Loading...
SR-120208-1A~- ~;tYof City Council Report Santa Moniea City Council Meeting: December 2, 2008 Agenda Item: To: Mayor and City Council From: Stephanie Negriff, Director of Transit Services Subject: .Modification of Professional Services Agreement No. 8956 (CCS) for Interior Design Services for the Big Blue Bus Operations Building Recommended Action Staff recommends that the City Council authorize the City Manager to negotiate and execute three modifications to Contract No. 8956 (CCS) with Harley Ellis Devereaux Corporation to provide interior design services at the Big Blue Bus operations building located at 1660 7th Street, in an amount not to exceed $71,39,5 (including 10% contingency) fora revised contract total of $265,349. Executive Summary Harley Ellis Devereaux Corporation is currently providing design services for various improvements to the building located at 1660 7th Street. The design process, initiated in 2008, addresses improvements to the interior of the building. During the preliminary design process, additional improvement areas were added to the project .scope of work for the consultant including the redesign of the exterior areas on the north and south sides of the building, to obtain LEED Certification, and to provide CAD Drafting and Field Verification for the building. Funds are available for this project in account 0410826.589000. Background On July 23, 2008, City Council authorized the negotiation of a Professional Services Agreement with Harley Ellis Devereaux Corporation under Contract No. 8956 (CCS) for the design of the operations .building improvements. Akick-off meeting was held September 18, 2008, at which time staff and the designers determined that the project would benefit substantially by obtaining LEED certification, and incorporating the north and south side exteriors. Due to a determination that there were no existirig CAD drawings of the building, it is also necessary to produce CAD drawings at this time. 1 Discussion Capacity exists to accommodate administration and operations personnel in the present structure for approximately the next ten years. Inclusion of the north and south side exterior areas in the project will contribute substantially to the ability to obtain LEED certification, as well as provide a cohesive design flow for the project. The CAD drawings wilt allow for optimal utilization of the space. Financial Impacts & Budget Actions Funds for increased design services in the amount of $71,395 are available in account 0410826.589000. Prepared by: Gretchen Kubacky, Senior Transit Programs Analyst roved: Council: S p ie Negriff, Director P. mont well Depa ent of Transit Services C Manager 2 Reference Amendment to Contract No. 8956 (CCS).