r-10585ATTACHMENT F1
City Council Meeting: 06-21-2011 Santa Monica, California
RESOLUTION NO. 10585 (CCS)
(CITY COUNCIL SERIES)
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF SANTA MONICA SETTING PERMIT AND USER FEES FOR NEWSRACK
PERMITS, BLANKET UTILITY PERMITS, AND STREET OFFSiTE IMPROVEMENTS
WHEREAS, it is the policy of the City of Santa Monica to charge for the full cost
of services provided by City staff when such services benefit individual users rather than
members of the community as a whole; and
WHEREAS, the City desires to revise and establish permit and user fees in order
to recover costs associated with these activities, to preserve public resources for the
benefit of the community as a whole and to avoid diverting these resources to the
benefit of individuals: and
WHEREAS, after reevaluation of current City costs to provide services related to
street offsite improvements, newsrack permits, and blanket utility permits, the City
desires to revise the fees for such services in order to more accurately reflect and
recover the City's cost of providing these services.
ATTACHMENT Fl
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF SANTA MONICA
DOES HEREBY RESOLVE AS FOLLOWS:
SECTION 1. The following fees are established for services of the Public Works
Department, effective June 22, 2010.
A. Newsrack Permits:
New installation -permit for the $155 for the first rack, plus $85 for each
installation of a newsrack in the public additional rack on the same permit
right-of-way
Renewal of a newsrack permit $84 for the first rack, plus $43 for each
additional rack on the same permit
Impound fee for the removal and storage $142 per rack
of a nohconforming newsrack
B. Blanket Utility Permits:
Minor use of public right-of-way (up to $88 per work activity in the public right-of-
320 square feet) way
Minor excavation (up to 24 linear feet) $197 per work activity in the public right-
- of-way
C. Offsite Improvements by City Crews:
Sidewalk removal, hauling and $12.72 per square foot (straight time)
replacement (up to 4 inches thick) $16.62 per square foot (over time*)
Driveway Removal, hauling and $24.49 per square foot (straight time)
replacement -depth of up to 6 inches $32.63 per square foot (over time)
Removal, hauling, and replacement of $35.95 per linear foot (straight time)
curb only $46.68 per linear foot (over time`)
Removal, hauling, and replacement of $46.57 per linear foot (straight time)
curb and gutter $60.52 per linear foot (over time*)
z
ATTACHMENT Fl
Removal, hauling, and replacement of $23.29 per linear foot (straight time)
gutter only (excludes curb) $30.26 per linear foot (overtime')
Removal, hauling and replacement of $30.52 per square foot (straight time)
concrete alleys - up to 6 inches $41.26 per square foot (over time')
Asphalt removal, hauling and $8.86 per square foot (straight time)
replacement up to 4 inches $11.35 per square foot (over time*)
Asphalt removal, hauling and $9.86 per square foot (straight time)
replacement over 4 inches $12.35 per square foot (over time*)
Asphalt cement overlay (1/2" to 1 '/" $6.26 per square foot (straight time)
thick) $8.04 per square foot (over time*)
Asphalt cement overlay (1 Yz' to 4" thick) $8.29 per square foot (straight time)
$10.46 per square foot (over time*)
Parkway removal and hauling $141.77 for 15 linear feet plus $9.94 each
additional linear foot. (straight time)
$198.24 for 15 linear feet plus $13.30
each additional linear foot (over time)
Removal and hauling of abandoned $25.73 per square foot (straight time)
driveway (includes up to 16 linear feet of $31.38 per square foot (over time)
curb re lacement)
Miscellaneous saw cuts for Portland $91.01 for 121 linear feet plus $.75 each
concrete cement or asphalt-cement additional linear foot (straight time)
$128.02 for 136 linear feet plus $.94 each
additional linear foot (over time")
Tie-ins into existing asphalt or concrete $62.46 for 11 linear feet plus $5.75 each
additional linear foot (straight time)
$88.46 for 12 linear feet plus $7.27 each
additional linear foot (over time)
Miscellaneous concrete/asphalt work not $99.70 for 8 square feet plus $12.88 each
captured in above categories additional square foot (straight time)
$136.70 for 8 square feet plus $16.58
each additional square foot (over time*)
Rubber sidewalk installation or $52.71 per square foot (straight time)
replacement of existing tiles/payers (does $72.61 per square foot (over time*)
not include root pruning)
ATTACHMENT Fl
Rubber sidewalk maintenance -lifting $111.56 per linear foot.
and resetting of existing rubber sidewalk
pavers, charged at root pruning rate
Root pruning -pruning of tree roots under $111.56 per linear foot
sidewalks, driveways, or in the gutter or
curb.
Bicycle rack installations, includes saw $152.34 per rack (straight time)
cuts, breakout, dump and concrete $208.98 per rack (over time')
pouring for bollard racks
Bicycle rack, bolt-down only bicycle rack $62.08 per rack (straight time)
installation and/or removal $86.81 per rack (over time*)
Message board -delivery, programming $124.98 per board (straight time)
and retrieval $183.51 per board over time*)
"UVert~me rates will be charged for expedited service with less than two-week notice.
SECTION 2. All fees adopted by Resolution 10487 (CCS), to the extent not in
conflict with this resolution, will remain in effect.
SECTION 3. Commencing on July 1, 2011 and on July 1 of each fiscal year
thereafter all fees established by this resolution, unless noted otherwise, shall be
Administratively revised and increased annually by a factor equal to the difference in the
Los Angeles-Anaheim-Riverside Consumer Price Index for Wage Earners and Clerical
Workers for the period February through February of the prior fiscal year, except that
any such administrative revision shall not be less than any annual cost of living
adjustment provided to the employees of the City of Santa Monica through
Memorandums of Understanding entered into between the City and the employees'
4
bargaining representatives for the comparable fiscal year, and in no event shall the
annual administrative revision be less than zero percent (0%).
SECTION 4. The City Clerk shall certify to the adoption of this resolution and
thenceforth and thereafter the same shall be in full force and effect.
APPROVED AS TO FORM:
MARS A JO MOOT IE
City At orne
s
Adopted and approved this 21St day of June, 2011.
U'
Richard Bloom, Mayor
I, Maria M. Stewart, City Clerk of the City of Santa Monica, do hereby certify that
the foregoing Resolution No. 10585 (CCS) was duly adopted at a meeting of the Santa
Monica City Council held on the 21St day of June, 2011, by the following vote:
Ayes: Councilmembers:
Noes: Councilmembers:
Absent: Councilmembers:
Holbrook, McKeown, O'Connor, O'Day,
Mayor Bloom, Mayor Davis
Shriver
None
ATTEST:
Maria M. Stewart, City C rk