Loading...
sr-061411-3mCity Council Meeting: June 14, 2011 Agenda Item: ~ " M To: Mayor and City Council From: Stephanie Negriff, Director of Transit Services Subject: Liquefied Compressed Natural Gas Fueling Station Maintenance Recommended Action Staff recommends that City Council award Bid No. 3023 to General Physics Corporation, aCalifornia-based company, to provide maintenance, repair, service and parts for the Liquefied. Compressed Natural Gas (LCNG) fueling station for afour-year term for a total amount of $560,235. Executive Summary Staff recommends awarding Bid No. 3023 to General Physics Corporation to provide maintenance, repair, service and parts for the LCNG fueling station at specified rates plus applicable sales tax, through June 30, 2015. Three additional one-year renewal options are available at a 3°/u increase each year. The total expenditure for the four-year term is $560,235. Background The LCNG fuel system was built and put into service in 2002 to fuel the Liquefied Natural Gas (LNG) and Compressed Natural Gas (CNG) buses. The Big Blue Bus fuels its fleet of 125 LNG buses at the facility on a daily basis. The City's fleet of CNG vehicles is also fueled at the station. The LCNG fuel system dispenses approximately 3,250,000 gallons of LCNG per year. LCNG fuel systems incorporate very sensitive and costly components, some of which require lead times of up to three to four months to replace. Many of the components will be warehoused to minimize down time due to the essential operation of the fueling site. 1 Discussion In March 2011, the City published Notices Inviting Bids to provide maintenance, repair, service and parts for the LCNG fueling station as required by the Big Blue Bus in accordance with City specifications. The bid was posted on the City's on-line bidding site, Planet Bids, and notices were advertised in the Santa Monica Daily Press in accordance with City Charter and Municipal Code provisions. Two bids were received and publicly opened on March 21, 2011 per Attachment A. Bids were evaluated based on competitive pricing, vendor's experience and references. Based on these criteria, General Physics Corporation is recommended as the best bidder. Financial Impacts & Budget Actions The purchase order amount to be awarded to General Physics Corporation for the four- yearterm is $560,235. Funds in the amounts of $140,059 for FY 2011-12 and $140,059 for FY 2012-13 have been included in the proposed budget in accounts 41651.555015 for $60,000 and 0410826.589000 for $80,059 for FY 2011-13. Future funding for additional years will be requested in future years' budgets and will be contingent upon Council's approval. All funds used for this purchase come from funding sources specifically dedicated for transit uses. Prepared by: Ralph Merced, Transit Maintenance Manager Approved: Forwarded to Council: S e anie Negriff i~ Rod Gould D'ir~ctor of Transit Services City Manager Attachment A: Pricing 2 ATTACHMENT A elD RESULTS BID q: 3023 CLOSE DATE: March 21, 2011 BID TITLE: PROVIDE MAINTENANCE,REPAIR &SERVICE OF THE LNG/CNG FUEL FACILITY AS REQUIRED BY THE BIG BLUE BUS. General Physics Corporation- Esegntlitlo, CA Clean Energy, Seal eegch, CA PRIC ING SERVICE RATES: ITEM DESCRIPTION PRICE PER ONE (l)92 DAV SERVICE per specificafions~: $ 3,200.00 /SERVICE $ 4,100.00 /SERVICE EXTENDED AMOUNT ANNUAL RATEOF920AYSERVICE $ 12,800.00 /YEAR $ 16,400.00 /YEAR ITEM DESCRIPTION gppI TIONAI SERVICES BEYOND SPECIFICATIONS Ap01TIONAL SERVICES BEYOND SPECIFICATIONS ' HOURLY LABOR RATE (7AM -4PM) $ 90.00 /HR $ 150.00 /HR EMERGENCY RAFTER-HOURS)RATE $ 105.]5 /HR $ 150.00 /HP SATURDAY $ 105.]5 /HR $ 150.00 /HR SUNpgY $ 121.50 /HR $ 150.00 /HR EgUIPMENT COST fOR GOODS QF DIFFERENT) /HR /HR TRAVELTIMEIFAPPLICABLE: PER TRIP OR MINIMUM N/A N/A RENEWAL OPTIONS/SERVICE MAINTENANCE: PERIOD 2: 3%INWEASE 3°h INCREASE PERIOD 3: 3°h INCREASE 3°6INCREASE PERIOD 4: 3bINCREASE 3%INWEASE SPA RE PARTS FOR LNG/CNG STATION: ESTIMATED PERIOD 1 PERIOD 1 N 1 ANNUAL QUANTITY 1 DESCRIPTION COOLED END FOR THE LNG PUMPS " UNIT COST $ 11,412.00 E%TENOED COST $ 11,412.00 DELIVERY WITHIN 90 DAV5 UNITfOST $. 10,275.20 E%TENOED[OST $ 10,2]5.20 DELIVERY WITHIN 56 DAV5 2 3 1/2 WORCHESTER PACKING KITS $ 188.89 $ 566.6] 20 DAYS $ 184.24 $ 552.72 14 DAYS 3 3 1"WORCHESTER PACKING KIT $ 231.00 $ 693.00 20 DAYS $ 286.32 $ 858.96 14 DAYS 4 5 3 3 11/2" WORCHESTER PACKING KITS 2"WORfHE$TER PACKING KITS " $ $ 311.46 343.64 $ $ 934.38 1,030.92 20 DAYS 20 DAV5 $ $ 35].28 454.38 $ $ 1,0]1.84 1,363.14 14 DAYS 14 DAYS 6 1 3 WORCHESTER PACKING KITS $ 521.23 $ 521.23 20 DAYS $ 66].25 $ .66].25 14 DAV5 ] 4 KUNKLE RELIEF VALVES $ 218.52 $ 8]4.08 15 DAYS $ 156.85 $ 62].40 21 DAV5 e 10 END SEATS FOR IC CgRTEft LNG NOZZLE $ 109.64 $ 1,096.40 10 PAYS $ 143.16 $ 1,431.60 14 DAYS 9 1D 1 1 JC CARTER N02ZLE W/ADAPTER FITTING MACRO TECH VENT NOZZLE $ $ 9011.09 365.8] $ $ 9,011.09 365.8] 10 pAYS S DAYS $ $ 7,593.]4 262.2] $ $ ],593.]4 262.2] 21 DAV5 J DAYS 11 12 2 q GRDUND REELS FOR DISPENSERS&OFFLOAD FUELING HOSES $ $ 26].4] fi52.00 $ $ 534.94 2,608.00 SDAYS 15 DAYS $ $ 352.05 361.01 $ $ ]04.10 1,444.04 ]DAYS 21 DAYS 13 14 q 2 VENT HOSES MACHINED BREAKAWAY FITTINGS FOR LNG $ $ 536.00 532.29 $ $ 2,144.00 1,064.58 i50AY5 200AY5 $ $ 243.]5 303]5 $ $ 9]S.OD 60].50 21 DAYS ]DAYS 15 16 2 2 CGA GASKETS FOR OFFLOAD FITTING RETRACTORS FOR DISPENSER HOSE $ $ 20.93 233.33 $ $ 41.86 466.66 SDAYS 15 DAYS $ $ 39.28 260.56 $ $ ]8.56 521.12 ]DAYS ] OAVS 1] 1 SUREX 3600 psi $ 1,]08.63 $ 1,]08.63 15 DAV5 $ 1,599.00 $ 1,599.00 210AY5 18 1 SUREX 3000 psi $ 1,]09.51 $ 1,]04.51 15 DAYS $ 1,599.00 $ 1,599.00 21 DAV5 19 1 COOLED END FOR THE LNG PUMPS $ $ 10,891.]1 $ 10,891]1 20 1 LNG OFFLOAD PUMP $ 60,455.40 $ 60,455.40 120 DAV5 $ 55,556.25 $ 55,556.25 126 DAV5 21 1 SPARE PASS THROUGH FOR LNG $ 99]]5 $ 99275 30 DAYS $ 941.03 $ 941.03 28 DAYS 22 1 LNG BOOST PUMP $ 22,8]9.42 $ 22,8]9.42 90 pAYS $ 22,335.]5 $ 22,335.75 84 DAYS PAY MEN T TERMS NET 30 NET 30 Page 1 of i