sr-060810-7aCity Council Meeting: June 8, 2010 Agenda Item: ~-~ ~' To: Mayor and City Council From: Eileen Fogarty, Director, Planning & Community Development Subject: Introduction and .First Reading of an Amendment to Santa Monica Municipal Code Chapter 8.08 Regarding Time Allocated for the Processing of Plan Check Applications and Building Permits Recommended Action Staff recommends that the City Council adopt an ordinance amending Section 8.08 of the Santa Monica Municipal Code to allow a six month extension of the current one year plan check time period and on a temporary basis allow one additional six month extension for plan check applications and one additional 180 day extension to the time period allowed to start construction. Executive Summary The proposed amendment to Santa Monica Municipal Code Section 8.08 was presented to the Council on May 25, 2010. At that meeting the Council continued the item and requested that staff return with an option to the proposed amendment that included a provision that a project would only be entitled to the additional time extensions if it could be demonstrated that no applicable provisions within Article IX of the Municipal Code had been amended. The draft ordinance presented at the May 25th hearing is attached as well as an amended draft ordinance that .incorporates the changes discussed at that hearing. Santa Monica Municipal Code Section 8.08 currently states that a building permit application expires unless the permit is issued within one year after the date the permit application is filed. Under current code, the Building Officer may grant an extension provided that the time allowed to obtain the permit does not exceed one year and one month, which effectively results in a one month extension of the one year plan check time period. The proposed ordinance would increase the allowed one month extension to six months and on a temporary basis add an additional six month extension to the time allowed to obtain a building permit. Once a building permit is issued, the current code allows the Building Officer to grant one 180 day extension to start construction or resume construction after cessation of work, and up to three 180 day extensions to complete work. The proposed ordinance 1 would allow, on a temporary basis, the Building Officer to grant one additional 180 day extension to the time period allowed to start construction, provided that the applicant satisfies the requirements set forth in the ordinance. The additional extensions contained in the proposed ordinance are recommended on a temporary basis due to the current economic climate and would sunset on July 1, 2012. Discussion Under current code, the Building Officer may grant an extension to the one year time period allowed to obtain a permit provided that the time does not exceed one year and one month, which effectively results in a one month extension of the one year plan check time period. In many cases a one month extension is not adequate, which results in the applicant having to reapply and start the process from the beginning. Once a building permit is issued, the current code allows the Building Officer to grant one 180 day extension to start construction or resume construction after cessation of work, and up to three 180 day extensions to complete work. The proposed ordinance would, on a permanent basis, increase the allowed one month extension on plan checks to six months, allow the Building Office, on a temporary basis, to extend the plan check period for an additional six months, and allow the Building Officer, on a temporary basis, to grant one additional 180 day extension to the time period allowed to start or resume construction after a permit is issued. The existing time lines related to plan checks, the start of construction, and the completion of a project are generally adequate under normal circumstances. However, because the ongoing global economic downturn has caused significant and wide-spread impacts on.the overall U.S economy and the local economy, applicants with entitled projects have found it difficult to start and complete projects within the time allotted under the current code. This situation has been exacerbated by the shortage of credit available for construction projects, which has hampered applicants' ability to submit plan check applications in a timely manner and to commence construction once a building permit is issued. An applicants inability to obtain a building permit, start construction, 2 and complete construction not only represents a hardship for the applicant, but may also negatively impact the surrounding community when lots are left vacant or projects are partially constructed, The proposed ordinance provides the Building Officer additional flexibility to grant extensions in situations where it can be determined. that there have been no changes to the original plans, no pertinent laws or ordinances have been amended subsequent to the date of the original application, the approvals granted under Article IX of the Municipal Code are still valid, and circumstances beyond the control of the applicant have prevented the permit from being issued or the project from being completed within the authorized time period. The increase of the allowed extension of the plan check process. from one month to six months would be a permanent change to the code. Due to the fact that the additional extensions recommended in this report are related to the current economic climate, the extensions contained in the proposed ordinance are for a limited time period. The additional six month extension for plan check approval and the additional 180 day extension to start or resume construction would be effective for approximately two years, until July 1, 2012. At the City Council. meeting on May 25, 2010, the Council continued this item and requested that staff return with an option to the proposed amendment that included a provision that ensure that a project would only be entitled to the additional time extensions if it could be demonstrated that no applicable provisions within Article IX of the Municipal Code had been amended. The draft ordinance presented at the May 25th hearing is attached as well as an amended draft ordinance that incorporates the changes discussed at that hearing. If the Council adopts the amended draft ordinance, the additional time extensions could only be granted in cases where no applicable provisions within Article IX of the Municipal Code have been amended since the filing date of the original permit application. 3 Financial Impacts & Budget Actions The recommendation in this report does not have any budgetary or financial impacts. Prepared by: David Martin, Deputy Director, Planning and Community Development Approved: Forwarded to Council: ~` Rod Gould City Manager Attachment: A. Draft Ordinance (originally presented at May 25, 2010 Council meeting) B. Draft Ordinance (with amendments) 4 VCVGIVE.JIIIGIIt ATTACHMENT A: Draft Ordinance 5 Council Meeting 06-08-2010 ORDINANCE NUMBER (CCS) (City Council Series) Santa Monica, California AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF SANTA MONICA AMENDING CHAPTER 8.08 THE SANTA MONICA MUNICIPAL CODE RELATED TO TIME ALLOCATED FOR. THE PROCESSING OF PLAN CHECK APPLICATIONS AND BUILDING PERMITS WHEREAS, the City of Santa Monica is committed to maintaining a land use and building permit process that is reasonable and efficient; and WHEREAS, the ongoing global economic downturn has caused significant and wide-spread impacts to the overall U.S. economy and to the local economy; and WHEREAS, these economic impacts include dramatic slow-downs in the building and development industries, particularly in California; and WHEREAS, in Santa Monica, the overall economic conditions, exacerbated by the shortage of credit available for construction projects, have hampered applicants' ability to timely submit plan check applications and to commence construction upon the issuance of building permits; and WHEREAS, the result is that many applicants' permits will expire before the applicants can exercise the rights conferred by the permits, and the projects will be abandoned; and 1 WHEREAS, abandoned projects leave the community with lots that are vacant or partially constructed, and this degrades neighbors' quality of life, contributes to blight, and fosters nuisances; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF SANTA MONICA DOES HEREBY ORDAIN AS FOLLOWS: Section 1. Section 8.08.060 of the Santa Monica Municipal Code is hereby amended as follows: 8.08.060 Permit Application. (a) Application. To obtain a permit, the applicant shall first file an application in writing on a form furnished by the Building Officer for that purpose. Every such application shall identify and describe the work to be covered by the permit for which each application is made, the responsible party for the work and such other information that the Building Officer may require to show conformance to applicable laws and regulations. When an architect or engineer prepares or is required to prepare submittal documents, the application shall designate the architect and/or engineer of record. (b) Submittal Documents. When required by the Building Officer, plans, specifications, engineering calculations, diagrams, soil investigation reports, sound tests, material tests, special inspection and structural observation programs and other data shall be submitted with each application for a permif. When an architect or engineer does not prepare such plans, the Building Officer may require the applicant submitting such plans or other data to demonstrate that State law does not require that 2 a licensed architect or engineer prepare the plans before accepting submittal documents or permit application. Deferral of any submittal items shall require prior approval of the Building Officer. If the Building Officer approves the deferral of submittals to a time after permit issuance, the approved plans shall list the deferred submittals. The deferred submittal items shall not be installed until the Building Officer has approved their design and submittal documents. (c) Investigation. Whenever work for which a permit is required by this Chapter has been commenced without first obtaining a permit, a special investigation shall be made before a permit may be issued for such work when so ordered by the Building Officer. (d) Information on Plans and Specifications. Plans and specifications shall be drawn to scale on substantial paper and shall be of sufficient clarity to indicate the location, nature and extent of the work proposed and show in detail that it will conform to the provisions of all relevant laws, ordinances, rules and regulations. Plans for buildings of other than one- and two-family dwellings and their accessory structures shall also indicate how required structural and fire-resistive integrity will be maintained where penetrations will be made for electrical, mechanical, plumbing and communication conduits, pipes and similar systems. (e) Special Inspection and Structural Observation Program. When the Building Code requires special inspection and/or structural observation, the architect or engineer of record shall prepare an inspection program which shall be submitted to the Building Officer for approval prior to issuance of the building permit. The inspection 3 program shall designate the portions of the work to have special inspection, the name or names of the individuals or firms who are to perform the special inspections and indicate the duties of the special inspectors, including any required nondestructive testing. The Building Officer, or when approved by the Building Officer, the owner, the engineer or architect of record, or an agent of the owner, but not the contractor or any other person responsible for the work, shall employ the special inspector. When structural observation is required, the inspection program shall name the individuals or firms who are to perform structural observation and describe the stages of construction at which structural observation is to occur. The inspection program shall include samples of inspection reports and provide time limits for submission of reports. (f) Preconstruction Meetings. The Building Officer may require the permit holder to participate in a preconstruction conference prior to the completion of plan review and permit issuance to review the plans and specifications for adequacy and sufficiency of details and conformance to building standards and interpretations. (g) Change of Architect or Engineer of Record. If the circumstances require, the owner may designate a substitute architect or engineer of record who shall perform all the duties required of the original architect or engineer of record. In such cases, the owner shall notify the Building Officer in writing if the architect or engineer of record is changed or is unable to continue to perform the duties. The architect or engineer of record shall be responsible for reviewing and coordinating. all submittal documents prepared by others, including deferred submittal items, for compatibility with the design of the building. 4 (h) Expiration of Application for Permit. ~~^°^+ °° ^•^~^~'°~' "°'^~^~ ° j1) A permit application shall expire if no permit is issued within one year after the date the permit application is filed, except as provided below. (~-A) An application for a demolition permit for the demolition of residential buildings and structures, which are subject to the replacement project requirements of Section 9.04.10.16.010, shall expire if no permit is issued within two years following the date the application is filed. (~B) An application for a permit for a project subject to the construction rate program of Section 9.04.10.02.450 shall not expire while that project remains on the waiting list for a building permit. (a2) ~~^°^+ ° .,'~'°~' ~^ +"•^ c°^+~^^ ^ No action may be taken on an application after expiration. Plans and other data submitted for review may thereafter be returned to the applicant or destroyed by the Building Officer. To obtain a permit, applicants shall submit a new application, new. submittal documents and pay a new plan review fee. All applicable standards in affect at the time of the new application shall then apply to the project. (i) Extensions. The Building Officer may grant one six-month extension of the one-vear plan check time period set forth in subsection (h)(1) above if the applicant demonstrates that: 5 (A1) No changes have been made or will be made to the original plans and specifications except as required by the original plan review; and (~2) No pertinent laws or ordinances have been amended subsequent to the date the original application was filed which would cause the development project at issue to be inconsistent with such amended provisions; and (93) Any approvals granted under Article IX of the Municipal Code are still valid and have not expired; and (€4) Circumstances beyond the control of the applicant have prevented the permit ac~ierrfrom being +~, issued in the authorized time period. Section 2. Section 8.08.070 of the Santa Monica Municipal Code is hereby amended as follows: 8.08.070 Permit issuance, extension and renewal. (a) Issuance. If the Building Officer finds that the work described- in an application for a permit and submittal documents conforms to the requirements of the technical codes and other pertinent laws and ordinances, and that the applicant has 6 paid all required fees, the Building Officer shall issue a permit for the work to the applicant. When a permit is issued for which plans are required, the Building Officer shall endorse in writing or stamp the plans and specifications APPROVED FOR CONSTRUCTION. No building permit or demolition. permit shall be issued by the City for any development that requires a coastal development permit under the California Coastal Act of 1976, Public Resources Code .Sections 30000 et seq., until such time as a coastal development permit has been issued for such development. (b) Partial Permit. The Building Officer may issue a permit for the construction of part of a building, structure or building service equipment before the entire plans and specifications for the whole building, structure or building service equipment have been submitted or approved, provided adequate information and detailed statements have been filed complying with all pertinent requirements. The holder of a partial permit shall proceed without assurance that the permit for the entire building, structure or building service will be granted. (c) Expiration. Every permit issued under the provisions of this Code expires by limitation and becomes null and void when any of the following circumstances is applicable: (1) Failure to Start Construction. If the building or work authorized by such permit is not started within one hundred eighty days from the date of permit issuance; (2) Cessation of Work. If the building or work authorized is suspended or abandoned at any time after the work has started, for a period of one hundred eighty days or more. 7 (3) Time to Complete. In addition to subsections (1) and (2) above, every permit issued under the provisions of this Chapter expires by limitation and becomes null and void when the time allowed to complete all work authorized by the permit exceeds the following time periods based on valuation: Valuation Time Allowed Under $300,000 ................. 12 months $300,001 to $1,000,000 ......,. 24 months $1,000,001 to $20,000,000 .... 36 months Over $20,000,000 .............. 48 months When a project is divided into separate permits for the convenience of the owner or tenants and the work on such permits is to be done concurrently, the time allowed to complete all work on each separate permit shall be equal to the time period for the total valuation of the separate permits. (d) Extensions. (~ ~,~,-tea Extensions of time from the stated periods in subsection (~c) above may be permitted for good reason, provided such requests are submitted to the Building Officer in writing prior to permit expiration. The written request must demonstrate that: (4A) Due to circumstances beyond the owner's or permittee' s control, construction could not be commenced, continued or completed in the authorized time period; (~B) If construction has started, substantial progress has been made; 8 (~C) The condition of the property presents no health or safety hazard; and (4D) The continued delay will not create any unreasonable visual aesthetic impact to the neighborhood or substantial economic detriment to neighboring property owners. (2) .The time periods set forth to start construction within one hundred eighty days or resume construction after cessation of work for one hundred eighty days may each be extended no more than once, and the time period set forth to complete construction may be extended no more than three times. Each extension of time shall not exceed one hundred eighty days. (e) Extension Request Appeals., The decision of the Building Officer may be appealed to the Director of Planning and Community Development n'rn me+on..o~ .+ or+inn n o hnriJ~hin +,. +he .,.,.,r...,..+ who shall conduct a de novo review. Any such appeal shall be filed in writing within seven days of the decision of the Building Officer. The decision of the Director of Planning and Community Development shall be final. (f) Renewal. Before any work authorized under an expired permit can be recommenced, the permit holder shall file an application for renewal. Such application shall include all original submittal documents and shall identify any changes that have been made or will be made in the original plans and specifications for such work. If the Building Officer finds that the work remaining to be completed under the permit conforms to the requirements of the Technical Codes and other pertinent laws and ordinances, and that the applicant has paid all required fees, the Building Officer 9 shall renew the permit for the work to the applicant. No work shall recommence until the renewal application and submittal documents are approved. Section 3. Section 8.08.075 of the Santa Monica Municipal Code is hereby added as follows: 8.08.075 Temporary Time Extension for Plan Checks and Building Permits (a) Plan Check Application Extension In addition to the extension authorized by Municipal Code Section 8.08.060(1), the Building Officer may grant one additional extension fora permit application (excluding applications covered by Sections 8.08.060(h)(1)(A) or (B)), prior .its expiration, for a period not to exceed six-months, provided that the applicant satisfies the requirements set forth by Sections 8.08.060(1)(1) (2) (3), and (4) of this Code. (b) Building Permit Extension In addition to the extension authorized by Municipal Code Section 8.08.070(d)(2) the Building Officer may grant one additional extension to the time period set forth in Section 8.08.070(c)(1) to start construction within one hundred eighty daVS, provided that the applicant satisfies the requirements set forth in Section 8.08.070(d)(1) of this Code. (c) Sunset This Section shall remain in effect only until July 1, 2012, and as of that date shall sunset and have no further force or effect. Section 4. Any provision of the Santa Monica Municipal Code or appendices thereto inconsistent with the provisions of this Ordinance, to the extent of such 10 inconsistencies and no further, is hereby repealed or modified to that extent necessary to effect the provisions of this Ordinance: Section 5. If any section, subsection, sentence, clause, or phrase of this Ordinance is for any reason held to be invalid or unconstitutional by a decision of any court of competent jurisdiction, such decision shall not affect the validity of the remaining portions of this Ordinance. The City Council hereby declares that it would have passed this Ordinance and each and every section, subsection, sentence, clause, or phrase not declared invalid or unconstitutional without regard to whether any portion of the ordinance would be subsequently declared invalid or unconstitutional. Section 6. The Mayor shall sign and the City Clerk shall attest to the passage of this Ordinance. The-City Clerk shall cause the same to be published once in the official newspaper within 15 days after its adoption. This Ordinance shall become effective 30 days from its adoption. APPROVED AS TO FORM: A A JO ES MO TRIE City Attor e 11 ATTACHMENT B: Amended Draft Ordinance 6 Council Meeting 06-08-2010 ORDINANCE NUMBER (CCS) (City Council Series) Santa Monica, California AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF SANTA MONICA AMENDING CHAPTER 8.08 THE SANTA MONICA MUNICIPAL CODE RELATED TO TIME ALLOCATED FOR THE PROCESSING OF PLAN CHECK APPLICATIONS AND BUILDING PERMITS WHEREAS, the City of Santa Monica is committed to maintaining a land use and building permit process that is reasonable and efficient; and WHEREAS, the ongoing global economic downturn has caused significant and wide-spread impacts to the overall U.S. economy and to the local economy; and WHEREAS, these economic impacts include dramatic slow-downs in the building and development industries, particularly in California; and WHEREAS, in Santa Monica, the overall economic conditions, exacerbated by the shortage of credit available for construction projects, have hampered applicants' ability to timely submit plan check applications and to commence construction upon the issuance of building permits; and WHEREAS, the result is that many applicants' permits will expire before the applicants can exercise the rights conferred by the permits, and the projects will be abandoned; and 1 WHEREAS, abandoned projects leave the community with lots that are vacant or partially constructed, and this degrades neighbors' quality of life, contributes to blight, and fosters nuisances; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF SANTA MONICA DOES HEREBY ORDAIN AS FOLLOWS: Section 1. Section 8.08.060 of the Santa Monica Municipal Code is hereby amended as follows: 8.08.060 Permit Application. (a) .Application. To obtain a permit, the applicant shall first file an application in writing on a form furnished by the Building Officer for that purpose. Every such application shall identify and describe the work to be covered by the permit for which each application is made, the responsible party for the work and such other information that the Building Officer may require to show conformance to applicable laws and regulations. When an architect or engineer prepares or is required to prepare submittal documents, the application shall designate the architect and/or engineer of record. (b) Submittal Documents. When required by the Building Officer, plans, specifications, engineering calculations, diagrams, soil investigation reports, sound tests, material tests, special inspection and structural observation programs and other data shall be submitted with each application for a permit. When an architect or engineer does not prepare such plans, the Building Officer may require the applicant submitting such plans or other data to demonstrate that State law does not require that 2 a licensed architect or engineer prepare the plans before accepting submittal documents or permit application. Deferral of any submittal items shall require prior approval of the Building Officer. If the Building Officer approves the deferral of submittals to a time after permit issuance, the approved plans shall list the deferred submittals. The deferred submittal items shall not be installed until the Building Officer has approved their design and submittal documents. (c) Investigation. Whenever work for which a permit is required by this Chapter has been commenced without first obtaining a permit, a special investigation shall be made before a permit may be issued for such work when so ordered by the Building Officer. (d) Information on Plans and Specifications. Plans and specifications shall be drawn to scale on substantial paper and shall be of sufficient clarity to indicate the location, nature and extent of the work proposed and show in detail that it will conform to the provisions of all relevant laws, ordinances, rules and regulations. Plans for buildings of other than one- and two-family dwellings and their accessory structures shall also indicate how required structural and fire-resistive integrity will be maintained where penetrations will be made for electrical, mechanical, plumbing and communication conduits, pipes and similar systems. (e) Special Inspection and Structural Observation Program. When the Building Code requires special inspection and/or structural observation, the architect or engineer of record shall prepare an inspection program which shall be submitted to the Building Officer for approval prior to issuance of the building permit. The inspection 3 program shall designate the portions of the work to have special inspection, the name or names of the individuals or firms who are to perform the special inspections and indicate the duties of the special inspectors; including any required nondestructive testing. The Building Officer, or when approved by the Building Officer, the owner, the engineer or architect of record, or an agent of the owner, but not the contractor or any other person responsible for the work, shall employ the special inspector. When structural. observation is required, the inspection program shall name the individuals or firms who are to perform structural observation and describe the stages of construction at which structural observation is to occur. The inspection program shall include samples of inspection reports and provide time limits for submission of reports. (f) Preconstruction Meetings. The Building Officer may require the permit holder to participate in a preconstruction conference prior to the completion of plan review and permit issuance to review the plans and specifications for adequacy and sufficiency of details and conformance to building standards and interpretations. (g) Change of Architect or Engineer of Record. If the circumstances require, the owner may designate a substitute architect or engineer of record who shall perform all the duties required of the original architect or engineer of record. In such cases, the owner. shall notify the Building Officer in writing if the architect or engineer of record is changed or is unable to continue to perform the duties. The architect or engineer of record shall be responsible for reviewing and coordinating all submittal documents prepared by others, including deferred submittal items, for compatibility with the design of the building. 4 (h) Expiration of Application for Permit. ~~^°^+ °° ^~^~~~~'°~' ~°'^~~~ ~) A permit application shall expire if no permit is issued within one year after the date the permit application is filed, except as provided below. (4A) An application for a demolition permit for the demolition of residential buildings and structures, which are subject to the replacement project requirements of Section 9.04.10.16.010, shall expire if no permit is issued within two years following the date the application is filed. (~B) An application for a permit for a project subject to the construction rate program of Section 9.04.10.02.450 shall not expire while that project remains on the waiting list for a building permit. (~2) c.,..°..+ °^ ^ .,;.~^.~ ;.. +ti•^ c°,.+;^^ ^ No action may be taken on an application after expiration. Plans and other data submitted for review may thereafter be returned to the applicant or destroyed by the Building Officer. To obtain a permit, applicants shall submit a new application, new submittal documents and pay a new plan review fee. All applicable standards in affect at the time of the new application shall then apply to the project. (i) Extensions. The Buildind Officer may Grant one six-month extension of the one-year plan check time period set forth in subsection (h)(1) above, if the applicant demonstrates that: 5 (A1) No changes have been made or will be made to the original plans and specifications except as required by the original plan review; and (~2) No pertinent laws or ordinances have been amended subsequent to the date the original application was filed which would cause the development project at issue to be inconsistent with such amended provisions; and (93) Any approvals granted under Article IX of the Municipal Code are still valid and have not expired; and (€4) Circumstances beyond the control of the applicant have prevented the permit ashen-from beings issued in the authorized time period. Section 2. Section 8.08.070 of the Santa Monica Municipal Code is hereby amended as follows: 8.08.070 Permit issuance. extension and renewal. (a) Issuance. If the Building Officer finds that the work described in an application for a permit and submittal documents conforms to the requirements of the technical codes and other pertinent laws and ordinances, and that the applicant has 6 paid all required fees, the Building Officer shall issue a permit for the work to the applicant. When a permit is issued for which plans are required, the Building Officer shall endorse in writing or stamp the plans and specifications APPROVED FOR CONSTRUCTION. No building permit or demolition permit shall be issued by the City for any development that requires a coastal development permit under the California Coastal Act of 1976, Public Resources Code Sections 30000 et seq., until such time as a coastal development permit has been issued for such development. (b) Partial Permit. The Building Officer may .issue a permit for the construction of part of a building, structure or building service equipment before the entire plans and specifications for the whole building, structure or building service equipment have been submitted or approved, provided adequate information and detailed statements have been filed complying with all pertinent requirements. The holder of a partial permit shall proceed without assurance that the permit for the entire building, structure or building service will be granted. (c) Expiration. Every permit issued under the provisions of this Code expires by limitation and becomes null and void when any of the following circumstances is applicable: (1) Failure to Start Construction. If the building or work authorized by such permit is not started within one hundred eighty days from the date of permit issuance; (2) Cessation of Work. If the building or work authorized is suspended or abandoned at any time after the work has started, for a period of one hundred eighty days or more. 7 (3) Time to Complete. In addition to subsections (1) and (2) above, every permit issued under the provisions of this Chapter expires by limitation and. becomes null and void when the time allowed to complete all work authorized by the permit exceeds the following time periods based on valuation: Valuation Time Allowed Under $300,000 ................. 12 months $300,001 to $1,000,000......... 24 months $1,000,001 to $20,000,000 .... 36 months Over $20,000,000 .............. 48 months When a project is divided into separate permits for the convenience of the owner or tenants and the work on such permits is to be done concurrently, the time allowed to complete all work on each separate permit shall be equal to the time period for the total valuation of the separate permits. (d) Extensions. ~^ °.,-~~t~s;o.; Extensions of time from the stated .periods in subsection (~c) above may be permitted for good reason, provided such requests are submitted to the Building Officer in writing prior to permit expiration. The written request must demonstrate that: (~-A) Due to circumstances beyond the owner's or permittee' s control, construction could not be commenced, continued or completed in the authorized time period; (~B) If construction has started, substantial progress has been made; 8 (3C) The condition of the property presents no health or safety hazard; and (4D) The continued delay will not create any unreasonable v+suat aesthetic impact ^~ ^"••°'^^~ -~^+•~^,^^+ to the neighborhood or substantial economic detriment to neighboring property owners. (2) The time periods set. forth to start construction within one hundred eighty days or resume construction after cessation of work for one hundred eighty days may each be extended no more than once, and the time period set forth to complete construction may be extended no more than three times. Each extension of time shall not exceed one hundred eighty days. (e) Extension Request Appeals. The decision of the Building Officer may be appealed to the Director of Planning and Community Development c•.^ ^.°*.w^ce° ~°°°^t'^ ° ".^..rd~"' t.^~tl' ~~^^^~ who shall conduct a de ~~„w~~~.. ., p..,...,....g u ,.^iq..,, ..p ~r~R novo review. Any such appeal shall be filed in writing within seven days of the decision of the Building Officer. The decision of the Director of Planning and Community Development shall be final (f) Renewal. Before any work authorized under an expired permit can be recommenced, the permit holder shall file an application for renewal. Such application shall include all original submittal documents and shall identify any changes that have been made or will be made in the original plans and specifications for such work. If the Building Officer finds that the work remaining to be completed under the permit conforms to the requirements of the Technical Codes and other pertinent laws and ordinances, and that the applicant has paid all required fees, the Building Officer 9 shall renew the permit for the work to the applicant. No work shall recommence until the renewal application and submittal documents are approved. Section 3. Section 8.08.075 of the Santa Monica Municipal Code is hereby added as follows: 8.08.075 Temporary Time Extension for Plan Checks and Buildinq Permits (a) Plah Check Application Extension In addition to the extension authorized by Municipal Code Section 8.08.060(1) the Buildinq Officer_ may grant one additional extension fora permit application (excluding applications covered by Sections 8 08.060(h)(1)(A) or (B)) prior its expiration, for a period not to exceed six-months provided that the applicant satisfies the requirements set forth by Sections 8.08.060(1)(1) (2) (3) and (4) of this Code. (b) Buildinq Permit Extension In addition to the extension authorized by Municipal Code Section 8.08 070(d)(2) the Buildinq Officer.. may grant one additional extension to the time period set forth in Section 8.08.070(c)(1) to start construction within one hundred eighty days provided that the applicant satisfies the requirements set forth in Section 8.08.070(d)(1) of this Code and further demonstrates that no applicable provision within Article IX of this Code has been amended, subsequent to the filing date of the original permit application which would cause the development project at issue to be inconsistent with such amended provisions. (c) Sunset This Section shall remain in effect only until Julv 1 2012, and as of that date shall sunset and have no further force or effect. 10 Section 4. Any provision of the .Santa Monica Municipal Code or appendices thereto inconsistent with the provisions of this Ordinance, to the extent of such inconsistencies and no further, is hereby repealed or modified to that extent necessary to effect the provisions of this Ordinance. Section 5. If any section, subsection, sentence, clause, or phrase of this Ordinance is for any reason held to be invalid or unconstitutional by a decision of any court of competent jurisdiction, such decision shall not affect the validity of the remaining portions of this Ordinance. The City Council hereby declares that it would have passed this Ordinance and each and every section, subsection, sentence, clause, or phrase not declared invalid or unconstitutional without regard to whether any portion of the ordinance would be subsequently declared invalid or unconstitutional. Section 6. The Mayor shall sign and the City Clerk shall attest to the passage of this Ordinance. The City Clerk shall cause the same to be published once in the official newspaper within 15 days after its adoption. This Ordinance shall become effective 30 days from its adoption. APPROVED AS TO FORM: ~/~ ~ d' M HA O ES MOU~RIE Cit Atto ne 11