Loading...
sr-061069-8aDATE: TO: FROM: SUBJECT: CITY OF SANTA MONICA ITE- June 2, 1969 Perry Scott, City Manager Bartlett L. Kennedy, City Engineer Cloverfield Boulevard Widening ,~ ~~ ~::~ ~ , , F, ~~~. ~:J,.~ ~ n TI-IS ,x`i--.~ . RET±, CITY ~' _.~ ,-: ,.; You will recall that the City Council, at its meeting of October 8, 1968, approved the recommendations of the Traffic F~igineer relative to the improvements required to alleviate the traffic congestion on Twenty- sixth Street and on Cloverfield Boulevard north of the Santa Monica Freeway ramps, Among the improvements approved was the widen- ing of Cloverfield Boulevard from the Freeway to Santa Monica Boulevard. Design studies have shown that the extent of the structure remodeling that would be required to widen Cloverfield Boulevard, as recommended northwest of the approximate midpoint of the block between Colorado and Broadway, would be excessive and beyond our ability to finance at this time. The project, therefore, has been set up iri stages, with Stage I to include the following: 1. Widening to a roadway width of 60 feet from the Freeway to the approximate midpoint of the block between Colorado and Broadway. 2. Transitioning at this point to a 48-foot width within the existing 60-foot right of way. 3. widening to a 48-foot roadway width from the end of the transition to Broadway. The above work will provide f~ two moving lanes in each direction from Broadway southeasterly,. and will provide a satisfactory transition to the existing 40-foot roadway north of Broadway. June 2, 1969 Page 2 Subject: Cloverfield Boulevard widening At such time as traffic volumes warrant and available funds will permit, we would continue the widen- ing, to a 60-foot roadway width, to Santa Monica Boulevard (Stage II). Since the cost of property acquisition and structure remodeling appears to be considerably greater on the west side of the street than on the east, we presently propose to shift the alignment of this portion of the roadway easterly so that all of the property required for widening would be taken from the east side of the street. This will require the acquisition of 16 feet of property. In order to prevent the construction of struc- tures on this property prior to the street widening, it is recommended that the City Council be requested to instruct the Planning Commission to institute the proceedings required to establish a 16-foot setback on the northeast side of Cloverfield Boulevard, from Broadway to Santa Monica Boule- vard. BAR.TLETT L. KENNEDY City Engineer