Loading...
SR-07137-8c~~ ' CITY OF SANTA MONICA ~.. - T DATE: July 6, 1971 TO: Perry Scott, City Manager FROM: Bartlett L. Kennedy, City Engineer ~~ 9 ...." a ~J ,~ x JUG .i J `'lll T~iIS R~IU ~, 8 I21;Tlii:t~'ED TO TIiK; ~~TY CLERK'S OFFICE FOR FILING, SUBJECT: Traffic Signal at Pico Boulevard and Sixth Street In. compliance with City Council instructions (Items 7A and B, meeting of May 25, 1971), we have reviewed the relative merits of the alternate proposals (traffic signal or pedestrian overerossing) suggested in my May 21, 1871 memo to relieve the problem caused by high school student pedestrian traffic at the subject intersection. Subsequent to the above date, construction has been started on the Ramada Inn on the southwest corner of Sixth Street and Pico Boulevard. This construction, by eliminating the possibility of constructing a fence across said intersection to force pedestrians to use a pedestrian overpass, has also eliminated such an overpass as a solution to the problem. As stated in my May 21, 1971 report, sufficient Warrants - Accident Hazard and Interruption of Continuous Traffic - exist to justify a traffic control device at this intersection, However, such traffic control device will be completely ineffective unless accompanied by a fence along the center- line of Pico Boulevard to force pedestrians to cross at the Sixth Street intersection. In view of the above, this office recommends as follows: (1) Installation of a semi-actuated traffic signal at Pico Boulevard and Sixth Street. (2) Construction of a solid barrier, consisting of a 4-foot wide raised island with a i+-foot high chain link fence, along .the centerline of Pieo Boulevard from Fourth Street to Lincoln Boulevard, with an 80-foot opening for both vehicles and pedestrians at Sixth .Street. This recommendation has been discussed with and has the unqualified approval of Dr, George Drake and Mr, Porter Leach of the Santa Monica High .School. Date: July 6, 1971 Page 2 Subject: Traffic Signal at Pico Boulevard and Sixth Street The estimated cost of the above is as follows; (a) Traffic signal installation .,,,,,,...>....... $ 15,000 (b) 1450 feet 4' wide asphalt concrete traffic island at $8 per foot ................ 11,600 (c) 1450 feet 4' high chain link fence at $4 per foot ,.......,...> .................. 5,800 Sub-Total .,...,......®........ $ 32,400 Cantingencies ................. 1,600 Total Estimated Cost ........,. 34 000 Although the Ramada Inn will in all probability not be com- pleted until the end of 1972, it is recommended that this construction be added to our 1971-72 traffic signal program, and that the City Couneil appropriate $34,000 to Account 413-920 to finance the urork, BARTLETT L, KENNEDY City Engineer