Loading...
SR-121107-1F~_ ;tYof City Council Report Santa Monica City Council Meeting: December 11, 2007 Agenda Item: To: Mayor and City Council From: Craig Perkins, Director -Environmental and Public Works Management Subject: Approval of Third Modification to the Existing Professional Services Agreement for the City Hall Seismic Retrofit Project for Contract Extension, Modification of Existing Scope and Scope Addition. Recommended Action Staff recommends that the City Council: 1. authorize the City Manager to negotiate and execute a third modification to Contract No. 8529 (CCS) with Black and Veatch, modifying the existing scope, schedule, and cost of the Seismic Retrofit Project. This total modification is not to exceed $213,826 (including 10% contingency) for a revised contract total of $1,524,715; and 2. authorize the City Manager to negotiate and execute a third modification to Contract No. 8529 (CCS) with Black and Veatch, adding the new scope of Jail Area Tenant Improvement (TI), elevator addition, restroom addition, and electric room addition scope, schedule, cost to the existing Seismic Retrofit Project. This total modification is not to exceed $377,686 (including 10% contingency) for a revised contract total of $1,902,401. Executive Summary Black and Veatch is currently under Contract No. 8529 (CCS) to provide design services for the seismic retrofit of City Hall. This project has two major components, seismic retrofit to City Hall and tenant improvement to the jail area. These two components include numerous scopes of work which are monitored with itemized cost breakdowns. Recommendation #1 relates to the scope included within the existing seismic retrofit cost breakdown and is required to complete the Seismic Retrofit Project. Recommendation #2 relates to Jail Area TI new scope that will be tracked in a separate cost breakdown within the existing Seismic Retrofit Project and is necessary to complete the new elevator/electrical room addition. The two part recommendation is presented in order to facilitate Council's flexibility in approving the scopes separately. Staff recommends that Council approve Recommendation #1 to allow the consultant to complete their existing scope of work and approve Recommendation #2 to allow the consultant to continue development of the elevator/electrical room addition required to 1 provide a code compliant TI to the jail area. Staff requests authorization of recommendation one and two. Recommendation #1 provides an extension to the current contract to develop construction drawings due to the extensive coordination of "Construction Phasing" required between the Seismic Retrofit and Heating Ventilating Air Conditioning (HVAC) Replacement Projects. This contract extension requires additional project management services, additional fees and expands the consultant's services for the design of the seismic retrofit of City Hall to March 31, 2008. This modification increases the consultant's fee from the Second Modification total of $1,310,889 to a total not to exceed $1,524,715. Recommendation #2 authorizes the consultant to develop plans for the Jail Area TI, data center relocation, new elevator, and new electric room in conformance with direction given by Council given in study session. Development of these TI plans requires additional services, fees and expands the consultant's services for the design of the seismic retrofit of City Hall to May 31, 2008. This modification increases the consultant's fee from the Second Modification total of $1,310,889 to a total not to exceed $1,902,401. Staff recommends authorization of this modification to allow the consultant to continue work on the design within Federal Emergency Management Agency (FEMA) grant expenditure deadlines. Discussion The City intends to construct the Seismic Retrofit project and the HVAC replacement project simultaneously. This construction approach will provide less disruption to services at City Hall and will lower construction costs. This approach requires a high level of coordination between the construction documents, the bidding documents, and the construction activities of the two projects. The HVAC replacement project provides the critical factors in determining the size and phasing of the construction zones, therefore completion of the Seismic Retrofit project bidding package cannot be completed prior to completion of the HVAC replacement project bidding package. Additional services are also being added for assistance during the bidding phase, which were not included in the original contract or previous modifications. FEMA has approved utilizing grant funds for the design and construction of the data center relocation, Jail Area TI project for the relocation of Information Systems Department (ISD) and the construction of a new elevator. 2 City Hall currently houses the main data center that serves all City facilities. This data center and ISD offices must be relocated in preparation for the Seismic Retrofit Project. The proposed new location for the data center and ISD offices is in the vacant jail in City Hall. Conversion of the jail into the data center and offices requires addition of an exterior elevator, restrooms and a new main entry door. Increased power requirements of the new data center and elevator create additional electrical demands that require a larger main electrical service to the building. This new electrical service requires the addition of an exterior electrical room. The current total estimated construction cost for the City Hall Seismic Retrofit Project is approximately $10.5 million. Funds have been approved by FEMA for the additional design work by Black and Veatch, with the exception of funds for construction of the electrical room, which is ineligible under federal guidelines. Previous Council Actions On May 24, 2007, City Council authorized the second modification to the Professional Services Agreement with Black and Veatch for design of the City Hall Seismic Retrofit Project. On April 25, 2006, City Council authorized the first modification to the Professional Services Agreement with Black and Veatch for design of the City Hall Seismic Retrofit Project. On November 22, 2005, City Council authorized the negotiation of a professional services agreement with Black and Veatch, Contract No. 8529 (CCS) for design of the City Hall Seismic Retrofit Project. Contract Modification Recommendation #1- A modification to the existing professional services agreement with Black and Veatch, Contract No. 8529 (CCS) in the amount of $213,826 is required for the increased scope of work. This modification includes both additive and deductive scopes. Services to be added to the existing scope include the project management during the completion of the Seismic Retrofit construction documents and services 3 during the construction bidding process. Services to be deducted from the existing scope include portions of the as-built process (second modification), not completed due to unforeseen site conditions. A three month extension of the project completion date is also required. The modified agreement will now expire on March 31, 2008. With this modification, the new agreement is not to exceed $1,524,715. The modification to the existing agreement is funded by FEMA grant funds. Recommendation #2- A modification to the existing professional services agreement with Black and Veatch, Contract No. 8529 (CCS) in the amount of $377,686 is required for the increased scope of work. Services to be added to the existing scope include the creation of design and construction documents of the new ISD offices, an exterior elevator, an electric room, restrooms, and a new ISD office entry door. A three month extension of the project completion date is also required. The modified agreement will now expire on May 31, 2008. With this modification, the new agreement is not to exceed $1,902,401. The modification to the existing agreement is funded by FEMA grant funds and General Funds. FEMA has approved the use of grant funds for the elevator addition project. The electric room addition is ineligible under FEMA regulations. General funds will utilized to fund the electrical room portion of this contract modification. Financial Impacts & Budget Actions Recommendation #1-The total cost of the modification to the Black and Veatch contract for project management services is $213,826. Funds in the amount of $213,826 are available in account E130748.555010, "City Hall Seismic Retrofit." The total cost of the modified professional services agreement is not to exceed $1,524,715. 4 Recommendation #2- The total cost of the modification to the Black and Veatch contract for architectural services is $377,686. Design of the new electric room will be funded with General Funds ($15,750). Funds in the amount of $361,936 are available in account E130748.555010, "City Hall Seismic Retrofit." Funds in the amount of $15,750 are available in account 0010162.589000, "City Hall Expansion." The total cost of the modified professional services agreement is not to exceed $1,902,401. Prepared by: Alex Parry ,Architect Approved:. Forwarded to Council: oar C~ig Perkins " ~,Y_amont Ewell Director -Environmental and Public City Manager Works Management 5 Reference Amended Contract No. 8529 (CCS).