Loading...
SR-6K (14) EPWM:CP:LR:gs/CC1309.WP (S:\SP1309) Council Meeting: September 13, 1994 Santa Monic~c~ornia ,_ TO: Mayor and city Council /C~ J-~ FROM: city staff SEP 1 3 1994 SUB.JECT: Recommendation to Authorize the city Manager to Negotiate and Execute a contract for structural Improvements to the Charnock Contact Basin to stillion Construction, Inc. Introduction This report recommends that the City Council authorize the city Manager to negotiate and execute a contract for structural improvements and repairs to the Charnock Contact Basin to stillion Construction, Inc.,the lowest responsible bidder, in the amount of $10S,236.00. Backaround Dur ing the FY 1992-93 budget process, the ci ty council approved funding for improvements to the Charnock Contact Basin. This is a metal enclosure over the preliminary water treatment plant for well water at Charnock. All existing metal beams and structural supports of the building have deteriorated. This condition is the result of corrosion caused by the chlorine used in the water treatment pond. In addition, as a result of the January 17, 1994 earthquake, the building shifted off the foundation, breaking all existing non- structural fasteners attached to the siding and the foundation. Also, the adjacent (six) 6-foot high concrete block wall fractured and is tilting to one side. The contract includes demolition of the existing building, and the SEP 1 3 1994 - 1 - 6K design and construction of a new metal building. The new construction will incorporate the most recently adopted Uni form Building Code specifications per FEMA funding requirements for reimbursement of earthquake damaged buildings. A Notice Inviting Bids was published on July 14 and 15, 1994, in The Outlook, as well as in four construction journals. In addition, bidding documents were sent to six woman/minority business enterprise associations (WMBE) . Bidding packages were requested by nine (9) contractors. The City Clerk's office received three (3) sealed bids, which were publicly opened and read aloud on July 27, 1994 by the Deputy city Clerk. The bid results were as follows: 1. stillion construction, Inc. $105,236.00 2. Bremco Construction, Inc. $132,390.00 3. Shook Building Systems $138,067.00 city Engineer's Estimate.....$145,OOO.OO The lowest bidder, stillion construction, Inc. , supplied the city with five (5) references and all references reported that the contractorrs work was satisfactory. The state Contractors License Board verified that the contractor's license is current, active and in good standing. None of the vendors who submitted bids are WHBE firms. Budqet/Financial Analysis It is expected that a portion of the funding for this project will be reimbursed by the Federal Emergency Management Agency (FEMA) and the Office of Emergency Services (OES). The lowest bidder - 2 - estimates repair work to the foundation to be $22,304.00. It is anticipated that 97.5% of this expense would be reimbursed by FEMA and OES. It is recommended that the City council approve the funding shown below at this time. FUNDS REQUIRED Contract. . . . . . . . . . . .$105,236.00 contingencies (15%) . . . . . .$ 15,864.00 TOTAL $121,100.00 Funds are available in CIP account number: Contract Project Account Number Amount Continqencv Total 25-760-671-20092-8900-99293 $ 82,932.00 $12,518.40 $ 95,371.80 Additional funds will be available in account number: 13-500-402-86684-5501-13005 $ 22,304.00 $ 3,345.60 $ 25,649.60 TOTAL: $105,236.00 $15,864.00 $121,100.00 Recommendation It is recommended that the city Council: 1. Award a contract for improvements to the Charnock Contact Basin to stillion Construction, the lowest responsible bidder, in the amount of $105,236.00. 2. Authorize the City Engineer to issue any necessary change orders to complete additional work in conformance with the Administrative Instructions on change orders. 3. Approve the earthquake related budgeting as indicated above. Prepared by: craig Perkins, Director of Environmental and Public Works Management Department Anthony Antich, city Engineer John Mundy, utilities Manager - 3 - -- - - - -- -- --- - - --- CITY OF SANTA MONICA INTER-DEPARTMENT MEMORANDUM DATE September 14, 1994 TO CraIg Perkins, DIrector of EnvIronmental & PublIc Works Management FROM RIta Thompson, CIty Clerk's OffIce SUBJECT Contract Nos 7079, 7080 and 7082 On September 13, 1994, the Cny CouncIl awarded Contract Nos. to the following: 7079 Demand Management Company (DMC) for admIillstratIve and inspectIon servIces related to the Bay Saver Retrofit Program for the period of August 1, 1994 to July 31, 1995 Item 6-H on the 9/13/94 agenda. 7080 The CIty of Los Angeles for the contmuatIon of the dry-weather low flow diverSIOns from the Pico- Kenter storm dram Item 6-1 on the 9/13/94 agenda 7082 StIllIon ConstructIOn, Inc m the amount of $105,236 00 for structural improvements to the Charnock Contact Basin. Item 6-K on the 9/13/94 agenda Please provIde the City Clerk's Office WIth a fully executed copIes of the contracts