Loading...
SR-502-009 (5) EPWM:CP:GB:Komex Council Meeting: July 12, 2005 Santa Monica, California TO: Mayor and City Council FROM: City Staff SUBJECT: Extension of Professional Services Contract 7816 OS with KOMEX H0 2 Science, Inc., for Groundwater Modeling and Engineering Consulting Services INTRODUCTION This report recommends that the City Council authorize the City Manager to extend the professional services contract (7816 OS) with KOMEX H0 Science, Inc. (KOMEX), for 2 Groundwater Modeling and Engineering Consulting Services through June 30, 2006, in an amount not to exceed $91,000. This contract will be paid by funds provided in the MTBE settlement agreement of 2003. BACKGROUND All five City water wells at the Charnock well field were shut down in 1996 due to MTBE contamination from underground gasoline storage tanks and pipelines owned by various oil companies. In December 2003, terms included in a settlement agreement between the City and the responsible parties stipulated the formation an Engineering Committee to coordinate and direct the design, construction, and operation of a treatment facility to remove MTBE from the Charnock wells. The Charnock Engineering Committee (CEC) was created in January 2004 toward this end. The City retained KOMEX from 1996 through 2004 for the purpose of technical oversight of activities related to the Charnock 1 well field restoration. Among the tasks KOMEX has performed on behalf of the City are review of work plans and other correspondence, laboratory analyses, interpretation of data, regulatory compliance and permitting review, preparation of technical reports and presentations, litigation support, and continuous coordination and communication with City technical and legal staff. DISCUSSION The CEC has retained various consulting firms to provide engineering support, groundwater modeling, and field monitoring services. Groundwater modeling, in particular, presents a technical challenge beyond the expertise of city staff; accordingly, Komex will provide modeling support to city staff. Komex is in the unique position of having prepared a groundwater model for the city, having an institutional knowledge of the water division?s operations, and possessing an understanding of the Charnock basin?s hydro-geologic characteristics. In addition to providing assistance to the City in reviewing the development and calibration of the CEC-commissioned groundwater model, Komex can also provide engineering support relative to the design, construction, and operation of MTBE treatment facility. The contract for technical oversight for Charnock represents the extension of a contractual relationship with Komex. 2 BUDGET/FINANCIAL IMPACT Funds in the amount of $ 91,000.00 are available at Account No. 25671.555060 for the Groundwater Modeling and Engineering Consulting Services contract with Komex. These funds are made available to the water fund from the MTBE settlement agreement, as approved annually in the CEC budget. RECOMMENDATION Staff recommends that the City Council: Authorize the City Manager to extend contract 7816 OS with KOMEX H0 Science, Inc. 2 (KOMEX) for Groundwater Modeling and Engineering Consulting Services through June 30, 2006, in an amount not to exceed $ 91,000.00. Prepared by: Craig Perkins, Director of Environmental and Public Works Management Gil Borboa, Water Resources Manager Joseph Lawrence, Assistant City Attorney 3 4