Loading...
SR-1000-001-10 (3) 0--r SEP - 8 1987 GS:SES:JAS - 8/14/87 Council Meeting: September 8, 1987 Santa Monica, California TO: Mayor and city Council FROM: City staff SUBJECT: Award of Contract to Construct an oil/Water Separator, Settling and Distribution Basin, and Underground Waste oil Tank at the Transportation Yards Introduction This report requests that the City Council award a contract to construct an oil/water separator, settling and distribution basin, and underground waste oil tank at the Transportation Yards to New York Construction, the lowest responsible bidder, in the amount of $119,400. Background In FY 1985-86, the City Council appropriated funds to construct an underground leak detection and control system at the Transportation Yards to comply with the City's Underground Tank Ordinance adopted December 13, 1983. The proj ect consists of removing and disposing of existing pavement, excavating, placing the distribution and settling basin and oil/water separator, replacing the existing 550 gallon waste oil tank with a 5000 gallon waste oil tank, and replacing asphalt concrete with concrete paving. Both the oil/water separator and the new 5000 gallon waste oil tank contain leak detector devices. A Notice Inviting Bids was published on July 15 and 16, 1987, in the Evening Outlook, four construction journals, and - 1 - 6-1 SEP - 8 1987 sent to seven minority/women associations. Plans and specifications were issued to twelve contractors. Bids were received and read publicly on August 10, 1987, by the Deputy city Clerk. Two bids were received as follows: New York Construction Progressive Systems Design, Inc. $119,400 $179,357 City Engineer's Estimate: $130,000 New York Construction provided three references in the bid package. Staff contacted and received positive comments from the references on work previously performed by the Contractor. BUdget/Financial Analysis FUNDS REQUIRED Contract Contingencies Total $119,400 11,940 $131,340 Appropriation authority is available at Account No. 41-750-657-000-906 in the amount of $134,276. Recommendations It is recommended that the City Council: 1. Award a contract to construct an oil/water separator, settling and distribution basin, and underground waste oil tank at the Transportation Yards to New York - 2 - construction, the lowest responsible bidder, in the amount of $119,400. 2. Authorize the City Engineer to issue any necessary change orders to complete additional work in conformance with the Administrative Instructions. Prepared by: stan Scholl, Director of General Services Desi Alvarez, P. E., city Engineer Jean Stanley, Administrative Analyst (CCI087) - 3 -