City Council Meeting: July 24, 2012 Agenda Item:,` To: Mayor and City Council From: David Martin, Director of Planning and Community Development Subject: Development Agreement 12 -002 for Amendment to Development Agreement 00 -001 for the RAND Corporation Recommended Action Staff recommends that the City Council introduce for first reading an ordinance adopting Development Agreement 12DEV -002. Executive Summary The applicant, RAND Corporation (`RAND "), proposes to amend its approved Development Agreement with the City of Santa Monica, approved in 2000, that authorized the construction of its facility at 1776 Main Street. RAND proposes to convert approximately 17,300 square feet of floor area within Parking Level P1, which contains 56 parking spaces, into primarily offices. One additional space is lost on level P2 due to the installation of an elevator. The offices would house production, warehousing and distribution, a call center, and research offices. These functions, along with the 45 -50 employees engaged in the activities, are currently located across First Court alley in the office building at 1733 Ocean Avenue. The Planning Commission considered the proposed DA modification at its meeting of May 16, 2012. No additional community benefits, beyond those already committed to by RAND as part of the 2000 Development Agreement, are recommended by staff or by the Planning Commission. Background A Development Agreement between RAND and the City, dated November 23, 2000, authorized the construction of their approximately 309,000 square foot headquarters at 1776 Main Street. The building contains 3 levels of subterranean parking (P1 — P3) with a total of 827 parking spaces. 1 As part of the original Development Agreement for the project, a number of substantial public benefits were negotiated for inclusion in the project; these include: • Dedication of land and construction of Vicente Terrace. • Dedication of land and construction of a sidewalk along Main Street Y Contribution and support to the Early Childhood Education Center: $500,000 to promote full -day affordable, quality childcare and early child development opportunities for young children. Provide support to identify funding opportunities for early childhood education and convene annual community conferences to support awareness of early childhood education and policy. RAND is currently in compliance with all of the provisions of the 2000 Development Agreement. Project Description and Analysis RAND proposes to amend its Development Agreement in order to convert approximately 17,300 sq. ft. (18,216 gross sq. ft.) of area within Parking Level P1, which contains 56 parking spaces, into offices for print, distribution, media services and new UPS generator room. A small HVAC room and UPS generator room are also included. More specifically, the offices would house production, warehousing and distribution, a call center, and research offices. These functions, along with the 45 -50 employees engaged in the activities, are currently located across First Court alley in leased space in the office building at 1733 Ocean Avenue. The interior modifications required for the space include: • Extend one stairway and one elevator cab from the ground floor to level P1 • Relocate existing electrical equipment • Add an air conditioning system to serve the new office space • Relocate existing electrical, mechanical, plumbing and other services as necessary to facilitate build -out of the space 2 As noted above, the new office space would allow 45 -50 employees currently working in the Ocean Avenue office building to relocate across the alley. These employees currently park in the RAND building. The proposed amendment would improve pedestrian safety for these RAND employees as the immediate area of First Court alley which is the pedestrian access path between RAND and the Maguire Thomas building, currently a major construction zone for The Village project. Further, once The Village is completed and occupied, First Court alley will be a significant vehicle access point to the development. a 0 K Z a� 6 Proposed conversion of parking area to office (see Attachment D for greater plan detail) 3 Photo of existing parking area to be converted RAND Parking Utilization Data RAND provided parking utilization data from October 2009 to May 2010 (see Class 32 Categorical Exemption - Attachment B) which shows that the peak parking demand in the RAND building is approximately 730 spaces at around 1:OOpm. The average peak demand is approximately 583 spaces. During its deliberations, the Planning Commission suggested that the parking utilization data from 2009 -2010 was old and needed to be updated for the Council's consideration. RAND has provided staff with data from the period February 20, 2012 through May 17, 2012 (Attachment E). This more recent data indicates that the peak parking demand has decreased from 730 vehicles to 625 vehicles. Similarly, the average peak demand has dropped from 583 to 555 vehicles. Based on the parking garage's 827 space capacity, there is a surplus supply of between 202 to 274 spaces, depending on peak or average peak period data. This surplus supply demonstrates RAND's effective Transportation Demand Management plan (see employee summary sheets and Average Vehicle Ridership (AVR) calculation — Attachment C) which results in an AVR of 1.6 in the AM peak period 4 and 1.61 in the PM peak period. Therefore, the loss of 57 parking spaces associated with the project would not result in a significant shortage of parking and associated traffic impacts of queuing and road congestion. Although RAND consistently has surplus parking spaces available, due to the nature of their work and the need for security, these spaces cannot be offered to off -site users as shared parking spaces. Summary of Development Agreement Amendment Only limited changes to the Development Agreement are required to accommodate RAND's proposal: f Plans for parking level P1 will be revised to include the office space; • Permitted project floor area will increase by 18,216 square feet to a total of 327,085 square feet. Below -grade parking is not included in floor area calculations but below -grade office space is considered floor area; • Description of the principal components of the subterranean parking garage will be revised to include the 17,300 square feet of production, warehousing and distribution, a call center, and research offices; and • Minimum number of parking spaces required on -site reduced to 768 spaces. A Development Agreement Amendment is required for this project because the original Development Agreement expressly requires an Amendment for the building to exceed the floor area limitation contained in the original DA. Community Benefits The proposed DA Amendment will convert 17,300 sq. ft. (18,216 gross sq. ft.) of existing parking to offices and bike storage, which is less than 6% of the total building size. As noted above, the original 2000 DA limited the size of the building and does not contain a provision used in current DAs that allows the Director of Planning to approve minor modifications such as the proposal. Since a number of community benefits were 5 negotiated with RAND as part of the original Development Agreement for the construction of their 309,000 sq. ft. headquarters building, staff believes that additional community benefits are not warranted with this minor DA modification. Planning Commission Action The Planning Commission conducted a public hearing on the proposed DA modification at its meeting of May 16, 2012. In its deliberations, the Commission supported RAND's request and lauded them for their successful Transportation Demand Management program which, as noted earlier, has resulted in Average Vehicle Ridership (AVR) of 1.6 in the morning hours and 1.61 in the evening hours. Nevertheless, the Commission, fearful that the 1.5 AVR target (contained in Chapter 9.16 Transportation Management of the Code) would not result in enough available spaces to meet peak demand, recommended to the Council that the DA contain a provision that RAND maintain a 1.6 AVR. RAND response to AVR Condition RAND believes the 1.6 AVR standard is unnecessary to address the Planning Commission's concern regarding providing sufficient parking to meet demand. RAND has provided a map of the distribution of RAND staff by zip codes that are in reasonable proximity of the Expo light rail line (Attachment F), together with a map of rail line (Attachment G). The number of RAND staff who live Santa Monica, Venice, Marina del Rey, and Brentwood totals 271 individuals. Another 212 staff live in communities to the east along the light rail route. RAND believes that targeting this group with information and transit incentives when the light rail first opens will persuade additional staff to leave their cars at home, further reducing on -site parking demand. Staff concurs with RAND's position with respect to the AVR condition. With a peak of approximately 1,100 employees at RAND, the 1.5 AVR target would result in a demand for approximately 733 spaces, which is 33 spaces fewer than the 770 spaces available after the project. In addition, since the Commission's action, the updated parking R utilization data indicates a significant decline in peak and average peak parking demand since 2010. Finally, the opening of the light rail and RAND's success to date with their TDM program will likely further lower the parking demand at RAND. Land Use and Circulation Element Consistency The proposed project is consistent with Land Use and Circulation Element (LUCE) Goal LU4.8 which states that the City should: "Utilize parking and TDM Districts to facilitate efficient use of parking resources, shared and reduced parking opportunities, and trip reduction goals." The LUCE Sustainability and Climate Change section includes a Parking Management Strategy that calls for lower of- street parking requirements and LUCE Circulation Policy T26.4 calls for projects to adjust parking requirements when it can be demonstrated that a lower parking demand is appropriate. Environmental Analysis An Environmental Impact Report (EIR) was prepared for the RAND headquarters building in accordance with the requirements of the California Environmental Quality Act (CEQA).On September 19, 2000, the City Council certified the Final Environmental Impact Report, adopted a Statement of Overriding Considerations and Mitigation Monitoring Plan and approved the project. Staff concluded that the proposed project, the conversion of existing parking area to offices, was exempt from the provisions of the California Environmental Quality Act (CEQA) pursuant to a Class 32 In -Fill Development Project exemption. The proposed project qualifies for this exemption because: • The project is consistent with the applicable general plan designation and all applicable general plan policies as well as with applicable zoning designation and regulations. • The proposed development occurs within City limits on a project site of no more than five acres substantially surrounded by urban uses. 7 • The project site has no value as habitat for endangered, rare or threatened species. • Approval of the project would not result in any significant effects relating to traffic, noise, air quality, or water quality. • The site can be adequately served by all required utilities and public services The Class 32 determination is attached (Attachment B) Conclusion Only limited changes to the Development Agreement are required to accommodate RAND's proposal. Staff's recommendation is based on the fact that the proposed amendment would provide for greater efficiencies for RAND and greater safety for off - site employees working in the Ocean Avenue office building. The immediate area of First Court alley is currently a major construction zone for The Village project and will be for some time. Once The Village is completed and occupied, First Court alley will be a major vehicle access point to the development. Finally, the conversion of parking area to office space can be accomplished while still providing sufficient off - street parking to meet peak parking demand. Financial Impacts & Budget Actions There is no immediate budget/financial impact related to the policy decision. Prepared by: Paul Foley, Principal Planner Approved: Forwarded to Council: VN David Martin, Director Rod Gould Planning and Community Development City Manager 0 ATTACHMENT A Draft Ordinance and Amendment No. 1 to RAND Development Agreement IN City Council Meeting 07 -24 -12 Santa Monica, California ORDINANCE NUMBER (CCS) (City Council Series) AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF SANTA MONICA APPROVING THE FIRST AMENDMENT TO THE DEVELOPMENT AGREEMENT BETWEEN THE CITY OF SANTA MONICA, A MUNICIPAL CORPORATION AND THE RAND CORPORATION, A CALIFORNIA NOW PROFIT CORPORATION WHEREAS, on or about November 23, 2000, the RAND Corporation ( "RAND ") and the City of Santa Monica ( "City ") entered into a Development Agreement recorded in the Official Records of the County of Los Angeles, State of California on February 1, 2001, as Instrument No. 01- 0176770 (the "Development Agreement "), authorizing the construction of RAND's approximately 309,000 square foot headquarters at 1776 Main Street; and WHEREAS, on February 14, 2012, RAND filed an application to amend the Development Agreement ( "First Amendment "); and WHEREAS, the First Amendmentwould convert approximately 18,216 square feet of area within Parking Level P1 of RAND's 1776 Main Street facility, which contains 56 parking spaces, into primarily offices (one additional space is lost on level P2) to relocate publications production, warehousing and distribution, a call center, and research offices currently located across First Court alley in the Maguire Thomas building at 1733 Ocean Avenue; and WHEREAS, the First Amendment will provide for greater safety for RAND employees currently in the Maguire Thomas building as the immediate area of First 1 Court alley is currently a major construction zone for The Village project and, in addition, once the Village project is completed and occupied, First Court alley will be a major vehicle access point to the development; and WHEREAS, the First Amendment only involves the conversion of subterranean parking area to offices within an existing building where it has been demonstrated that the reduction in parking area will not affect the number of available parking spaces necessary to meet the peak demand of employees and visitors to RAND's 1776 Main Street facility; and WHEREAS, the First Amendment to the Development Agreement is consistent with the General Plan, as summarized below, and as detailed in the accompanying City Council staff report prepared for this proposed project and the exhibits thereto, including, but not limited to: "Utilize parking and TDM Districts to facilitate efficient use of parking resources, shared and reduced parking opportunities, and trip reduction goals." (LUCE Citywide Land Use Policy LU4.8, p. 2.1 -14) "The City plans to encourage parking efficiency strategies such as shared parking (including sharing of existing parking), lowered parking requirements, and parking pricing to reduce the demand for parking. Reducing parking demand can also encourage alternatives to auto travel, promoting a pedestrian - friendly urban landscape by reducing the amount of urban space dedicated to parking." (LUCE Sustainability and Climate Change p. 3.1 -10) 2 "Adjust parking requirements for projects when it can be demonstrated that a lower parking demand is appropriate." (LUCE Circulation Policy T26.4, p. 4.0 -73) NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF SANTA MONICA DOES HEREBY ORDAIN AS FOLLOWS: SECTION 1. The First Amendment to the Development Agreement attached hereto as Exhibit 1 and incorporated herein by reference between the City of Santa Monica, a municipal corporation, and the RAND Corporation, a California non - profit corporation, is hereby approved. The City Manager is authorized to execute the attached First Amendment to the Development Agreement. SECTION 2. Each and every term and condition of the FirstAmendment to the Development Agreement approved in Section 1 of this Ordinance shall be and is made a part of the Santa Monica Municipal Code and any appendices thereto. The City Council of the City of Santa Monica finds that public necessity, public convenience, and general welfare require that any provision of the Santa Monica Municipal Code or appendices thereto inconsistent with the provisions of this Development Agreement, to the extent of such inconsistencies and no further, be repealed or modified to that extent necessary to make fully effective the provisions of this Development Agreement. 3 SECTION 3. Any provision of the Santa Monica Municipal Code or appendices thereto, inconsistent with the provisions of this Ordinance, to the extent of such inconsistencies and no further, are hereby repealed or modified to that extent necessary to effect the provisions of this Ordinance. SECTION 4. If any section, subsection, sentence, clause, or phrase of this Ordinance is for any reason held to be invalid or unconstitutional by a decision of any court of any competent jurisdiction, such decision shall not affect the validity of the remaining portions of this Ordinance. The City Council hereby declares that it would have passed this Ordinance, and each and every section, subsection, sentence, clause, or phrase not declared invalid or unconstitutional without regard to whether any portion of the Ordinance would be subsequently declared invalid or unconstitutional. SECTION 5. The Mayor shall sign and the City Clerk shall attest to the passage of this Ordinance. The City Clerk shall cause the same to be published once in the official newspaper within 15 days after its adoption. This Ordinance shall be effective 30 days from its adoption. APPROVED AS TO FORM: V16X�16� W-v x w IVI "Q- HVny NES M UTRIE City Atto 4 Recording requested and return to: P RAND Corporation 1776 Main Street Santa Monica, CA 90407 -2138 Attn: Donn Williams AMENDMENT NO. 1 TO DEVELOPMENT AGREEMENT BY AND BETWEEN THE CITY OF SANTA MONICA AND RAND CORPORATION Dated: 2012 AMENDMENT NO.1 TO DEVELOPMENT AGREEMENT This Amendment No. 1 to Development Agreement ( "Amendment No. 1) is entered into as of 2012, by and between the CITY OF SANTA MONICA, a Charter City organized and existing under the laws of the State of California (the "City "), and RAND CORPORATION, a California non - profit corporation ( "RAND "), with reference to the following facts: A. The City and RAND entered into that certain Development Agreement dated November 23, 2000 and recorded in the Official Records of the County of Los Angeles on February 1, 2001 as Instrument No. 01- 0176770 (the "Agreement "). B. The Agreement relates to the real property located in the City of Santa Monica, State of California, described in Exhibit A attached hereto (the "Property "). RAND holds legal title to the Property. The Property is developed with an office building and related uses and a subterranean parking structure, commonly known as the RAND headquarters (the "Project "). C. On or about June 16, 2011, the City Director of Planning and Community Development approved a Minor Modification to the Agreement to revise Section 2.7.1(b) to delete the requirement that RAND dedicate land for a new traffic circle on Main Street and to modify Section 2.7.1(d) to require RAND to construct an Emergency Access Path in lieu of the Pedestrian Path originally contemplated in the Agreement. D. The Project was constructed to consolidate RAND's operations in a new headquarters building; however, RAND continues to occupy space at 1733 Ocean Avenue, Santa Monica, located adjacent to the Property (the "Adjacent Property "), for production and office uses. RAND desires to incorporate those uses into the Project to reduce trips, improve operational efficiency and to enhance the safety of its employees, who currently must walk between the Property and the Adjacent Property by crossing an alley that is becoming more frequently used by vehicles in the area. E. Through prolonged and detailed monitoring, RAND has documented a surplus of parking spaces in the Project's subterranean parking structure. F. RAND and the City desire to amend the Agreement in the manner set forth herein in order to permit RAND to renovate the first floor of the Project's subterranean parking structure to remove up to 57 parking spaces and add up to 17,300 square feet of floor area for RAND's production and office uses. G. The City has determined that the modifications to the Agreement set forth herein are consistent with the goals and policies of the City's Land Use and Circulation Element ( "LUCE "), including the following: (1) "Utilize parking and TDM Districts to facilitate efficient use of parking resources, shared and reduced parking opportunities, and trip reduction goals." (LUCE Citywide Land Use Policy LU4.8, p. 2.1 -14) (2) "The City plans to encourage parking efficiency strategies such as shared parking (including sharing of existing parking), lowered parking requirements, and parking pricing to reduce the demand for parking. Reducing parking demand can also encourage alternatives to auto travel, promoting a pedestrian - friendly urban landscape by reducing the amount of urban space dedicated to parking." (LUCE Sustainability and Climate Change p. 3.1 -10) (3) "Adjust parking requirements for projects when it can be demonstrated that a lower parking demand is appropriate." (LUCE Circulation Policy T26.4, p. 4.0- 73) H. The City Planning Commission held a duly noticed public hearing on May 16, 2012 with respect to the Amendment No. 1 and recommended that the City Council adopt the proposed amendment. I. In taking this action, the City Council has (a) specifically considered and approved the impacts and benefits of the requested Amendment No. 1 and has concluded that this Amendment No. 1 is consistent with the public health, safety, and welfare of the residents of the City and the surrounding region, and as detailed above, promotes the goals, objectives, and policies of the General Plan, (b) determined that the City has complied with all procedures required by Government Code Section 65864, et. seq., and Santa Monica Municipal Code Chapter 9.48 with respect to Amendment No. 1, and (c) duly authorized the City to enter into this Amendment No. 1. NOW, THEREFORE, IN CONSIDERATION of the foregoing facts and the mutual covenants set forth herein, the parties hereto agree as follows: The Agreement is hereby amended in the following respects: a. Project Description. The Project Plans and Schematics, as defined in the Agreement, are amended with respect to Level P -1 Parking as shown on the P -1 Floor Plan attached as Exhibit B to this Amendment No. 1 (the "P -1 Floor Plan "). All references to the Project Plans and Schematics in the Agreement, including Sections 2.1 and 2.5, shall refer the Project Plans and Schematics as so amended. In the event of any conflict or inconsistency between the text of the Agreement or the Project Plans and Schematics, on the one hand, and the P -1 Floor Plan and this Amendment No. 1, on the other, the P -1 Floor Plan and this Amendment No. 1 shall control. b. Permitted Floor Area. The third sentence of Section 2.2 of the Agreement is amended to read as follows: "The Floor Area of the Project shall not exceed 326,169 square feet." c. Principal Components of the Subterranean Parking Garage. Section 2.2. 10) of the Agreement is amended to read as follows: "Subterranean parking, including carpools, vanpool and bicycle parking. The first level of the parking garage may also include up to 17.300 square feet of production and office uses, including a warehouse and distribution center, call center, research offices, and storage." d. Parking. Section 2.8 of the Agreement is amended to read as follows: "Except for the drop -off vehicle zones reserved at the entry court, all parking shall be located in the Subterranean Garage as shown on the Project Plans. The Project shall provide a minimum of 768 parking spaces. The provisions of this Section 2.8 set forth the exclusive off - street parking requirements for the Project and supersede all other minimum parking requirements under the Existing Regulations, including Part 9.04. 10 of the Zoning Code." 2. Except as expressly set forth herein, all of the terms and conditions of the Agreement, as previously modified, shall remain unmodified and in full force and effect. IN WITNESS WHEREOF, this Amendment No. 1 has been executed as of the date first above written. APPROVED AS TO FORM: City Attorney CITY OF SANTA MONICA, a municipal corporation C City Manager Attest: City Clerk RAND Corporation, a California non - profit corporation C Title: Exhibit A Legal Description Exhibit B P -1 Floor Plan ATTACHMENT B Class 32 Exemption Electronic version of attachment is not available for review. Document is available for review at the City Clerk's office and the Libraries. 11 City of Santa Monica California Environmental Quality Act (CEQA) S1100 510.11cle Class 32 Exemption Findings Project Location (include site address): 1776 Main Street (Rand Building), Santa Monica, CA Project Applicant: Rand Corporation Discretionary Approval(s) Required: Amendment to Development Agreement CEQA Guidelines Section 15300 provides a list of classes of project which have been determined to not have a significant effect on the environment and therefore are categorically exempt from the requirement for the preparation of environmental documents. CEQA Guidelines Section 15332 provides a class of in -fill development projects (Class 32) that are categorically exempt. In order to qualify for this exemption, projects must comply with all of the following findings: Please describe in detail how the proposed project will meet the following criteria: (attach additional pages if necessary) 1. The project is consistent with the applicable general plan designation and all applicable general plan policies as well as with applicable zoning designation and regulations. The proposed project would convert a portion of the existing area within the Rand subterranean parkincigarage into office space The purpose of the project is to consolidate existing office functions that currently occur off -site (in the adjacent building to the west) into the existing Rand building. Specifically, approximated 15,000 square feet of parking area (consisting of approximately 57 parking spaces) within the P1 Level of the larking _ garage would be modified to house office functions such as print /distribution shop, call center, and bicycle parking The proposed project would require relocation of electrical equipment installation of an HVAC system and the extension of circulation stairs and elevator to the P1 Level. No new employees and no new trips would be generated by the conversion of the parking area to office space Rather, the project would allow for the 45 -50 existing off -site employees to work within the Rand building. 2. The proposed development occurs within city limits on a project site of no more than five acres substantially surrounded by urban uses. City of Santa Monica California Environmental Quality Act (CEQA) Santa 510,11,111 Class 32 Exemption Findings The project site consists of approximately 15,000 square feet of existing interior parking area in the Rand subterranean parking garage. 3. The project site has no value as habitat for endangered, rare or threatened species. The project site is entirely developed as a parking garage No endangered rare or threatened species occurs on the site. 4. Approval of the project would not result in any significant effects relating to traffic, noise, air quality, or water quality. No new employees and no new trips would be generated by the conversion of the parking area to office space Rather, the project would allow for the existing off -site employees that currently work in the adjacent building to work within the Rand building. These existing off -site employees currently park in the Rand building and walk to the adjacent off -site building. No changes to trip generation or trip distribution would occur as a result of the project. Therefore, no significant traffic impacts would occur. Relative to parking parking utilization data (see Appendix A) shows that the peak parking demand in the Rand building is s approximately 730 spaces occurring at approximately 1.00 pm on a typical Tuesday afternoon The average peak demand is approximately 583 spaces Based on the parking garage's capacity of 827 parking spaces there is a surplus supply of between 103 to 244 spaces depending on peak or average peak period) Therefore the loss of 57 parking spaces associated with the project would not result in a significant shortage of parking and associated traffic impacts tog queuing, circulation issues). Since no new trips would be aenerated from the proiect, no operational increases in vehicular noise and air pollutant emissions would occur. During construction noise and air pollutant emissions would be enclosed within the subterranean parking area and would not affect off -site sensitive receptors. Therefore no significant impacts related to noise or air quality would occur. Furthermore operational and construction - related impacts related to water quality would not occur as the project site would be located within the interior of the subterranean parking garage. 5. The site can be adequately served by all required utilities and public services. DO City of Santa Monica California Environmental Quality Act (CEQA) s�;..tn m0,110d, Class 32 Exemption Findings The proiect site is already served by existing utilities (storm drains, water, and sewer) and public services. Conversion of the parking area to office space would not increase the demand for these facilities and services. As previously stated, the purpose of the project is to consolidate the office functions that currently occur off -site into the Rand building. No new employees would be generated as a result of the project, and no new major utility improvements or expansion of public services would be required. ATTACHMENT C RAND Employee Summary Sheets and AVR Calculation Electronic version of attachment is not available for review. Document is available for review at the City Clerk's office and the Libraries. 12 6 • *, ;• •, Employee Summary Sheets and Average Vehicle Ridership Calculation September 2011 Site IUq: 001303 Year 7011 Weekly Employee 5nmmaty Form - A.M. AVR WINDOW l "bh form Is for anplogrex reparliny In axd lanrlq x,,rlr nitlrhr Ihv A, hl. AV 14 w1a,lo" usly, Yleure I 10 Insbarrnms Ih fo *v rvwplrnnz rldx farm. U in [Y.rys_^ D9t12121II1 09litl2l11[ S- qb1 +Il0il 11'111 ell) I1 jj t191IG OII 9=1111 _..il - INSTU, No Hcaponac .. 756.__ -_ 1861 I6. ll Marccly' S 4 G 4 2 2 �lC.3 —1 r­ --- 7?.'._.� _..� ._ U.3 person,car�+nai_ t� I:; i iti I? i Ill K jrcnnn iarLnrnl L _i 5 �I 77711-7-3 _ ._I� 2O_J —_ _. �jF.ipctxmr <ugnrol �17­-��� Q ! U L - -!�_ j�C. 6 person env-pool L'_It 7 person car r�mrl �._ L._....._`_,.._.....J t_? 1 I:S .I. 9 rcrsnn car root U U U h. l0 prr +r n sarPaol i_,_._ Jt, 12 Person raryrm >I N. 13 C�O. I', 15 person Cnrpaul — [ � l�l_�trl� _ ]U 251 147 •1'. Urcrvlc j 31 U LlccL re Vehirlc, = IhIU �5 ,i'eicenmmutc____�t�W '7J�L 6 -tiR (iI RO t44 1V. Nonr.onmruling �L 26��_ 3��_ 'ii 33 Flit,] AA.A aenl ion y _ AU 17 ,, 33 s7,� ?Od... cu mans 1.^,3,4,5, xdrrn adtle i xparawly should equal ouch other and (PORNI III -I. A., [.ine I.). when the mtnls or(3,lumns1. ?.,lfi, S 5 me uddcd l,L-,tl -r. they ihould equal rsdmnn 6 mud. SUr lll�; 1H)[30H Vwfr. 1011 Weekly EinployeeNchicle CalcLit-aflons - A.M. Peak Period AVR WINDOW Column 2 NNKI No Skirw,v, RiSponBc A I Dmi vionc -- - ------- dcfl 6v I .... ace- - --------- 1. 17 111 't crnnu Cn�vtd F's ------ I F-mi II --- ------ puls"n w q"�l =1 Fl F- 7 rK F1,71 divided by �10 Td -1 LIO F1 LIT — I pm)" CA E LI divid 0 N 13 mK__ F, o -1 FN 1 di ndq—hHl E tI 0 POI—dl� "cd bT Fp F r I Total ............ 204 i� low Current Worksito AVR - Morning 1. Total on¢deyeo trips gennraled, five day period, within A,M. AVR Windoo imlusive IET1, Colurvt 1. j 2. Total VolicaS arriving at amf Isavh -the vrorkalte far the five day potforl within the A.fA, AVR Window. Use (TVi.. Column 2). 2. 21 C6__, 3. Divide line at by an U2 for oiurent braining AVR. 3. I 1150 4. klom ng AVR laiget. 4. 5. prtaryoar morning RVfl (leave blank It filing mr first year). 5. �_... —.IAA (Fill in fast war's AVR 7 tiled vith AOktD.t 6, Divide fine X 1 by line d4 to compute yinx Trensportatiou Qrdinunae allowable venues, 0. 2251, 7. 4a61rect fine r16 [ram fine 162. This Is Jour m�essary waekkf vehicle reduction to reach your target morning AVR. 7. __ __. -145 R. Divide line U7 by the averaging panod of live days to calculate the necossaly daily vohido rorkg3irin to reach your target morning AVR. Pale 20 U. Wmkly Employvc S'ummmy Form - PA4 AVR \VI NDO`d' S{tr IM: 001301 yow 3411 Pup I of I Weekly Tmployee Summary Form - 11,1M. ANrR WINDOW I hii A"m Is h.r empin) <et r <Pnrtiai; woad iea +tnN +.wk wItMn 16e P.M A \TI W ... 4,, uly- Mow rcbl iuAllifmn btfen cmvvirlml! ib6 form. c"I'lums I,1,1 J, i, ;s Ivi add xi eep.vaiely +hnuld rn {wJ each ether :md (PbR \f 111-1, A., Lico 1. }. Whni the igial. of Cohunm I,?B & 3 ate ams u'gmber, 60 A.Mw quo Mum 6 WIM. lilc+ i,' U'.'\\' cekly°,% 2ilRmplrry' ccifi7.[ tSummop .n<+alpi.mi��2b'Sfi201'_ivl %204 \'IL "'o'20 \1'INUO\ \',61rn 9t7tlt']Oii Situ 1011; D01 JON Yflic! all 1 Weekly Ernployce/Veldcle, Calculations - P.M. Peak Period AVII WINDOW Colunin i�R I � No smr%cy 1 71 . . ....... F — ---] F 11 114 ------ -s i- 2, p—mc a fp on im i, mw h)2= - = I. -9U 1 . . I .-- -�i- r -i-ixi;---- 3 Imqon lipmon L", ;16 caTwJ ji 6 Ifi —divikivc, !n 6- It 'p . ...... dividcd by 7 I I F— —11-1 F1 ld,�,,Id h, X F I —bA LJI carpool L— L__ "i j p�mon �am-nl— I, TF �,�L [1I1 12 2_-_ lrul�ti— E-T= Kd Ij Ini dGwo,] I'l jT IQ I Bui 11 114 F344 ITY] NO cchi0o, NSItl Till I1 -48 -1. Sicic Si R�c l.91. ..... __j F 5� SITE 10. t,:SQ1�34�r.� YEAR 2011 Current Worksite AVR - Evening 1. Total employee trips generated for a live day period betwoon 3'.00 p.m. and 7 JO p.m., inclusive (ET2, CUMN) 1). I, 2. Total vehicles atdviixl it and leaving the worksite tar a live day period hehveen 3:00 p.m. and 7:C0 No.: use (TV2. Column 2). 2. 3. - Divide line # 1 by line #2 for current evening AVR. 3. 4. Evening AVR target, 5. Prior year awning AVR (leave blaruc 3 1111ria for first yearj. b- 6. Owida One #1 by Zinn N4 10 comlxrte your Ttan ^:p0r±alian Ordinance allowable volu les. 7. Subtrdct Gno Ito from line 02. This is your necessary weakly vahz:le reduction to readl your target evening AVR. 71 4. .1_s4 6, 087 8. Divide line k7 by the averaging aeriod of live days to calailate necassary daily vehicle redoclicn 10 raeal7 your target evening AVR. 8. ..ru, --.... Payo 24 ATTACHMENT D P1 Floor plan with converted space Electronic version of attachment is not available for review. Document is available for review at the City Clerk's office and the Libraries. 13 y \ \ 6 / J o p Z y jy N 0. A V / / D AC®M P1 LEVEL PLAN 04/1112012 ATTACHMENT E RAND Parking Utilization Data — February to May 2012 Electronic version of attachment is not available for review. Document is available for review at the City Clerk's office and the Libraries. 14 830 747 664 581 498 415 332 249 166 83 0 7:00 AM 8:00 AM 9:00 AM 10:00AM 11:00AM 12:00 PM 1:00 PM 2:00 PM 3:00 PM 4:00 PM 5:00 PM 6:00 PM MSB Parking Utilization (February 20, 2012 - May 17, 2012) 0 RAND ATTACHMENT F Distribution Map of RAND employees Electronic version of attachment is not available for review. Document is available for review at the City Clerk's office and the Libraries. 15 ATTACHMENT G Map of Metro Light Rail — Phases I and 11 Electronic version of attachment is not available for review. Document is available for review at the City Clerk's office and the Libraries.