Loading...
sr-111263-8g'+p c'~,rrr. CITY OF SANTA ivIONICA ii`~~~°d~~'=~ CF~1C?~ 0; i ~;~ CITY LE LATE: November 7, 1463 P~e~6 ~ ~ 4~2 P~ 9~~ TO: The Honorable City Council SdNTd WOgCA,CdttF. FRO1vI: Ernest N. Mobley, City Manager j-~~ ~ ,y. -~> SUBJECT: Engineering Studies--U-Turn Grade Separations--Coast Highway Mr. Mount, a member of the Causeway-Freeway Commission, has developed an idea for expediting the flow of traffic on the Coast Highway between the tunnel and Santa Monica Canyon. At the direction of the Commission, the idea and its pictorial rendering were turned aver to the City Engineer for study and report. Mr. Kennedy's report, made to the Commission at its meeting of October 10, 1463, was to the effect that though a number of problems had to be resolved, the idea possessed considerable merit. Again at the direction of the Commission, the idea was submitted to the local district office of the Livision of Highways. Apparently the Livision engineers were also favorably impressed by Mr. Mount's proposal, as we have received a repay indicating that the State would consider favorably a request to construct the grade separations if studies showed that solutions could be found for the problems involved. It is the recommendation of our City Engineer, with which I concur, that we undertake the studies relative to location and dimension of the structures, as well as the determination of the rights of way that would be required for their construction. This much can be accomplished with our own staff by reassigning priorities. If the proposal still appeaas as practical and useful as it does now, we can contract for the actual design of the structures by a consulting structural engineer. A preliminary engineering study can be ready in 30 days if the Council wishes us to proceed. ~,°sg/' NOV ~ ~ 1963 ~°~. ---_"_~~'"~_ ENM/cc ~~~~3D g~ ERNEST<N. MOBLEY ~ _,~ ,~ City Manager cc: City Clerk " City Engineer Causeway-Freeway Commission Members