SR-11-C (30) / .".. . ... e Santa Monlca, Callfornla GS:SES:DM:KS t Councll Meeting: ne 14, 1983 11- C JUN 1 4 ]983 TO: Mayor and Clty Councll FROM: Ci ty Staff SUBJECT: Addltional Design Fees to DeLeuw Cather and Company for New Transportatlon FaCllities Introductlon ThlS report requests the Clty Council to authorize a change order in the amount of $54,560 to DeLeuw Cather and Company for additlonal profesSlonal services requlred durlng the design and constructlon of the new Transportation Department facilities, and to authorlze addltlonal change orders to DeLeuw Cather not to exceed $20,000. Background On December 3, 1979, the Clty Councll awarded Contract No. 3427 (CCS) to the design/engineerlng firm of DeLeuw Cather and Company ln the amount of $350,000 to proVlde archltectural and englneerlng serVlces for the new transportatlon facilitles. Section 3-e of that Contract states in part "Any maJor changes requested by the Clty after acceptance of the prellmlnary phase, that requlre redeslgn work or substantlal changes to drawlngs wlll be compensated for as Extra Work." Durlng the lnitlal phases for thlS project the followlng design changes were requested from the approved prellminary plans: 11- c 1 JUN 1 4 1983 r ~ GS:SES:DM:KS I Councll Meet1ng: une 14, 1983 e Santa Mon1ca, California 1. An lmproved bus lnterlor cleaning system was added--$17,217 2. A monorall system for transportation of heavy parts added--$6,896 3. A chassls dynamometer was added--$4,518 4. A new emergency generator was added--$4,518 5. A new bus washlng system was added--$6,183 6. A new steam cleaning system was added--$1,712 7. Floor area was lncreased from 16,000 square feet to 21,000 square feet. {It was origlnally envisioned that a bUlldlng of about 16,000 square feet would be sufficlent but as the design progressed it became apparent that 21,000 square feet would be necessary. The model approved by Clty Counell indlcated 21,000 square feet)--$9,516 8. The mechanlcal equipment room was relocated 1n order to provide more useable space--$4,OOO Clty staff has held numerous meetings wlth DeLeuw Cather staff for the purpose of resolvlng the cost of the additlonal ltems of work performed durlng the design phase. There were other items of work for WhlCh payment was requested that were denied by Clty staff. The requested ltems belng recommended for extra payment 2 - GS:SES:DM:KS . Councl1 Meetlng: e 14, 1983 Sant~Monica, California are JU5t1fled and extra payment 15 provided for in the origlnal contract documents. It should be noted that the orlg1nal deslgn contract amount of $350,000 was only 4.7% of the orlglnal $7,420,000 constructlon contract---a very low deslgn percentage for this type of construct1on and remodeling work. Financlal AnalysTs. Funds are ava11able for thlS proposal in Account No. 41-600-657-000-902. At mld-year (FY 82-83) $436,000 of State Transportatlon Development Act monies were re-approprlated to Account No. 41-600-657-000-902 for the purpose of covering additional costs 1ncurred throughout the constructlonjremodel of the Transportation facllitles. Both the $54,560 and additlonal $20,000 are elig1ble under the Transportatlon Development Act. Cont1ngenc1es An additional $20,000 w1ll be required to meet unexpected deslgn costs. Although the new Transportation admTnlstrat10n facillty lS nearlng completlon, a maJor remodellng of the eXlstlng structure wlll occur as phase two. Experience has shown that unforeseen structural/design problems may arise durlng the remodel of an ex;stlng buildlng and $20,000 wlll meet these un-antlc1pated but necessary changes. Recommendatlon It 15 recommended that the Councl1: 3 - ~ GS:SES:OM:KS I Council Meeting: J e 14, 1983 sant~onica. California 1. Authorlze the City Englneer to issue a change order to Contract No. 3427 (CeS) in the amount of $54,560. 2. Authoflze the Clty Englneer to issue addltional change orders to Contract No. 3427 (CCS) up to $20,000 for any addltlonal deslgn changes WhlCh may become necessary. Prepared by: Stan Scholl, Director of General Services Doug McAteer, Clty Englneer Jack Hutchlson, Dlrector of Transportatlon 4