SR-1000-001-05 (8)Council Meeting: December 9, 1986 Santa Monica, California
l!/ ~
To : Mayor and city Council ~~~ ~ g 1986
FROM • City Staf f ~i, tr~_-''~`} 1`` `~
SUBJECT: Award of Contract for the Improvements to the Air
Conditioning System at the Transportation Department
Administration Building
Introduction
This report requests that the City Council award a contract for
improvements to the air conditioning system at the Transporation
Department Administration Building to Sanders Engineering Co.,
Inc., the lowest responsible bidder, in the amount of $24,887.
Background
In April 1984, the construction of the Transportation Department
Administration Building was completed. Since the building has
been occupied, several deficiencies in the air conditioning
system have been discovered. These include temperature
variations of 36 degrees F. from the north side of the building
to the south side, lack of air flow in some areas, and excessive
maintenance costs due to the complex control system specified by
the original building design. A claim against the architect for
deficient work has been made.
The project consists of adding one package air conditioning unit,
upgrading temperature controls, testing and balancing alI
systems, and miscellaneous other work. Funds for this project
and other improvements to the Transportation Department
Administration and Maintenance Facilities were approved by the
City Council in FY 1985-86.
~ -K
QEC 9 1996
- 1 -
Council Meeting: December 9, 1986 Santa Monica, California
A Notice Inviting Bids was published on October 9 and 10, 1986,
in the Evening Outlook and nina construction journals. Plans and
specifications were issued to fifteen contractors. Bids were
opened and read publicly on November 24, 1986, by the Deputy City
Clerk.
Three bids were received as follows:
Sanders Engineering Co., Inc. $24,887
San-Val Engineering, Inc. $27,450
Fairway Air Conditioning $30,000
City Engineers's Estimate: $25,000
City staff checked the references provided by the low bidder and
found them to be satisfactory. In addition, Sanders Engineering
Co., Inc. is minority-owned firm.
Budget/Financial Analysis
FUNDS REQUIRED
Contract $24,887
Contingencies 5,113
Total $30,000
Appropriation authority in the amount of $174,062 is available in
Account No. 41-750-657-000-905.
Recommendations
It is recommended that the City Council:
- 2 -
Council Meeting: December 9, 1986 Santa Monica, California
1. Award a contract for improvements to the air
conditioning system at the Transportation Department
Administration Building to Sanders Engineering, Co.,
Inc., the lowest responsible bidder, in the amount of
$24,887; and
2. Authorize the City Engineer to issue any necessary
change orders to complete additional work in
conformance with the Administrative Instructions.
Prepared by: Stan Scholl, Director of General Services
Desi Alvarez, P. E., City Engineer
Jean Stanley, Administrative Analyst
- 3 -
•