Loading...
SR-1000-008 (5) EPWM: CP:AA:DB:LV:S:\SP1705\RNLINTER\CC1705.doc Council Meeting: January 9, 2000 Santa Monica, California TO: Mayor and City Council FROM: City Staff SUBJECT: Recommendation to Authorize the City Manager to Negotiate and Execute the Second Modification to Professional Services Contract No. 7445 (CCS) with RNL /Interplan, Inc., d.b.a. RNL Design for Design of the Santa Monica Big Blue Bus Natural Gas Fueling Facility Introduction This report recommends that the City Council authorize the City Manager to negotiate and execute the Second Modification to Professional Services Contract No. 7445 (CCS) with RNL / Interplan, Inc., d.b.a. RNL Design (RNL) for design of the Santa Monica Big Blue Bus Natural Gas Fueling Facility in the amount of $295,000 and approve a contingency of $30,000. Background As part of the planned expansion of the Santa Monica Big Blue Bus (BBB), a portion of the bus fleet and support vehicle fleet will be converting to alternative fuels, such as Liquefied Natural Gas (LNG), Compressed Natural Gas (CNG) and electric operation. The first phase of implementation of the BBB Master Plan calls for construction of a Natural Gas Fueling Facility (LNG for buses, CNG for other fleet vehicles). On March 31, 1999, the City entered into a contract with RNL to perform design of the Natural Gas Fueling Facility at the BBB. 1 Discussion This Modification to the Agreement will allow redesign of the Natural Gas Fueling Facility, to enhance the architectural motif from an industrial look to a more attractive facility, appropriate for this major gateway to the City. An artist has been selected to assist in the design process to help create a more attractive facility. The modification will allow coordination of the artist’s proposals into the current design. In addition, several other major revisions and additions to the original design scope have been made, including relocation of the Edison transformer building, addition of a standby generator that will supply the entire BBB facility in the event of a power outage, reconfiguration of the brake pit, revision of the canopy and security fence at the fleet area of the CNG plant, and the addition of green space for employee use at that location. The original contract amount including contingency was $480,000. These changes will increase the project design by a total of $325,000 to $815,000. Budget/Financial Impact FUNDS REQUIRED Contract Amendment: $295,000 Contingency: $ 30,000 Total Increase: $325,000 2 Funds in the amount of $325,000 are available in CIP account C41010499.589000 “Transportation Facility Improvement” Recommendations Staff recommends that the City Council: 1. Authorize the City Manager to negotiate and execute a Second Modification to Professional Services Contract No. 7445 (CCS) with RNL/Interplan, Inc.,d.b.a. RNL Design in the amount of $295,000 for additional design services for the Santa Monica Big Blue Bus Natural Gas Fueling Facility and approve $30,000 in contingencies; and 2. Authorize the City Engineer to issue any necessary change orders within budget authority in accordance with the Administrative Instructions on Change Orders. Prepared by: Craig Perkins, Director of Environmental & Public Works Mgt. John Catoe, Director of Transportation Anthony Antich, P.E., City Engineer Dave Britton, P.E., Sr. Civil Engineer Lee Vanderlinden, P.E. Program Manager CH2MHill 3