sr-012412-8aCity of City Council Report
Santa Monica'
City Council Meeting: January 24, 2012
Agenda Item: V
To: Mayor and City Council
From: David Martin, Director, Planning and Community Development
Subject: Annual Development Agreement Compliance Review
Recommended Action
Staff recommends that the City Council:
1) Review the status of Development Agreement compliance
2) Determine good faith compliance for those that are in compliance
Executive Summary
This report provides an annual summary of the status of compliance for each of the 20
Development Agreements that are currently in effect and subject to annual compliance
report submittals, and provides in response to Council direction, a summary of
Transportation Demand Management (TDM) Program measures that have been
incorporated in newly- approved or amended Development Agreements since 2010 in
conjunction with the City's Land Use and Circulation Element (LUCE) implementation.
Council reviewed the status of Development Agreement compliance most recently at its
May 11, 2010, September 28, 2010, and January 25, 2011 meetings. This year's
summary includes review of all 12 previously- constructed projects, two projects that are
currently under construction, and the status of the remaining six Agreements where
construction has not yet commenced.
Based on staffs review of each of the 12 projects already built and the annual reports
submitted by the developers or successors in interest to demonstrate good faith
compliance, it has been determined that all of these Agreements are in full compliance.
Staff will continue its ongoing and annual review of compliance reports for each
Agreement submitted by the developers, or successors in interest, to demonstrate good
faith compliance. The next annual report to Council for all Development Agreements
subject to annual compliance reporting is scheduled for January 2013. This review will
again include all 12 previously- constructed projects and any new Agreements where
construction has commenced or recently completed, as well as a summary of TDM
Program measures that have been incorporated in any new Agreements.
Background
Chapter 9.48 of the Municipal Code establishes the processes and requirements for the
City to enter into a Development Agreement. One of the provisions is annual review by
the City Council of each approved Development Agreement to determine good faith
compliance with the terms and conditions of the Agreements. Since the passage of this
ordinance in 1982, 20 Development Agreements have been enacted. Each
Development Agreement contains unique time frames, obligations, and requirements.
The obligations can be one -time or ongoing; some are fees, some are actual physical
improvements, and some are ongoing services. The 20 Development Agreements
monitored by the Planning and Community Development Department are listed below
and include six Agreements where construction has not yet commenced.
�—
-
f
f
f
Development
Full Compliance
Working to Achieve
Untler
Construction Has Not
Agreements (20)
(12)
Full Compliance (0)
Construction (2)
Commenced (6)
Partnership
I f
I
- - --
f -
C plian<e not
(Sheraton Delfina) (1983)
requlmd at this time
I Rand (z0oo>
(Yaho o
Lantana East (2004)
1
f
F
Paseo Del Mar (issz)
I 1
( - 1
I Hill Street Partners III (zoos)
National Medical Enterprise
-
f
f
f
(Viacom)
Santa Monica College
Bayview CA Unlimited
Parking & Pool
_
Partnership
I f
I
- - --
f -
Saint John's Health Center
(Sheraton Delfina) (1983)
Arboretum (1987)
F
1
Santa Monica College
Parking & Pool
Ma uire Thomas isso
s O
I f
I
- - --
f -
Saint John's Health Center
I Rand (z0oo>
Lantana East (2004)
1
f
F
Lantana South (2004)
I 1
( - 1
I Hill Street Partners III (zoos)
( I
_
I The Village (2008)
r
�
_
- r
Saint Monica's Catholic
__ --_ --
Community (zmo).•
Agensys (zmoi..
- -- - - -- - - -- - ----- ____ - - ----
00lorado Creative Studios
( 702 Arizona Avenue (2011) -
13177hStre4t (2011)—
( 401 Broadway (2o11)- (—
** Development Agreements with Transportation Demand Management Program measures summarized in this report.
K
As explained in the compliance report submitted to Council on May 11 and September
28, 2010 and January 25, 2011, there are also five very early Development
Agreements:
• Lincoln Property /Phase II of the Ocean Park Redevelopment Area
• 1426 California Avenue
• 2823 -2825 Santa Monica Boulevard
• 10404 th Street (Dorchester)
O 701 Santa Monica Boulevard
In general, these early Development Agreements required certain street improvements
and, in some cases, the payment of fees. For example, the Agreement for 701 Santa
Monica Boulevard required the payment of an Arts and Social Service Fee and an In-
Lieu Housing Fee. Such fee obligations were satisfied when the projects were
completed. Thus, compliance and monitoring have not, in general, been an issue.
However, in one case, the Dorchester, ongoing affordability obligations were imposed
by contract and recorded against the property. All but four of the owners are in
compliance with the affordability restriction. The City is litigating against two of these
owners who are not in compliance; the other two owners, who purchased without
knowledge of the restriction, are cooperating with the City in the litigation.
Discussion
As noted above, as a result, of staff's review of all 20 Development Agreements subject
to compliance reporting, all 12 previously- constructed projects have been determined to
be in full compliance. Below is a summary of all Agreements where annual compliance
reports have been submitted for the current review period, and a brief status update on
the two projects under construction and six Agreements where construction has not yet
commenced. Following this discussion is a summary of Transportation Demand
Management Program measures that have been incorporated in the eight Development
Agreements that have been amended or newly- approved since 2010, consistent with
the City's implementation of the LUCE transportation strategy to reduce single -
occupancy vehicle trips and increase use of alternative means of transportation.
3
Recommend Finding of Good Faith Compliance
Colorado Place I & II (Yahoo Center)
2600 -2800 Colorado Avenue
Agreement Effective: 10/27/1981
Expires: 9/15/2036
Amended:
4/1984; 7/1984; 5/1985; 12/1987; 6/2011
Reporting Period: 10/27/2010 to 10/27/2011
Full Compliance Confirmed
The project was approved for approximately 900,000 SF of office uses along with a
daycare center, park, health club, food services and community rooms. Building heights
range from 65' to 80'. On -site parking structures currently contain 3,085 parking spaces.
Community Benefits Summary
• Child care center (Hill `N Dale)
• Public park with tennis courts, children's play structure, basketball court, and
public gathering space
• 51 units of affordable housing which per an agreement between the City Housing
Authority and the County, are monitored by the County and a contribution of
$2,652,909 to the City's Affordable Housing fund
• Community rooms open to the public and available free of charge for community
& neighborhood groups
• Nearly $3 million worth of art and social service benefits through Park &
Community room maintenance
• TDM Program (enhanced by Amendment No. 5)
• Off -site traffic signal, street lighting, and turn lane improvements
Status of Compliance
The required annual compliance report was received on October 27, 2011. The property
owner is in full compliance with all Development Agreement fee payments and public
benefits associated with requirements in effect during the 2010 -2011 reporting period.
Amendment No. 5 to the Development Agreement that permits leasing of up to 1,053
a
underutilized spaces to off -site parties with the requirement to implement an enhanced
Transportation Demand Management Program was approved by Council on June 28,
2011 and the amendment was fully executed on October 31, 2011. Staff is proactively
reviewing and monitoring the new requirements associated with the Amendment.
Staff's review of compliance with these new requirements will be presented to Council in
January 2013.
Paseo Del Mar
1541 Ocean Avenue
Agreement Effective: 1/26/1982
Expires: 10/112031
Reporting Period: 1/26/2010 to 1/26/2011
Full Compliance Confirmed
X50
O
The project consists of approximately 54,000 SF in two buildings ranging in height from
28 to 36 feet. Uses include restaurant, office, retail, and 10 units of low, median, and
moderate income housing. The subterranean parking garage contains 72 spaces.
Community Benefits Summary
6 10 deed - restricted affordable housing units at a prime oceanfront location
$75,000 Art and Social Service fee or in -kind provision of art on -site
Y Parking, Carpool, and Transit Incentive Program
Status of Compliance
The required annual compliance report was received on June 6, 2011. Planning and
Housing and Economic Development staff reviewed the annual compliance report for
the 2010 -2011 reporting period and verified that the property owner is in full compliance
with Agreement requirements, including the new art installation in the courtyard and
provision of additional bicycle parking on site.
3
National Medical Enterprise (Viacom)
2700 Colorado Avenue
Agreement Effective: 4/16/1982
Expires: 4/16/2037
Amended: 1/1987; 4/1987; 5/1988
Reporting Period: 4/1612010 to 4/16/2011
Full Compliance Confirmed
a�y�
Cn4
?�jc
r
�FaP
r�
.e�
n
tips
The project consists of a 5 -story, 312,000 square foot building with creative offices. The
site also contains a child care center, a public park, and a 1,000 space subterranean
parking garage.
Community Benefits Summary
• Provision of 30 affordable rental units, later amended to require the payment of a
$1,500,000 in lieu fee
• On -site child care center
• Payment of $25,000 to Santa Monica Arts Foundation
• Park of approximately 7,200 square feet to be open to the public during
reasonable hours
Status of Compliance
The required annual compliance report was received on March 24, 2011. Staff has
verified compliance with all Development Agreement requirements for the 2010 -2011
reporting period. In addition, the City has requested that the child care facility revise its
application and enhance its outreach efforts during the current 2011 -2012 reporting
period to ensure the facility continues to provide child care programming that meets the
needs of priority children. Accordingly, staff's final review of the Agreement indicates
that the project is in full compliance with all requirements.
E
Bavview CA Unlimited Partnership
(Sheraton Delfina Hotel
530 Pico Boulevard
Agreement Effective: 6/29/1983
Expires: 12/1/2022
Reporting period: 6/29/2010 to 6/2912011
Full Compliance Confirmed
This Agreement allowed for the 72,400 square foot expansion of an existing Holiday Inn
hotel. The development included the addition of 134 hotel rooms and 282 parking
spaces. The hotel is currently operated by the Sheraton Delfina.
Community Benefits Summary
• Hiring priority to Ocean Park and Pico neighborhood residents, and then to other
City residents
• Job Training Program, with priority given to Santa Monica High School Students
and City residents (requirement expired in 2011)
• Hotel Room Voucher Program (this requirement expired in 1996)
• Free Hotel Parking with sign denoting this in parking area
• Valet parking tipping prohibition with sign denoting this in parking area
• Relocation of on -site, rent - controlled apartment buildings (five of these units were
subsequently converted through the TORCA process)
• $50,000 annual contribution to the Big Blue Bus for the Tide Shuttle operation
(expired in 2011)
• Six rent controlled units added to the existing building at 1920 6th Street
• Installation of public art piece approved by the Arts Commission
Status of Compliance
The required annual compliance report was received on July 20, 2011. Staff has
reviewed the annual report and determined that the property owner is in full compliance
with all reporting year requirements, including provisions addressing operational
requirements, community benefits, and fees.
7
As noted in staff's last report to Council, the City will continue to monitor the hotel's
compliance with Agreement hiring program provisions. The Agreement specifies a
number of outreach and advertising requirements to assist in the recruitment of local
residents for available jobs at the hotel. The Agreement also states that "the Project
Owners' goal shall be to have City residents (particularly Neighborhood Residents)
constitute not less than 80% of the Sheraton Delfina's employees...." The Agreement
does not mandate that 80% of the hotel workforce be City residents; rather this
percentage is identified as the property owners' goal with respect to hiring of new
employees.
There are currently 176 employees of the hotel; 12 employees are Santa Monica
residents. During the reporting year, the hotel has continued its commitment to both its
Job Training Program and local employment recruitment goal through partnerships and
outreach with organizations such as Santa Monica High School, Santa Monica College,
the Art Institute of California (Culinary School), Pico Youth and Family Center, and the
Santa Monica Chamber of Commerce. The City will continue to work with hotel
management over the next reporting period to assess whether increased local hiring
can be achieved through more targeted local recruitment efforts, building upon the
hotel's active local recruitment program..
Arboretum (Previously Colorado Place III)
2000 Colorado Avenue
Agreement Effective: 12/16/1987
Expires: 1/11/2042
Amended: 12/1988; 2/1995
Reporting Period: 12/1612010 to 12/1612011
Full Compliance Confirmed
��
aE
CF�p
4�
\YP
This Development Agreement involves the construction of Phase III of Colorado Place,
a 12.7 acre parcel located on Colorado Avenue. The Agreement initially allowed for the
construction of 1,040,490 square feet of floor area, with a Floor Area Ratio of 1.85, and
9
allowed 25,000 square feet of restaurant space, 10,000 square feet of retail, 35,000
square feet medical office, 20,000 square feet for banks, up to 720,490 square feet for
commercial office space, a 270,000 square foot hotel, and 60,000 square feet for a
health club. However, subsequent modifications to the Development Agreement
removed the hotel as a permitted use, and allowed for a general market/grocery use
(not to exceed 50,000 square feet), and multi - family residential development with some
affordable units.
Community Benefits Summary
• TDM Program/Traffic Emission Abatement Program
• $721,318 Housing Parks Mitigation Fee
• $5,000,000 Traffic Improvement Fee
• On -site art installation
$250,000 child care contribution
Status of Compliance
The property owner's annual compliance report was submitted on December 5, 2011.
The City's Housing Division continues its on -going work with the property owner to
ensure compliance with the Development Agreement's affordable housing
requirements. After reviewing the remaining Agreement terms, all of the supporting
documentation provided to the City, and conducting a site visit to confirm that alcohol
display at the grocery store is less than 950 linear feet per their floor plan, staff has
determined that the Arboretum is in full compliance with Development Agreement fee
payments, remaining public benefits, and operational requirements.
Water Garden
1620 26th Street & 2425 Olympic Boulevard
Agreement Effective: 3123/1988
Expires: 3/23/2043
Reporting Period: 3/23/2010 to 3/23/2011
Full Compliance Confirmed
I
A
z
h
The project was constructed in two phases and consists of four, six -story buildings,
totaling approximately 1,259,577 SF. The development contains commercial office,
medical office, retail space, restaurants, health club, child care facility, and
subterranean parking for 4,035 vehicles.
space area and man -made lake.
Community Benefits Summary
The development also includes an open
• $3,811,307 Housing and Parks Mitigation Fee payment
• On -site child care facility for 54 children
• TDM Program submitted annually to the City
Y $6,408,486 Traffic Improvement Fee payment
• Annual preferential Parking District fee payment to cover permit and district
administration costs
• $150,000 fee payment to the Santa Monica Arts Foundation
• $300,000 fee payment to the City for homeless services
Status of Compliance
After reviewing the Agreement terms, all of the supporting documentation provided to
the City on May 9, 2011, staff has determined that the Water Garden is in full
compliance with all Development Agreement fee payments, public benefits, and
operational requirements.
Santa Monica College
Parking and Community Pool
1900 Pico Boulevard
Agreement Effective: 11114/1989
Expires12 /31/2014
Amended /Restated: 1/1999; 12/2000
Reporting Period: 11/14/2010 to 11/14/2011
Full Compliance Confirmed
10
This Development Agreement covers specific locations on the Santa Monica College
Campus, including 3 parking structures (A, B and C) and the Municipal Swimming Pool,
which is located on the northwest side of the campus.
The Municipal Pool Facility is a 28' tall building surrounded by an 18' sound wall.
Parking Structure B, with a total of 486 spaces, was approved for a maximum height of
30' and 165,000 square feet of gross floor area. The restated agreement lists parking
structures A and C as completed prior to the restatement, and are no longer included in
the Development Agreement terms.
The original Development Agreement between the City and the District was entered into
on November 14, 1989. Due to damage sustained in the Northridge earthquake, the
agreement was revised on January 12, 1999, to relocate a damaged parking structure
and rebuild the Municipal Pool Facility in its place.
Community Benefits Summary
• Santa Monica Swim Center, a first class recreational facility open to the public
with guaranteed parking availability at peak hours
• Improved circulation for neighborhood, with relocated traffic signals and 16th
Street parking structure rebuilt as exit only with right turn toward Pico Boulevard
• Earthquake- damaged parking structures replaced to meet needs of college
community and to reduce impacts on neighborhood
Status of Compliance
The required annual compliance report was received by staff on August 10, 2011. A
Joint Operating Agreement between the City and the Community College District
regulates parking for pool users as well as hours of operation, staffing requirements,
and maintenance. The property owner is in full compliance with all Development
Agreement community benefits and operational requirements.
11
Maguire Thomas
1733 Ocean Avenue
Agreement Effective: 10/18/1990
Expires: 10/18/2045
Amended: 12/1995
Reporting Period: 10/18/2010 to 10/18/2011
Full Compliance Confirmed
This Agreement authorizes construction of a four -story, 56 foot tall commercial
development. It allows for a 68,040 square foot building, including a maximum 5,983
square foot/250 seat restaurant and a maximum of 8,040 square feet of retail space.
Three levels of subterranean parking provide 267 parking spaces.
Community Benefits Summary
• $250,000 contribution to the Civic Center /Oceanfront Improvement Special Fund
• $403,399 Housing and Parks Impact Mitigation Fee
• $820,85.4 Affordable Lodging Mitigation Fee
Status of Compliance
City staff received the annual Development Agreement Monitoring Report from the
property owner on July 28, 2011. Based on staff's review of the Agreement and a site
visit, the property remains in full compliance with the provisions of its Development
Agreement.
Saint John's Health Center
1328 22nd Street
Agreement Effective: 6/9/1998
Amended: 7/12/2011
Expires: 6/912053
Reporting Period: 7/1/2010 to 7/1/2011
Full Compliance Confirmed
12
As amended in July 2011, the Saint John's Health Center Development Agreement
grants approval for construction of new hospital facilities that would occur in two
phases. Phase I consists of vested rights for the construction of a new 475,000 square
foot hospital:
• Below -grade central plant
• Inpatient Center (205,000 SF & maximum height of 75 feet)
• Outpatient and Diagnostic & Treatment Center (265,000 SF & maximum height
of 58 feet) with ambulance entrance and North Lawn
• Provide on- and off -site parking to meet peak facility demand and construct an
Entry Plaza on Santa Monica Boulevard
Phase II has a 17 -year vested rights term, subject to extension, to implement a health
center master plan with sufficient floor area for health care - related uses and parking as
outlined in the Agreement; the City retains broad discretion to review future applications
for Phase II buildings. Key components include:
• Permit construction of up to 799,000 square feet of hospital and hospital - related
development with maximum building heights ranging from 70 -95 feet
• Requires approval of a South Campus Master Plan prior to approval of any
Phase II buildings
• Development Review Application required for Phase II buildings
• CEQA determination /review required for Phase II buildings
Community Benefits Summary
• Community Benefit Program and Annual Plan: Program to support the health
and well -being of Santa Monica residents and community; the annual plan
summarizes benefits provided and economic valuation.
Calendar year 2010: Saint John's Health Center provided services and cash
support equal to $8,145,814 plus an additional $22,045,899 in unreimbursed
Medicare costs.
Based on the past three years of community benefit data self - reported from non-
profit Catholic hospitals throughout the state to California's Office of Statewide
Health Planning and Development (OSHPD), the median dollar value of
community benefits provided by these facilities was $30,931,478. Saint John's
Health Center reported an average of $31,325,774 over the same three years, a
13
value that exceeds the median value of benefits provided by other non- profit
Catholic general acute hospitals that self - reported data to OSHPD.
• Santa Monica Community Access Plan: A component of the annual
Community Benefit Program requiring the following health service activities:
• In -kind and cash support to local non - profit agencies that service Santa
Monica residents and to the Santa Monica Malibu Unified School District
• Charitable medical and mental health services provided to patients that are
clients of and directly referred by local non - profit organizations
• Charitable medical and mental health services provided to patients that are
students and directly referred by the School District
• Free community services available to the general Santa Monica community
that promote health education and preventative health services
Annual minimum level of support: $732,000 dollar value subject to 1.5%
compounded annual adjustment ($875,192 required for calendar year 2010).
Saint John's Health Center provided health services valued at $5,259,235 during
calendar year 2010 through its Santa Monica Community Access Plan, an
amount that is over five times greater than its 2010 requirement.
• Child Care Program: provide a minimum of 49 full -day child care for employees
and the community; 21 of these spaces must be infant/toddler care
• North Lawn: 41,000 SF public open space, including landscaping and walkways
• Off -site traffic mitigation improvements: payment of a minimum of $332,000
in fees to the City to construct improvements
• Off -site public works improvements: payment of $641,000 in fees to the City
to construct sidewalks, curbs, streetlights, and street paving in the project area
• Transportation Demand Management Program: enhanced by First
Amendment
• Light rail shuttle: 15 -month requirement to operate shuttle to /from Memorial
Park Station (required by First Amendment)
• Off -site transit improvements: $100,000 Contribution for Memorial Park light
rail station upgrades (required by First Amendment)
• Neighborhood protection measures: 11 requirements including establishing a
community Ombudsperson, providing a reduced valet rate for parking 90 minutes
or less, and paying for installation of a crosswalk at 21St StreeVArizona Avenue
(required by First Amendment)
14
Status of Compliance
The required annual compliance report was received on June 24, 2011. Staff has
reviewed the Development Agreement, all of the supporting documentation provided to
the City for the 2010 reporting year, and conducted a site visit during the annual review
period. Based on this review, staff has determined that Saint John's Health Center in full
compliance with the terms and conditions of its Development Agreement.
Staff is also reviewing and monitoring new requirements established by the First
Amendment to the Development Agreement approved in July 2011. Staff has held
periodic meetings and discussions with Saint John's Health Center about Development
Agreement compliance and has conducted a site visit to review the early
implementation of new requirements and neighborhood protection measures. Staff's full
review of compliance with these new terms will be presented to Council in January
2013.
Finally, in response to the issue of neighborhood parking that arose during the First
Amendment hearings in 2011, staff is evaluating the impact, and consistency with the
Municipal Code, of allowing preferential parking permit holders to park at metered
parking spaces adjacent to non - residential properties during meter hours or exclusively
afterhours, and will report back to the Council at a later date.
Rand Corporation
1776 Main Street
Agreement Effective: 11/23/2000
Expires: 11/23/2055
Reporting Period: 11/23/2010 to 11/23/2011
Full Compliance Confirmed
The Rand Corporation Agreement involved the demolition and remediation of the
existing buildings on the 3.7 acre project site located at 1776 Main Street and the
construction of a 308,869 SF headquarters for Rand Corporation. The new five -story,
15
69' tall building houses research - related facilities, management, staff cafeteria, fitness
room, and meeting /conference rooms. Parking is provided in a four - level, 825 -space
subterranean parking garage.
Community Benefits Summary
• Land dedication and construction of Vicente Terrace
• Land dedication for Main Street Circle should this be constructed
• TDM Program implementation
• Policy Analysis Partnership on Childhood Development and Education including
pursuing research funding for early childhood development
• Early Childhood Development Research, including organizing conferences and
maintaining a child policy website, www.promisingpractices.com
f $500,000 contribution to Early Childhood Development Programs /Early Childcare
Education in the Civic Center
Status of Compliance
The required annual compliance report was received by staff on November 14, 2011. A
Minor Modification to the Development Agreement was approved in June 2011 allowing
for the replacement of a pedestrian pathway with a requirement to transfer land to
complete an alternative pedestrian pathway through the Civic Center Village Project,
and the elimination of a condition requiring Rand to offer, for dedication, a portion of the
property necessary to construct the Main Street Traffic Circle. Based on staff's review
of the amended Development Agreement, the property owner is in full compliance with
all required fee payments, public benefits, and operational requirements.
Lantana East
3030 Olympic Boulevard
Agreement Effective: 10/28/2004
Expires: 10/28/2024
Amended: 8/2008
Reporting Period: 10/28/2010 to 10/28/2011
Full Compliance Confirmed
16
Lantana East consists of a 3 -story, 64,105 SF building containing entertainment
production /post - production studio space and a total 433 parking spaces provided in a
subterranean parking garage and surface lot.
Community Benefits Summary
• $356,200 joint use improvement fee for improvements to Edison School, plus
$35,600 paid annually for 5 years (requirement shared with Lantana South)
• $266,650 childcare contribution
• $90,000 arts fee
• New public restrooms at Stewart Park
• Construction of neighborhood traffic protection improvements
Off -site roadway improvements
Status of Compliance
An estoppel certificate was issued in December 2009 and a Certificate of Performance
was fully executed on April 1, 2010. An annual Development Agreement Compliance
Report was submitted on July 20, 2011 for the 2010 -2011 reporting year. Based on
staff's review of the Agreement, the property has been determined to be in full
compliance with all Development Agreement fee payments, public benefits, and
operational requirements.
Lantana South
3131 Exposition Boulevard
Agreement Effective: 10/28/2004
Expires: 10/28/2024
Amended: 8/2008
Reporting Period: 10/28/2010 to 10/28/2011
Full Compliance Confirmed
Lantana South consists of a 3 -story, 130,000 SF building for entertainment
production /post - production studio space with a total of 456 parking spaces located within a
subterranean garage and surface lot.
17
Community Benefits Summary
• $356,200 joint use improvement fee for improvements to Edison School, plus
$35,600 paid annually for five years (requirement shared with Lantana East)
$133,350 childcare contribution
• $60,000 arts fee
• Off -site roadway improvements
Status of Compliance
An estoppel certificate for the property was issued in December 2009. An annual
Development Agreement Compliance Report was submitted in October 2011. As
required by its Development Agreement, the Applicant has implemented neighborhood
traffic protection measures in the neighborhood area bounded by Exposition Boulevard,
Virginia Avenue, Stewart Street, and Centinela Avenue to mitigate potential traffic
generated by the project. Measures included curb extensions with new landscaping,
and wedge- shaped physical barriers at intersections. As part of the process established
by the Development Agreement, the Applicant provided a traffic study with these
measures in place once the Lantana South Building was occupied in order to review the
effectiveness of these measures.
The study compared the projected project traffic identified in the Certified Supplemental
EIR with the actual traffic resulting from the project. In accordance with the Agreement,
a community meeting was held in Fall 2011 to discuss the findings of the study, and to
obtain resident opinion on the traffic measures. As part of the evaluation process
established by the Development Agreement, staff will be reporting to Council with the
study findings and residents' feedback regarding the neighborhood traffic protection
measures implemented for the project. Based on staff's review of property, the
Applicant is in full compliance with all Development Agreement .fee payments, public
benefits, and operational requirements.
18
Projects Under Construction
Saint Monica's Catholic Community
725 California Avenue
Agreement Effective: 5/27/2010
Expires: 5 /27/2030
Project Under Construction
The Saint Monica's Catholic Community Development Agreement consists of
construction of a single -phase Campus Enhancement and Parking Improvement Plan
on St. Monica's property. The project includes the following key components:
• Demolition of existing Pastoral Center
• Construction of a new Community Center (27,500 square feet) with three levels
of subterranean parking (154 parking spaces)
• Construction of a 7,700 square foot, six classroom addition to the High School
East building
• Renovation of the existing auditorium, gymnasium and other facilities
Community Benefits Summary
• TDM Program for students, employees, and parishioners
• Shared Parking allowing neighborhood use of 15 parking spaces located at the
off -site surface parking lot at 1140 7th Street during off -peak hours
Availability of a community meeting space to city departments, community
groups, and nonprofit organizations
• Public use of the Bookstore /Coffee Bar during all operating hours
Status of Construction
The property owner submitted a compliance report on April 18, 2011. At the time of
required report submittal, construction had not commenced. St. Monica's Catholic
Community received, building permits in December 2011 and is commencing
construction. It is anticipated that construction of Phase One will last approximately 12
m
4ti
C�
fly
PAW
�y
C�
The Saint Monica's Catholic Community Development Agreement consists of
construction of a single -phase Campus Enhancement and Parking Improvement Plan
on St. Monica's property. The project includes the following key components:
• Demolition of existing Pastoral Center
• Construction of a new Community Center (27,500 square feet) with three levels
of subterranean parking (154 parking spaces)
• Construction of a 7,700 square foot, six classroom addition to the High School
East building
• Renovation of the existing auditorium, gymnasium and other facilities
Community Benefits Summary
• TDM Program for students, employees, and parishioners
• Shared Parking allowing neighborhood use of 15 parking spaces located at the
off -site surface parking lot at 1140 7th Street during off -peak hours
Availability of a community meeting space to city departments, community
groups, and nonprofit organizations
• Public use of the Bookstore /Coffee Bar during all operating hours
Status of Construction
The property owner submitted a compliance report on April 18, 2011. At the time of
required report submittal, construction had not commenced. St. Monica's Catholic
Community received, building permits in December 2011 and is commencing
construction. It is anticipated that construction of Phase One will last approximately 12
m
months. Staffs review of compliance with terms for the 2011 -2012 reporting year will
be provided to Council in January 2013.
Agensys
1800 Stewart Street
Agreement Effective: 10/28/2010
Expiration: at termination of ground lease
Project Under Construction
The Agensys Agreement permits a project including the following key components:
• 24,625 square feet for administration offices and entry lobby
• 45,590 square feet for manufacturing of new cancer treatments
• 72,050 square feet for research and development _
• 11,390 square feet of meeting rooms, employee amenities including a cafeteria
open to the public during lunchtime hours
• 5,140 square -feet of publicly accessible open space
• Publicly accessible pedestrian path to allow access to the Bergamot Station site
and future Expo Line light rail station
Surface parking for 200 -220 cars
Community Benefits Summary
• Publicly accessible pedestrian path
• Publicly accessible passive open space along Stewart Street
• Widened sidewalk along Stewart Street
• Cafe open to pedestrians during limited daytime hours
• TDM Program geared to the project site's location within a "Higher Goal" District
designated by the LUCE
• Sculpture garden with up to 10 sculptures adjacent to the pedestrian path
• Local hiring program including a job fair and a local hiring policy
• Student internship program
20
• Student tours
• Signage and way- finding system
• Shared parking for events at Bergamot Station
• Continued community outreach
• Transit contribution toward improved transit infrastructure focused on bicycle
access at the light rail station
Status of Construction
Construction for the project began in Spring 2011. It is anticipated that the facility will
open later in 2012. Staff's review of compliance with terms for the 2011 -2012 reporting
year will be provided to Council in January 2013.
Update on Proiects Not Under Construction
The Village
1725 Ocean Avenue
Agreement Effective: 5/27/2008
Expires: 12/31/2028
Going Through Plan Check Process
Compliance Not Required at this Time
P
ll
:
The Village development provides six residential buildings with approximately 324
residences, and approximately 20,000 square feet of commercial retail on three
separate development sites. The following summarizes key project components:
Site A:
• Two condominium buildings, with ground floor retail on Ocean Avenue
• Olympic Drive and Main Street frontages with approximately 66 residences
• Maximum 65' building height
• 109,346 gross square feet (GSF) of residential and 9,930 GSF of retail uses
• 180 parking spaces
21
Site B:
• Four affordable apartment buildings with ground -floor live /work space
• Approximately 28 one - bedroom, 56 two - bedroom, and 66 three - bedroom units
• 10 affordable units of live /work space intended for artists
• Maximum 60' building height
• 191,549 GSF
• 197 parking spaces
Site C:
• One condominium building with ground floor retail
• Approximately 98 one - bedroom and 98 two - bedroom residences
• Maximum 96' building height
• 159,288 GSF of residential and 7,400 GSF of retail uses
• 237 parking spaces
Status of Compliance
The project is currently in the plan check process and it is anticipated that building
permits will be issued in early 2012. Staff's review of compliance with terms for the
2011 -2012 reporting year will be provided to Council in January 2013.
Hill Street Partners III
1333 -1337 Ocean Avenue
Agreement Effective: 6/07/2007
Expires: 6 /07/2027
Compliance Not Required at this Time
1331 OCEAN AVE
i
e
This Development Agreement allows development of a new 73 -room hotel which
includes the adaptive re -use of two designated City Landmark properties. The project
contains a total of approximately 41,810 square feet over a 129 space subterranean
garage. The project includes the demolition of two commercial buildings on the property
and the on -site re- location of the Landmark Victorian building to create a publicly
WA
accessible plaza in the center of the site. Plan check applications for building permits
have not yet been submitted for this project.
Status of Compliance
Since this project has not advanced to issuance of a building permit, public benefits
have yet to be realized and there are no compliance issues to report.
Colorado Creative Studios
2834 Colorado Avenue
Agreement Effective: 9/22/2011
Expires: 9122/2026
Compliance Not Required at this Time
e�
P
PJ�
�s
This Development Agreement authorizes the construction of a four -story, 191,982
square foot mixed -use creative arts /entertainment production building over a three -level
subterranean parking garage with up to 640 parking spaces. The site includes
landscaping and seating areas and the building also features ground floor neighborhood
serving uses.
Community Benefits Summary
• Dedicated 62 -foot wide surface easement for the extension of Pennsylvania
Avenue and construction of roadway, curb, and gutters
• Contribution to Expo station enhancement at Bergamot of approximately
$363,000
• Widened sidewalks along Stewart Street to enhance the pedestrian environment
• Community cafe
• Internships to Santa Monica College students or Santa Monica residents
• Shared parking program
• TDM Program implementation
• Local hiring program for construction - related jobs
23
Status of Compliance
Since this project has not advanced to issuance of a building permit, public benefits
have yet to be realized and there are no compliance issues to report.
702 Arizona Avenue
Agreement Effective: 12/8/2011
Expires: 12 /8/2021
Compliance Not Required at this Time
This Development Agreement authorizes construction of a new, four -story mixed -use
building with approximately 6,276 SF of neighborhood - serving commercial space on the
ground floor, 49 residential units on the upper floors, and two levels of subterranean
parking.
Community Benefits Summary
• TDM Program that includes secure bicycle storage for residents, employees, and
visitors
• $50,000 contribution towards transit infrastructure in the Downtown area
• Infrastructure for potential future installation of electric vehicle charging stations
• Achievement of a minimum LEED Silver certification or a demonstrated
equivalent sustainable design status
Local hiring program
• Urban design features including a small pedestrian courtyard and walkway
Status of Compliance
Since this project has not advanced to issuance of a building permit, public benefits
have yet to be realized and there are no compliance issues to report.
24
1153
JQ
p
J0J
1310
yD�p.
pQ
224
13]2
1316
1l'A
63E
1325 'H�.,.
4GV 1]19
1]31
Illl
1319
1119
IHS
6'lV
This Development Agreement authorizes construction of a new, four -story mixed -use
building with approximately 6,276 SF of neighborhood - serving commercial space on the
ground floor, 49 residential units on the upper floors, and two levels of subterranean
parking.
Community Benefits Summary
• TDM Program that includes secure bicycle storage for residents, employees, and
visitors
• $50,000 contribution towards transit infrastructure in the Downtown area
• Infrastructure for potential future installation of electric vehicle charging stations
• Achievement of a minimum LEED Silver certification or a demonstrated
equivalent sustainable design status
Local hiring program
• Urban design features including a small pedestrian courtyard and walkway
Status of Compliance
Since this project has not advanced to issuance of a building permit, public benefits
have yet to be realized and there are no compliance issues to report.
24
13177 th Street
Agreement Effective: 12/8/2011
Expires: 12/8/2021
Compliance Not Required at this Time
1307
625
1, ll.V
632 1325
62V
131V
3333
1]3V
1]LV
�, I3,V I3A5
This Development Agreement authorizes construction of a new, five -story mixed -use
building with approximately 2,929 SF of neighborhood - serving commercial space on the
ground floor, 57 residential units on the upper floors, and two levels of subterranean
parking.
Community Benefits Summary
• One extra on -site affordable housing unit
• TDM Program that includes secure bicycle storage for residents, employees, and
visitors
Y $50,000 contribution towards transit infrastructure in the Downtown area
Y Infrastructure for potential future installation of electric vehicle charging stations
Achievement of a minimum LEED Silver certification or a demonstrated
equivalent sustainable design status
Local hiring program
• Urban design features including a small pedestrian courtyard and walkway
Status of Compliance
The 1317 7th Street project has not advanced to issuance of a building permit, therefore,
public benefits have yet to be realized and there are no compliance issues to report.
25
3253
Q
]OJypOPP
1310
o
1312
1307
625
1, ll.V
632 1325
62V
131V
3333
1]3V
1]LV
�, I3,V I3A5
This Development Agreement authorizes construction of a new, five -story mixed -use
building with approximately 2,929 SF of neighborhood - serving commercial space on the
ground floor, 57 residential units on the upper floors, and two levels of subterranean
parking.
Community Benefits Summary
• One extra on -site affordable housing unit
• TDM Program that includes secure bicycle storage for residents, employees, and
visitors
Y $50,000 contribution towards transit infrastructure in the Downtown area
Y Infrastructure for potential future installation of electric vehicle charging stations
Achievement of a minimum LEED Silver certification or a demonstrated
equivalent sustainable design status
Local hiring program
• Urban design features including a small pedestrian courtyard and walkway
Status of Compliance
The 1317 7th Street project has not advanced to issuance of a building permit, therefore,
public benefits have yet to be realized and there are no compliance issues to report.
25
401 Broadway
Agreement Effective: February 9, 2012
Expires: February 9, 2022
Compliance Not Required at this Time
1,143 v
rays
A Q
AOb
This Development Agreement was approved by Council on January 10, 2012 and
authorizes construction of a new, five -story mixed -use development project consisting of
56 residential units and 4,159 SF of ground floor commercial space.
Community Benefits Summary
• TDM plan with measures applicable to both the commercial and residential
components of the project
• $125,000 contribution towards transit and circulation infrastructure in the
Downtown area
• Ground floor arcade that enhances the adjacent sidewalks providing additional
space for pedestrians at the street corner
• One on -site affordable housing unit exceeding the minimum five units required
pursuant to the City's Affordable Housing Production Program
• Minimum LEED Silver certification as established by the LEED Rating System or
a demonstrated equivalent sustainable design status
O Roof- mounted photovoltaic solar panels
Local hiring provision to facilitate the employment of local workers during
construction
Status of Compliance
The 401 Broadway project has not advanced to issuance of a building permit, therefore,
public benefits have yet to be realized and there are no compliance issues to report.
Summary of New TDM Program Measures
The following discussion provides, in response to Council's request, a summary of new
Transportation Demand Management Program measures required with new and
26
amended Development Agreements in conjunction with the City's implementation of the
2010 Land Use and Circulation Element.
Since 2010, there have been eight Development Agreements that incorporated new
TDM Programs, including two amendments (Yahoo Center and Saint John's Health
Center) and six newly- executed Agreements (Saint Monica's Catholic Community,
Agensys, Colorado Creative Studios, 702 Arizona Avenue, 1317 7th Street, and 401
Broadway).
Each Development Agreement that has been either amended or newly- adopted since
2010 includes requirements that support the City's transportation strategy and broader
goals of reducing single- occupancy vehicle trips and associated parking demand, and
increasing use of alternative means of transportation including public transit, bicycles,
and walking. A summary of the key requirements imposed for each of these eight
Agreements is provided in the following table:
Summary of TDM Plan Measures Required Since 2010
Development
Average
Bicycle Parking &
Transit
Transportation
SharmployeAgreements
Vehicle
Amenities
Station
Management
Parking
CashouRidership
Fee
Association (TMA)
Facility
Incentives
(AVR)
_
Fahl
-and -
Transit Coordinator
Yahoo Center
• 1. AVR
5
• 117 bicycle
•Establish and
Provides
• Yes
parking spaces
operate facility -wide
shared
• 1.6 AVR
TMA
parking
• Yes
with light
facility
rail
Saint John's
. 1.5-AVR
• 90 bicycle
$100,000
Required
. Co -lead TMA
Utilizes
• Yes
Health Center
-
parking spaces
18 -month
formation in
off -site
•
shuttle
Healthcare District
shared
• Yes
wkh IAiVR
.Shower &locker
operation
parking
rail
• Provide space for
Fund TMA
facility
future bicycle
feasibility study
sharing station
Participate in future
Healthcare District
TMA
Saint -
• 1.5 AVR .
• M bicycle
• Assist in formation
Provides
• Yes
Monica's
parking spaces
of geographic-
shared
Catholic
based TMA if City
parking
,yes
Community
Shower & locker
requires
facility
• Participate in future
geographic -based
TMA
Y.fl
Development
ycle Parking &
Transit
Transportation
Shared
Agreements
enities
Station
Management
Parking
Fee
a
Association (TMA)
Facility
Par�flcipate
Yes
,a king spaces
ic
geogriphic- ase
to share
1.75 AVR
TMA
parking in
Yes
with light
S h,"r 8, locker
future
rail
64 bicycle
$363,200
Participate in future
Provides
Yes
Creative
parking spaces
geographic-based
shared
Studios
1.75 AVIR
TIVIA
parking
Yes
with light
Shower& locker
facility
rail
Provide space for
future bicycle
sharing station
5
_-Participate in future
Pen-nitWcI
yes
Avenue
b 111"dylar
parking spaces
geographic-based
to share
F
ofo,xupancy
TIVIA
parking
Yes
Shower & locker
future
-7
parking spaces
geographic-based
to share
ofoccupancy
TMA
parking in
Yes
Shower& locker
future
U-113-ro—adyvay
b cycle
e
$12-5,060
--Participate 'in future
third yea
rbk
F/a
Public Outreach
The Code requires that that the City provide at least 10 days' notice to the applicant or
successor in interest of the City Council's scheduled meeting to review the
Development Agreement. This notice has been provided.
Next Steps
Staff will continue its ongoing Development Agreement compliance review; reports will
be made tO Council annually iOJanuary.
28
Financial Impacts & Budget Actions
All fees associated with constructed Development Agreements have been paid to date.
The recommendations presented in this report do not have any direct budget or fiscal
impact.
Prepared by: Roxanne Tanemori, AICP, Senior Planner
Approved:
[avid Martin
Director, Planning & Community
Development
ME
Forwarded to Council:
Rod Gould
City Manager