Loading...
SR-417-007 (40)~_ . . ~ ~;ty of City Council Report Sant~ Monics City Council Meeting: June 27, 2006 Agenda Item: ..~ ^ Z To: Mayor and City Council From: Jeff Mathieu, Director of Resource Management Department Subject: Modification to Agreement with Black and Veatch Corporation for Additional Design Services for Parking Structure 4 Recommended Action Authorize the City Manager to negotiate and execute a modification to the Professional Services Agreement #8473 (CCS) with Black and Veatch Corporation in the amount of $120,197 to provide additional design services for Parking Structure 4 improvements, increasing the total contract amount from $731,500 to an amount not to exceed $851,697. Executive Summary On May 25, 2005, the City Council awarded a contract to Black and Veatch Corporation for the design of the seismic retrofit improvements to Parking Structure 4. To better manage additional design issues involving improvements to Parking Structure 4, it is recommended that the contract with Black and Veatch be amended to include into the scope of work the foflowing additional items: • Design services for the relocation of the City's Promenade Maintenance sweeper storage/maintenance room from Parking Structure 4 to Parking Structure 2 to accommodate the expanded restrooms and trash room in Parking Structure 4 1 (Design fee is $79,270). • Design services for alley-side lobby entrance improvements in Parking Structure 4. Improvements will provide increased headroom clearance over the alley-side lobby entrance and provide greater visibility and perception of security (Desigr~ fee is $30,000). The total amount of the additions would be $109,270. With the inclusion of a 10°10 contingency the total amount of the amendment would be $120,197. Discussion Backqround On May 10, 2005, Council awarded a contract to Black and Veatch Corporation, for design of seismic retrofit improvements to Parking Structure 4 in an amount not to exceed $665,000, and with contingency funds in the amount of $66,500 (10%). The contingency funds have been used for services required during the design phase. To better coordinate design issues affecting Parking Structure No. 4, staff asked Black and Veatch to include within its scope of work two separate projects that had been authorized in the Capital Improvements Budget for FY 2005-06 -- the construction of a state of the art trash room and a new central public restroom in the Bayside District. Black and Veatch's contract included funds to cover the anticipated costs of coordination with a separate architect selected to design fa~ade improvements for Parking Structures 2, 4 and 5. Creating a better trash bin room, with clarifier, mister, and other amenities will do much 2 to improve the experience for pedestrians who use this alley. Creating a new central restroom has been a high priority for the Bayside District for many years. Relocation of SweeperlMaintenance Room The work that Black and Veatch has completed provides for a state-of-the-art trash bin room for 13 trash bins and a new central restroom that provides for 13 women's stalls and 13-men's facilities. However, to create space for the trash bin room and expanded central restroom, the storage facility for Promenade Maintenance, now located in Parking Structure 4, must be relocated to Parking Structure 2. Design of this new storage area in Parking Structure 2 is outside the scope of work of Black and Veatch's contract and is the first item within the recommended contract amendment. Alley-Side Lobby Entrance Improvements On May 2, 2006, the Bayside Land and Assets Committee reviewed the plans for the central public restroom and trash bin room and toured the facility with Black and Veatch. The Committee was satisfied that the pfans met their goals of a farge restroom facility and trash bin room. However, after touring the site with Biack and Veatch, the Committee suggested that the height of the entry to the lobby area in Parking Structure No. 4 be increased ta create greater head room, to increase visibility and the perception of security, and to create a more attractive alley-side entry. Creating additional height can be accomplished without {osing any parking spaces by removing a portion of the second level parking deck that is directly above the Parking Structure's lobby. Design of this improvement is the second item in the proposed contract amendment. 3 The two new elements will create new project costs, as shown below: Project Design Cost Estimated Additional Pro'ect Cost Promenade Maintenance $79,270 $350,000 Relocation from PS #4 to PS #2 Lobby Improvements in PS #4 for $30,000 $110,000 additional head-room and visibilit Additional Costs $109,270 $460,000 Contin enc $ 10,927 Total Desi n Amendment $120,197 $460,000 Based on Council's direction, Black and Veatch also was asked to study alternative approaches for dealing with pedestrian restraint and to evaluate the feasibility of creating retail space within the street frontage area. The studies have not yet been completed and staff will return at a later date with recommendations. Budget/Financial Impact Funds for design services are available in account number C170621.589000. Prepared by: Elana Buegoff, Senior Administrative Analyst, Economic Development urce Management Dept. 4 Approved: Forwarded to Council: •