Loading...
sr-021009-1c~~ ~;Ya, City Council Report Santa Monica City Council Meeting: February 10, 2009 Agenda Item: ~~~ To: Mayor and City Council From: Lee E. Swain, Director of Public Works Subject: Barker Hangar Paving Project Recommended Action Staff recommends that the City Council: 1. award a construction contract to All American Asphalt, the best bidder, in the amount of $115,115 plus a 10% contingency for a total of $126,600; and 2. authorize the City Engineer to issue any necessary change orders to complete additional work within budget authority. Executive Summary The Barker Hangar Paving Project repairs an approximately 122,000 square foot area surrounding. Barker Hangar at the Santa Monica Airport. Following a competitive bid process, the construction contract is recommended to be awarded to All- American Asphalt. Construction management and public outreach will be managed by Public Works staff. Funds in the amount of $126,600 are available in M33063 8.589000 (Runway/Taxiway Slurry Seal). Discussion The City has contractual obligations to the Santa .Monica Air Center to pave the area around Barker Hangar. The pavement in this area is in poor condition and there is potential for damage to aircraft that park adjacent to Barker Hangar. For these reasons, City staff has identified the asphalt area around Barker Hangar as a priority for repair. ContractorlConsultant Selection A Notice Inviting Bids was published in the Santa Monica Daily Press on December 19 and 20, 2008. The Notice Inviting Bids was also posted on the City's website and Planet Bids. Eight contractors (8) attended the job walk on December 30, 2008. Eight (8) contractors requested bidding documents, and seven (7) sealed bids were received 1 by the City Clerk's office and publicly opened on January 8; 2009, by the Deputy City Clerk. The bid results are as follows: Company Name Bid Amount All American Asphalt $115,115 Tyner Paving Company $123,850 R.C. Becker & Son, Inc $134,012.03 Sully-Miller Contracting Co $140,580 PALP, Inc. DBA Excel Paving Co $147,995 Graph Company $167,140 Mission Paving and Sealing, Inc $170,362 City Engineer's Estimate $170,000 Bids were evaluated based on price, understanding of the project's scope, direct experience on similar projects, approach to the work, technical competence, qualifications of the proposed staff, and the ability to meet the desired time frames. All American Asphalt is recommended as the best bidder based on the. quality of services offered and experience. Recent similar projects include University Drive Rehabilitation for the City. of Irvine, Superior Avenue Improvements for the City of Newport Beach, Citywide Street Improvements for the City of Westminster, Crown Valley Parkway Street Reconstruction for the City of Mission Viejo, and the 2006 Street Rehabilitation Project for the City of Hemet. All reference agencies reported the contractor's work was completed in a timely and cost efficient manner while maintaining consistent quality. The State Contractors' License Board also verified that the company's license is current; active, and in good standing. Additionally, All American Asphalt has performed similar work for the City of Santa Monica including the FY1999- 2000 Street Improvement Project, emergency paving on 20`h Street near Arizona, and on-call work on Dohald Douglas Loop South at the Santa Monica Airport. Public Works staff has reported that all work was satisfactorily completed. 2 Construction Management Construction management will be provided by Department of Public Works staff. Construction management will include: inspection of the contractor's work during construction, verifying and controlling field changes and unforeseen conditions, monitoring and mitigating impact as a result of the. construction activities, attending contractor's safety meetings, attending periodic progress meetings, and maintaining all necessary inspection documentation relevant to the work conducted during construction. Public Outreach Public outreach for this project will be provided by Department of Public Works staff. Public outreach will consist of public notifications to adjacent property owners and tenants and the surrounding community on the scope of the project, potential impacts and schedule and periodic updates. Financial Impacts & Budget Actions Funds in the amount of $126,600 are available in M330638.589000 (Runvvay/Taxiway Slurry Seal). Prepared by: Mark Cuneo, P.E., Principal Civil Engineer Approved: Lee E. Swain, Director Department of Public Works Forwarded to Council: 3 Reference Contract No. 9034 (CCS).