Loading...
SR-6-L (80) ... 6 EPWM:CP:RS:sm/CC1538 (S \SP1538) Counc~l Meet~ng: October 17, 1995 Santa Mon~ca, Californ1a OCT 1 7 1995 TO: Mayor and C~ty Council FROM: C~ty Staff SUBJECT: Award of Contract for the CitYW1de Repa1r/Replacement ProJect - Contract II Roof Introduction This report recommends that the City Counc~l award a contract for the Citywide Roof Repair/Replacement Project - Contract II, to Leo Lee Inc. dba Allstate Roofing Co., the lowest respons1ble b~dder, in the amount of $248,978. The Project was divided into two separate contracts due to the two different types of constructon mater~als, methodology, and certifications requ1red for the two types of roof construction. Backqround During the FY 1995-96 budget process, the City Council approved fund1ng for the CitYW1de Roof Repair/Replacement Project - Contract II. In a ser~es of meeting 1n August 1995} representatives from Public Engineer1ng, Facilit~es Maintenance ( PFM) , Parks, Electrical, Carpentry, and Plumbing d~scussed which of the buildings had the worst leaks and could possibly not get through the next rainy season without ser10US inter10r and/or structural damage The group of City representatlves determined the priorities of buildings to repair. Th~s proJect will lrnplement necessary roof repalrs and/or 1nstallat1on of new hot built up roof ~ ~:~ - 1 - OCT 1 7 f995 6 , i~~ systems at the followlng Clty facilities: 1. City Hall 2. Senior Recreatlon Center 3. Fleet Maintenance Buildlng 4. Beach Parking Lot Headquarters Portlons of these roofs leak extensively due to deterloration from age and the elements. Over the last five years, PubllC Facilitles Maintenance (PFM) crews have worked extensively to locate the sources of the visible leaks reported ln each bUllding. Efforts to perform patch repalrs have had llmlted success wlth reduclng the number and severlty of leaks. Some of these roofs have exceeded thelr useful life and are ln need of complete replacement, whlle others require extensive repair. The City hlred IntroSpec Archltectural Consultants, Inc. to conduct an assessment of roof damage and to prepare plans speciflcatlons and an. engineering report of ci~ywide roofs. In thelr study, the consultants dlvided the damage lnto two categorles of work - one slngle ply P.V.C. roofs to be included ln Contract I, and the second, hot bUllt up roof repalrs to be included ln Contract II of the Project. A Notice Invltlng Bids was publlshed on September 18 and 19, 1995 ln The Outlook, as well as in four construction journals. In additlon, bidding documents were sent to six womanjminorlty business enterprise assoclatlons (WMBE). Biddlng packages were - 2 - requested by 15 contractors. The Clty ClerkTs offlce recelved SlX (6) sealed blds, WhlCh were publicly opened and read aloud on October 10, 1995 by the Deputy City Clerk. The bid results were as follows. Bid Prices l. 2 . 3 . 4. 5 Leo Lee Inc. dba Allstate Roofing Co.* Best Roofing Co., Ine Stone Rooflng Co., Inc. J. Cab & Sons Roofing Inc*. SCR Group, Inc dba So. Californla Roofing Co Coast Roofing Company 370,350** 580,573 $248,978 317,310 463,453 323,105** 6. Clty Engineer's Estimate. $232,550 * WMBE **addendum is not included The low bidder, Leo Lee Inc. dba Allstate Rooflng Co., supplied the City wlth several references and all references reported that the Board verlfied that the Contractor's llcense is current, active and contractor's work was satlsfactory The State Contractors' Llcense In good standlng. Budqet!FlnanClal Analysis FUNDS REQUIRED Contract Contlngencies {20%}* $248,978 49,796 $298,774 TOTAL *A 20% contlngency is belng requested In lieu of the typical 15% because the actual subsurface condltion of several decks included In the bld package lS not known. There could be greater damage to the wooden frame than what was vlsible at select inspections - 3 - Funds are avallable ln ClP account numbers: Contract ProJect Total Amount Contlnqency Account Number City Facllity Roof Repair $ 150,690 30,138 $180,828 01-710-401-20096-8900-99168 Park Facilltles Improvements 43,934 8,787 57,721 01-740-511-20096-8900-99262 Reroof Yard Building 42,394 8,470 50,864 01-710-451-20094-8900-99503 Beach Parklng Headquarters Roof 11,960 2,392 14,352 11-740-521-20096-8900-99231 TOTAL 5248.978 S 49.7'Q7 $298.765 Recommendatlon It is recommended that the Clty Counell: 1. Award a contract for the Cltywide Roof RepalrjReplacement ProJect - Contract I to Leo Lee Inc. dba Allstate Roofing Company, the lowest responslble bldder, in the amount of $248,978; and 2. Authorlze the City Engineer to lssue any necessary change orders to complete additlonal work ln conforMance with the Adminlstrative Instruction on change orders. Prepared by: Craig Perkins, Director of Environmental & PubllC Works Management Department Anthony Antich, P.E , City Englneer - 4 -