Loading...
sr-020965-8b 1 ) ~ {~ CITY OF SANTA MONICA ~-; ~ ~~ INTER-DEPARTMENT MEMO ~*~~~'~` t ""` I r'' nti ~~. DATE: t = n ~. s~ ~, / ~3 Vanua 1 1 ~ . ~ ~~ ~ ~-~ ry 9J ~5 ~ ,~ ~a~ . , Er 1>> w N 1 ~,F>- 1 gy .•,f ~ tl ~ Lf 3.83V H..~ ' ' T0: 4. k3 Perry Scott, City Manager f FROM: Bartlett L, Kennedy, City Engineer SUBJECT: Z,andseapint, Olympic Boulevard Center Strip - 10th Street to pitta Street. Included in Account 421-920 of the 19b#-65 Budget (Street Division) is an arrsount of X20,000 for ttae subject impraver~ent . As you know, the Harnrser Company, Inc., 1'045 Euclid Street, Santa Monica, completed ttae landscaping of the Glyn:pic Boulevard Center Strip between 14th Street and 20th Street, {except for the temporary crossing at 15th Street necessitated by Freeway construction), an May 25, 1~4, at a contract cost of ~,20,1t~2.~0, This work was performed under our Contract No. 1553 {C.C.S,), .lab Order Ate. 2543-By Drawing Ida.. X012, and Special Provisions RIa. 588. The landscaping of the above mentioned 15th Street crossover, after its removal by the State, is covered by a Ctaange Order to the contract, which therefore is still in force and effect. Since acceptance of the completed work, the City has had some problems in maintaining a healthy stand of grass. The soil has been analyzed by U.C.L.A. and the test results indicate that the removal of original soil and the ir„„port of soil was not necessary and that a better ,job would have been obtained if the original soil had been diseed and left open so as to leach out prior to landacapin operations. In order to achieve the best laradscapint; yob possible in the section between 30th Street and 14th Street, the exist- ing soil should be prepared as mentioned above. Thin should be done as aeon as possible. Singe plans and specifications have not been prepared for the sub,#eet pro,jeet, this office inquired of the Fiair~ner Company if they would be willing to perfarrn the sub,jeet ;ark at the sane unit prices as were paid for the completed section; i.e., as a Change Order to the existing contract. Attached is a letter dated ~'anuary 14, 1~5 from the I3ammer Company stating that they would a;~s°ee to such an arrange- ment. January 19, 19x5 Sub,~ects Landscaping Olympic k3oulevard Center Strip - 10th Street to 14th Street. Page 2 used on the unit costs and a pro-ratio of the automatic sprinkling System, the following estimate of the cost of the suks,ject landscaping is furnisheds 1. 900 c.y. Removing and disposing of Oil Cake and 6" of soil ~ i.75 ~ 1,580 2. 830 c.y. 2mporting and placing 5-i/2" of imported top soil ~ 2.`(5 2,2$0 3. it eaoh Furnishing, and planting C oral Trees ~ 12. 0 0 20 0 "~ • J ~ g q / ~ l`( di `ca~1k? V®nr9t ru~°rtinj~ trek $de ll7~. ~ ~3 e W n ~~L 5. Job Constructing automatic sprinkling system for Lump Sum $,200 u. ~}5:750 s.f. Turfing the Site ~ 0.05 2,290 3'4TAL ~3TI~ATF.i) CONTRACT C03T ~15,1i0 Zt shauld be noted tkaat reduced or possibly eliminated if conditioned and reused. Tte~~as 1 and. 2 may ~€: fatly the existing soil can be The cast of Item 5 may have to be adjusted slightly after completion of the plans and specifications, because of a lower water main pressure and the passibility of waking a water line under 11th Street. Since the scope of this additional work is greater than that allowed under our specifications, it is recommended that the City Council authorize the issuance of a Change Order covering the above work in order that the Hammer Company can proceed lmmediately to start preparing the soil. The work, of Bourse, will be coordinated with the completion of the Freeway work at t3lympic >'3oulevard and lOtka Street . This procedure has been discussed with the Director of k2eereation and Parks and with the Ya.~'k Superintendent, both of whom concur in this recommendation. Attachments Letter from Hammer Co. B~?TLSTT L. // City Bngineer v '~ l {~ I.I. ~ ~' ~ ` ' ~ , HAMMER COMPANY INC ~ ~~ . 1645 EUCLID AVENUE .~ -~- ;~~` ' ~ ~_' ~ ~. ~ SANTA MONICA, CALIFORNIA 904.04 ~: ~ Telephone EXbrook 5.2990 ~- s "'~~~ 9F . t,~ . ~,~ City of Santa Monica Department of Public 4Vorka and Engineering Santa Monica City Hall January 14, 1965 Per. Bartlett L. Kennedy RE Contract 1553 (CCS) Gentlemen: VVe would like to subsrit"ar proposal to extend this'd improvement con'~ruct tc include the islands between 10th. Street ~.'_~ i4~in. Street on Olympic Blvd. The Pric<> ~v:::adule will remain the same. If the existing soil does not need to be removal - this item can be deletel z°rrcr: the contract. The :Sprinkler System was a lump sum pri.s. This price will be figured at the same rate as ~~e ariinal ~cb. As soon as the plans are fina"i'.zed t'r_e final price can be submitted. There are two items prat may Nava an effect on the Sprinkler Price: 1. ^lhe water pressure is lower„ 2. 4Ve may have to drive tinder 11th. Street to make a connection to the Automatic Controller, lNe realize that part of this fob will have to be coordinated and scheduled with the related freeway work. We are close to this fob, and the extra pulling on and off of the fob will not effect the price. Sincerely, cc. Donald T. Arnett Ron Severeid Ham by Inc. ~f u.'.~t1--L/~