Loading...
SR-904-006 e .- JCitYOf Santa Moniea@ City Council Report +~nAc::::t06 B) 2-DU= City Council Meeting: December 5, 2 6 Agenda Item: ~ &A- To: Mayor and City Council From: Gordon R. Anderson, Assistant City Manager Subject: Direction to Proceed with a Temporary Office Building east of City Hall and Authorize the City Manager to Negotiate and Execute a Professional Services Agreement with Natoma Architects, Inc. Recommended Action Staff recommends that the City Council: 1) direct staff to proceed with steps necessary to develop a temporary office building east of City Hall and provide any initial design direction; and 2) authorize the City Manager to negotiate and execute a professional services agreement with Natoma Architects, Inc. in an amount not to exceed $885,500 for design services for the building and tenant improvements. Executive Summary City offices are currently in City Hall and at various leased space located throughout the City. This decentralization results in operational inefficiency as well as creates decreased level of customer service by having staff not located at City Hall. The compacted space within City Hall also contributes to the challenge in customer service areas for those that visit City Hall, as wells as having many employees in substandard work space. The current first floor permit center is inadequate to provide good service to the high volume of daily customers. Within City Hall, there are many locations where 2-3 staff work in 1 areas that were originally designed to house one staff member and in some cases hallways are used for work surfaces and storage. The lack of space also has prevented the development of improved office space for the Mayor and Council to meet with the public. Staff has evaluated different options to best meet the office space needs at City Hall in the shortest time frame and cost effective approach, including construction of temporary and permanent buildings of various sizes at the location of the former Police Building and in the location identified for the City Services Building in the Civic Center Specific Plan. Temporary buildings are used as an interim solution to provide services for periods of five to fifteen years while permanent solutions are developed. The temporary building being considered by staff could last for 20 years or more and can be deconstructed and relocated. At this time, staff recommends the construction of a 16,000 square foot steel frame temporary building, with 5,500 square feet of remodeled City Hall space as the most cost efficient option. Following a competitive procedure, staff executed a $55,000 Purchase Order with Natoma Architects, Inc. to prepare schematic designs of a temporary office building to illustrate how this could function within the Civic Center area. City Council approval of the proposed Professional Services Agreement in the amount of $885,500 is recommended for design development, construction drawings and construction monitoring of the temporary office building as well as for the adaptive reuse of any potentially vacated portion of City Hall. 2 The total estimated cost of this project is $7,904,741. Currently $2,000,000 is budgeted for this project. The remainder of the funds will be considered as part of the fiscal year 2006-2007 Capital Improvement Program budget. Discussion The City currently leases approximately 46,000 square feet in eleven locations throughout the City for various department and division offices at an annual cost in excess of $1.4 million. The largest leased spaces are on Lincoln Boulevard (BBB and City Clerk), Fourth Street (Finance Department), Main Street (Civil Engineering & Architecture Division), Broadway (City TV, RCD, and ISO) and Cloverfield Boulevard (Housing Division). Additional offsite office space exists at the Airport and at small spaces throughout downtown. The scattered location of staff throughout the City is an inefficient way to deliver services. The Civic Center Specific Plan addressed the need for staff to be centrally located by identifying a 100,000 square foot City Services Building and on June 28, 2005, Council adopted an updated Civic Center Specific Plan that identifies a 40,000 square foot City Services Building in the area north of City Hall. Staff has analyzed the financial feasibility of funding a permanent 40,000 square foot building, as identified, as well as several other alternatives to meet short and long term needs. Staff also analyzed the cost of constructing temporary and permanent buildings of various sizes to meet the short and long term needs of the City. The estimated cost includes the building and all necessary furnishings and finishes to occupy the building. Below is the comparison of cost of all alternatives staff explored: 3 ANALYSIS OF TEMPORARY VS. PERMANENT BUILDING CONSTRUCTION (ADDITIONAL CITY OFFICES IN CIVIC CENTER) Temporary Construction Permanent Construction Remodeled Space* Subterranean Parking** Owner's Costs $770,000 FF&E $102 $1,938,000 TOT AL COST: I $7,048,000 * Anticipated 5,500 square foot City Hall Remodel. ** Not required for temporary building, required for permanent. Estimated CostlS .Ft. $240 $486 $200 Temporary Building Options 13,500 s. ft. 16,000 s. ft. $3,240,000 $3,840,000 Permanent Building Options 40,000 s. ft. 60,000 s. ft. $1,100,000 $19,440,000 $29,160,000 $1,100,000 $1,100,000 $1,100,000 $16,284,000 $16,284,000 $770,000 $2,777,500 $2,920,500 $2,193,000 $4,641,000 $6,681,000 $7,903,000 I $44,242,500 $56,145,500 An option to construct a new permanent building would require a much longer project timeline (five to seven years for design and construction) and debt financing, either Lease Revenue or General Obligation Bonds. At this time, staff recommends proceeding with the 16,000 square foot temporary building due to the funding level needed and due to the short term benefits of constructing a temporary structure. The building would include a two story portion roughly along the footprint as the former Police building and a three story portion to match the old jail wing (see attached site plan). It should be noted that prior to the demolition of the former Police building, staff considered the adaptive reuse of the building for staff office space prior to its demolition but found this prohibitive in terms of cost and reuse possibilities, which would have necessitated seismic retrofitting, accessibility upgrades and bringing the building up to current building codes, including electrical and heating, ventilation and air conditioning. On December 16, 2003, Council authorized its demolition due to the cost and constraints of the adaptive reuse. 4 Temporary BuildinQ Staff executed a $55,000 Purchase Order with Natoma Architects Inc. to develop a conceptual drawing of a temporary office building behind City Hall and to analyze the feasibility of this type of construction versus a permanent structure (Attachments 2-3). In order to test the feasibility of the temporary building, staff considered what type of use may be assigned to the new space. Development of the space presents an opportunity to design and develop a one-stop center for development and permit services and to implement additional recommendations of the Matrix Study, a report prepared in 2004 which identified improvements to the permitting, building and safety and inspection processes in the Planning & Community Development Department. The proposed temporary office building provides sufficient space to include counter space for all permit and development functions, customer self-service and waiting areas and space for staff supporting these functions, including all of Planning and Community Development. A temporary office building in the location of the former Police building is recommended as the most cost effective solution to meet the short term needs of the City because of its versatility, relatively low cost and ease and timing of construction. The temporary building would be a steel building system that is able to be assembled quickly and dismantled and reused at another location at the end of its use. Since a temporary building has a useful life of twenty or more years, the City would have ample time to identify the financing mechanism and to design, approve and construct a permanent City Services building. Other advantages to proceeding at this time include: 5 . A temporary steel building system is environmentally sustainable In that its components may be dismantled and reused at the end of its use. . The centrally located office space at City Hall provides services more efficiently and effectively, while being more accessible to the public. . Coordination of the completion of the temporary office building with the City Hall Seismic Retrofit project, scheduled for construction in 2007 and 2008, will facilitate both projects by allowing larger portions of City Hall to be retrofitted at one time while minimizing impact to staff and the public from the disruption of relocating multiple times. . Facilitate interdepartmental coordination of projects by bringing staff and management closer together. . Provide an opportunity to re-design some space inside City Hall, bringing space to current industry standards for workspace. . Eliminate some offsite leases, creating cost savings. Staff estimates approximately 12,500 square feet of offsite leases could be eliminated. Primary disadvantages that Council should consider include: . The funds could be used for other uses or reserved for financing the construction of the permanent City Services Building identified in the Civic Center Specific Plan. . Although a portion of the recently completed City Hall courtyard will be preserved, an area roughly equal to where the grassy area is will be used as the site for this building. 6 Staff has completed a Net Present Value analysis for the completion of the recommended building. Assuming elimination of 12,500 square feet of leased space, a 3% annual lease payment increase and a 5% present value discount rate, the costs are as follows: Estimated Net Present Lease Value of Lease Construction Unrecovered Years Payments Payments Cost Cost 10 Yrs 5,674,620 4,330,060 7,903,000 3,572,940 15 Yrs 9,206,462 6,202,128 7,903,000 1,700,872 20 Yrs 13,300,835 7,902,568 7,903,000 Breakeven Commission Considerations Because City Hall is a designated City Landmark, the Landmarks Commission will be required to review and approve a Certificate of Appropriateness application for any proposed exterior modifications or additions to the building. The proposed project concept has been informally reviewed by the City Planning Division's Liaison to the Landmarks Commission. One potential concern identified is related to the Landmarks Commission's 2005 approval of the demolition of the former 1950s Police Station wing addition to City Hall and the temporary courtyard landscaping plan. The Commission expressed support for the project, in part, because it re-established the historic u-shaped configuration of City Hall and the public courtyard area. The current proposal would again alter these features of the City Hall facility. Planning staffs informal review also included preliminary comments on the project design. Based on this review, the schematic design was revised so that there is a clear differentiation between the new building and the historic structure. The new building will 7 be constructed of modern materials so as to not mimic the aesthetics of the historic structure, be detailed so as to visually delineate the separation between the new building and the historic structure, and will be a different height then the historic structure. The Liaison also made suggestions that the new permanent exterior elevator and entry door to the existing Jail area follow the same design guidelines. The new permanent elevator and entry door to the existing Jail area are required to provide code required accessibility for the new tenant of the converted Jail area. Upon approval to proceed with the development of the building, staff will bring the project to the Landmarks Commission for formal comments prior to further development of project plans. Contractor/Consu Ita nt Selection On May 3, 2006, a Request for Proposals for design services was posted on the City website. The RFP was requested by 13 firms, including some local firms. Six proposals were submitted on May 18, 2006. The proposals were reviewed by a selection committee including staff from Environmental & Public Works Management, Planning & Community Development and City Manager's Office. The selection committee unanimously recommends Natoma Architects, Inc. based on the firm's project manager's extensive experience in design of temporary buildings, infill buildings, design of buildings using unique and sustainable materials, and experience with municipal projects including designing other public service buildings. Staff recommends that Council direct staff to proceed with the development of the 16,000 square foot temporary building and authorize the City Manager to negotiate and execute 8 a professional services agreement with Natoma Architects Inc. in an amount not to exceed $885,500 for design services through construction of the temporary building, including design of all interior spaces, space planning, design of the old jail space and design of selective areas of City Hall re-used as a result of this project. Budqet/Financiallmpact Funds in the amount of $885,500 are available in account C010361.589000. The total estimated cost of this project is $7,904,741. Currently $2,000,000 is budgeted for this project. Funds to complete construction of the project will be included in the fiscal year 2007 -2008 Capital Improvement Program. Staff will return to Council prior to start of construction. At that time, Council could re-consider whether to move forward with the project, prior to expending all funds awarded as part of this agreement. Prepared by: Donald Patterson, Assistant to the City Manager for Management Services Approved:/'7 , / o ./. It'~ Gordon R. Anderson Assisi'ant City Manager Forwarded to Council: /;J /",,--'-~'~" ~""",_. 9