Loading...
SR-202-002 (24) - ]"1'. I' ' ;':"'i~'lnhn ~;n~ ~A F:\FINANCE\BUDGET\MYBUDREV\MY0304\MIDTERM.doc Council Meeting: January 27,2004 JAN 2 7 2004 Santa Monica, California TO: Mayor and City Council FROM: City Staff SUBJECT: Recommendation to Conduct FY2003-04 Mid-Term Budget Review; Approve Associated Budget Changes; Adopt a Resolution Establishing Various Classifications and Salary Rates, Review FY2003-04 Progress on Community Priorities; Receive Public Comment and Provide Staff with Direction Regarding Budget Preparation, Including Community Development Block Grant and Home Investment Partnership Act (HOME) Programs and Planning and Community Development Work Priorities Introduction This report provides a status update of the FY2003-04 budget and work plan and recommends necessary budget and personnel changes. Council is also requested to receive public input and provide staff with policy direction regarding. budget development for FY2004-05 and planning for FY2005-06, including receiving input and providing direction on the Community Development Block Grant and Home Investment Partnership Act (HOME) programs and Planning and Community Development Department priorities. Mid-Term BudQet Review Financial Review - The City has made a substantial reduction in the gap between ongoing revenues and ongoing expenditures for the next five years due to 1) actions taken by Council to reduce expenditures and increase revenues in the FY2003-04 budget and, 2) 1 ~A JAN 2 7 2004 "g.,.. updated projections of revenue and expenditures based on the most recent trend information. While, smaller, a gap still exists. For FY2004-05 there remains a funding gap of $4.0 million that increases to $5.6 million in FY2005-06 if no corrective measures are taken. As the FY2004-05 Proposed Budget and FY2005-06 Financial Plan are developed, staff will review options for closing the ongoing divergence. One action by Council at this time, described below, can further reduce the funding gap. The FY2002-03 fiscal year closed with the 10% operating fund balance set-aside of $16.7 million. Also, the availability of an additional $5.7 million in one-time funds offers an opportunity to fund a critical capital improvement - Pier Structural Rehabilitation and Repair - without a commensurate decrease in programs and services. Total project costs are estimated at over $6.0 million; although this number will be refined over the next few months based on the work awarded tonight to Moffatt and Nichol. The application of one- time funds to a finite and discrete project will eliminate the need for ongoing revenues to pay for this multi-year expense, as originally forecast. As a result, the FY2004-05 funding gap will be lowered to $2.1 million and the FY2005/06 funding gap will be lowered to $3.8 million. Revenues for FY2003-04 reflect a net increase of $3.4 million ($1.5 million one-time, $1.9 million ongoing). One time funds include Vehicle License Fee (VLF) "Backfill" revenues that were not budgeted by the City for FY2003-04, but have been received in the amount of 2 $539,853 by the City. Due the uncertain status of the VLF Backfill at the State level, no VLF Backfill beyond what has been received to date is included in the projections. Other one-time monies identified in FY2003-04 are Transient Occupancy Tax audit recoveries of $525,000 and Sales Tax collection anomalies of $400,000. Of the $1.9 ongoing revenue increases identified, approximately $900,000 is required to fund increases identified as necessary for the remainder of FY2003-04. Changes to revenues are described in Exhibit A. General Fund expenditure changes include: one-half year funding for 3.0 FTE code enforcement positions and their associated supply/expenses costs in Planning & Community Development approved by Council (11/25/03). In addition, $5.7 million is recommended to fund the Pier project. Other General Fund expenditures include funding for purchasing two additional years of PERS credit associated with certain staff reductions approved by Council (8/12/03), destination promotion by the Convention & Visitor's Bureau, special project funding for the Fire Department and special park project funding for Community & Cultural Services. Proposed expenditure changes are described in more detail in Exhibit A. General Fund Overview - The General Fund status at Mid-Term is detailed in the table shown on the next page: 3 FY2003-04 MID-TERM BUDGET GENERAL FUND CHANGES (in millions) Year-End & Other Adopted Post -Adoption Revised Proposed Budget Revisions Budget Midterm as of 7/1/03 - as of Budget Revised 7/1/03 12/31/03 12/31/03 Changes Budget Beginning Fund Balance 16.7 5.7 22.4 0.0 22.4 Revenues 170.8 0.7 171.5 3.4 174.9 Expenditures (174.7) (0.8) (175.5) (6.6) (182.1) Balance Sheet Transfers 4.3 0.0 4.3 0.0 4.3 Ending Fund Balance 17.1 5.6 22.7 (3.2) 19.5 * *Includes 10% operating reserve Personnel Actions -Included at Exhibit B 1 is a resolution establishing new classifications and adopting salary rates for various positions. These changes result from an analysis of similar positions in comparable cities and internal equity factors. The cost of the changes will be absorbed in the existing budget. At Exhibit B2 is a listing of position changes and classifications that have been reviewed and approved by the City Manager and the Director of Human Resources and require approval by Council in order to be incorporated into the FY2003-04 City budget. 4 ns ve ":nf . un} changes hstin.9 if> ~~":)-,Nq::;;"(F<:tf\.~::': b~f~~~ ..... ~-, ,. ""~I'I.,.,. 1 tIlj" "Tfl'!IIII n,.. fill and the vehicle license fee itself is far from assured. The Governor's action to preserve the back-fill may be challenged legally and a ballot initiative may eliminate the VLF altogether. As happened in the early 1990's, the Governor's proposed budget diverts local property tax revenue away from cities and counties in order to meet the State's Prop 98 statutory responsibility to fund public education. At a minimum, the City of Santa Monica will lose three-quarter million dollars in property tax reduction to the General Fund and $1.6 million to the Redevelopment Agency for that purpose. Ironically, while the State is shifting revenue away from the City to benefit schools, there is also a local attempt to mandate by initiative that City revenue in excess of the current ongoing $3 million commitment be provided to SMMUSD. Successive City Councils have observed fiscal policies that provide an essential safety valve in times of disaster and that preserve financial flexibility for times of fiscal stress. Budget reductions for FY2004-05 are a certainty and will likely continue into FY2005-06 and beyond. Absent additional State take-backs and/or passage of the local initiative, the reductions required, while substantial, should be less than those that balanced the current fiscal year. Pursuant to Council Direction in December 2003, staff is pursuing discussions regarding a long-term joint use agreement with the School District as well as potential property transactions that might benefit the community. For the former to occur at ongoing funding levels above those currently provided, new revenue streams must be achieved. 6 It will assist staff in developing the budget to hear from Council and the community this evening. CDBG/HOME Program - As part of the FY2003-04 budget process, funding for the Community Development Program (social service grants) was recommended for a period of three years dependent on appropriations in each of the two subsequent fiscal years. While cuts to the General Fund portion of the CD Program are anticipated, the City has not been notified of any anticipated reductions to the CDBG or HOME federal funding. Second year funding for grantees may be recommended in the FY2004-05 Budget for agencies that continue to meet the performance targets and work plans set out in their grantee agreements. Public input on year two of the grant program, including use of the City's CDBG and HOME funds, will assist in preparation of an action plan for this year as required by the U.S. Department of Housing and Urban Development. Planning and Community Development Priorities - An update of workload priorities for the Planning and Community Development Department for FY2003/04 is described in Exhibit D. No change in the priorities is recommended at this time. Recommendations It is recommended that 1) City Council approve the budget changes detailed in Exhibit A and position and classification changes detailed in Exhibit B2 and, 2) City Council adopt a Resolution establishing various classifications and salary 7 -~ rates for various positions (Exhibit B1). 3) City Council receive the FY2003-04 Community Priorities Update 4) Council take public input on the community budget priorities for FY2004-05 and FY2005-06 including Community Development Block Grant and Home Investment Partnership Act (HOME) programs and Planning & Community Development Department work priorities. 5) Council provide direction to staff regarding budget preparation. Prepared By: Steve Stark, Director of Finance Janet Shelton, Budget Manager David Carr, Acting City Treasurer/Revenue Manager Kathy Chang, Principal Budget Analyst Annette Morales, Senior Budget Analyst Prema Krishnan, Senior Budget Analyst Karen Bancroft, Director of Human Resources EXHIBITS A: B1 : Proposed Changes to FY2003-04 Revenue and Expenditure Budgets Resolution Establishing New Classifications and Adopting ~Iary Rates for Certain Positions GtE~ Al>OPT[j) {2..e50l..iJ1"ID"/ :# rJeQ3((!f;~ Position and Classification Changes Community Priorities Update Planning & Community Development Department Work Priorities B2: C D: 8 EXHIBIT A PROPOSED CHANGES TO FY2003-04 REVENUE AND EXPENDITURE BUDGET BudQet Fund Departmentl Division Adiustment Reason REVENUES General Finance/ Treasury $ (371,000) Primarily reflects lower Utility User Tax receipts from electricity service reflecting an earlier than anticipated implementation of a Southern California Edison (SCE) rate decrease plus an unanticipated refund to electric customers. General Finance/ Treasury $ 1,100,000 To reflect greater than anticipated sales tax receipts primarily due to one-time anomalies and modest economic growth in the City. General Finance/ Treasury $ 322,803 To reflect greater than anticipated property taxes primarily from unsecured aircraft taxes. General Finance/ Treasury $ (121,000) To reflect lower than anticipated business license taxes from the professional business category, partially offset by greater than anticipated taxes from the retail category. General Finance/ Treasury $ 1,450,000 To reflect greater than anticipated Transient Occupancy Taxes due to higher occupancy and room rental rates in luxury hotels and one-time audit recoveries. General Finance/ Treasury $ 547,600 To reflect more real property transfer taxes due to reflecting a greater than anticipated number of property transfers and a higher than anticipated average tax per transaction, primarily due to sales of large properties (over $3.0 million assessed value). General Finance/ Treasury $ (299,350) To reflect less than anticipated interest earnings as interest rates have not risen as expected. General Planning and Community $ (550,000) To reflect timing change in the Development! Transportation purchase and installation of new Management parking meters and the associated meter rate increase. ,o!;,1.l EXHIBIT A PROPOSED CHANGES TO FY2003-04 REVENUE AND EXPENDITURE BUDGET BudQet Fund Departmentl Division Adiustment Reason General Planning and Community $ 195,000 To reflect greater than anticipated Development! Transportation attendant parking revenue from the Management downtown structures. General Finance/ Treasury $ 156,000 To reflect greater than anticipated parking facility taxes. General Finance/ Treasury $ 1,199,194 To reflect updated impact of State FY 2003-04 budget reductions. Revised estimate of vehicle license fees (VLF) account for $0.9 million of this increase. City Adopted Budget assumed a $4.1 million loss due to the State actions ($3.7 million in vehicle license fees (VLF) and $.4 million in other revenues). Due to the VLF backfill being reinstated in November 2003, the VLF loss is now projected to be only $2.9 million (the VLF backfill was received for several months). The remainder of the increase primarily results from an administrative correction transferring the loss of Traffic Congestion Relief funds from the General Fund to the Gas Tax Fund ($0.3 million). General Planning and Community $ (163,140) To. reflect less than anticipated plan Development! City Planning check and zoning application/ variance fees. General Planning and Community $ (164,600) To reflect delay in implementation Development! Building & Safety of new special inspection program (-$300,000), partially offset by revenues from a new code enforcement monitoring program. General Community and Cultural Services/ $ 97,490 To reflect increased participation in Community Programs the Summer Surf Academy programs. General Community and Cultural Services/ $ (10,943) To reflect delayed implementation Community Programs of snack bar and storage facility rental program. EXHIBIT A PROPOSED CHANGES TO FY2003-04 REVENUE AND EXPENDITURE BUDGET BudQet Fund Department! Division Adiustment Reason Beach Community and Cultural Services/ $ 347,005 To reflect greater than anticipated Open Space Management beach parking revenues ($162,379) and revenues from rental of beach parking areas for special events and filming ($199,947), partially offset by less encroachment revenue ($15,321). Citizens Option for Public Police/ Office of Administrative $ 46,024 To reflect actual State funding Safety Services level. Civic Auditorium Community and Cultural Services/ $ (200,000) To reflect decreased parking Civic Auditorium revenues due to courthouse construction and loss of revenue to new metered spaces on Olympic Drive. Gas Tax Environmental and Public Works $ (302,183) To reflect loss of Traffic Congestion ManagemenU Administration Relief funding due to State budget actions. Information Technology City Manager/ Information Systems $ 13,970 To reflect contributions from Replacement and General Fund for new computers Services for proactive code enforcement program. EXPENDITURES General Planning and Community $ 108,309 To appropriate funds for proactive DevelopmenU Building and Safety code enforcement program, including the addition of 3.0 FTE positions. General Planning and Community $ 10,000 To appropriate funds for a DevelopmenU Transportation preferential parking study. Management General Police/ Animal Control $ 58,352 To appropriate funds for animal control programs (+$15,927), voucher redemptions (+$30,144) and neuter services (+$12,281). General Fire/ Fire Suppression and Rescue $ 46,124 To appropriate funds for defribulator equipment at city facilities. EXHIBIT A PROPOSED CHANGES TO FY2003-04 REVENUE AND EXPENDITURE BUDGET BudQet Fund Department! Division Adiustment Reason General Community and Cultural Services/ $ 75,791 To appropriate County Proposition Open Space Management A grant funds for maintenance of BIG improvements at Palisades Park. General Community and Cultural Services/ $ 79,352 To appropriate funds for recreation Community Programs software upgrade (+$25,000) and contract programming (+$54,352). General Non-Departmental/ Retirement $ 191,190 To appropriate funds for new positions (+$7,187) and for additional two-year service credit benefit with PERS for certain job classifications (+$184,003). General Non-Departmental! All Other $ 232,578 To appropriate funds for new Transactions positions (+$15,538), for additional two-year service credit benefit with PERS for certain job classifications (+$17,040) and additional funding to the Convention & Visitor's Bureau for promotional activities (+$200,000). General Non-Departmental! Interfund $ 5,666,418 To increase transfer to Pier Fund Transactions for Pier Structural Rehabilitation and Repair Capital Improvement Project. General General Government Capital $ 13,970 To appropriate funds for new Improvement! Computer computers for proactive code Equipment Replacement enforcement program. General Public Safety Capital Improvement! $ 100,000 To appropriate funds for Fire Station Improvements improvements at Fire Station 1 and 5. Beach Community and Cultural Services/ $ 15,911 To appropriate funds for increase Open Space Management cost of County Lifeguard contract (+$5,911) and County Proposition A grant funds for maintenance of BIG improvements at the Beach (+$10,000). Beach Environmental and Public Works $ 24,789 To appropriate County Proposition Management! Beach Maintenance A grant funds for maintenance of BIG improvements at the Beach. EXHIBIT A PROPOSED CHANGES TO FY2003-04 REVENUE AND EXPENDITURE BUDGET Fund Department! Division Miscellaneous Grants Recreation and Cultural Capital Improvement! Joslyn Park Improvements Pier Non-Departmental/ Interfund Transactions Pier Community and Economic $ Development Capital Improvement! Pier Structural Rehabilitation and Repair Gas Tax Streets, Traffic Control and Parking $ Capital Improvement! Traffic Congestion Relief Information Technology Replacement and Services General Government Capital Improvement! Computer Equipment Replacement $ $ $ BudQet Adiustment 1,267 (5,666,418) 5,666,418 18,065 13,970 Reason To appropriate additional Proposition A Grant funding for improvements at Joslyn Park. To increase transfer from General Fund for Pier Structural Rehabilitation and Repair Capital Improvement Project. To appropriate additional funds to the project in order to move the project forward to meet critical needs. To appropriate interest earnings on traffic congestion relief funds to comply with the State Controller's audit. To appropriate funds for new computers for proactive code enforcement program. The following appropriation changes result from MOU requirements. All appropriations are financed from each fund's available fund balance. Beach Recreation Environmental and Public Works $ Management Disaster Relief Environmental and Public Works $ Management Water Environmental and Public Works $ Management Solid Waste Environmental and Public Works $ Management Management Pier Police $ Pier Resource Management $ Wastewater Environmental and Public Works $ Management Civic Auditorium Community and Cultural Services $ Airport Resource Management $ 40,470 9,000 106,374 130,489 17,638 23,113 51,905 28,089 20,649 EXHIBIT A PROPOSED CHANGES TO FY2003-04 REVENUE AND EXPENDITURE BUDGET BudQet Fund Department! Division Adiustment Reason Cemetery Environmental and Public Works $ 20,035 Management Big Blue Bus Big Blue Bus $ 478,114 Cable Communications City Manager $ 25,943 Vehicle Management Environmental and Public Works $ 14,962 Management Workers' Compensation City Manager $ 29,873 EXHIBIT B-2 POSITION AND CLASSIFICATION CHANGES Department Division Delete Add City Attorney City Attorney 1.0 FTE permanent Paralegal City Council City Council 0.60 FTE permanent 0.60 FTE permanent Staff Assistant III Senior Information Assistant City Manager Risk Management 0.50 FTE permanent 1.0 FTE permanent Staff Assistant II Liability Claims Technician Community and Community 1.0 FTE permanent 1.0 FTE permanent Cultural Services Programs Community Services Community Services Program Supervisor Program Supervisor- Senior Services Community and Community 0.5 FTE permanent 0.5 FTE permanent Cultural Services Programs Community Services Community Services Specialist IV Specialist IV - Cultural Arts Environmental and Environmental 1.0 FTE permanent 1.0 FTE permanent Senior Public Works Programs Senior Administrative Environmental Analyst - Management Analyst-Sustainable Sustainable City Cities Environmental and Environmental 1.0 FTE permanent 1.0 FTE permanent Senior Public Works Programs Senior Administrative Environmental Analyst- Management Analyst-CUPA Hazardous Materials Finance Ad min istration and Budget 1.0 FTE permanent Technical Staff Assistant I Planning & Community Development Building and Safety 2.0 FTE permanent Code Compliance Officers Planning & Community Development Building and Safety 1.0 FTE permanent Business Assistant EXHIBIT B-2 POSITION AND CLASSIFICATION CHANGES Department Division Delete Add Police Office of Administrative Services 8.0 FTE permanent Police Officer Police Office of Administrative Services 1.0 FTE permanent Youth Services Counselor Police Office of Administrative Services 1.0 FTE permanent Family Services Liaison Police Office of Criminal Investigations 8.0 FTE permanent Police Officer Police Office of Criminal Investigations 1.0 FTE permanent Youth Services Counselor Police Office of Criminal Investigations 1.0 FTE permanent Family Services Liaison EXHIBIT C COMMON WORK OBJECTIVES Enhance the quality of life, safety and community involvement of residents of the Pico neighborhood. ~.".., ._,r;, ;', ''-:<'7'' Pico is a neighborhood rich in racial, ethnic, and income diversity. Challenges faced by the neighborhood are best addressed through collaborative efforts of residents, businesses, religious and cultural institutions and government agencies. Despite fiscal constraints, this year City departments will be able to: (J Improve interdepartmental and interagency communication to assess emerging needs, ensure effective direction of resources and facilitate crisis communication. Establish an interdisciplinary neighborhood team to share information and assist in community problem solving. CCS, PO The community and the city have engaged in a community wide, interdepartmental- interagency effort to improve safety, security, and quality of life in the Pica Neighborhood. Key City departments have designated staff that will meet regularly to ensure effective interdepartmental communication and participate in community problem solving. Community outreach is one of the major emphases of the Police Department's Neighborhood Centered Policing Program. The Department's Neighborhood Service Area Coordinators and their support staff provide up-to-date information to members of the public at community meetings, in person and through a newsletter. (J Coordinate closely the activities of City youth services, including after-school, park, gang enforcement and school resource programs to reach children and families with constructive activities and information. CCS, PO With the temporary closure of Virginia Avenue Park, CCS staff offer lunchtime and after school activities at John Adams Middle School. Educational enrichment and homework assistance programs are coordinated between PAL, CREST elementary school sites, Virginia Avenue Park staff and the Fairview Library's new teen technology after school program. The City-funded Pico Youth and Family Center is funded by the City to work with older youth and their families, offering case management, employment and other social services. Police and CCS staff are involved in the Police Activities League (PAL) activities, and serve on the Virginia Avenue Park Advisory Board. The officers at PAL teach SAT and test preparation classes for high school-aged children. 1 EXHIBIT C o Refine analysis of Community Voices survey and demographic data regarding the needs and feedback from Pico residents to enhance relevance of city programs. CCS CCS staff has compiled survey and demographic data from Community Voices along with the findings of other recent Pico neighborhood community needs assessments. This data will inform planning for service in the short term and upon the opening of an expanded community center at Virginia Avenue Park. o Designate a Lieutenant to be the ongoing Police Neighborhood Service Area Coordinator, responsible for opening and maintaining lines of communication between police and neighborhood residents as well as local school and church leaders, maintaining contact with and providing direction to Police resources assigned to the area, and developing interdepartmental solutions to problem conditions in the neighborhood. PD Three Police Lieutenants were appointed as Neighborhood Service Area Coordinators in the Southeast service area containing the Pico Neighborhood. One is designated as primary for the Pico Neighborhood and the other two are secondary resources to that neighborhood. They attend school, church and community group meetings in the Pico Neighborhood, and provide information about crime, current Police Department activities and broader services available to the community. a Continue officer training focused on building relationships and working collaboratively with residents to improve conditions in the neighborhood. PO Police Department personnel who work in the Pico Neighborhood have received training on Neighborhood Centered Policing goals and work methods. Training of this type will be ongoing and expanded as the program evolves. o Reposition neighborhood bicycle officers organizationally within the Police Department to increase their focus on community building and outreach while ensuring effective communication regarding neighborhood problems and needs within the department. PO Public Safety resources needed to identify and address the. Pico Neighborhood's safety & security-related problems are now located within a single departmental work unit. The Pico Neighborhood Bicycle Patrol and Gang Intervention Officers are part of the Police Department's Youth Services Division within the Office of Criminal Investigations. The Department's School Resource Officers, Youth Counselor, Family Services Liaison, and Youth Investigators are also part of the Youth Services Division. This consolidation facilitates interaction with detectives who are investigating current crime problems in the neighborhood and improves communication between community members, the Police Department, and other agencies providing resources and services to the neighborhood. 2 ,ilillJil, EXHIBIT C [J Increase uniformed personnel on all patrol watches with deployment of the Directed Resources Division's anti-crime team and judicious use of overtime as required during peak activity hours, supplementing presence with intermittent use of air support as conditions warrant. PO The Police Department has continued its emphasis upon deployment of uniformed officers within the Pico Neighborhood. Daily regular patrol assignments provide not only for the presence of one or more patrol units in the neighborhood, but also for frequent and easy coverage of the neighborhood by patrol units assigned to adjacent beats. During night and early morning hours, additional officers patrol the area and respond to calls for service on overtime deployment. During times when there is tension in the area and/or threat of violence, officers from the Department's Directed Resources Division (anti-crime team) are deployed and officers are assigned to operate a police- equipped helicopter as a proactive safety measure. During the first five months of this fiscal year, the overall number of Part I and Part II crimes reported in the Pico Neighborhood was 169, approximately 7% lower than the total number of Part I and Part II crimes reported for the Pico Neighborhood during the same time period in Fiscal Years 2001-02 and 2002-03. Calendar Years 2000, 2001, and 2002 (which encompass Fiscal Years 2001-02 and 2002-03) were the 3 lowest crime years in the Pico Neighborhood during the last decade. During that decade, the number of reported crimes in the Pica Neighborhood halved. [J Assess the effectiveness of school-based services for youth and families and coordinate with Saint John's Hospital's Community Benefit Program to ensure the most effective targeting of community resources. CCS CCS staff is conducting an inventory of existing school-based services in conjunction with SMMUSD staff. Analysis and evaluation of these services will be coordinated with SMMUSD and/or Saint John's Health Center through FY04-05. [J Begin construction of $15 million, 3.7 acre Virginia Avenue Park to be completed in FY 2004/05. EPWM, CCS Construction of Virginia Avenue Park began in mid-October and is on schedule to be completed in FY 2004/05. [J Pursue MTA funding for streetscape enhancement projects on 20th Street and Cloverfield Blvd. EPWM EPWM submitted application for funding through the MT A Call For Projects. Final funding determinations are made by MT A in February 2004. [J Complete construction of Freeway soundwall between Cloverfield & Stewart. EPWM EXHIBIT C Project completed. 1:1 Provide arts and cultural programming for adults and youth in the Pico neighborhood: CCS Provide FY 2003/04 grants to local arts agencies, including 18th Street Arts Complex, Virginia Avenue Project, Santa Monica Museum of Art, Highways, and Santa Monica Playhouse. Offer grants to public schools and nonprofit agencies in the Pico neighborhood to fund field trips to cultural venues throughout Los Angeles County. Assuming continued funding, with the assistance of the California Arts Council, provide artist-in-residency programs to Pico neighborhood elementary schools. Organizational Support Grants to the above-noted agencies are in place. CO-ARTS and Latino CO-ARTS Grants will be announced in January with eleven grants targeted to the Pico Neighborhood, and five Arts Education Transportation Grants to schools serving the Pico Neighborhood. California Arts Council funding was not available in FY03-04, but savings made in FY02-03 and grants received by the "SMARTS in the School Program" made 13 artists-in-schools residencies possible in FY03-04. 1:1 Continue to provide neighborhood-based Library services including Pre-school outreach programs with three Pico neighborhood Head Start programs. LIBRARY Collaborate with Reading is Fundamental, distributing free books to children at the Head Start programs three times a year. Offer two Spanish language story time programs for families in the neighborhood. Collaborate with the National Library of Medicine to offer assistance and free access to Spanish language public health information online. Collaborate with the Healthy Start program at the Venice Family Clinic by hosting family story times at the Library. Offer free citizenship classes in collaboration with the Mexican American Opportunity Foundation. Offer a story time for babies 0-24 months and caregivers in collaboration with the SMMUSD/lnfant and Family Support program The Library provides programs and services to enrich the Pico neighborhood community. Communication with the National Library of Medicine has been established and the program initiated. The Mexican American Opportunity Foundation canceled free citizenship classes due to low enrollment. The Youth Technology Center (YTC) opened at the Fairview Branch in September 2003. This program was partially funded by a grant from the Verizon Foundation and is staffed by both Library and Community and Cultural Services staff. The YTC is designed for use by students in grades 4 to 12 and features eight laptop computers with educational and recreational software. Weekly computer classes are offered as is online homework help. In addition the 4 EXHIBIT C Library hosts several programs formerly sited at Virginia Avenue Park which serve a large number of Pico youth. 1:1 Provide a constructive staff presence at neighborhood activities when requested. ALL City staff continues to be an active presence in the neighborhood through enrichment activities, attendance at youth and community meetings, and through ongoing coordination and communication with residents, business and other community partners on projects, programs and services. Incorporate ways to achieve the goals of the Sustainable City Plan into daily activities and special projects. In 2002, the City Council adopted a new 10-year Sustainable City Plan, setting goals in the areas of Resource Conservation, Environmental and Public Health, Transportation, Community and Economic Development, Housing, Open Space and Land Use, Community Education and Civic Participation and Human Dignity. Despite fiscal constraints, this year City departments will be able to: CJ Promote the use of "green building" techniques in public and private sector projects EPWM, PCD Showcase aspects of the Public Safety facility in interactions with the public and law enforcement communities. This has been accomplished through tours and printed information on the building. A display is nearing completion that will be installed in the building's lobby. Compile data regarding building performance to demonstrate the effectiveness of "green building" measures. The PSF building controls and monitoring systems are in place. Over time the building's energy consumption can be assessed and compared to the energy modeling assumptions. Achieve at least LEED Silver Rating for the VAP extension, Main Library and BBB Campus expansion projects, using sustainable practices. Develop a program at the Main Library to showcase the sustainability features of the new facility and demonstrate the importance of sustainability to the community. Staff is tracking sustainable elements of each of these projects and is currently optimistic about achieving goals. EXHIBIT C Continue planning for new housing and park open space for the Civic Center area to ensure sustainable design and construction. Demolition of the old Police Building will add open space in the Civic Center area. Through development agreement negotiations with Lantana and discussions with other potential permit applicants, green building techniques and LEED certification are being encouraged. PCD Building and Safety staff developed guidelines and standards for use of reclaimed and gray water plumbing systems. tJ Further reduce paper use city wide: CITY CLERK, PCO, PO, CMO Extend use of technology in Police Department and Building and Safety Division. Save paper and achieve efficiencies and savings in noticing and information dissemination through greater use of electronic publishing and less use of traditional print-and-mail, wherever practical and in keeping with the City's commitment to extensive outreach. The Police Department is using available technology and systems to reduce paper use. Routine reports are created and distributed as electronic documents. Citywide, staff reports are emailed whenever possible (rather than providing a hardcopy) and interoffice communication is conducted on-line where appropriate. Legally required publications are published by Records and Elections Services staff. Further, 100% recycled paper is provided for use in City Hall satellite copiers. PCD provides permit applications and other forms on-line. Building and Safety is working on processing single trade permits and payments via the web. Code Compliance and Permitting have their own Groupwise accounts so concerned parties can e-mail staff their concerns. Extensive use of electronic publishing systems has been implemented. tJ Pursue planning, organizational structure, and funding availability for future light rail on Exposition Right of Way. CMO, PCO, BBB Staff worked with the Westside Cities to develop a Westside Mobility Plan that includes the Exposition Light Rail line to Santa Monica as a key component. The City sponsored legislation (Kuehl) that was signed into law regarding the formation of a construction authority for the Exposition Light Rail Line. The City also supported a sales tax bill (Murray) that, if approved at the ballot box, would fund a list of projects including the Exposition Light Rail. Staff monitored various MT A planning/policy documents such as peer review of the first phase preliminary engineering and the light rail grade separation policy. Environmental review is scheduled to commence in Winter, 2004. tJ Develop strategies to increase the use of sustainable products and to develop methods for tracking the increased usage. FINANCE, EPWM EPWM & Finance are considering a citywide tracking system that would better document green purchasing. 6 EXHIBIT C Fully operate Big Blue Bus LNG fueling facility by end of calendar year. BBB -he LNG fueling facility is complete with the exception of final testing and :ommissioning by appropriate agencies. The facility is expected to be operational in larly calendar year 2004. Explore the land use and financial feasibility of "beach greening" to pilot sustainable landscape management practices in the city's beach parking lots beautifying the lots and capturing runoff from PCH where possible. CCS ~ grant request for the "beach greening" demonstration project was submitted by CCS o the State Water Resources Control Board's Coastal NonPoint Source funding on I )ctober 15, 2003. The project would demonstrate the feasibility of greening beach larking lots via use of a best management practice aimed at preventing urban runoff rom entering Santa Monica Bay while simultaneously providing recreational and lesthetic benefits to the City's residents and visitors. The area chosen for this project ncludes two existing beach parking lots located at 1030 Palisades Beach Road (Pacific ~oast Highway or PCH) and 2030 Barnard Way in Santa Monica. If the City receives Irant funding, staff will undertake a public process to receive input on the site design. 3rant awards will be announced February 2004. If funded, the project should begin in ~005 and be completed in 2007. In FY's 2003-06, continue the implementation of sustainable landscape maintenance practices by CCS Using integrated pest management in landscaped areas; Producing wood chips for dog parks from the City's own tree materials; Specifying drought tolerant species for new landscaped areas in the City; ~{ Specifying irrigation systems that prevent overspray, thereby reducing urban runoff; Implementing a reforestation plan committed to preservation of the tree canopy provided by public trees. ,taff uses integrated pest management in landscaped areas in parks and off-leash dog ireas; keeps Santa Monica parks pesticide-free zones; will produce wood chips for dog )arks from the City's own tree materials (beginning in FY 04-05); specified drought- olerant species for new landscaped areas including the Crosswalk Project landscaping >n Wilshire, Broadway and Colorado, Hacienda del Mar (Euclid) and the Main Library; ;reated drought tolerant demonstration projects at Fire Station #2, the Civic Auditorium md the Ashland Walkway; and specifies irrigation systems that prevent overspray, hereby reducing urban runoff - drip irrigation system will be installed at Kansas ;rosswalk. A reforestation plan effort will preserve the tree canopy provided by public rees and incorporate tree preservation in all public works / hardscape repair projects. rhis entails meeting with neighborhood groups to select "the right tree for the right........ ocation" when trees must be replaced. EXHIBIT C Cl Continue the environmental activities as well as the community arts performances at the Santa Monica Festival for 2004. CCS, EPWM Santa Monica Festival will take place on May 1, 2004. Booths at the Festival will promote sustainable projects and environmentally friendly activities. Cl In collaboration with City-funded agencies, develop and implement strategies to mitigate the impact resulting from cuts in social service funding to address the "human dignity" goals of the City's Sustainable City Program Update. CCS CCS staff works to link City-funded agencies with prospective partners for collaborative services delivery and expanded fundraising. Cl Continue Leadership Series, Citizens Police Academy and other similar community education efforts. CMO, PO The Leadership Series continues with 'Budget Basics' on January 22. The Police Department has expanded its Citizens' Police Academy Program. In addition to the Citizens' Police Academy Program (for English-Speaking Adults), there is the Junior Police Academy Program for youth and the "Academia Communitaria Policial" (a Community Police Academy program presented in Spanish, with translators and childcare provided). Cl Continue mailing Seascape, airing City TV programming and maintaining dynamic website, including web information network and easily accessible information in city processes. CMO This spring, the City will launch a redesigned, more user-friendly website with a variety of navigation tools and new content organization based on user feedback received over the past 5 years. Staff will publish an updated customer services directory, combined with a City Hall on Call directory available in print, on CD and on-line in late winter. Equipment and software has been upgraded for improved netcasting of City Council and Planning Commission meetings. New information available through the web information network includes: . Planning Department Active Projects List . Zoning Administrator Determinations . Architectural Review Board Agendas . Environmental Impact Reports . Housing Commission Agendas . Maps Cl Maximize the supply and use of available Section 8 Rental Vouchers. RMO EXHIBIT C The Section 8 program is currently 100% leased. For the past 6 months the program has averaged a 98% to 100% monthly lease up rate. Normal monthly program attrition accounts for any lease up rate below 100%. [J Continue to provide hazardous materials inspection practices, mitigation strategies and emergency incident response. FIRE The Fire Department makes hazardous materials inspections and educates business owners to work towards the reducing, recycling and reusing. The Department has prompt and efficient emergency incident response to hazardous material incidents providing proper mitigation strategies at each incident. Ensure that the public receives timely and responsive service from all departments and that the City's regulatory processes are fairly, efficiently and courteously administered with a high degree of predictably for customers moving through a process. City government exists to meet public needs for service and order. Public perception of the value received for the public dollar is always important, but never more so than in times of fiscal stress. Despite fiscal constraints, this year City departments will be able to: [J Focus employee training efforts on timely and responsive customer service. CMO, HR Customer service standards are being reviewed, with common values and standards to be reinforced interdepartmentally through training, performance evaluations, and internal communication. In addition to individual department customer service efforts (e.g., Big Blue Bus ongoing training, PCD ongoing permit processing improvements), a program of 20 half-day basic customer service workshops will be offered to approximately 600 staff members at all levels in 2004. Additional workshops will be developed and offered in 2004 for staff units whose work responsibilities require extra training in handling difficult or potential conflict situations (e.g. code compliance officers, parking checkers, park rangers, park staff balancing user and homeless individual rights). Staff is developing a communications plan to help all departments communicate service impacts resulting from resource reductions. [J Continue improvement of the permit, inspection and code enforcement efforts through training, process improvements and work plan redesign including expert input and customer feedback. CMO, PCD, EPWM, CCS, FIRE 9 EXHIBIT C An RFP for review of the permit, plan-check, inspection process and code enforcement process has been issued and in independent consultant will be selected by March to conduct the review. Tracking systems indicate that 66% of submitted plan checks are approved after the second submittal, and 92% of plan checks are approved after the third submittal. Over 80% of the plan checks are completed within the six-week turn-around time performance target. User feed back meetings have identified potential process improvements. A new system has been implemented at the Planning Counter with one experienced planner dedicated to counter service in order to provide clear and consistent information to the public, predictable and reliable customer service, and to maximize efficiency and reduce customer wait time. Civil Engineering staff is working with Building and Safety staff to ensure the timely review and submittal of plan checks. In addition, Civil Engineering and ISD staff are coordinating efforts to place plan check forms on-line before the end of FY 2004. Customer handouts include a new, user-friendly "Homeowner's Guide to Building Permits" that answers the most frequently asked questions about obtaining a permit for construction work on a single-family residence. "Opening a Business in Santa Monica" is a flow chart currently in draft form and under review, intended to assist individuals interested in establishing businesses in the City. Two code compliance officers are now assigned to zoning and sign compliance cases, in order to ensure that these concerns are addressed in addition to life-safety concerns and a variety of methods are being employed to gain code compliance, such as mailings to educate residents and businesses on common code violations, proactive enforcement sweeps and use of administrative hearings when voluntary compliance is not achieved. Staff provides quarterly progress reports on enforcement efforts for the Planning Commission and City Council. City Council has authorized three new positions in Code Compliance to begin proactive enforcement of discretionary permit conditions of approval. IJ Analyze existing regulations and suggest modifications where feasible to achieve clarity of purpose and effectiveness in the permit process. PCD, CA Revisions to the multifamily regulations and downtown development guidelines will present opportunities for process improvement. These standards are scheduled for Council review in Spring, 2004. IJ The Fire Prevention Bureau will continue to maintain plan check review "turn around" times at the current standard of completing all plan reviews within two weeks or less, and 90% of all plan reviews completed in one week. FIRE 10 EXHIBIT C During the first five months of fiscal year 2003-04, 185 plan checks have been completed. Of this total, 95% have been completed in less than 1 week. The remaining 5% were completed within 2 weeks or less. [J Complete Right of Way Management Ordinance to streamline the utility excavation process while ensuring proper public notifications and protecting the integrity of street infrastructure. EPWM, CMO, CA A combined ROWand Wireless Facilities Ordinance is in draft and scheduled for Council consideration by Spring, 2004. [J Complete website redesign to make accessing information about city government easy and intuitive. CMO Redesign of City website graphics and navigational templates is complete. Website content is being reviewed, improved, and migrated to the new template design. The redesigned site will be available by June 30, 2004. [J Implement utility billing customer service improvements including interactive voice response system, automatic customer bank account debits and internet payment options. EPWM On-line utility bill payment is now available. Customers have more convenient methods of paying utility bills through the City's website and interactive voice response systems. [J Provide customer oriented service at the Temporary Main Library and branches during construction of the new Main Library. LIBRARY The Temporary Main Library (TML) opened to the public in May 2003. TML features new items, nonfiction, fiction, paperbacks, current magazines and newspapers, videos, DVDs, CDs, audio books, language-learning materials, reference materials, California and local resources, plus Young Adult materials and a core Children's collection. The bulk of the Main Library children's materials and services were relocated to the Ocean Park Branch Library. The Temporary Main Library offers reference, readers' advisory, public access Internet, and reference, catalog assistance and renewal telephone services. Online services include 24/7 interactive, live reference service, email reference, and access to a host of informational electronic resources. ATTACHMENT "D" UPDATE TO WORKLOAD PRIORITIES FOR PLANNING AND COMMUNITY DEVELOPMENT DEPARTMENT IN FY 2003/04 In June 2003, the Council approved the priorities for the Planning and Community Development Department (PCD). The attached information updates the Department priorities for FY 2003/04. Staffing Retaining staff in the Planning Division continues to be a challenge. Currently, out of the 22 planner positions, there are five vacancies, two staff temporarily on maternity leave and one planner out with a serious injury. This reduces productive work by eight full time equivalent positions and impacts the Division's ability to complete policy projects. Because meeting performance standards for permit, plan check and inspection turnaround is the top priority for staff, and completion of projects such as the Noise Ordinance have taken longer than projected, other policy projects have been delayed. Revised completion dates for policy projects are reflected in Attachment 1. Staffing in the other two Divisions, Building and Safety and Transportation Management, is stable. The Plan Check function in Building and Safety is now fully staffed, and in Code Compliance there are four vacancies, three of which are associated with the new positions authorized recently for proactive monitoring of permit conditions. 1 Permitting Process Improving the permit process and providing useful informational handouts and materials for process users continues as a top priority in the Department. City Planning and Transportation Management have consistently met the turn-around goals for plan check submittals. New tracking systems indicate that 66% of submitted plan checks are approved after the second submittal, and 92% of plan checks are approved after the third submittal. Turn-around times have improved with over 80% of the projects completed within the six-week turn-around time for first review. Throughout the year, Planning and Community Development staff, in concert with the City Manager's Office, Environmental and Public Works Management, Fire, and Community and Cultural Services have held user feedback meetings. Target areas for improvements are identified thru input and comments received at these meetings. Since Council authorized new approval practices associated with environmental processing, all initial studies and EIRs have been completed within the legislative time period of six months or one year respectively. Code Compliance In the first quarter of FY 2003/04, Code Compliance hired staff and improved the performance of the division. Two out of the three code compliance officer vacancies were filled and new staff received training and orientation on municipal code requirements. All positions are filled with the exception of one senior code compliance officer and the three new positions authorized by Council for proactive permit 2 enforcement. Two code compliance officers were recently dedicated to Zoning enforcement, thereby improving responsiveness to Zoning violations. As illustrated in the chart below, code enforcement efforts have improved. The number of Compliance Orders issued in the first quarter was the highest of any quarter (56) while the number of Notices of Pending Administrative Citation remained relatively constant. The number of Administrative Citations issued decreased, but staff believes this is because violators are becoming more responSIve to the Notices of Pending Administrative Citation. As word of fines and criminal prosecution spreads throughout the community, compliance rates are increasing. As a result, fewer violations require the actual issuance of the Administrative Citation. The number of new complaints filed remains high but because of staffing and improved noticing, the number of cases closed increaSed. The backlog of outstanding cases remains high because of the staff vacancies in prior quarters. Because the backlog cases are now being resolved, and factored into statistics, the average number of days to achieve compliance has increased. This trend will continue as staff continues to reduce the backlogged cases. Quarter Starting New Cases Cases Ending Numerical Cases Received Closed Cases Change 2M 02/03 850 461 403 908 +58 3ra 02/03 908 382 458 832 -76 4th 02/03 832 323 292 863 +31 1 st 03/04 863 433 455 841 -22 3 Item 2na Q 02/03 3TOQ 4thQ 1stQ 02/03 02/03 03/04 Calendar Days First Site Visit 10 8 14 14 Obtain Compliance 113 175 172 227 Quantities Compliance Orders 38 40 28 56 Notice of Violations 277 43 44 51 Administrative Citations 46 12 13 2 Site Inspections 1,093 632 544 1,203 Proactive enforcement of sign violations began. Staff initiated 57 sign cases during the first quarter, 29 of which were favorably resolved before the end of the quarter. Staff also opened and initiated action on twenty-two (22) possible sign violations referred from the Architectural Review Board and Planning Commission. During the next half of the fiscal year the focus of code compliance will be on hiring and training new staff associated with proactive monitoring of discretionary permits and noise enforcement. Enforcement efforts will also focus on fence/hedge and visual obstruction violations, proactive sign enforcement and compliance hearings for non-compliance. Special Projects As outlined in Attachment 1, six of the ten policy projects projected for completion within FY 2003/04 should be completed by June 30, 2004. The delay of projects shifts other projects out to the next fiscal year. 4 RECOMMENDATION Staff recommends the Council consider and approve the updated priorities of the Planning and Community Development Department. Prepared By: Suzanne Frick, Director Andy Agle, Assistant Director Lucy Dyke, Transportation Planning Manager Ellen Gelbard, Assistant Director Timothy P. McCormick, Building Officer Amanda Schachter, Acting Planning Manager Lynn Wolken, Sr. Administrative Analyst Attachment 1: City Planning Priorities Flow Chart Attachment 2: PCD 2003/04 Updated Department Priorities 5 ATTACHMENT 1 CITY PLANNING PRIORITIES FLOW CHART J 6 tn W j:: <(0:: 00 -0:: ZQ. Oz ~O <(- I-~ Z> <(- tnC LLC) O~ >Z I-Z <3:5 Q. > != o ~ .... z z ~ :J :J ~ ~ .., to ""> to :J < < :J 0 ~ ::;; 0 .C- 7 :5 ~ Q: Q. Q. ~ < ~ Q: Q: - ~ < < Q; ~ ...!. 1:: to to :J lD m W W ::> 0 lL lL 0 ... "E ~ Z ... 8 z ~ "E 8 N C') < <11 < C') N ~ .., .., u J1l 0 - I N Q; W ., <II W Q; ~ 1:: ~ ~ "0 0 1:: >- to > CI) 8 ""> to lL ::> -E ::> 0 ~ "E 0 0 <11 .8 z "0 > T "0 e .... .S1 .z::: e N g " .2' g N 0 .$ ., Q. III <11 Z <11 "8- "E Q. Q; W W Q; CI) .\1 01 <11 CI) 1:: (D c: c: ::l > S 1:: tIl 0 'iij 0: .S1 Cl to :J :J ::E " ., " ~ :J :J 0 ~ .l!l 0 E 0 .l< < 0 "til <II c: J: .S1 III <11 -:;- "til ...J U i: I!' I!' ~ ~ ., <11 W ::l ~ C/) 0 :c III .., 'e- 0: ~ c: !!! .... 0 Q; Z 0- .... ., '" ~ $1 z :J 1:: !:::!. > <11 S :J Q; 1:: -2.. 0 :::; ~ (; .., 1:: to >- e- ., c: -,:- to :J < <i: 7ii <II .z::: ., < :J c: 1:: E 0 .2- "€ 0 0 c: ::;; 0 .C- $1 < u z e 7 .C- ~ Q: .2 0: " >- ~ Q. <II S .\1 Q. < I!' c: e < .'!l ... <11 0 " !:::!. W 0- Q: " c: i: 0: Q: Q; < ., ., <11 0 < Q; 1:: ~ 0 E 0- CD .z::: ::;; 1:: tIl e "0 1il !:::!. 0 'al to lD c: .!.I :J W 0- ., <II W ::> 0 lL ~ E .$ c: < lL 0 '" "E I-- .!II < <11 " Q: - "0 8 8 "&. C/) z > 0: N Z ~ 0 N C') < ., ::l .2 !:::!. ~ N ;n .., 0:: l() ;a 8 0: !:::!. ., <II 0 .... u 0 "E u Q; 0 N Q) W '" c: W N ~ 1:: ~ !:::!. <11 <11 0 1:: >- c: "0 '"> lL to e5 'E c: tIl :J .l!l 0 ::> 0 ~ 0 C/) ~ 0 "0 <11 ~ "0 e .... c: .... e N g c: 8 N .$ 0: c: & T f-- ~ Q. 0: < .... w 0: w Q) ~ ., .$ (/) 1:: to '" E 0 <11 Cl to Cl !:::!. :J :J c: c: 01 "0 :::> ::> 0 0 ~ c: a. 0 ~ :2 ::l < N -:;- "til ...J 0 ., ." 0: "til ~ :J C/) 0: III ., ~ ~ .., ::E ., W c: E c: -' 0 "0 ., .S1 Jll z z c: c: I!' W 0- Q; Q; :J ., <11 <11 :::> T :; c: el 01 Q; .., 1:: 'E <II -,:- 1:: to .5 1:: .'!l 01 c: 7ii to :J < 0 < c: 'iij <11 < :J 0 .2- 01 c: 'g.'!l " ::E ::;; 0 c: <II S ., 0 .C- 'iij t: c: I' E ., c: J: <II 7 .C- ~ Q: " <11 '" '" 0'" 0: "E ~ Q. > 0- ~ 0 E "0 e )( E ~ < - J: "0 'u ~ .~ ~ Q: .2 c: .EO a. ~ Q: ~ < <11 1il .s 0" < Q; ~ -' : ., 0" U ::;; C .$ ~ ll: 'e-& .2 I--;a 1:: to m ., " 0: to :J E <11 C/) iii 0- W ::> w "&. ; ., s 0 0 lL "0 c: <II ., lL '" I-- c: ::l 'OJ ., .5 E c: I-- "E '" ~ "E z ., "0 E .S1 ., z 0 E 0: ::E 0 C') ~ <11 W E < C') N ~ < N 0: .!a <11 c: c: .., ~ U ";( ~ ~ "OJ I!' .Q e u .... w ., 0- W (;j 0: 'S: w Q; ~ ., ~ 0 I- .2 0: ":5 E c: 0 1:: ~ ~ 0: W t---s;- to to S .... l:! ., 0: ::> ::> CD U I!' 0 0 0 Z ~ c: 01 l() Z "0 I--- ., 0: <01 ~ ~ "0 e .... E C "E 8 e N g c: - N e ., 0 '> ., E'=' t-r - a.C: Q; 0- c: " 00 ~ w W c: <II W 1:: ~ ~- 0: ~ .~ Qj::E (/) > Cl to to Cl o.l!l E. <a. ., ::> :J :J 0:: [ii ~~ 0 ., :J 0 0 ~ <II ....::... c: E "E 0: .5 "til "til ...J .Q c: <11 .l!l.,~ ... U ...J ~ :J ~ .~ ...., , "0 c:o... .EO :J ~ .., c: oc:o .., o > .l!l ~.~ ~ .\11 z a.C: CI) a. g -B i ~ E z Q; Q; :J <IIw E o "EO; ,g :::> T c:- <II .ii <11 JllO .., 1:: 1:: e 01 " 0:: 6'i. <11 = <.- "OJ -,:- to to I- .5 )( <11 g.E .5 ~ ~ ~ U ::> ::> < ., ., .Iii < 0 ::;; ii:'5 z 0 0:: 'C: "E.,.,!!:!. ::;; 0 0- ~.$ $1 8 -= 7 ~N 1:: .9 .... 0- c: c: ODO::~ ~ .C- 8 ~ Q. < " $1 0- .2' E "'0 >.""" :;- ]j Q. ~ N S; < - < S :::. <II .~ ~ 3 &i ~ c: < ~ I!' € ~ <II ., ~ g Q: <11 c: c~cno...... E Q: N Q; < ., ., -; "e -g -g co c: < Q; u ~EOI<I)- ~~ ~ ~ ., '" E e ::;; 1:: >- 1:: <II 0 :s/ c: ~~.~.~~ 0" os co cu '> I--;a to lL tIl m ,_ c: :c e ~~ ".' ~:a~~ ::> ::> 0<11 c: W 0 W Z .5 U '> &. 5 5 e-~ & ~'E ~ w lL 0 ~ :::6 ~ c: oel e I-z "E w ~mI~(O 0 E:.etf~ "E z ~ iii < C') C') ~ .., I- Z W ~ :I: o <( I- ~ <Il X ~ ~ <Il 1: tIl .C- o <Il Q) ;e o ~ .c M o ;:: ~ U; C W l- n. o c <( en w i= 0:: <(0 (,)- 0:: Za. Oz :eO <(en 1-- Z> <(0 en(!) LLZ Oz ~Z -<( (,).J a. ~ (,) z ~ ;; <\If-;:- a ~ :57 ~ a. <( 1-7 ~ <( ~~ ~ ffi o LL .... "0- g ~ ~ ~ .., ~-o ~ ~ ~ <\1;;- a ~ -g~ N 0 -- a. ~ w ~ <f) ~~ o ~ 1iS~ ~ ~ z ~ ;s <\I >- a ~ :57 ~ a. <( -7 as ~ 'ffim o ~ ~ "E z <> '" <( ~ ..., ~-=-~ Q) 0 ~ 'ffi;;- a ~ -g~ N 0 --;:::- ~ a. Q) W 1::~ ~ g o <( 1ii 1-::;-, c -- ~ I:.. Z ~ ~ <\I >- :0 <( o ::;; :57 ~ a. --~ CD ~ 1:: ::;; ~"ffi :g <;~ <> ~ z !if '" <( g-~ N ~ ~ ~ <\1;;- o ~ "0-;::- c!ii U --f a. Q) W 1:: <f) ~ g o <( Ui-:J ~ :J .., z ~3- <\I >- :0 <( o ::;; :5- ~ g: <( 1--1-- Qj ~ 1:: ::;; ~~ ... 0 LL g "E 7 ~ M <( g7~ N Q) W ~ 1:: ~ ~ ~ o Z "0 c!ii u I-~ ~ a. Q) W 'ffi-% a ~ u;~ ~ J!l <.) '" "e- a. t o e- <( ~ .g '" ~ " "0 '" g ll: ~ Q) -s Q) a:: il:" M ~ .& III "0 0. :J Q) <.) ~ ~ o III c: c: .& c: <( il:" o ~ Q) -!;; U .!;; ro <.) .g :s c: Q) E c: e -s c: W il:" e c: ~~ ,rg ~ <( Q) ",OLL -gca~ wtS ;OJ!! --a; <f) "~",,,m....u..'" '" c: -in " o :I: i!: o ~ Q) >- :::; u; 1:: <( .g ~ Q) E "0 c: Q) E <( il:" It) ~ '" c: o N o en ~ ...J Q) = -!;; '" c: -in " o :I: .E :s c: Q) E c: e -S c: W '" c: Q) E "0 c: Q) E <( x Q) I- il:" ~ 3: 0- a::~ c: Q) ~E III c: te ~.~ c:W elO ~.~ a.O oN t <( ~ III '" <.) ~ "OQ) EZ <.) ~ '" E III "0 c: .$ en a; m o B " <( ~ B c: ~ ~ '" i!: III E "0 c: III ...J Q) 0; X :J il:" M a; i:i: .2 :So. i5 E ~~ e -S c: W ::;- .& III "0 0. :J i: Q) E Q) W c: o ~ ~ Q) '" c: o <.) il:" ~ ,., -!,! -0 a. -0 ~ o <.) ;;;: il:" ~ .& III "0 0. :J c: Q) E Q) W c: _2 ]i " l: U il:" N c: III i:i: .$ '" III ~ E III >- .i?:' U .g :s c: Q) E c: e -S c: W il:" ~ B~Q)~ !'C~~ ~O~(;J -E.$lll S: "l6 6 .5- :::.~~! E2l?_ 2 ~.~ e c: e- 0 lJ) ;oJ:~ ~~~~ at & ~ .: a:.1:~ e.E. ~r~_ € o Z "0 c: III i!: III a. Q) '" c: " en .g '" E III "0 c: .$ en a: il:" E J!l c: Q) E Q) >- e 0. .5 '5 iD '" '" ~ ro a. .E :s c: Q) E c: e -s c: W il:" ~ '" Q) -!;; a; "0 -5 (!) c: '" -in Q) o c: ~ o i: ~ o ~ '" "0 o o -E o .0 ~ '" -a; c: ~ :E !!! ~ '0 c ::'?i~1 a; 0; ~ III ~ !Xl ~ .E ~ Q) E c: e -s c: W il:" ~ Q) ~ J!l Q) ~ (f) E III >- Q) :; o !Xl rl -0' o ~ .$ c: c?J . il:" .... ~ '" c: ~ -5 !Xl c: Q) ~ (!) '" c: '0 Q) Q) <.) >< W", J(l~ Q) E i.~ :El ~ Q) -s Q) a:: Q) -!;; E III ~ iii il:" (Xl :::. i: Q) E c: ~ Q) i: W ~ ~ <( :s c: Q) "0 -<3 .!;; Q) ~ en c: -iij ~ il:" ~ i: Q) E Q) ~ '" <('" 1:: "E Q) 0 E"" o.c: 00 a;~ >- Q) o il:" It) Vl x -.i 9 ~ <Ii :s en ,; Q) O~ ~~ "'- =-=(0 3: '" '5 .~ €~ o.!!. ZJ!l 5 -~ LL Q) -cia. OlS -~ ~ .& E c: Q) Q;O <.) III 0. Q) a:: E a::~ os? o~ ";N <.) '" c: Q) .~ -6- "E~ 0- E~ jl ~o ~:2 ~~ a:: Q) _:'::'i:::':'~'!l\i.'!1.\'#J,J!S! Vl 1:: <\I .r:. '-' Vl Q) =E o -c: ~ .r:. ATTACHMENT 2 FY 2003/04 Updated Priorities Planning and Community Development Department CUSTOMER SERVICE AND PERMIT PROCESSING CITY PLANNING Permit processing continues to be a top priority. Between July and December, City Planning has consistently met permit-processing turn around times 97% of the time. Environmental impact reports and initial studies have met the performance goals in 100% of the cases. During this period over 16,000 phone calls were received and over 80% of the calls were returned within the next business day. Approximately 4500 people were helped at the public counter with an average wait time of 20 minutes. Ongoing processing of current planning cases continues, including Administrative Approvals, Variances, Temporary Use Permits, Use Permits, Conditional Use Permits, and Development Review Permits. During the next six months the following projects will be going through environmental review and public hearings: . Lantana Development Agreement · 145 Multi-family Residential Development at 2834 Colorado · Artist Studios and Production Offices at 1630 Stewart Street · Mixed use residentiaVcommercial at 3107 Santa Monica Boulevard · 9 unit condominium at 125 Pacific TRANSPORTATION MANAGEMENT Between July and December, Transportation Management consistently met permit processing turn around times over 90% of the time. During this period over 14,000 phone calls were received and over 97% of the calls were returned within the next business day. Approximately 6800 people were helped at the public counter with an average wait time of 5 minutes. Approximately 193 citizen concerns were filed during this period. When added to the 167 pending concerns, the Division is working on 360 requests and has resolved 156 ofthem. The Division continues to provide services for citizen requests, inquiries and complaints; public counter plan checks and inquiries from the public, engineers, architects and developers; oversize, overweight and house moving permits; traffic control plan checks; review of street and encroachment permits; traffic signal operations (signal timing and minor improvements); assist City Attorney's office with traffic related lawsuits; annuaVregular updates of traffic count, speed, and related information; process parking 7 lot permits; maintain on-street meters; issue on-street meter permits; manage employee parking lot, permits and keycards; issue and enforce valet parking permits; issue temporary parking permits; review traffic studies/environmental impact reports; install, maintain and repair all traffic control devices along the City's street system, including signs, striping and pavement markings, curb zones, parking meters and traffic signals. This includes approximately 160 traffic signals, 25,000 traffic signs, and 6,000 parking meters. In emergency situations the Division also provides personnel and materials to assist with emergency traffic control, including providing and installing road barricades and traffic signs, and the after-hours repair of traffic signals. BUILDING AND SAFETY Between July and December, Building and Safety had difficulty meeting permit processing turn around times due to staff vacancies. Turn-around goals were met 60%- 70% of the time. During this period over 23,550 phone calls were received and over 98% of the calls were returned within the next business day. Approximately 8,700 people were helped at the public counter with an average wait time of 30 minutes. 6,386 building inspections were performed SPECIAL PROJECTS ADMINISTRATION Civic Center Specific Plan. A Draft Environmental Impact Report will be released for public review and comment, followed by consideration by the Civic Center Working Group and Planning Commission, culminating with consideration of final adoption by the Council. Initial implementation steps for the Village area will begin. Development Agreement negotiations regarding redevelopment of Santa Monica Place will be pursued. Civic Center Parking Structure. Project approvals have been completed and design development drawings are underway. Pedestrian Extension to Downtown Transit Mall. A design team will be selected and will be managed for streetscape improvements on 2nd and 4th Streets between Wilshire and Colorado. Promenade Uses Task Force: A workplan for implementation of the Task Force recommendations has been developed and associated legislative changes will be prepared. 8 CITY PLANNING (in priority order) 1. Noise Ordinance (In Process-estimated completion February 2004) 2. Child Care & Arts Nexus Study. (In Progress - Estimated completion: June 2004.) Preparing nexus analysis to determine private developer obligation in providing childcare services and facilities in new development projects. 3. Auto Dealer Standards. (In Progress - Estimated completion: October 2004) Develop recommendations to address both the neighborhood concerns and parking and development needs for existing automobile dealerships. 4. Environmental for Pier Ramp. (In Progress - Estimated completion: June 2004) Continue preparing Pier Bridge EIR and NEP A documents for Pier Bridge seismic strengthening and vehicle ramp off the Santa Monica Pier to the1550 parking lot. 5. Short-Term/Corporate Housing. (In Progress - Estimated completion: March 2004) Establish permanent regulations related to short-term/corporate housing to replace current interim ordinance, which enacted a moratorium. 6. Downtown Design Guidelines. (In Progress - Estimated completion: April 2004) Conduct public process and prepare design guidelines to shape development in downtown and create a streamlined and predictable review process. 7. Amendments to Multi-Family Development Standards. (In Progress - Estimated completion: June 2004) Prepare permanent standards to replace interim ordinance. Also, amend the multi-family zoning standards to enable adjustments to the building envelope standards in multi-family zones in appropriate cases when an existing structure is remodeled or expanded. Study Analyze the housing constraint potential of eliminating the provision to count ~ of the alley for purposes of determining density; evaluate the definition of substantial remodel; evaluate whether alleys should be used for purposes of measure setbacks, but not density; analyze potential exemptions for 100% affordable housing projects. 8. Environmental For California Incline (In Progress - Estimated completion September 2004). The following projects listed with a number and P (for pending) will be initiated upon completion ofthe top priorities listed above and in the following order: 9P. Transportation Right-of-Way Zoning and Environmental. (Estimated time to complete: 6 months) Develop a new zoning district to address short term and long term uses along the Exposition right-of-way. lOP. Montana Avenue Standards. (Estimated time to complete: 4 months.) Prepare permanent standards to replace interim ordinance for Montana Avenue. llP. Circulation Element Update. (Estimated time to complete: 18 months.) Update the City's Circulation Element of the General Plan and associated environmental analysis. 12P. Text AmendmentlEnvironmental to Evaluate Housing in the Light Manufacturing and Studio District (LMSD). (Estimated time to complete: 14 months.) Evaluate changing the Zoning Ordinance to allow housing in the Light Manufacturing Studio District. 13P. Environmental for Palisades Bluff Improvements. (Estimated time to complete: 12 months.) Prepare environmental document for Palisades bluff improvements. 14P. Development Agreement Monitoring. (Estimated time to complete: 6 months to develop tracking system and then ongoing.) Monitoring of existing development agreements to ensure compliance of programs and implementation of required policies. l5P. Environmental for City Yard Master Plan. (Estimated time to complete: 12 months.) Prepare environmental document for City Yard Master Plan. 16P. Revise Procedures Related to Enacting Interim Ordinances. (Estimated time to complete: 9 months.) Prepare ordinance amendments related to the procedures for adopting interim ordinances. 17P. Streamline Permit process for Projects Exceeding Green Building Requirements. (Estimated time to complete: 12 months.) Streamline the planning and permitting process for projects that exceed green building requirements. 18P. Main Street Incidental Arts and Entertainment. (Estimated time to complete: 12 months.) Analyze appropriate mechanism to allow incidental arts and entertainment on Main Street. 19P. Update Landmarks Ordinance. (Estimated time to complete: 18 months.) Conduct public process and prepare comprehensive update to landmarks ordinance and prepare associated environmental document. 10 20P. Antenna Ordinance Update. (Estimated time to complete: 9 months) Update wireless antenna ordinance to reflect existing neighborhood conditions and current FCC regulations. 21P. R-l Standards for Sunset Park and North of Wilshire Neighborhoods. (Estimated time to complete: 18 months.) Initiate review of development standards for all Rl districts in Sunset Park and North of Wilshire areas. 22P. Alcohol Policy. (Estimated time to complete: 9 months.) Develop citywide alcohol policy related to location, permitting, licensing, concentration, and enforcement. 23P. Review Procedures for Airport Projects. (Estimated time to complete: 12 months.) Develop procedures for the review of projects at the Santa Monica Airport. Draft procedures developed with a subcommittee of Airport Commission and Planning Commission. 24P. Conservation Element Update. (Estimated time to complete: 18 months.) Update the City's Conservation Element of the General Plan and prepare the associated environmental document. 25P. Artist Live/Work Housing. (Estimated time to complete: 13 months.) Conduct review of existing live/work opportunities, study regulatory approaches and incentives in other communities, review existing codes and requirements, develop new regulations and procedures for live/work housing and prepare associated environmental document. 26P. Environmental for Breakwater. (Estimated time to complete: 12 months) Preparing EIR for proposed Santa Monica Bay Breakwater and present to City Council for certification. 27P. Santa Monica Boulevard Streetscape. (Estimated time to complete: 18 months.) Design improvements for Santa Monica Boulevard between th Street and the eastern City limits. BUILDING AND SAFETY: Visitability Ordinance: State legislation authorizes local jurisdictions to enact mandatory standards after January 2005. Inioroved Property Maintenance Standards: Propose improved property maintenance standards for nuisance properties and substandard dwellings. 11 CODE COMPLIANCE BUILDING AND SAFETY: Ongoing Code Enforcement. Continue responding to new cases and working to reduce the backlog of complaints. It is anticipated approximately 1900 new cases will be filed in addition to the 800 pending cases. Staff is expected to close approximately 1700 cases in FY 2003/04 resulting in a continuing backlog of close to 1,000 cases. Special Enforcement. In addition to responding to complaints, proactive efforts will focus on the final phase of auto repair enforcement, obstructions and signage in the public right of way, monitoring of discretionary review permits, noise, after hour construction and seismic retrofitting. MOBILITY ADMINISTRATION: Exposition Bikeway Grant. Procure and manage design process for Exposition Bikeway from Centinela to 17th Street. Downtown Parking Study. Complete programmatic EIR for Downtown Parking Task Force recommended parking program for the downtown area. Update cost and revenue analysis of implementation plan. Colorado Medians (Mid City Traffic Plan). The final components ofthe Mid City Traffic Plan are the design and construction of landscaped medians on Colorado between Stewart and Centinela. The Colorado improvements will be coordinated with the Colorado crosswalk enhancement study. Complete design and obtain Council adoption. East-West Corridor Parking Study. Conduct Task Force process and develop recommendations. TRANSPORTATION MANAGEMENT: Neighborhood Traffic Management Plans. Develop and implement traffic management plans for residential and neighborhood areas throughout the City. The program includes the use of traffic calming devices to manage the speed and volume of traffic on residential streets. This effort will be significantly scaled back and only improvements currently funded or improvements in areas with critical safety hazards will be implemented. Currently funded improvements will be installed on Highland A venuelMarine Street and Wilson Place. Efforts are underway to develop a neighborhood protection plan for the Exposition area neighborhood. 12 Transportation Management Program. This is an on-going program to administer the City's Transportation Management Ordinance and encourage employees to use alternative transportation. Preferential Parking Program. This is an on-going program to improve the administration and implementation of the City's preferential parking program, including the processing of requests, the establishment of parking zones and the sales and administration of parking permits. The number of permits and households requiring permits has continued to grow sharply. Division staff continue to keep costs in check through mail-only renewal period and streamlining of permits. During this fiscal year we anticipate renewing over 31,000 permits. Downtown Signal Synchronization. Complete installation of signal hardware and begin operation of signal control equipment. Traffic Signal Upgrades. Prepare designs for upgrades of signal equipment and communications at priority intersections. Complete installation of Opticom emergency vehicle signal priority system at funded locations. Convert S.M. Place Structures to Attendant Parking. Work with Santa Monica Place to implement attendant parking in the Santa Monica Place parking structures. Circulation Element. In cooperation with Planning Division, prepare draft update of General Plan Circulation Element. Summer Traffic Counts. Take new summer traffic counts and update the traffic database of summer weekend traffic conditions. Library Construction. Continue to assist implementation of construction mitigation program. Speed Hump Alternatives. Review and make recommendations to Council on permanent installations. Sign Redesign. With assistance from sign design consultant, complete designs for new parking signage and begin installation of new signs throughout the City. MAINTENANCE AND OPERATIONS Budget reductions will result in increased response times for sign and striping installation. Consolidated Parking Ooerations. Efforts will focus on improving auditing and accountability and maintaining minimum service levels despite staffing cuts. Operations staffwill continue to support new library design/construction. Citywide Sign Replacement Program. Replace non-standard regulatory signs, such as parking and preferential parking signs throughout the City. Comouterized Traffic Control Devices Inventory Proiect. Work with ISD to develop a citywide sign and street-marking database. Parking Meter Reolacement. Install new and upgraded meters. With Treasury, improve coordination and control over meter collections. 14