Loading...
sr-042865-3CITY OF SANTA MONICA ITE-E T T E DATE: April 19, 19x5 TO: Perry Scott, City Manager ,. FROM: Bartlett L. Kennedy, City Engineer SUBJECT: Construction Inspection - Third Street Mall As you know, it is essential that all phases of the construction of the Third Street Mall be subject to complete and competent construction inspection. Only in this cvay can ~nre be assured that the construction plans and specifications are complied with in all respects. The City's permanent inspection force (2 men} is not adequate to provide full-time inspection for the Mall and still provide inspection coverage on the other projects which will be in progress during this period. One of our two inspectors must be reserved for assign- ment to projects other than the Mall. To provide adequate construction inspection for the Mall, due to its length and the variety of work that will be in progress at various locations, will require the services of two inspectors. One of these two will be our Chief Inspector: it will be necessary to hire another man to be the second inspector. It is recommended that the City Council be re- quested to authorize the administration to employ an inspector on a contract basis, as was done in the case of the Resident Engineer on the Ne*rr Main Library project. This procedure provides adequate compensation for the employee but eliminates all vacation, sick leave, and other fringe benefits. The skills and knowledge required of this employee are such as to warrant the contract stipulating a rate of pay of $4.48 per hour, which is the median rang ~c ~.} Public Works.Inspe~tor. ~ ~; ~~ APR 2 ~ 1965 ~~ BSI ~: i ~~ ~`~ ~~ BARTLETT L. NE ~'-~~' City Engineer BLK~f s / ,~