Loading...
SR-506-003-01 (41) EPWM: CP: AA: BZ: AS P:\SP1901\Construction Management\CC1901.DOC City Council Meeting: October 26, 2004 Santa Monica, California TO: Mayor and City Council FROM: City Staff SUBJECT:Increase Contract Number 8198 (CCS) with Security Paving Company Inc., for the FY01-02 and FY02-03 Street and Parking Lot Resurfacing and Sidewalk Repair Project. Introduction This report recommends that the City Council approve an increase of $148,000 to contract number 8198 (CCS) with Security Paving Company Inc., for the FY01-02 and FY02-03 Street and Parking Lot Resurfacing and Sidewalk Repair Project. Background Each fiscal year, the City Council authorizes the construction of street improvements identified by the Environmental and Public Works Management Department including street resurfacing, slurry sealing, new curb ramps and bus pads, and repairs to curbs, gutters, and sidewalks. This project also included runway/taxiway slurry seal and restriping at the Santa Monica Airport. On March 25, 2003, City Council awarded a contract in the amount of $5,778,000, including contingency, for the construction of the FY01-02 and FY02-03 Street and Park Parking Lot Resurfacing and Sidewalk Repair Project. Council subsequently increased the authorization by $280,000 to accommodate emergency repairs to the intersection of 1 Colorado Avenue and Lincoln Boulevard after the water main break that occurred January 1, 2004. Discussion The original contract included repairs to damaged sidewalks, curbs, gutters and driveways along the streets to be resurfaced. Between the time of the original estimate and construction, additional damage had occurred to sidewalks, curbs, and gutters from tree root incursion and other causes. In order to minimize repeated disruption from construction activity to residents, repairs to the additional damaged areas were included as part of this project. Airport staff also requested slurry sealing of additional infield and taxiway areas for consistency and improved pavement visibility, and significantly more runway and taxiway striping than the quantity identified in the contract. Finally, the th construction of one additional concrete intersection on Wilshire Boulevard at 17 Street was added to the contract in order to complete all the work identified for Wilshire Boulevard at the same time. As a result the contract needs to be increased by $148,000 to pay for this additional work. At this time all street and park parking lot resurfacing; street and airport slurry sealing; curb, gutter, sidewalk and driveway repairs; street and airport striping; traffic loop installation, maintenance hole adjustments; and other appurtenant work has been completed. This contract amendment will close-out the project. Budget/Financial Impact 2 Funds in the amount of $124,050 are available in Street Improvement Fund account M010152.589000 and $23,950 in Airport Improvement Fund account M330638.589000. Recommendation Staff recommends that the City Council approve an increase to Contract Number 8198 (CCS) with Security Paving Company Inc., in an amount not to exceed $148,000 for the FY01-02 and FY02-03 Street and Park Parking Lot Resurfacing and Sidewalk Repair Project. Prepared by: Craig Perkins, Director of Environmental and Public Works Management Anthony Antich, P.E., City Engineer Bob Trimborn, Airport Manager Bill Zein, P.E., Principal Civil Engineer Allan Sheth, Civil Engineering Associate 3