SR 10-11-2011 8ACity of City Council Report
Santa Monica
City Council Meeting: October 11, 2011
Agenda Item: 8A
To: Mayor and City Council
From: David Martin, Director of Planning and Community Development
Subject: Development Review Permit 11DR -002, Conditional Use Permit 11CUP-
007, and Parking Variance 11VAR -011 to allow a new 8,630 square foot
branch library (Pico Branch Library) located at Virginia Avenue Park.
Recommended Action
Staff recommends that the City Council:
1. Approve Development Review Permit 11DR -002
2. Approve Conditional Use Permit 11 CUP -007
3. Approve Parking Variance 11VAR -011
Executive Summary
The proposed Pico Branch Library is the result of an on -going series of public
workshops with the Pico community and its organizations. After the allocation of $1.2.8
million in Redevelopment Funds for the project, City staff and consultants conducted
five public workshops and numerous outreach meetings. This information and input led
to the proposed plan, which consists of a single story, 8,630 square foot building located
in Virginia Avenue Park directly adjacent to the existing Thelma Terry Building. The site
plan has been configured to maintain existing park green space and the existing
number of vendor stalls for the Farmers Market on Saturdays. The library would fulfill
the community's needs for a local library that would provide educational and cultural
programming, and would consist of adult, teen, and children's collections, study rooms,
seating and story areas, and a community meeting room.
Pursuant to Santa Monica Municipal Code (SMMC) Section 9.04.08.58.060, a
Development Review Permit is required for the project, and pursuant to SMMC Section
9.04.08.58.040(c), a Conditional Use Permit is required to allow the operation of a
library in the Designated Park District. A parking variance to allow a waiver of the
parking requirement is proposed since no additional parking spaces would be provided
for the project, pursuant to SMMC Section 9.04.20.10.030(b) which allows the
modification of off - street parking requirements through a variance application.
1
To avoid a conflict of interest under Government Code Section 1090, the Planning
Commission did not review this project.
The following issues should be considered by the City Council in its review of the
proposed project and are addressed in this report:
• Whether the proposed structures are compatible with the subject property and
surrounding neighborhood.
• Whether the proposed library is compatible with the existing land -uses on -site,
and the surrounding land -uses in the neighborhood.
• Whether the proposed parking variance request and Transportation Demand
Management Program mitigates any potential parking impacts.
• Whether the proposed library is consistent with the Land Use and Circulation
Element, Virginia Avenue Park, and surrounding districts.
Background
The Pico community has expressed a long -held desire for a neighborhood library on the
north side of Pico Boulevard. On September 2, 2008, Library staff held a focus group
discussion with community members gathered by the Pico Neighborhood Association at
Virginia Avenue Park. The meeting was designed to explore library service priorities for
the Pico neighborhood and to discuss the advantages and disadvantages of possible
library locations including Edison Language Academy and Virginia Avenue Park. The
findings of that discussion verified the value of adding a library facility and programs that
meet the needs of the culturally diverse Pico neighborhood and a preference for the
Virginia Avenue Park location. In its meeting of September 4, 2008, the Library Board
supported a possible library site in the Pico neighborhood and encouraged continuing
discussion
On September 23 2008, Council directed Public Works and Library staff to investigate
the possibility of locating a new branch of the Santa Monica Public Library in the Pico
neighborhood and to request input from stakeholders and the relevant Boards and
Commissions.
2
Koning Eizenberg Architecture was hired to investigate the feasibility of library siting
locations at Virginia Avenue Park. As part of this planning process, a public workshop
was held at the park's Thelma Terry Building on January 22, 2009. Over 6,100 notices
were mailed to Pico neighborhood residents and businesses inviting their input on Pico
area library service. At this meeting, site options and three schemes for a 7,000 to 7,500
square foot library branch with 25 to 30 additional parking spaces at Virginia Avenue
Park were presented. More than 35 community members attended and commented on
a range of issues, concerns, and general ideas on a Pico neighborhood branch library.
Design concepts were also presented to the Recreation and Parks Commission, which
met on February 19, 2009. The Commission approved a motion to support a Pico area
branch library located in the Virginia Avenue Park Farmers' Market zone, expressing its
concern, however, over the loss of open space as a result of providing additional
parking.
While Koning Eizenberg Architecture evaluated library options at Virginia Avenue Park,
staff surveyed the Pico neighborhood between 20th Street and 30th and from Pico
Boulevard to the 10 Freeway for 25,000 sq. ft. parcels to accommodate a 7,500 square
foot library with parking for 28 -30 cars
On April 28 2009, the City Council held a study session to consider a preferred location
for the Pico Branch Library. The discussion focused on the opportunities and impacts of
locations inside and outside the park, including the opportunity to draw Virginia Avenue
Park users to the library's learning facilities if located in the park, the negative open
space implications of locating the library in the park, the revitalization opportunities of
locating the library along Pico Boulevard outside the park, and the opportunity to
expedite the opening of the library if the park site was selected.
On May 12, 2009, the City Council considered long -term priorities for the expenditure of
Redevelopment Agency funds. To support the Council's consideration, staff estimated
3
that the cost for a branch library in Virginia Avenue Park would be approximately $12.8
million. The budget estimate for constructing the library on a Pico Boulevard site was
$30 million, including site acquisition. The May 12, 2009 Council discussion resulted in
Council's identification of redevelopment funding priorities, including an allocation of
$12.8 million to fund construction of the Pico Neighborhood Library in Virginia Avenue
Park.
Following the Council's action, staff prepared and published a Request for Proposals
soliciting firms to provide design services for the branch library in Virginia Avenue Park.
On February 23, 2010, the design contract was awarded to Koning Eizenberg
Architects.
Starting in Fall 2010 through Spring 2011, the City held five community workshops
which focused on library programming, building location and siting, and schematic
building design. On February 22, 2011, the Council was presented with a schematic
design for the proposed library and directed staff to move forward with the project
design. Finally, on September 27, 2011, the Council was presented with the final
project design and directed staff to move forward with the project. Further details on the
project's public outreach are provided later in this report.
Discussion
The City proposes to construct a new 8,630 SF single -story branch library located within
Virginia Avenue Park. The library would consist of adult and children collections,
popular materials, children's area, public computers, reading areas, group study rooms,
and customer support services. The proposed library operating hours are 12pm to 9pm
Monday- Thursday, and 10am- 5:30pm Friday- Saturday, closed on Sundays.
Additionally, the project would provide improvements such as outdoor shading and
leisurely areas, an amphitheater for small gatherings, and an additional community
room that would further enhance park amenities for visitors. The project would be
2
developed according to LEED Certification Standards and seeks to achieve a silver
rating. A brief summary of the project site location is available in Attachment A.
Building Siting
The library facility is centrally located adjacent to the Thelma Terry Community Center
in an area of the park that is currently underutilized. The project area consists of a
retaining wall with trellis- covered seating that abuts the south wall of the Thelma Terry
building. The proposed building location would have the least amount of impact to the
existing park open space and on the current operations of the Farmers Market held on
Saturdays. As situated, the library building would enhance the existing park venues,
including the Thelma Terry Community Center, the Park Center Building, and the
Farmers Market, and is oriented to provide a visual focal point as viewed from Pico
Boulevard. Furthermore, locating the library to the center of the park would promote
pedestrian walkability of the overall site, and is consistent with the concept of a
neighborhood serving branch library.
The Farmers Market layout consists of 30,000 square feet and 41 vendor market stalls.
With the proposed project, three market vendors would need to be re- located, which
can be accommodated within the vendor area. The proposed building layout would
have the least impact to the market compared to the other locations studied that would
significantly reduce the usable area and the number of vendor stalls.
5
4:
t lf�
Project Design
The proposed library is contemporary in architectural style, and consists of smooth
troweled stucco and concrete exterior finishes. The building is pedestrian- oriented and
includes expansive clear glazing panels along the south, east, and west walls that
provide natural daylight and a visual connection to the park. The strong visual
connections between the interior and exterior spaces enhance the relationship of the
library use with the park. In addition, skylights are designed to provide the interior space
with adequate indirect sunlight. The building includes a dynamic folded -roof design with
large projecting roof overhangs providing shaded areas for library and park visitors.
The south building elevation would be shaded with a fabric canopy structure, providing
additional shading essential for Farmers Market patrons. In addition to these sun -
shading elements, a series of landscape improvements would further activate the areas
surrounding the library facility.
U.
Southeast Elevation
The landscape design includes improvements such as new concrete paving, raised
planters and seat walls for visitors adjacent to the building. An amphitheater with
terraced steps is designed adjacent to the south elevation of the community room that
can accommodate small performances and seating for approximately 15 people. New
trees would be planted around the facility that would provide additional shading for the
area.
In efforts to preserve park space to the east, the 818 square foot community room is
located in a separate building across the 20' -6" fire access lane /pedestrian path.
Although detached from the primary building, the two structures are connected at the
roofline with a wood /steel trellis creating a breezeway for pedestrians. This design
reinforces this existing pedestrian path that links Pico Boulevard with Virginia Avenue.
Separating the community room from the primary building allows the space to function
independently from library operations, including access outside of library hours. The
community room can accommodate groups of approximately 50 persons, and has
operable sliding doors that connect the interior space with the exterior amphitheater.
�I
North Elevation View of Access Lane I Pedestrian Path
Site and Neighborhood Compatibility
The architectural style of the proposed library buildings is consistent with the park
buildings. The folded roof design was influenced by the roof forms on.the existing Park
Center and Patio building, providing design continuity with the existing structures.
Moreover, the single -story library buildings would be consistent and compatible with the
low -scale buildings on -site. As mentioned, the building's expansive clear glazing panels
provide a strong visual connection between the park and library, further enhancing site
and use compatibility. Centralizing the library activity to the center of the site promotes
pedestrian walkability of the park, while also minimizing any potential noise impacts to
adjacent residential properties along Virginia Avenue and Cloverfield Boulevard. As
shown below, the size of the proposed building is designed consistent with the existing
buildings at Virginia Avenue Park.
M
i
f
View From Northwest
The proposed library programming would be consistent with and contribute to the
variety of educational programming currently provided at the park, which include adult
and cultural art classes, fitness and lunch programs, and teen center activities. The
proposed library would include access to books, media, and resources for
youths /adults, and cultural /educational programs. Existing park uses and the proposed
library are complimentary activities that would support the neighborhood vitality and
enhance both the residential neighborhood and Pico business community. It is
anticipated that the branch would be utilized by neighborhood residents who will walk,
bike, or use transit to the site, thereby improving the pedestrian vitality of the nearby
neighborhoods. Moreover, it is anticipated that during a single visit, patrons would
utilize the park for recreation, classes, the library, and the Market. The project would be
consistent with the Land Use and Circulation Element (LUCE) goals of creating
"complete neighborhoods" where all needs of daily life are within walking distances.
Parking Analysis and Variance
Preserving the maximum amount of green space and play area was an important
consideration while determining whether additional parking would be designed for the
0
project. During early stages of site planning, an area adjacent to the overflow parking
area located along Cloverfield Boulevard (utilizing the existing driveway) was
considered that could provide approximately 30 additional parking spaces for library
parking. However, this design would be contrary to the goal of preserving the existing
open green space in the park, resulting in the removal of existing mature trees,
landscaping and pedestrian pathways. Moreover, the LUCE encourages the use of
transportation demand management strategies that emphasize walking, biking, and
transit to reduce vehicular trips when appropriate.
When the Virginia Avenue Park Expansion project was approved in 2002, the parking
requirement was established at 119 on -site parking spaces. Additionally, an overflow
parking area (along Cloverfield Boulevard) that provides 69 spaces, primarily used on
Saturdays during the Farmers Market, was also established for a total of 188 spaces.
Because additional parking beyond this amount is needed during the Farmers Market,
36 off -site parking spaces are secured for Market vendors and overflow patron parking
(at Edison Language Academy). Therefore on Saturdays, a total of 224 parking spaces
are available for park and Farmers Market uses.
Pursuant to City parking code, library parking standards are 1 parking space per 250 SF
of floor area (1/250), therefore 35 on -site parking spaces are required for the library
project. A shared parking arrangement was analyzed that would utilize existing Virginia
Avenue Park parking. Parking demand /occupancy surveys (Attachment F) were
conducted to determine the existing parking demand of the site. Surveys concluded
that both park and library parking demand could be accommodated utilizing the existing
on -site parking, except during the Farmers Market from 10am -2pm and during special
events.
Efforts were made to secure additional off -site parking during peak Farmers Market
hours. City staff identified properties within close proximity to Virginia Avenue Park and
explored possible parking arrangements with property owners. However, additional
10
parking spaces were not identified for lease by the City. Therefore, staff began to
further analyze library parking demand to determine whether the existing Virginia
Avenue Park parking could accommodate the project as suggested by the parking
survey data, using comparable Fairview and Montana neighborhood branch locations
as examples.
Based on a 2011 survey conducted by library staff concerning how visitors arrive to the
Santa Monica Libraries, approximately 65% of Fairview branch visitors stated they drive
to the site, and 62% for the Montana branch. Currently, .the Fairview branch operates at
a 1/645 SF parking rate based on the library square footage and the number of existing
on -site parking spaces (12), while the Montana branch operates at a 1/537 SF parking
rate (14). Although these libraries are currently legally non - conforming to current library
parking standards, the existing on -site and metered street parking accommodates
library parking demand. To staff's knowledge, there are minimal neighborhood parking
concerns or library- related parking impacts associated with these branch locations.
While the parking rates for the Fairview and Montana branches mentioned above are
not entirely reflective of the parking demand of these sites, since visitors also utilize
metered street parking, the parking demand for these neighborhood branch libraries
appears to be less intensive than the 1/250 City parking ratio. This could be attributed
to the limited size of the facilities and that the libraries are neighborhood branches that
serve residents in the immediate area who walk or bike to access the site.
Similar to these branch libraries, the Pico branch would also primarily serve and be
utilized by neighborhood area residents, and due to the project's limited size and
programming, be less frequented by City -wide visitors. It is expected that a
considerable percentage of local area residents will access the library and park facilities
by walking, biking, and use of public transit. It is therefore anticipated that the parking
demand generated by the proposed library would be generally comparable to the
Fairview and Montana branch library demand. However, the Pico branch location is
unique because Virginia Avenue Park consists of multiple activities, in addition to the
11
broad range of commercial activity along Pico Boulevard across from the site. Since the
existing park uses and library uses are complimentary activities, it is anticipated that
visitors would utilize the park for recreation, the library, and the Farmers Market during
single visits, thereby resulting in fewer vehicular trips in the neighborhood and limited
increased demand for parking. Furthermore, although street parking is not exclusive to
park and library patrons, there are a total of 51 metered parking spaces along
Cloverfield and Pico Boulevards adjacent to Virginia Avenue Park that are available for
park, library, Farmers Market, and adjacent commercial business patrons, adding to the
overall parking capacity of the area. Therefore, consistent with the parking demand
data of Virginia Avenue Park as mentioned above, staff believes that both park and
library parking demand could be accommodated utilizing the existing surface parking
lots (119 spaces) during the weekdays and Sundays.
To further help mitigate any potential parking shortages, staff has prepared a
Transportation Demand Management (TDM) program to reduce parking demand that
encourages alternate modes of transportation to the park other than vehicle, and
addresses the peak parking demand and parking shortage during Farmers Market
hours on Saturdays with the implementation of a bike valet service. Staff believes that
the bike valet service, in conjunction with the existing 224 parking spaces available on
Saturdays, would accommodate the park, library, and Market uses. Based on the
existing parking demand of the site and the anticipated parking demand generated by
the proposed library, a waiver of the parking requirement for the project is requested.
The proposed TDM program consists of the following measures
1. Transportation Information Center, including Santa Monica Big Blue Bus Transit
Pass Purchasing: The library shall maintain, for the life of the Project, a
Transportation Information Center ('TIC ") at the facility, providing a public
outreach program that provides public transportation information. In addition, as
a part of the library operations, the library shall provide Santa Monica Big Blue
Bus transit passes available for residents and visitors to purchase at the site.
12
2. Convenient and Secure Bicycle Storage for Employees: Four secured bicycle
parking spaces shall be provided for Virginia Avenue Park or Library employees.
Secure bicycle parking shall mean bicycle lockers or a secure parking area.
3. Employee Shower Facility: An existing unisex shower for staff located in the
Park Center Building shall be available for library employees who bicycle or use
another active means, powered by human propulsion, of getting to the site or
who exercise during the work day.
4. Public Bicycle Parking: Bicycle racks for public use shall contain space for a
minimum of eight bicycles.
5. Bike Valet Program: A bike valet service shall be provided for visitors of the
library and Farmer's Market patrons on Saturdays during market operating hours.
The City's transportation staff is supportive of the proposed Transportation Demand
Management program. The bike valet service on Saturdays would provide" a viable
service encouraging neighborhood residents to use bicycle as an alternate mode of
transportation to the site. Recently, the City provided a bike valet service for VIRGINIA
AVENUE PARK Farmers Market patrons resulting in considerable demand throughout
the day, demonstrating that the service could result in a high percentage of bicyclists to
the site. Furthermore, it is encouraged that library employees (approximately six
employees) do not utilize on -site parking spaces on Saturdays, and that events utilizing
park venues should not be scheduled concurrent with the peak Farmers Market hours in
efforts to maximize the availability of on -site parking spaces for Farmers Market
patrons. Overall, the TDM program would help reduce the peak parking demand
anticipated on Saturdays. Staff has included this proposed TDM program as a condition
of approval (Condition No. 1).
Land Use and Circulation Element (LUCE)
Virginia Avenue Park is located in the Parks and Open Space land use designation,
which intends to provide residents with a visually appealing amenity that provides the
opportunity for healthy recreation. While the LUCE does not expressly discuss public
libraries in depth as part of the objectives and policies for this designation, the use is
13
consistent with other allowed land uses such as community meeting facilities and
auditoriums. Furthermore, it is believed that public libraries are complimentary to
residential neighborhoods provided there are adequate measures in place to help
minimize any potential impacts, such as parking demand. As such, the Zoning
Ordinance requires a Conditional Use Permit (CUP) for such use. The proposed library
is consistent with the LUCE in that the new Pico Branch Library will provide a catalyst to
improve the pedestrian vitality of the nearby neighborhoods and supply a focal point for
the area.
The proposed public library is consistent with the LUCE vision of supporting lifelong
learning through support of parks and open space that will accommodate learning
activities and programs. Furthermore, LUCE Goal CE16.4 encourages improvement of
library facilities, including the planning and development of a library in the Pico
neighborhood area. The LUCE also promotes investment in public buildings and
facilities in the City to preserve and enhance the resources available for the spectrum of
activities that compliment Santa Monica and facilitate lifelong learning. The proposed
public library would be consistent with this vision in that it would provide neighborhood
residents with library services, educational and cultural programing, and additional
community meeting space.
Consistent with LUCE goal T10, the recommended bike valet service would expand the
bike valet program to a community event such as the Farmers Market to ensure that the
bicycle network is attractive to cyclists of all ages and experience levels. The bike valet
would provide a viable service encouraging neighborhood residents to use bicycle as an
alternate mode of transportation to the site on Saturdays.
Environmental Analysis
This request is exempt from the provisions of the California Environmental Quality Act
(CEQA), pursuant to Section 15303 (Class 3), New Construction or Conversion of Small
Structures, of the State Implementation Guidelines in that the project involves new
14
construction not exceeding 10,000 square feet in area and is located in an urbanized
area. The project consists of a public library building that consists of 8,630 square feet.
Public Outreach
City Staff has conducted over 70 public outreach meetings and informational
presentations, ranging in size from personal one -on -one meetings to large public
workshops held at the Thelma Terry Center. Beginning in September 2008 with the
initial meeting with the Pico Neighborhood Association, the Library and Community and
Cultural Services staffs have continually sought input from community groups. In
January of 2009, over 6,000 mailers were distributed announcing the series of
workshops to determine potential sites for the branch library. Following the workshops,
presentations were made to the Virginia Avenue Park Advisory Board and the
Recreation and Parks Commission. Library staff continues to provide information booths
at community and city -wide festivals, including the Unity Resource Festival, Cinco de
Mayo, and Juneteenth celebrations. In May 2010, the library launched a "Pico Branch
Library" website, the content of which included a bilingual survey, project information,
and a contact page.
Library and Architecture Division staff met with the Pico Improvement Organization, the
Pico Neighborhood Association, and the Friends of Sunset Park in August 2010,
presenting project updates and seeking input from the groups. In November 2010, staff
conducted workshops with the Youth Dialogue Cooperative, Semillas College Students,
and Pico Youth Family Center Students to elicit input from younger members of the
community. To further encourage participation in the planning process, bilingual surveys
were published on the City's website, with hard copies available at the Park Center,
Camp Santa Monica, Afro - American Outreach Committee, and at all libraries. Surveys
and notices were also hand delivered to the Edison Language Academy, St. Anne's and
Cavalry Baptist Church, and Grant School.
Concurrent with these meetings, email "blasts" were sent to 1,700 Pico - interest email
accounts containing updates and notification of future workshops. Prior to every public
15
workshop, notices were published in the Santa Monica Daily Press, Surf Santa Monica,
and Santa Monica Mirror. And at the request of community members, workshop notices
were also hand delivered to 5,000 addresses in the Pico neighborhood.
Workshops were held at the Thelma Terry Community Center on September 11th,
October 9th, November 6th, and December 4th of 2010, each progressing from the
information gathered at the previous meeting. The initial workshop focused on the
trends in branch libraries and the possibilities for the Pico Branch. In October, the
results of the survey were discussed, and preferences for the building location were
determined. November and December workshops concentrated on the building form
and programs desired by the community. A final public workshop was held on April 5th,
2011 to present the final schematic design for the facility.
Financial Impacts & Budget Actions
The recommendation presented in this report does not have a budget or fiscal impact.
Prepared by: Steve Mizokami, Associate Planner
Approved:
David Martin
Director, Planning & Community
Development
Forwarded to Council:
Rod Gould
City Manager
16
Attachments
A. Project / Site Location
B. General Plan Conformance & Municipal Code Comparison
C. Draft Statement of Official Action
D. Public Notification
E. Project Plans, Rendering & Photograph Booklet
F. Parking Surveys
17
ATTACHMENT A
PROJECT /SITE INFORMATION
and Site Information Table
Virginia Avenue Park is located on the northwest corner of Cloverfield and Pico
Boulevards within the Designated Park District. The surrounding land uses consist of
retail commercial at the east and west perimeters of the park and across the street
along the south side of Pico Boulevard. Both multi - family and single - family residential
uses are located along the Cloverfield Boulevard, Virginia Avenue, and 21St Street
perimeters. The project will have both pedestrian and vehicle entrances from each
street frontage.
ff]
ATTACHMENT B
GENERAL PLAN AND MUNICIPAL CODE COMPLIANCE WORKSHEET
Proiect Location and Permit Processina Time Limits
Project Address:
2200 Virginia Avenue
Application Filing Date:
June 23, 2011
CEQA Deadline:
September 22, 2011
PSA Deadline:
September 22, 2011
Total Process Review
Time (Days):
109 days.
General Plan and Municipal Code Compliance Worksheet
CATEGORY
LAND USE
ELEMENT
MUNICIPAL CODE
PROJECT
Permitted Use
N/A
Libraries require a
City requests a Conditional
Conditional Use Permit.
Use Permit to allow the
[SMMC 9.04.08.58.040(c)]
establishment of a library
within Virginia Avenue
Park.
Parking Spaces
N/A
Proposed Library:
35 additional off - street
8,690 SF
parking spaces required for
the project.
1 space per 250 SF of
City requests a variance to
waive the number of
area:
parking spaces require for
8,690 SF / 250 = 34.7 OR
the project, and proposes a
35 parking spaces
TDM program to reduce the
parking demand generated
for the proposed library.
19
ATTACHMENT C
DRAFT STATEMENT OF OFFICIAL ACTION
PROJECT INFORAMTION
CASE NUMBERS: Development Review Permit 11 DR -002
Conditional Use Permit 10 -018
Variance 10 -019
LOCATION: 2200 Virginia Avenue
APPLICANT: City of Santa Monica
PROPERTY OWNER: City of Santa Monica
CASE PLANNER: Steve Mizokami, Associate Planner
REQUEST: Development Review Permit 11 DR -002, Conditional Use
Permit 11 CUP -007, and Parking Variance 11VAR -011 to
allow a new 8,630 square foot branch library (Pico
Branch Library) located at Virginia Avenue Park.
CEQA STATUS: This request is exempt from the provisions of the
California Environmental Quality Act (CEQA), pursuant to
Section 15303 (Class 3), New Construction or
Conversion of Small Structures, of the State
Implementation Guidelines in that the project involves
new construction not exceeding 10,000 square feet in
area and is located in an urbanized area. The project
consists of a public library building that consists of 8,630
square feet.
20
CITY COUNCIL ACTION
October 11, 2011
Determination Date
Approved based on the following findings and subject to the
conditions below.
Denied.
Other:
EFFECTIVE DATES OF ACTIONS IF
Not Appealable
NOT APPEALED:
EXPIRATION DATE OF ANY PERMITS
October 11, 2012
GRANTED:
LENGTH OF ANY POSSIBLE
6 months
EXTENSION OF EXPIRATION DATES *:
* Any request for an extension of the expiration date must be received in the City
Planning Division prior to expiration of this permit.
Each and all of the findings and determinations are based on the competent and
substantial evidence, both oral and written, contained in the entire record relating to the
Project. All summaries of information contained herein or in the findings are based on
the substantial evidence in the record. The absence of any particular fact from any
such summary is not an indication that a particular finding is not based in part on that
fact.
FINDINGS:
DEVELOPMENT REVIEW FINDINGS
1. The physical location, size, massing, and placement of proposed structures on
the site and the location of proposed uses within the project are compatible with
and relate harmoniously to surrounding sites and neighborhoods, in that the
single -story library buildings would be consistent and compatible with the size
and scale of the existing single -story buildings on -site at the park. Furthermore,
the low- scaled buildings would be consistent with those of adjacent properties
surrounding the park. The architectural design, proportions, scale, and materials
of the proposed library buildings are consistent with the existing park buildings.
The folded roof design was influenced by the roof designs found on the existing
Park Center and Patio building on -site, providing a design compatibility with the
existing structures. Furthermore, the building's expansive clear glazing panels
would provide a strong visual connection between the library and park. The
project would provide additional shading and leisurely areas, further enhancing
21
the enjoyment of the park for visitors. The building's design establishes a
relationship between the library use and park settings that would further enhance
services for the neighborhood.
2. The rights -of -way can accommodate autos and pedestrians, including parking
and access, in that there are 119 existing on -site parking spaces available at
Virginia Avenue Park with existing access provided along Virginia Avenue and
Pico Boulevard. Furthermore, an additional 69 spaces are available in the
overflow parking area (accessible from Cloverfield Boulevard), primarily used on
Saturdays during the farmers market. No changes to the existing vehicular
access of the site are proposed. Pedestrian access is available along Virginia
Avenue, Pico Boulevard, Cloverfield Boulevard.
3. The health and safety services (police, fire, etc.) and public infrastructure (e.g.
utilities) are sufficient to accommodate the new development, in that the
proposed development is located within an urbanized area that is already
adequately served by existing City infrastructure. No new safety services or
public infrastructure will be required by this project.
4. Any on -site provision of housing or parks and public open space, which are part
of the required project mitigation measures required in Part 9.04.10.12 (Project
Mitigation Measures) of the City of Santa Monica Comprehensive Land Use and
Zoning Ordinance, satisfactorily meet the goals of the mitigation program would
not be applicable considering the proposed project involves the development of a
library facility and does not involve any new office construction.
5. The project is generally consistent with the Municipal Code and General Plan.
Approvals of applications are necessary and therefore with Development Review,
Conditional Use, and Variance approvals, consistency with Zoning Ordinance
requirements will be achieved. Furthermore, it is generally accepted that public
libraries are complimentary to residential neighborhoods provided there are
adequate measures in place to help minimize any potential adverse impacts. As
such, the Zoning Ordinance requires a Conditional Use Permit (CUP) for such
use. The proposed public library is consistent with the LUCE vision of supporting
lifelong learning through support of parks and open space that will accommodate
learning activities and programs. Furthermore, LUCE Goal CE16.4 states to
continue to improve library facilities, including the planning and development of a
library in the Pico neighborhood area.
6. Reasonable mitigation measures have been included for all adverse impacts
identified in the Initial Study or Environmental Impact Report, in that no mitigation
measures have been identified for the project since exempt from the provisions
of the California Environmental Quality Act (CEQA), pursuant to Section 15303
(Class 3), New Construction or Conversion of Small Structures, of the State
22
Implementation Guidelines in that the project involves new construction not
exceeding 10,000 square feet in area and is located in an urbanized area. The
project consists of a public library building that consists of 8,630 square feet.
CONDITIONAL USE PERMIT FINDINGS
1. The proposed use is one conditionally permitted within the subject district and
complies with all of the applicable provisions of the "City of Santa Monica
Comprehensive Land Use and Zoning Ordinance ", in that SMMC Section
9.04.08.58.040(c) provides that uses determined by the Zoning Administrator to
be similar and consistent with those uses specifically permitted or conditionally
permitted may be permitted subject to a Conditional Use Permit. It has been
determined that public libraries can co -exist in a neighborhood as long as there
are adequate measures in place to help minimize any potential adverse impacts.
2. The proposed use would not impair the integrity and character of the district in
which it is to be established or located, in that the library would provide
educational and cultural programming within an existing park that would be
utilized by neighborhood area residents. Moreover, staff believes that the
proposed library use is compatible and harmonious with the surrounding
residential neighborhood. Additionally, its location will enhance the existing
Virginia Avenue Park venues and services.
3. The subject parcel is physically suitable for the type of land use being proposed,
in that the project is proposed within the existing Virginia Avenue Park that is
currently developed to accommodate the proposed library facility.
4. The proposed use is compatible with any of the land uses presently on the
subject parcel if the present land uses are to remain, in that the library use is
consistent and compatible with other park uses such as community meeting
facilities and would contribute to the variety of educational programming currently
provided at the park. Moreover, the proposed library includes services that
appeal to a variety of library and park visitors.
5. The proposed use would be compatible with existing and permissible land uses
within the district and the general area in which the proposed use is to be
located, in that the use is consistent with other allowed land uses such as
community meeting facilities and auditoriums. Moreover, public libraries can co-
exist in a neighborhood as long as there are adequate measures in place to help
minimize any potential adverse impacts. The proposed library is consistent with
the LUCE in that the new branch library will provide a catalyst to improve the
pedestrian vitality of the nearby neighborhoods and supply a focal point for the
area. The facility would provide residents with a visually appealing amenity that
provides the opportunity for healthy recreation.
23
6. There are adequate provisions for water, sanitation, and public utilities and
services to ensure that the proposed use would not be detrimental to public
health and safety, in that the site is located in an urbanized area adequately
served by existing infrastructure.
7. Public access to the proposed use will be adequate, in that pedestrian access is
available from Virginia Avenue and Pico and Cloverfield Boulevards, with
vehicular access to the existing on -site surface parking lots from Virginia Avenue
and Pico Boulevard.
8. The physical location or placement of the use on the site is compatible with and
relates harmoniously to the surrounding neighborhood, in that locating the library
to the center of the park would promote pedestrian walkability of the park, and
also minimize any potential noise /gathering impacts to residential properties
adjacent to the park along Virginia Avenue, 21St Street, and Cloverfield
Boulevard.
9. The proposed use is consistent with the goals, objectives, and policies of the
Land Use and Circulation Element, in that the proposed public library is
consistent with the LUCE vision of supporting lifelong learning through support of
parks and open space that will accommodate learning activities and programs.
Furthermore, LUCE Goal CE16.4 states to continue to improve library facilities,
including the planning and development of a library in the Pico neighborhood
area. The LUCE also states to invest in public buildings and facilities in the City
to preserve and enhance the resources available for the spectrum of activities
that compliment Santa Monica and facilitate lifelong learning. The proposed
public library would be consistent with this vision in that it would provide
neighborhood area residents with library services, educational and cultural
programing, and additional community meeting space.
10. The proposed use would not be detrimental to the public interest, health, safety,
convenience, or general welfare, in that the proposed use is consistent with the
Zoning Ordinance and the Land Use and Circulation Element, and project
conditions have been added to mitigate any potential adverse impacts.
11. The proposed use conforms precisely to the applicable performance standards
contained in Subchapter 9.04.12 and special conditions outlined in Subchapter
9.04.14 of the City of Santa Monica Comprehensive Land Use and Zoning
Ordinance, in that no performance standard permit is required.
12. The proposed use will not result in an over concentration of such uses in the
immediate vicinity, in that the Pico community has expressed a long -held desire
for a neighborhood library on the north side of Pico Boulevard. The project would
24
fulfill the community's needs for a local library that would provide educational and
cultural programming, and additional community meeting space in a park setting
that would enhance the educational services available at Virginia Avenue Park.
VARIANCE FINDINGS
1. There are special circumstances or exceptional characteristics applicable to the
property involved, including size, shape, topography, location, or surroundings, or
to the intended use or development of the property that do not apply to other
properties in the vicinity under an identical zoning classification. Specifically, the
Virginia Avenue Park is currently developed with 119 on -site parking spaces, with
an overflow parking area (along Cloverfield Avenue) providing an additional 69
spaces primarily used on Saturdays during the farmers market. Based on
existing park configurations and conditions, additional code - required parking
cannot be provided on -site without the removal of existing landscaped park open
space which serves as the primary purpose of the neighborhood park. The
project seeks to limit impacts to and maintain the existing park green space.
Given the constraints of the existing park design and developments, combined
with the staff and public opinion to maintain the amount of existing park green
space, the City proposes a waiver of the parking required for the project, and
proposes a Transportation Demand Management program that would reduce the
parking demand generated by the proposed library facility. The TDM program
has been added as Condition No. 1. Additionally, in an effort to manage and
ensure the most efficient use of the on -site parking on Saturdays, it is
encouraged that library staff do not utilize on -site parking on Saturdays
concurrent with the Farmers Market.
2. The granting of such variance will not be detrimental nor injurious to the property
or improvements in the general vicinity and district in which the property is
located in that the proposed TDM program will reduce the employee parking
demand generated by the proposed library facility. The TDM program includes a
Transportation Information Center as a part of the library programming that will
provide residents and visitors with transportation information that will help to
encourage the use of alternate modes of transportation, consistent with the
educational component of the library. In addition, as a part of the library
operations, the library will provide Santa Monica Big Blue Bus transit passes
available for residents and visitors to purchase at the site. Secure bicycle parking
would be provided for library employees, with additional bicycle racks for public
use. Furthermore, to address the parking demand generated on Saturdays from
the Farmers Market, a bike valet service will be provided for library visitors and
market patrons, providing viable convenient and secure bike parking that would
encourage neighborhood residents to use bicycle as an alternate mode of
transportation to the site. Additionally, in an effort to manage and ensure the
most efficient use of the on -site parking on Saturdays, it is encouraged that
25
library staff do not utilize on -site parking on Saturdays concurrent with the
Farmers Market. Moreover, based on parking demand surveys of the existing
parking demand of the park, it is anticipated, with the exception of Saturdays
during Market hours, that both park and library parking demand could be
accommodated utilizing the existing surface parking lots.
3. The strict application of the provisions of this Chapter would result in practical
difficulties or unnecessary hardships, not including economic difficulties or
economic hardships in that opportunity to establish additional code - required
parking spaces on -site are limited based on existing park configurations and
developments without the removal of existing landscaped park open space which
serves as the primary purpose of the neighborhood park. Project goals include
limiting impacts to and maintaining the existing park green space.
4. The granting of a variance will not be contrary to or in conflict with the general
purposes and intent of this Chapter, nor to the goals, objectives, and policies of
the General Plan. Specifically, (reference specific goals /objectives /polices and
demonstrate how the project is consistent with those criteria)
5. The variance would not impair the integrity and character of the district in which it
is to be located in that the proposed TDM program will encourage employees
and visitors to use alternate modes of transit to the site, thereby reducing the
amount of vehicular trips and parking demand within the area. The TDM program
includes a Transportation Information Center as a part of the library programming
that will provide residents and visitors with transportation information that will
help to encourage the use of alternate modes of transportation, consistent with
the educational component of the library. In addition, as a part of the library
operations, the library will provide Santa Monica Big Blue Bus transit passes
available for residents and visitors to purchase at the site. Secure bicycle parking
would be provided for library employees, with additional bicycle racks for public
use. Furthermore, to address the parking demand generated on Saturdays from
the Farmers Market, a bike valet service would be provided for library visitors and
market patrons, providing viable convenient and secure bike parking that would
encourage neighborhood residents to use bicycle as an alternate mode of
transportation to the site.
6. The subject site is physically suitable for the proposed variance in that in that
there are 119 existing on -site parking spaces available at Virginia Avenue Park
with existing access provided along Virginia Avenue and Pico Boulevard.
Furthermore, an additional 69 spaces are available in the overflow parking area
(accessible from Cloverfield Boulevard), primarily used on Saturdays during the
farmers market. No changes to the existing vehicular access of the site are
proposed. Pedestrian access is available along Virginia Avenue, Pico Boulevard,
Cloverfield Boulevard.
26
7. There are adequate provisions for water, sanitation, and public utilities and
services to ensure that the proposed variance would not be detrimental to public
health and safety in that the subject property is located within a developed
urbanized environment that is adequately served by existing infrastructure, public
utilities and services. It is not anticipated that approval of the subject application
will create a need for additional utilities or services.
8. There will be adequate provisions for public access to serve the subject variance
proposal in that pedestrian access is currently available from Virginia Avenue
and Pico and Cloverfield Boulevards, with vehicular access to the existing on -site
surface parking lots from Virginia Avenue and Pico Boulevard. No changes to the
existing vehicular or pedestrian access of the site are proposed.
9. For the reduction of the automobile parking space requirements, the reduction is
based and conditioned upon an approved parking reduction plan that
incorporates transportation control measures that have been demonstrated to be
effective in reducing parking needs and that are monitored, periodically reviewed
for continued effectiveness, and enforced by the City as contained in Section
9.04.10.08.050 of this Chapter. The proposed TDM program will reduce the
employee parking demand generated by the proposed library facility.
Specifically, the TDM program includes a Transportation Information Center as a
part of the library programming that will provide residents and visitors with
transportation information that will help to encourage the use of alternate modes
of transportation, consistent with the educational component of the library. In
addition, as a part of the library operations, the library shall provide Santa Monica
Big Blue Bus transit passes available for residents and visitors to purchase at the
site. Four (4) secure bicycle parking would be provided for library employees,
with a minimum of eight (8) additional bicycle spaces for public use.
Furthermore, to address the parking demand generated on Saturdays from the
Farmers Market, a bike valet service would be provided for library visitors and
market patrons, providing viable convenient and secure bike parking that would
encourage neighborhood residents to use bicycle as an alternate mode of
transportation to the site. Furthermore, in an effort to manage and ensure the
most efficient use of the on -site parking on Saturdays, it is encouraged that
library staff shall not utilize on -site parking on Saturdays concurrent with the
Farmers Market. The TDM program has been added as Condition No. 1.
10. The strict application of the provisions of this Chapter would result in
unreasonable deprivation of the use or enjoyment of the property in that due to
existing parcel constraints, the location of existing improvements, and /or the
placement of adjacent uses, practical use or enjoyment of the subject parcel
would not be possible due to the inability to provide the additional parking spaces
required on -site by the proposed library facility that is a compatible use within the
27
district.
CONDITIONS OF APPROVAL:
PLANNING AND COMMUNITY DEVELOPMENT
Project Specific Conditions
1. As a part of a parking reduction plan for the project, the proposed TDM program
shall consist of the following measures:
1. Transportation Information Center, including Santa Monica Big Blue Bus
Transit Pass Purchasing: The library shall maintain, for the life of the
Project, a Transportation Information Center ( "TIC ") at the facility,
providing a public outreach program that provides public transportation
information. In addition, as a part of the library operations, the library shall
provide Santa Monica Big Blue Bus transit passes available for residents
and visitors to purchase at the site. The TIC shall include information
such as current maps, routes, fare information, and schedules for public
transit routes serving the site, bicycle routes, local maps, and bicycle
safety information.
2. Convenient and Secure Bicycle Storage for Employees: Four secured
bicycle parking spaces shall be provided for Virginia Avenue Park or
library employees. Secure bicycle parking shall mean bicycle lockers or a
secure parking area.
3. Employee Shower Facility: An existing unisex shower for staff located in
the Park Center Building shall be available for library employees who
bicycle or use another active means, powered by human propulsion, of
getting to the site or who exercise during the work day.
4. Public Bicycle Parking_ Bicycle racks for public use shall contain space for
a minimum of eight bicycles.
5. Bike Valet Program: A bike valet service shall be provided for visitors of
the library and Farmers Market patrons on Saturdays during market
operating hours.
Administrative
2. The City Council's approval, conditions of approval, or denial of this application
W
may not be appealed. The approval of this permit shall expire if the rights
granted are not exercised within from the permit's effective date. Exercise of
rights shall mean issuance of a building permit to commence construction.
3. Within ten days of City Planning Division transmittal of the Statement of Official
Action, project applicant shall sign and return a copy of the Statement of Official
Action prepared by the City Planning Division, agreeing to the conditions of
approval and acknowledging that failure to comply with such conditions shall
constitute grounds for potential revocation of the permit approval. By signing
same, applicant shall not thereby waive any legal rights applicant may possess
regarding said conditions. The signed Statement shall be returned to the City
Planning Division. Failure to comply with this condition shall constitute grounds
for potential permit revocation.
4. Within thirty (30) days after final approval of the project, a sign shall be posted on
site stating the date and nature of the approval. The sign shall be posted in
accordance with the Zoning Administrator guidelines and shall remain in place .
until a building permit is issued for the project. The sign shall be removed
promptly when a building permit is issued for the project or upon expiration of the
Design Compatibility Permit.
5. Prior to issuance of a Certificate of Occupancy, the applicant shall post a notice
at the building entry stating that the site is regulated by a Conditional Use Permit
and the Statement of Official Action, which includes the establishment's
conditions of approval, is available upon request. This notice shall remain posted
at all times the establishment is in operation.
6. In the event permittee violates or fails to comply with any conditions of approval
of this permit, no further permits, licenses, approvals or certificates of occupancy
shall be issued until such violation has been fully remedied.
Conformance with Approved Plans
7. This approval is for those plans dated October 11, 2011, a copy of which shall be
maintained in the files of the City Planning Division. Project development shall
be consistent with such plans, except as otherwise specified in these conditions
of approval.
8. Minor amendments to the plans shall be subject to approval by the Director of
Planning. A significant change in the approved concept shall be subject to City
Council Review. Construction shall be in conformance with the plans submitted
or as modified by the City Council, Architectural Review Board or Director of
Planning.
29
9. Project plans shall be subject to complete Code Compliance review when the
building plans are submitted for plan check and shall comply with all applicable
provisions of Article IX of the Municipal Code and all other pertinent ordinances
and General Plan policies of the City of Santa Monica prior to building permit
issuance.
Cultural Resources
10. If any archaeological remains are uncovered during excavation or construction,
work in the affected area shall be suspended and a recognized specialist shall be
contacted to conduct a survey of the affected area at project's owner's expense.
A determination shall then be made by the Director of Planning to determine the
significance of the survey findings and appropriate actions and requirements, if
any, to address such findings.
Project Operations
11. The operation shall at all times be conducted in a manner not detrimental to
surrounding properties or residents by reason of lights, noise, activities, parking
or other actions.
12. The project shall at all times comply with the provisions of the Noise Ordinance
(SMMC Chapter 4.12).
Final Design
13. Plans for final design, landscaping, screening, trash enclosures, and signage
shall be subject to review and approval by the Architectural Review Board.
14. The Architectural Review Board, in its review, shall pay particular attention to the
project's pedestrian orientation and amenities; scale and articulation of design
elements; exterior colors, textures and materials; window treatment; glazing; and
landscaping.
15. The existing mature trees shall be preserved in their present location on site,
relocated to a specific location on site or replaced with specimen trees to the
satisfaction of the Architectural Review Board.
16. Landscaping plans shall comply with Subchapter 9.04.10.04 (Landscaping
Standards) of the Zoning Ordinance including use of water- conserving
landscaping materials, landscape maintenance and other standards contained in
the Subchapter.
30
17. Refuse areas, storage areas and mechanical equipment shall be screened in
accordance with SMMC Section 9.04.10.02.130, 140, and 150. Refuse areas
shall be of a size adequate to meet on -site need, including recycling. The
Architectural Review Board in its review shall pay particular attention to the
screening of such areas and equipment. Any rooftop mechanical equipment
shall be minimized in height and area, and shall be located in such a way as to
minimize noise and visual impacts to surrounding properties. 'Unless otherwise
approved by the Architectural Review Board, rooftop mechanical equipment shall
be located at least five feet from the edge of the roof. Except for solar hot water
heaters, no residential water heaters shall be located on the roof.
18. No gas or electric meters shall be located within the required front or street side
yard setback areas. The Architectural Review Board in its review shall pay
particular attention to the location and screening of such meters.
19. Prior to consideration of the project by the Architectural Review Board, the
applicant shall review disabled access requirements with the Building and Safety
Division and make any necessary changes in the project design to achieve
compliance with such requirements. The Architectural Review Board, in its
review, shall pay particular attention to the aesthetic, landscaping, and setback
impacts of any ramps or other features necessitated by accessibility
requirements.
20. As appropriate, the Architectural Review Board shall require the use of anti -
graffiti materials on surfaces likely to attract graffiti.
Construction Plan Requirements
21. During demolition, excavation, and construction, this project shall comply with
SCAQMD Rule 403 to minimize fugitive dust and associated particulate
emission, including but not limited to the following:
• All material excavated or graded shall be sufficiently watered to
prevent excessive amounts of dust. Watering shall occur at least three
times daily with complete coverage, preferably at the start of the day,
in the late morning, and after work is done for the day.
• All grading, earth moving, or excavation activities shall cease during
periods of high winds (i.e., greater than 20 mph measured as
instantaneous wind gusts) so as to prevent excessive amounts of dust.
• All material transported on and off -site shall be securely covered to
prevent excessive amounts of dust.
• Soils stockpiles shall be covered.
• Onsite vehicle speeds shall be limited to 15 mph.
31
• Wheel washers shall be installed where vehicles enter and exit the
construction site onto paved roads or wash off trucks and any
equipment leaving the site each trip.
• An appointed construction relations officer shall act as a community
liaison concerning onsite construction activity including resolution of
issues related to PM10 generation.
• Streets shall be swept at the end of the day using SCAQMD Rule 1186
certified street sweepers or roadway washing trucks if visible soil is
carried onto adjacent public paved roads (recommend water sweepers
with reclaimed water).
• All active portions the construction site shall be sufficiently watered
three times a day to prevent excessive amounts of dust.
22. Final building plans submitted for approval of a building permit shall include on
the plans a list of all permanent mechanical equipment to be placed indoors
which may be heard outdoors.
Demolition Requirements
23. Until such time as the demolition is undertaken, and unless the structure is
currently in use, the existing structure shall be maintained and secured by
boarding up all openings, erecting a security fence, and removing all debris,
bushes and planting that inhibit the easy surveillance of the property to the
satisfaction of the Building and Safety Officer and the Fire Department. Any
landscaping material remaining shall be watered and maintained until demolition
occurs.
Construction Period
24. Immediately after demolition and during construction, a security fence, the height
of which shall be the maximum permitted by the Zoning Ordinance, shall be
maintained around the perimeter of the lot. The lot shall be kept clear of all trash,
weeds, etc.
25. Vehicles hauling dirt or other construction debris from the site shall cover any
open load with a tarpaulin or other secure covering to minimize dust emissions.
Immediately after commencing dirt removal from the site, the general contractor
shall provide the City of Santa Monica with written certification that all trucks
leaving the site are covered in accordance with this condition of approval.
26. Developer shall prepare a notice, subject to the review by the Director of
Planning and Community Development, that lists all construction mitigation
requirements, permitted hours of construction, and identifies a contact person at
City Hall as well as the developer who will respond to complaints related to the
32
proposed construction. The notice shall be mailed to property owners and
residents within a 200 -foot radius from the subject site at least five (5) days prior
to the start of construction.
27. A sign shall be posted on the property in a manner consistent with the public
hearing sign requirements which shall identify the address and phone number of
the owner and /or applicant for the purposes of responding to questions and
complaints during the construction period. Said sign shall also indicate the hours
of permissible construction work.
28. A copy of these conditions shall be posted in an easily visible and accessible
location at all times during construction at the project site. The pages shall be
laminated or otherwise protected to ensure durability of the copy.
29. Mechanical equipment shall not be located on the side of any building which is
adjacent to a residential building on the adjoining lot, unless otherwise permitted
by applicable regulations. Roof locations may be used when the mechanical
equipment is installed within a sound -rated parapet enclosure.
30. Final approval of any mechanical equipment installation will require a noise test
in compliance with SMMC Section 4.12.040. Equipment for the test shall be
provided by the owner or contractor and the test shall be conducted by the owner
or contractor. A copy of the noise test results on mechanical equipment shall be
submitted to the Community Noise Officer for review to ensure that noise levels
do not exceed maximum allowable levels for the applicable noise zone.
31. Construction period signage shall be subject to the approval of the Architectural
Review Board.
32. The property owner shall insure any graffiti on the site is promptly removed
through compliance with the City's graffiti removal program.
Drainage
33. To mitigate storm water and surface runoff from the project site, an Urban Runoff
Mitigation Plan may be required by the Department of Public Works pursuant to
Municipal Code Chapter 7.10. Prior to submittal of landscape plans for
Architectural Review Board approval, the applicant shall contact Public Works to
determine applicable requirements, which include the following:
• Non - stormwater runoff, sediment and construction waste from the
construction site and parking areas is prohibited from leaving the site;
• An sediments or materials which are tracked off -site must be removed the
same day they are tracked off -site;
33
• Excavated soil must be located on the site and soil piles should be
covered and otherwise protected so that sediments do not go into the
street or adjoining properties;
• Washing of construction or other vehicles shall be allowed adjacent to a
construction site. No runoff from washing vehicles on a construction site
shall be allowed to leave the site;
• Drainage controls may be required depending on the extent of grading
and topography of the site; and
• New development is required to reduce projected runoff pollution by at
least twenty percent through incorporation of design elements or
principles, such as increasing permeable surfaces, diverting or catching
runoff via swales, berms, and the like; orientation of drain gutters towards
permeable areas; modification of grades; use of retention structures and
other methods.
34. Automotive repair facilities and dealerships, parking areas and structures,
automotive paint shops, gas stations, equipment degreasing areas, and other
facilities generating wastewater with significant oil and grease content are
required to pretreat these wastes before discharging to the City sewer or storm
drain system. Pretreatment will require that a clarifier or oil /water separator be
installed and maintained on site. In cases where settleable solids are present (or
expected) in greater amounts than floatable oil and grease, a clarifier unit will be
required. In cases where the opposite waste characteristics are present, an
oil /water separator with automatic oil draw -off will be required instead. The
Public Works Department will set specific requirements. Building permit plans
shall show the required installation.
Hazardous Materials
35. Prior to the demolition of any existing structure, the applicant shall submit a
report from an industrial hygienist to be reviewed and approved as to content and
form by the Public Works /Environmental Programs Division. The report shall
consist of a hazardous materials survey for the structure proposed for demolition.
The report shall include a section on asbestos and in accordance with the South
Coast AQMD Rule 1403, the asbestos survey shall be performed by a state
Certified Asbestos Consultant (CAC). The report shall include a section on lead,
which shall be performed by a state Certified Lead Inspector /Assessor.
Additional hazardous materials to be considered by the industrial hygienist shall
include: mercury (in thermostats, switches, fluorescent light); polychlorinated
biphenyls (PCBs) (including light Ballast), and fuels, pesticides, and batteries.
34
Streets
36. Unless otherwise approved by the Department of Public Works, all sidewalks
shall be kept clear and passable during the grading and construction phase of
the project.
37. Sidewalks, curbs, gutters, paving and driveways which need replacing or removal
as a result of the project as determined by the Department of Public Works shall
be reconstructed to the satisfaction of the Department of Public Works. Approval
for this work shall be obtained from the Department of Public Works prior to
issuance of the building permits.
38. Street and /or alley lighting shall be provided on public rights of way adjacent to
the project if and as needed per the specifications and with the approval of the
Department of Public Works.
Off -site
39. All off -site improvements required by the City Engineer shall be installed. Plans
and specifications for off -site improvements shall be prepared by a registered
civil engineer and approved by the City Engineer.
40. A subdivision improvement agreement for all off -site improvements required by
the City Engineer shall be prepared and a performance bond posted through the
City Attorney's office.
Environmental Mitigation
41. To mitigate solid waste impacts, prior to issuance of a Certificate of Occupancy,
project owner shall submit a recycling plan to the Department of Public Works for
its approval. The recycling plan shall include:
1) List of materials such as white paper, computer paper, metal cans, and
glass to be recycled;
2) Location of recycling bins;
3) Designated recycling coordinator;
4) Nature and extent of internal and external pick -up service;
5) Pick -up schedule; and
6) Plan to inform tenants/ occupants of service.
42. Ultra -low flow plumbing fixtures are required on all new development and
remodeling where plumbing is to be added, including dual flush toilets, 1.0 gallon
urinals and low flow shower heads.
35
Construction Period Mitigation
43. A construction period mitigation plan shall be prepared by the applicant for
approval by the Department of Public Works prior to issuance of a building
permit. The approved mitigation plan shall be posted on the site for the duration
of the project construction and shall be produced upon request. As applicable,
this plan shall:
1) Specify the names, addresses, telephone numbers and business license
numbers of all contractors and subcontractors as well as the developer
and architect;
2) Describe how demolition of any existing structures is to be accomplished;
3) Indicate where any cranes are to be located for erection /construction;
4) Describe how much of the public street, alleyway, or sidewalk is proposed
to be used in conjunction with construction;
5) Set forth the extent and nature of any pile - driving operations;
6) Describe the length and number of any tiebacks which must extend under
the property of other persons;
7) Specify the nature and extent of any dewatering and its effect on any
adjacent buildings;
8) Describe anticipated construction - related truck routes, number of truck
trips, hours of hauling and parking location;
9) Specify the nature and extent of any helicopter hauling;
10) State whether any construction activity beyond normally permitted hours is
proposed;
11) Describe any proposed construction noise mitigation measures, including
measures to limit the duration of idling construction trucks;
12) Describe construction - period security measures including any fencing,
lighting, and security personnel;
13) Provide a drainage plan;
14) Provide a construction - period parking plan which shall minimize use of
public streets for parking;
15) List a designated on -site construction manager;
16) Provide a construction materials recycling plan which seeks to maximize
the reuse /recycling of construction waste;
17) Provide a plan regarding use of recycled and low- environmental- impact
materials in building construction; and
18) Provide a construction period water runoff control plan.
OPEN SPACE MANAGEMENT
44. Street trees shall be maintained, relocated or provided as required in a manner
consistent with the City's Community Forest Management Plan 2000, per the
36
specifications of the Public Landscape Division of the Community Maintenance
Department and the City's Tree Code (SMMC Chapter 7.40). No street trees
shall be removed without the approval of the Public Landscape Division.
45. The applicant authorizes reasonable City inspection of the property to ensure
compliance with the conditions of approval imposed by the City in approving this
project and will bear the reasonable cost of these inspections as established by
Santa Monica Municipal Code Section 2.72.010 and Resolution No. 9905 (CCS)
or any successor legislation thereto. These inspections shall be no more
intrusive than necessary to ensure compliance with conditions of approval.
VOTE
Ayes:
Nays:
Abstain:
Absent.
NOTICE
If this is a final decision not subject to further appeal under the City of Santa Monica
Comprehensive Land Use and Zoning Ordinance, the time within which judicial review
of this decision must be sought is governed by Code of Civil Procedure Section 1094.6,
which provision has been adopted by the City pursuant to Municipal Code Section
1.16.010.
I hereby certify that this Statement of Official Action accurately reflects the final
determination of the Planning Commission of the City of Santa Monica.
Richard Bloom, Mayor Date
Acknowledgement by Permit Holder
I hereby agree to the above conditions of approval and acknowledge that failure to
comply with such conditions shall constitute grounds for potential revocation of the
permit approval.
Print Name and Title Date
Applicant's Signature Date
37
ATTACHMENT D
PUBLIC NOTIFICATION INFORMATION
Pursuant to Municipal Code Section 9.04.20.20.080 and in accordance with the posting
requirements set forth by the Zoning Administrator, prior to application filing the
applicant posted a sign on the property regarding the subject application. At least eight
weeks prior to the public hearing date, the applicant submitted a photograph to verify
the site posting and to demonstrate that the sign provides the following information:
Project case number, brief project description, name and telephone number of
applicant, site address, date, time and location of public hearing, and the City Planning
Division phone number. It is the applicant's responsibility to update the hearing date if it
is changed after posting.
In addition, pursuant to Municipal Code Section 9.04.20.22.050, notice of the public
hearing was mailed to all owners and residential and commercial tenants of property
located within a (300 foot or 500 foot) radius of the project and published in the Santa
Monica Daily Press at least ten consecutive calendar days prior to the hearing.
On August 5th, the applicant was notified of the subject hearing date.
The applicant provided the following information regarding attempts to contact area
property owners, residents, and recognized neighborhood associations:
- Pico Neighborhood
- Friends of Sunset Park
NOTE: The Commission stated at their October /November 2010 hearing that will not
hear a project on Consent if the applicant has not contacted the neighborhood group.
M
NOTICE OF A PUBLIC HEARING
BEFORE THE SANTA MONICA CITY COUNCIL
SUBJECT: Development Review Permit 11 DR -002
Conditional Use Permit 11CUP -007
Variance 11 VAR -011
2200 Virginia Avenue (Virginia Avenue Park)
APPLICANT: City of Santa Monica
PROPERTY OWNER: City of Santa Monica
A public hearing will be held by the City Council to consider the following request:
The City of Santa Monica proposes to construct a new 8,630 SF single -story Pico Branch Library located
in Virginia Avenue Park. Library programing includes adult, teen, and children's collections, study rooms,
story areas, and a community meeting room. The placement of the building would preserve existing park
green space and would maintain the existing number of stalls for the Farmers Market on Saturdays. A
parking variance is proposed, requesting a waiver of the required parking for the project.
DATE/TIME: TUESDAY, OCTOBER 11, AT 6:30 PM
LOCATION: City Council Chambers, Second Floor, Santa Monica City Hall
1685 Main Street, Santa Monica, California
HOW TO COMMENT
The City of Santa Monica encourages public comment. You may comment at the City Council public
hearing, or by writing a letter. Written information will be given to the City Council at the meeting.
Address your letters to: Steve Mizokami, Associate Planner
Re: Virginia Avenue Park Library
City Planning Division
1685 Main Street, Room 212
Santa Monica, CA 90401
MORE INFORMATION
If you want more information about this project or wish to review the project file, please contact Steve
Mizokami at (310) 458 -8341, or by e -mail at STEVE. MIZOKAMI @SMGOV.NET. The Zoning Ordinance is
available at the Planning Counter during business hours and on the City's web site at www.santa-
monica.orq.
The meeting facility is wheelchair accessible. For disability - related accommodations, please contact (310)
458 -8341 or (310) 458 -8696 TTY at least 72 hours in advance. Every attempt will made to provide the
requested accommodation. All written materials are available in alternate format upon request. Santa
Monica Big Blue Bus Lines numbered 1, 2, 3, 4, 5, 7, 8, 9,10, and Rapid 3 and 7 serve City Hall.
Pursuant to California Government Code Section 65009(b), if this matter is subsequently challenged in
Court, the challenge may be limited to only those issues raised at the public hearing described in this
notice, or in written correspondence delivered to the City of Santa Monica at, or prior to, the public
hearing.
39
ESPANOL
Esto as una noticia de una audiencia pOblica para revisar applicaci6nes proponiendo desarrollo en Santa
Monica. Si deseas mas informaci6n, favor de Ilamar a Carmen Gutierrez en la Divisi6n de Planificaci6n
al numero (310) 458 -8341.
APPROVED AS TO FORM:
Amanda Schachter
Planning Manager
,K
ATTACHMENT E
PROJECT PLANS
Electronic version of attachment is not available for review. Document is available for
review at the City Clerk's office and the libraries.
41
ATTACHMENT F
PARKING SURVEYS
Electronic version of attachment is not available for review. Document is available for
review at the City Clerk's office and the libraries.
42
Project #600168
Saturday. Seotember 03.2011
QUALITY TRAFFIC DATA, LLC
9701 W Pico Blvd, Suite 205, Los Angeles, CA 90035
Phone: 310-341-0019 Fax:310 -807 -9247 Info @QualityTrafficData.com
Virginia Ave. Park
Virgina Ave,
Cloverfield
Pico Blvd.
Total
Total
North Lot
South Lot
Overflow
on street
on street
North
South
Occupied
Available
#Spaces
47
68
38
35
20
23
8
Hour
8:00
32
59
5
28
19
8
3
154
85
9:00
1 39
62
29
24
20
1 11
1
1
1 186
53
10:00
46
1 51
37
34
16
13
8
205
34
.11:00
43
63
42
25
15
15
5
208
31
12:00
47
60
38
33
15
21
8
222
17
13:00
47
43
39
25
10
19
3
186
53
14:00
44
37
21
20
14
14
2
152
87
QUALITY TRAFFIC DATA, LLC
9701 W Pico Blvd, Suite 205, Los Angeles, CA 90035
Phone: 310-341-0019 Fax:310 -807 -9247 Info @QualityTrafficData.com
Project #600168
Saturday Aiiaust27. 2011
QUALITY TRAFFIC DATA, LLC
9701 W Pico Blvd, Suite 205, Los Angeles, CA 90035
Phone: 310-341-0019 Fax: 310-807-9247 Info @QualityTrafficData.com
Virginia Ave. Park
Virgina Ave,
Cloverfield
Pico Blvd.
Total
Total
North Lot
South Lot
Overflow
on street
on street
North
South
Occupied
Available
# Spaces
47
68
38
35
20
23
8
Hour
8:00
29
40
2
33
15
5
2
126
113
9 :00
34
67
23
29
16
1 13
3
1
1 185
54
10:00
40
1 60
1 35
32
15
16
5
203
36
11:00
48
66
40
31
19
19
6
229
10
12:00
45
65
42
30
17
17
8
224
15
13 :00
45
35
35
29
13
15
4
176
63
14:00
43
32
11
27
15
9
1
138
101
QUALITY TRAFFIC DATA, LLC
9701 W Pico Blvd, Suite 205, Los Angeles, CA 90035
Phone: 310-341-0019 Fax: 310-807-9247 Info @QualityTrafficData.com
Tuesda*,- Getabe �
Project #500122
Saturday. October 30. 2010
QUALITY TRAFFIC DATA, LLC
9701W Pico Blvd, Suite 205, Los Angeles, CA 90035
Phone: 310 -341 -0019 Fax:310- 807 -9247 Info @QualityTrafficData.com
Virginia
Ave. Park
Virgina Ave,
Cloverfield
Pico Blvd.
Total
Total
North Lot
South Lot
Overflow
on street
on street
North
South
Occupied
Available
#Spaces
47
68
57
35
20
23
8
Hour
7:00
5
8
0
22
20
0
2
57
201
8:00
16
31
4
21
20
4
2
98
160
9:00
43
62
21
20
18
7
3
174
84
10:00
45
63
32
23
15
12
4
194
64
11 :00
42
65
58
26
14
19
4
228
30
12:00
44
60
51
25
14
16
5
215
43
13:00
45
59
45
22
14
15
4
204
54
14:00
25
49
14
19
18
9
3
137
121
15:00
31
57
3
18
21
5
1
136
122
16 :00
33
49
0
24
18
2
0
126
130
17:00
30
53
0
22
19
4
2
130
128
18:00
28
50
0
19
21
7
3
128
130
QUALITY TRAFFIC DATA, LLC
9701W Pico Blvd, Suite 205, Los Angeles, CA 90035
Phone: 310 -341 -0019 Fax:310- 807 -9247 Info @QualityTrafficData.com
Project #500122
Wednesday. October 27, 2010
QUALITY TRAFFIC DATA, LLC
9701 W Pico Blvd, Suite 205, Los Angeles, CA 90035
Phone: 310-341-0019 Fax: 310-807-9247 Info @QualityTrafficData.com
Virginia
Ave. Park
V-irgina Ave,
Cloverfleld
Pico Blvd.
Total
Total
North Lot
South Lot
Overflow
on street
on street
North
South
Occupied
Available
# Spaces
47
68
57
35
20
23
8
Hour
9:00
8
8
0
15
20
8
0
59
199
10:00
14
13
0
15
20
14
5
81
177
11:00
22
10
0
15
18
13
4
82
176
12:00
19
11
0
13
19
6
3
71
187
13:00
23
14
0
15
20
12
3
87
171
14:00
26
13
0
12
16
9
2
78
180
15:00
30
13
0
10
16
10
1
80
178
16:00
28
18
0
8
15
6
2
77
181
17:00
25
28
0
17
11
4
1
86
172
18:00
20
30
0
15
14
7
2
88
162
19:00
17
29
0
10
13
15
4
88
170
20 :00
10
32
0
12
16
20
6
96
162
21:00
8
28
0
10
18
19
6
89
169
22:00
6
25
0
14
20
16
6
87
171
QUALITY TRAFFIC DATA, LLC
9701 W Pico Blvd, Suite 205, Los Angeles, CA 90035
Phone: 310-341-0019 Fax: 310-807-9247 Info @QualityTrafficData.com
Tuesday, October 26th
Project #500122
Tuesdav, October 26, 2010
QUALITY TRAFFIC DATA, LLC
9701W Pico Blvd, Suite 205, Los Angeles, CA 90035
Phone: 310-341-0019 Fax:310- 807 -9247 Info @QualityTrafficData.com
Virginia
Ave. Park
Virgina Ave,
Cloverfield
Pico Blvd.
Total
Total
North Lot
South Lot
Overflow
on street
on street
North
South
Occupied
Available
#Spaces
47
68
57
35
20
23
8
Hour
9:00
19
25
0
20
9
17
4
94
164
10:00
20
19
0
15
8
10
5
77
181
11:00
25
18
0
15
10
7
1
76
182
12:00
18
10
0
13
12
6
0
59
199
13:00
33
18
0
10
9
13
1
84
174
14:00
29
20
0
11
10
18
1
89
169
15:00
23
22
0
9
12
7
0
73
185
16:00
25
22
0
10
15
9
0
81
177
17:00
28
23
0
11
17
11
0
90
168
18:00
21
22
0
13
14
11
2
83
156
19:00
34
36
0
12
14
20
6
122
136
20:00
18
30
0
15
16
16
7
102
156
21:00
19
26
0
16
16
11
6
94
164
22:00
17
21
0
18
16
10
5
87
171
QUALITY TRAFFIC DATA, LLC
9701W Pico Blvd, Suite 205, Los Angeles, CA 90035
Phone: 310-341-0019 Fax:310- 807 -9247 Info @QualityTrafficData.com
Development Review Permit 11DR -002
Conditional Use Permit 11CUP -007
Variance 11VAR -011
This note is to object tot he parking variance requested by the City of Santa Monica waiving the required
parking for the Library project proposed to be built in Virginia Avenue Park.
The project will create additional traffic which will inevitably affect the driving situation and parking
conditions on the streets surrounding the park. Without the 35 required parking, enormous pressure
will be place on the residents of the surrounding streets, especially on Saturdays (farmer's Market Day).
Although the creation of a community library in the area sounds like a definite improvement in the
neighborhood, additional parking must be provided for this project.
Secondly, it seems that the City follows a distinct unjust double standard when it comes to
implementing the codes and regulations on the book. On the one hand, the City forces private projects
to follow the precise codes by the letter, a nd on the other hand, when it comes to its own project the
City claims that a n 8630 SF of new construction will have no negative impact on the neighborhood and
on the environment. If this claim is correct, then a new law must be written in the books that all future
construction projects in the area shall not suffer from ANY negative impact due to this project and this
variance, be it environmental or otherwise.
Bernard Soroudi