Loading...
sr-111561-6mDATE "s TO: ' FROM SUBJECT CITY OF SANTA MONICA IT- T Novernb~-r g, 1961 T~aurice T%;. king, Acting City Tfanager ~~ MEMO Bartlett L. Kennedy, Acting City Engineer Seventh Street Bridge Removal and Street Jidening As you know, the removal of the Seventh Street bridge and the widening and lowering 'co grade df the street betvreen Colorado Avenue and Olympic Boulevard is included as Project TVo. 112 in our l9ni-62 State Gasoline Tax program. This project is over-all projec'c designed the mransportation Depart Electric Railway Right of Lincoln Boulevard acid the 'ch.ereto on th.e no'rthvrest . one of the three phases of the to provide nett facilities for Went in the abandoned Pacific :lay betvreen Fifth Street and old trailer park property adjacent The other tyro phases ayes (1) The construction Of a storm drain in the abandoned rigY?t of way, extending fro;n Lincoln Boulevard to F~ift'_n Street, to carry storm hater runoff from th.e sump area on Lincoln Boulevard under the netiv Transportation Department facility. This drain must be constructed before the right of „'ray can be f; fled to th.e nevi grade rewired for said" f aC7.11 ty . ~G) Th.e f 1111n~ 1n t0 gl'aCte Of the rign.t Of Lvay and tY?e CORStl'UCi,i On Of thE' ne'vd '1'anSi00rtat'! OYi Depart- f2ent faC111ty. .The subject reconstruction of Seventh Street 'sill be prograr,;r:ed for construction between the tiro other phases of th,e _pro ject described above . Tl_1e State Division Cf tii~l7wayS i1aS 1nf OYi~ieO iiie that State Gasoline Tax funds Can oe used to finance th.e construction of that portion of the storm drain that lies 'i+li tt11n the i'1~ht 01 S^lay Of S2 Vent%1 Street. The esti;aated cost of this portion of said storm drain (u0 feet ;n length.) including an allowance for contingencies, is 7,000. Ho~ntever, iVOVember g, 1901 Subjects Seven t7? Street Bridge Removal and Street i~~iidenii7g the original estimate for Project No. 112 did an item for this portion of said storm drain and the funds available for this prcject are ~~c perr.~it th.e i nclusion or' this i tem 4wi thout funds being provided. Page 2 not include construction, not suff i dent additional Included as Project Pao. 113 in our 1901-52 Agree- ment for the expenditure of State Gasoline Tax Funds is a 10,000 Contingency Fund, the ourpose of ~rahich is to finance such. unforeseen items. None of this amount has been p:co- gramrned for expenditure to date. No expenditure of Contingency Project funds can be made, h.o~nreve-r, until such expenditure has been -requested by the City Council and approved by the :State Division of Highways. It therefore is recommended that the City Council be requested to auth.ori2e the Acting City Engineer to request approval from the State Division of High?nays to spend not to exceed 7,000 from Contingency Fund Project ~•' No. 113 for the purpose of financing that portion of the Lincoln Boulevard sump storm drain that lies within the right of ?•vay of Seventh Street. _- f ~ ~ ;~ ~ r _ BARTLETT L. KENNEDY, Acting City Engineer