Loading...
SR-820504-12FPL:RO:nh Santa Monica, California Council Mtg.: May 4, 1982 ~9AY ~ t~~2 T0: The Mayor and City Council FROM: City Staff SUBJECT: DR 050, Revised Staff Report, Proposed Mini-Storage, .3250 Olympic Blvd., M2, Calvin B. Gross, Lessee. Staff is in receipt of new information regarding the proposed construction costs for the 40,000 sq,ft. of building to be converted to mini-storage use which affects the development fee. Accordingly the following explanation and revision is respectfully submitted. A. The fee as computed in the Staff Report was based on 40,000 sq.ft. of construction. B. The fee in accordance with Resolution 6385 should be assessed against the proposed addition based on adjusted gross floor area. C. The adjusted gross floor area of the second floor addition deducting stairwells, bearing walls and floor cutouts for loading purposes equals approximately 19,000 sq.ft. D, Based on the original figure for construction costs at $10.00 per sq.ft. as estimated by the Building Department those costs would be $190,000 which by assessing the 8o development fee would result in a revised figure of $15,200.00. Prepared by: Rex Oberbeck MAY 4 P982