SR-300-002-01 (26) e e got? -"' otJz-- 0/ J 1- H NS. BJS: n., Council Meeting 11/23/82 .NOV 2 ;:; 1932 Santa Monica, California TO: Mayor and City Council FRon. CIty Staff SUBJECT Annual Review of CDBG Program Introduction ThiS Annual Review of the Community Development Block Grant (CDBG) pro9ra~ IS part of the annual Performance Assessment process In conjunction with the pub! ic hearing held September 28, 1982. It is designed to provide City Council with an overview of the entire CDBG program and an opportunity to take any action which may be appropriate. This review is in addition to the semi-annual CDBG report required by the recently-adopted CDBG Ordinance. The purpose of this staff report is to (1) provide a brief review of all CDBG projects conpleted In 1981-82, (2) discuss the status of prior year projects still in progress, (3) prOVide an overvievl of the 1982-83 program Including pending requests for 1982-83 Contingency Funds, and (4) reco~mend necessary changes in projects or reprogramning of funds. Program Rev i ey, CDBG PROJECTS COMPLETED IN 1981-82 A. Senior Recreation Center Allocatlon 1979-80 - $75,000 Flnal Expend~tures - (74,529) PEPROGRAf1z.!ED $ 471 Design and construction of a 1,500 sq. ft. expansion of the Center located In Palisades Park. B Northeast Ocean Park Neighborhood Center Acquisition Al1ocat~on 1980-81 - $168,000 F2na1 Expend2tures - (168,000) o AcquiSition of a residential property for conversion to use as a NeIghborhood Center to be operated by Fraternal Endeavors (FE). Acqu i 5 J t i on ~"as camp 1 eted in April 1982. The Lease bebJeen FE and 11- H LNOV 2 3 1982 e e Mayor and City Council -2- November 23. 1982 the City was executed on October 22, 1982 and an additional $15.500 of 1982-83 CDSG funds was allocated for renovation of the property. This program serves a project area comprised of 67 ld: low/moderate- income residents C. Security Lighting - Joslyn Park Allocat~on 1980-81 - $20,500 F~na1 Expend~tures - (16,728) TO BE REPROGRAMMED $ 3,772 Installation of five new light poles with fixtures, and thirteen new light fixtures; located in a CDBG project area comprised 67 4% low/moderate-income residents D. Play Area Renovation - Joslyn Park A11ocat~on 1980-81 - $35,600 F~nal Expend~tures - (34,177) REPROGP~!~~ED $ 1,423 Redesign and reconstruction of play area and replacement of play equipment. E. Mural - Joslyn Park A11ocat~on 1980-81 - $1,000 F~na1 Expend~tures - (1,000) o Design and execution of mural on wall of park completed in June of 1982. Dedication held in July F. Traffic Signal - Pico and 18th Ct. A11ocat~on 1980-81 - $10,000 F~na1 Expend~tures - ( 9,500) TO BE REPROGRAMMED 5 500 Installation of pedestrian-activated traffiC signal located in a CDBG project area comprised of 71.5% low/moderate-income residents. G. Wheelchair Ramps A11ocat~on 1981-82 - 518,000 F~nal Expend~tures - (17,144) REPROGRlil.fi"JED $ 856 e e Mayor and City Council -3- November 23, 1982 Thirty wheelchaIr ramps (curb cuts) constructed in the Pico Neighborhood. The project area is composed of 67.3% low/moderate- Income residents. H. Sidewalk Construction - Michigan at 20th Street Al1ocat~on 1981-82 - $10,000 F~na1 Expend~tures - ( 1,964) REPROGRAMMED $ 8,036 Construction of 200 feet of sidewalk in project area composed of 67 3% low/moderate-income residents. I. Street Improvements - Delaware Avenue Al1ocat~on 1981-82 - $20,000 F~na1 Expend~tures - (13,516) REPROGRAMMED $6,484 ConstructIon of traffic islands and reconstruction of adjacent curbs and sidewalks. J. Residential Security Installation Program - Ocean Park Community Organization Al1ocat~on 1981-82 - $37,000 F~na1 Expend~tures - (29,866) REPROGRAMMED $ 7,134 Provision of security audits and lock installation in 177 residences. 100% of direct beneficiaries were of low/moderate inco~e. 66.6% of these were low Income. K. Youth Activities Program - Pica Neighborhood Association A11ocat~on 1981-82 - $70,000 F~na1 Expend~tures - (66,127) REPROGRAl"lMED $ 3,873 Neighborhood-level youth activities program provided by PIca Neighborhood Association. Approximately 150-200 youth from CDBG target area co~prised of 67.3% low/moderate-income residents had some kind of contact with PNA. Acitlvities included organizing ten youth block clubs, leadership activities and special projects. It e Mayor and City Council -4- November 23. 1982 L. Citizen Participation Outreach - latino Resource Organization Allocatlon 1981-82 - $BO,OOO Plna1 Expend~tures - (BO,OOO) o Latino outreach program, including the development and distribution of a bi-l ingual resource directory detailing social services for the Latino community, a needs assessment (finalized in 1982-83), and comnunity forums and meetings. I I. PRIOR YEAR CDBG PROJECTS STILL IN PROGRESS The following is an update on all eDBG projects approved In prior yea rs and not yet comp 1 eted. One of the ni ne projects was or i g i na 11 y approved in 1979-80, three In 1980-81. and five in 1981-82. Expenditure amounts reflect total actual expenditures to September 30, 1982. Encumbered or cash advances to subrecipients are not included. A. Multiservice Center Allocatlon 1979-80 - $2BO,OOO 1980-81 - 320,000 TOTAL ALLOCATION Expended Sept. 30 BALANCE $600,000 ( 91,584) $508,416 In Fall of 1981, the City Council reformulated the original project designed by a group of agencies to house social service prOViders. The new plan involved a mixed-use structure of housing, social services and parking to be located on a City-owned parking lot on 4th Street between Broadway and Colorado. Since that time. the following activities have been undertaken. (I) Bay Area Multi- service Center (BAMC) staff completed a concept paper on possible models for the center and an assessment of space needs of social service agencies in the area, (2) The BAMe Board raised a total of $43.120 in cash and pledges, (3) City staff researched a number of funding alternatives. including the State Rental Housing Construction Program and the CHFA Section 8 program, to supplement City and CDBG funds that would have provided the necessary support e e Mayor and City Council -5- November 23, 1982 to complete the project. This last effort was unsuccessful due to the decline in funding for housing construction and a preference on the part of funding agencies to avoid mixed-use projects. Although a full review and analysis is underway, the staff's preliminary findings are that it is infeasible to procure funding to cover the current $1.5 mi 11 ion deficit for the project. In response to this 11gloofl1Y" out- look, Staff recently located up to eight sites on the Mall and in the downtown area having potential rehab possibilities for social service space. A fiscal analysis of renovating an existing structure indicates that this alternative is feasible. In light of this analysis and considering the critical need for social servIce space in the community, Staff feels confident that viable rehab opportunities exit. Accordingly, the Staff's full review effort will focus on preparing a recofl1mendation on a rehab package in t~e CBD area for Council consideration. B. Security Lighting - Mall A11ocat~on 1980-81 - $50,000 Expended Sept. 30 - (14,571) BALANCE $35,429 At the time this prOject was approved, plans were being formulated for revitalization activities on the Mall. While consensus was not reached In the overall plan, it was decided to use a portion of the funds to provide increased illumination. Since a redeSign of the Mall area was anticipated, installation of new lIght poles and fixtures was postponed. It is anticipated that a funding strategy for expenditure of this money on a component of Mall improvements will be in place by the end of the fiscal year. C. Public Works Assessment Assistance Al1ocat2on 1980-81 - $5,000 Expended sept. 30 396 $4,604 To date assistance has been provided to three low/moderate-income property owners who have been assessed by the City for publ ic works construction. Activity is to continue as needed. NotificatIon of this fund IS included on all assessment notices involving residential assessments. However, additional advertising efforts are currently being explored by City Staff e Mayor and City Council -6- e November 23, 1982 D. Housing Acquisition/Rehabilitation A11ocat~on 1980-81 - $567,635 1981-82 - 400,000 1982-83 - 235,000 TOTAL ALLOCATION Expended Sept. 30 $1,202,635 (82,762) $1,119,873 BALANCE Funds earmarked for housing in prior years have been allocated to the 1982-83 Housing Program as follows (1) $735,043 for the HouSlnq Rehabil itation Program including a Handyperson Project In the Pico Neighborhood implemented by PNA and United Community and Housing Development Corporation, improvement of procedures for code enforcement, and a loan program for Section 8 Moderate Rehabll itation. It is antiCipated that 5485,048 of this will be expended in the 1982-83 prograM year and $250,000 In 1983-84. (2) $100,000 for site improvements for a public housing prOject to be developed by the Housing Authority in the County of Los Angeles (the site has been approved by HUD). (3) A grant of $9,000 awarded to Community Corporation to investigate the feasibility of acquiring Cloverfield Gardens. The unobligated balance of $358,587 is available to be used to acquire sites for construction or rehabil itation. The instability of Federal and State funding sources for housing has slowed this process consIderably. However, a variety of sites are under consideration and work with neighbors and other interested groups has begun in order to encourage citizen input into the selection process. Staff anticipates either acquiring a site in the 1982-83 program year, contingent upon aporoval by HUD,or alternately having rehab program recommendations for consideration. All obligated housing funds represent approximately 99% benefit to low/moderate-income persons. E Mural - Stewart Street Underpass hllocat~on 1981-82 - $9,000 Expended Sept. 30 - (B,750) BALANCE $ 250 e e Mayor and City Council -7- Novembe r 23, 1982 Pico Neighborhood ASsoclatlon1s Youth Employment Program assisted the artist in the execution of the mural depicting life in the Pico Neighborhood. The mural was completed in early November and PNA held a dedication ceremony at the mural site, followed by a picnic in Stewart Street Park. This mural is located in a target area comprised of 67.3% low/moderate-income residents and 100% of the youth assisting On the project were from low/moderate- income fami 1 i es. F. ~ecovery Home for Substance Abusing Youth - CLARE Foundation A11ocatLon 1981-82 - $200,000 Expended Sept. 30 0 BALANCE $200,000 In August of 1981, a site was identified for this project at 2937 Virginia Avenue. Appraisals of the property were prepared, an application for exemption from rent control was submitted and neighborhood meetings were held. Strong opposition from the surrounding neighborhood developed and the proposed Site was not approved. Another site (2902 3rd Street) was then identified and in February 1982, the acquisition orocess began. However, a title search on the property has indicated an Illegal subdivision occured in the past. In addition, a request for any necessary variances and new tract map cannot be reviewed until approval of the Housing Element. The Planning Department esti~ates that a decision could be made within 60 days of the approval of the Housing Element. Given the problems with the 3rd Street property, CLARE submitted an alternative proposal to USe the $200,000 in CDBG funds While the concept submitted (a youth center at an undetermined site) was an interesting one, Staff does not recommend the change of use. Given decreaSing resources for social services and resulting fiscal difficulties eXisting youth programs are facing, It would not be appropriate to Initiate a new program without also allowing eXisting programs to submtt competing funding proposals. e e Mayor and City Council -8- November 23, 1982 G. FacilIties for the Handicapped A11ocatLon 1981-82 - $10,500 Expended sept. 30 - ( 8(240) BALANCE $ 2,260 Construction of the wheelchair ramp in the Finance Department of City Hall has recently been completed. Recommendations for use of the final balance wIll be inc1uded in future recommendations for the use of 1982-83 Barrier Removal funds. These recommendations are being developed by this depart~ent's Office for the Disabled. H. Community Development Corporation {CDC) - Ocean Park Community Organization AllocatLon 1981-82 - $75,090 Expended Sept. 30 - (16,272) BALANCE $57,818 Progress on this grant began in 1981-82 with the selection of qualified staff to form the CDC and to seek out appropriate projects to under- take. Since the start of FY 82-83, the CDC (incorporated as the Community Corporation) has selected a Board of Directors, and has undertaken preliminary feasibility analysis for several projects such as the acquisition of Cloverfield Gardens. I. Fourth Street Improvements A11ocatLon 1981-82 - $100,277 Expended Sept. 30 0 BALANCE $100,277 Reconstruction of approximately 1,800 ft. of Fourth Street between Broadway and Wilshire Boulevard. This is part of a larger contract for street improvements totaling 51,006,446.50 which has been let. Work on other streets is stIll in progress. A dispute with the contractor regarding quantities of work performed has held up the payment process. I I I. CURRENT YEAR CDBG PROGRAM A. 1982-83 Projects Attached for Council review IS a list of all new projects approved e e Mayor and City Council -9- November 23, 1982 for the 1982-83 progra~ year. (See Attachment A) This report does not include updates in these new projects as this will occur at the time of the six-month report of the CDBG program in February. (The six-month report is detailed in the recently adopted CDBG Ordinance.) The basis of this report will be a set of targets developed at the beginning of the year for each project. In the case of City capital projects, staff has prepared implementatIon plans for each project including a timeline and benchmarks for monitoring progress Grants to community organizations include a Grantee Workplan which outlines (a) Program objectives including quantifiable levels of service as well as more subjective targets, (b) fundraising objectives to ensure that agencies are attempting to diversify funding, and (c) a "networking or technical assistance'! objective to encourage community agencies to share resources and coordinate services. B. 1982-83 CDBG Contingency Fund The CDBG Contingency Fund is maintained (I) to meet unpredicted and justifiable expenses of current CDBG projects, and (2) to give the Council flexibility in implementing new projects based on community development pol icy decisions made during the year. These new projects are to address critical community development needs arising during the year which, if not addressed in a tl~ely fashion, will adversely effect low/moderate-income residents of the City. Currently, contingency funds equal $134,384. In the past month, staff has received two requests from community agencies for use of a total of approximately S29,OOO of these funds. Staff has determined that both requests meet eligibility requirements and the criteria for contingency funds described above. These reques ts are: (1) Westside Legal Services (WLS)is requesting $3,975 for modificatIon of current office partitions in order to fully enclose attorney and mediator offices. Currently, WLS legal staff work In offices that provide no assurance of confidentiality and they report that this is in violation of attorney/client privilege because e e Mayor and City Council -10- November 23, 1982 of the lack of sound-proof office space. Conversations between cl ient and attorney can be heard in other offices and in the reception area. In addition, the Neighborhood Justice Center (which receives rent-free space from WLS as a condition of its grant with the City) cannot conduct on-site mediations because of the lack of privacy. Again, on-site mediation by Neighborhood Justice Center was a condition of the WLS grant. Staff has review the abilIty of Westside Legal Services to cover the costs of capital improvements from other Sources. This review resulted in the following conclusions: (a) that WLS is successful at procuring community resources through the extensive use of volunteer and pro bono attorneys, (b) that WLS conducts an ongoing fundraising campaign and submits proposals for funding whenever possible; but (c) that these resources are used to cover deficits In the operating budget, with no allowance for capital improvements. (2) Los Angeles Childbirth Center (LACC)is requesting $25,000 In additional eDBG funds for structural renovations to a facility at 1200 Pico for use by the Latina Maternity Care Project as an Alternative Birthing Center. A detail of those costs is attached. (See Attachment B) Review of these plans Indicate these costs are eligible except for $700 for equipment (stove/refrigerator). In addition to this request, LACe received $30,000 in GRS funds for operating expenses associated with the development of the Latina Maternity Care Project and an Alternative Birthing Center and $10,000 in CDBG funds for renovation of the facility. At the time that funding decisions were made LACC had not yet located a building. After many months of looking, the proposed site was found. The potential owners of the building (escrow closes November 28, 1982) have agreed to lease the facility to LACC for $.73/sq. ft. per month if they can secure the $25,000 in cnBG funds for renovation. Discussion with the potential owners indicate a will ingness to lease t~le improved space to LACe, the City or an agency designated e e Mayor and City Council -11- November 23, 1982 by the City for social service use for a period of ten years at the $.73 with no escalation in excess of CPl. Staff recommends approval of this request because of the increasing documentation regarding the need for low cost pre-natal care and alternative birthing services. The recently submitted draft of the Latino Resource Organization's needs assessment indicates that 46% of all Santa Monica Latina Mothers interviewed indicated they had received no pre-natal care. A study conducted by the Department of Community and Economic Development and the recent hearing on midWIves conducted by the Commission on the Status of Women also revealed this need. Increasing unemployment coupled with new and severe cutbacks In health care on the State and County level have increased the urgency to provide low-cost alternatives for maternity services for low-income mothers. Recommenda t ion City staff recommends that the Council I. Approve the change in the Multiservice Center project from the mixed-use facility on 4th Street to a single-use center and direct staff to proceed with the identification of property appropriate for rehabilitation. 2. Require that resolution of the imperfect deed of the CLARE Youth Recovery Home site occur within 60 days of the approval of the HOUSing Element or the funds will be reprogrammed 3. Allocate 52,975 from CDBG Contingency funds for the purpose of modifying internal partitions for Wests Ide Legal Services and authorize the City Manager to negotiate an agreement which includes proper assurances regarding CDBG eligibility requirements and owner/agency reimbursement. 4. Allocate an additional S24,300 from CDBG funds to supplement the preVIous award of $10,000 to the L.A. Childbirth Center for renovation of space for the Latina Maternity Care Project and authorize the City Manager to negotiate an agreement for the total amount of 534,300. This agreement should include assurances e e Mayor and City Council -12- November 23, 1982 of a ten-year co~~it~ent to lease the space to social service providers that substantially benefit low/moderate-income individuals, and City shall review and approve renovation plans to ensure the facility is appropriate for general social service use; and lease cost to LACC for the first year shall be S.73/sq. ft per month with provisions for an annual increase no greater than the increases in CPI for any year. Prepared by' Barbara Stinchfield PROJECT NO: 801 802 803 804 805 806 808 809 810 811 812 813 814 815 816 817 818 819 e e AMOUNT $ 545,048 190,000 10,000 130,000 125,000 150,000 175,000 37,000 20,500 85,000 100,000 43,000 97,500 25,500 40,000 15,600 12,400 5,000 185,500 2 . 1 85 $ , ,994, 2 33'~ ~1982-83 Allocation from HUD 51,404,185 Prior year funds a~d program income used to aug~ent 1982-83 Program Funds. COUNCIL-APPROVED ACTIVITIES FOR THE 8th YEAR (1982-83) COMMUNITY DEVELOPMENT BLOCK GRANT PROGRAM PROJECT/ACTIVITY Housing Rehabil itation - PNA Housing Rehabilitation - CITY Childbirth Center Renovation ff. S. 1 14th & Michigan Ave. Tra IC .gna 5 - 11th & Michigan Ave. Stewart Street Park Improvements Street Light Installation 1600 & 1700 Blocks of Franklin Street Street Light Installation 1400 & 1500 Blocks of 18th and 19th Streets Stepping Stone Acquisition Residential Security Installation Program - OpeD Wheelchair Ramps Facilities for Disabled Economic Development Youth Development and Employment Program - Pt.lA Citizen Participation Outreach to Latinos - LRO Neighborhood Housing Project - OPCO Fair Housing Progran Nei~~borhood Adult PartiCIpation Project (NAPP) Child Abuse Pilot Project - OPCC Ozone Park Play Equip~ent Planning and Ad~inistration Cor. t i '1gency FUiiC ATTACHMENT A e ESTIHATE- BONUS CONSTRUCTION 1200 Pica Boulevard COMMERCIAL RENOVATION I . D ry\....a I I - Wa 11 s 1,120 sq. ft $. 55/sq. ft. + 30% = 1,500 sq. ft. including labor 2. Floor Covering - Carpet/Linoleum 1,400 sq. ft. = 155 sq. yds. $15/sq. yd. installed = $2,300 Ramp/Floor Repair $500 3. Electrical = Rough + Finish (Fixtures) $1. 95/sq. ft. (Floor) 4. Painting - Prime + Z Coats $2.35/sq. ft. (Floor) 5. Glass Work 2 Large (New) Windows (Face East) S800/ea. IncludIng labor 2 Sky1 ights (Opening) - $800/ea. includIng labor 6. Carpentry Walls (Rough) - 20 hours x S20/hr. Finish - 40 hours x $20/hr. 7. Doors Exteriors (2 Ne\oJ) - S300/ea. including HDW Locks Interior (7) - S125/ea. 8. Heating Add 2, 4 are In place ($SOO/ea. including labor) 9. Plumbing Rough - I New Bathroom/Kitchen Renovate Present e LICENSE #419680 1,400 sq. ft. $ 900 2,800 2,700 3,300 3,200 1,200 1 ,500 1,000 1,000 ATTACHMENT B I of 2 co~r1UNITY S~RV~ PROJECTS (co~t) e A-3 CC."""'lJNIT'f OU~';(EAC, u.,7!NO RESClJRCE CRGp.Nrz.!l,rC~~ SANT;" :-'ClNICA tAID CITY hEIGH30RS lDl,:"OO :::>BG 117,338 :;RS I i -., 43,836 GRS i3, 681 GKS 51),000 STA"'c G FI,;ND 20,ODO G. FUND ! 30,JOO :G. "'1.;/.0 t I I I. 30,9gl IG "'U~iD 1 (DSG 1+4,720 G. FI,,;ND n C:lSG Jessi I 51,200 VIT-GIL. I I CC::A.\1 ?ARK COM-\;NliY :~G.\~HZA7ICN ~ICO NEIG~60R~ ASSOCIATION WISE SE~IOR :R!~e ~~EVENTICN ~ROGRA~ CCI"MlJrJl7'V CRIME PI:1EVENTICN "'UND CI7Y CRI~E PR~/E'\ITICN ~ROG~ CITY OFFICE FOR "'HE DISAB~-n RADIO KCRW (COLNCIL BROADCASTS) =.M~GENCY FOOD AN) Si-IEL. -=:R 8"'.ERG~"lCY "'000 AND SHEL T=~ ;=Ut-.D PARA7~NSI"" "'CR JIS & ""LDEi(LY WISE ?ARATRPtSIT Pl:lOGAA"l 5.), :JOO PROP A rt>lpI:10VE-'E'-lT 01= HOUSI~ CJND.; ',IESTSIDE COM>1 FOR ['D. LIVING ('NeIL) HOUS I NG LAW ~F 'NISE SENIOR S'"'ARED HQUSII\G P~CNGRAM C5G ....OB~ JOSS TEf-w.T COUNSELII\G I; ASSISTANCE F\J~ i 55,auo ! G. =t.ND 1 I. TOTAL C~jNITY SERVICE pqOJECTS $1,794,184 -) I