Loading...
SR-PA-2 . . . f1t.~ APR 2 3 1991 LUTM:PB:RF:db:PKGSTRUC:DESK:GENSERV Council Meeting, April 23, 1991 Santa Monica, California To: Chairperson & Parking Authority From: City Staff Subject: Recommendation to Appropriate Funds to Enhance the Operation and Maintenance of the Downtown parking structures Introduction This report recommends the City council appropriate $85,000.00 from Parking Authority reserves to enhance the operation and maintenance of the downtown parking structures. Discussion In response to city Council direction and in response to comments about the need to enhance the operations and maintenance in the downtown parking structures, staff believes certain improvements should be made in the downtowrr parking structures. The areas of improvement include the operation of the elevators, the parking information and directional signing, the parking stall markings, the lighting, and the elevator flooring. Attached is a list of improvements and estimated costs for each category. The discussion below provides detail of what is proposed. The elevator operation improvements include installing additional vandal-proof buttons in the cars and in the halls, insuring that the elevator buttons coordinate with the levels in the structure, 'R\~~ - 1 - APR 2 3 1991 ~ .- .".. . ' \. '. ~ ..- and Installing new door detector devices. All of these changes are designed to reduce problems associated with elevator operations and the amount of maintenance due to vandalism. Staff has prepared changes to the existing parking directional signs inside each structure to more clearly direct motorists to available parking areas and to the exits. Also, in conjunction wi th the parking meter changes in the structures, addi tional parking information signing will be provided. The proposed improvements also include repainting all of the parking stall markings, relamping all of the existing light fixtures, and reflooring all of the elevators in each of the six structures. These improvements have been discussed with staff of Bayside District Corporation and are supported by the BOC. Budqet/Fiscal Impact All of the proposed improvements are estimated to cost $85,000.00. It is recommended the funds for this cost be appropriated from the Parking Authority reserves. . Recommendation It is recommended the the City council appropriate $85,000.00 from Parking Authority reserves to account number 77-500-610- 00000-6691-00000 (parking structure maintenance) to enhance the operation and maintenance of the downtown parking structures. Prepared by: Ron Fuchiwaki, City Parking and Traffic Engineer ~r ..... <. ",;; ..J ~ ~, , .. , - 2 - r . . LIST OF POTENTIAL IHPROVEKEN'l'S IN THE DOWNTOWN PARKING STRUCTURES Vandal proof station buttons ........................... $12,000 (cars and hall stations) Match existing car floor buttons with existing position indicators ........................ $ 2,000 Install new solid state door detectors ................. $30,000 Improve and modify existing directional signing ........ $ 6,000 Repaint parking stall markings ......................... $20,000 Relamp existing light fixtures ......................... $10,000 Replace elevator floor tiles ........................... $ 5,000 TOTAL $85,000 (promena) . -3-