Loading...
SR-111296-6C Contract 6563 eCCS) 6C PCD SF OS f /share/ccreportlsmscon NOV 1 2 1996 COUNCIL MEETING November 12. 1996 Santa MOnica, California TO Mayor and City Council FROM City Staff SUBJECT RecommendatIon to Award a Contract to Impact SCiences, Inc for Preparation of an Environmental Impact Report on the Santa MOnica StudiOS Project INTRODUCTION This staff report recommends that Impact SCiences, Inc be awarded a contract In the amount of $69,535, With a 20% contmgency. to prepare an EnvIronmental Impact Report on the Santa MOnica StudiOS project proposed by Santa MOnica StudiOS (3025 OlympiC Boulevard, Santa MOnica) The project conSists of the conversion of the studiO'S SIX acre site to film and teleVISion studiO production facilitIes The contingency amount IS being recommended In order to cover addItional costs that may arise dunng the analYSIS of the proJect's Impacts and to expedite the review process for the project BACKGROUND The City Planning DIVISion received applications from Santa MOnica StudiOS for a Development Review Permit, a Conditional Use Permit (to permit the on-sale of alcoholic beverages), a Vanance (to permit a sculptural wall exceeding the Code-reqUired height), and a Text Amendment to allow residential bUildings With a maximum height of four stones or 45 feet 1 6C NOV , 2 1998 ~ A total of 394,000 square feet of new construction IS proposed for the project with approximately 230,000 square feet of space devoted to production and office uses located In four four-story bUIldings One of these bUildings Will have ground floor retail and food service for a 90 seat restaurant and a 250 seat food court Above thIS space Will be 75 apartments In approximately 100.000 square feet of work/live space for artists The studIOS Will also contain two sound stages occupYing about 15.000 square feet each WIth an outdoor production stage located between these bUildings The Planning and Commumty Development Department has determined that an Environmental Impact Report (EIR) Will be required to evaluate the proposed project The EIR Will examine a number of potential environmental Issues regarding the proposed project Including air quality, nOise. light and glare, shadows. human health, population, land use, hOUSing, transportation, Circulation and parkmg, utilities, public services, constructIon Impacts, recreational resources, cultural resources, aesthetiCS. and neighborhood effects Once an EIR IS prepared, there WIll be a public comment period durmg which tIme Interested persons can review and comment on the environmental analYSIS Public heanngs on the project Will also be conducted by the Plannmg Commission and City CouncIl 2 A Request for Proposal to prepare the EIR for thiS project was Issued by the Planmng and Community Development Department, which IS responsible for preparing CIty environmental documents Four firms responded with proposals Staff recommends that Impact SCiences, Inc be selected to prepare the EIR due to their competitive cost proposal and their experience In preparing Similar types of environmental reviews For example, they prepared the environmental analysIs for the Warner Brothers StudIos Master Plan and are currently Involved m the preparatIon of the EIR for the NBC Studios project In addition, Impact SCiences, Inc and Myer, Mohaddes Associates, Inc (the traffic and circulation subconsultant chosen for the project) prepared the first Master Envlfonmental Assessment (MEA) fOf the City and the first annual update of the MEA BUDGET/FINANCIAL IMPACT The City's costs for thiS EIR, mcludmg the requested twenty percent contingency amount. Will be fully paid In advance by Santa MOnica Studios Funds from the applicant In the amount of 569,535 Will be deposited Into the General Trust and Agency Fund Account Number 80-000-000-00000-9750-04362 AddItional contmgency funds (up to a maximum of 20% of the original contract amount) Will be deposited by the project applicant to thiS same account If It IS determmed by the DIrector of Planmng & CommunIty Development that the ongmal scope of services needs to be amended to proVide additional environmental analysIs Expenditures to cover the cost of thiS additional analysIs Will be 3 charged to this fund without any fmanclallmpact to the City RECOMMENDA liON It IS respectfully recommended that upon receipt of $69,535 from Santa MOnica Studios. the City Council authonze the City Manager to enter Into a contract with Impact SCiences, Inc at a cost of $69,535, with a 20% contingency, for preparation of an EIR for the proposed Santa Monica StudioS project Prepared by Suzanne Fnck, Director of PCD Dean C Sherer, Acting Planning Manager 4