Loading...
SR-021396-6F CONTRACT # 7186 eCCs) 6F - FEB 1 3 1996 - PCD:SF:RF:rn:04BWPISR:WINWORD council Meeting, February 13, 1996 Santa Monica, california To: Mayor and City Council From: city staff Subject: Recommendation to Award a Contract to steiny and company, Inc. for the Traffic Signal Modifications: 4th street and Broadway; 4th Street and Pico Boulevard Introduction This report requests that the city council award a contract in the amount of $165,061.00 to Steiny and Company, rne. , the lowest responsible bidder, for the modification of two intersection traffic signals at 4th street and Broadway, and 4th street and pico Boulevard. It is also requested that the City Parking and Traffic Engineer be authorized to issue any change orders necessary to complete additional work to the extent of funds available in accordance with the Administrative Instruction on Change Orders. Discussion This project entails upgrading the existing outdated traffic signal equipment and controllers and completing the synchronization system along 4th street between pico Boulevard and Wilshire Boulevard. The purpose of this project is to synchronize traffic signals along this transit/traffic arterial. The proposed lmprovements Wil: reduce delay and fuel consump:iO~ F FEB 1 3 1996 - and will improve the flow and safety of transit operations and traffic. Although the city is considering possible traffic circulation changes in the downtown area, construction of these signal projects at this time will not require substantial changes or their reconstruction at a later date, especially at the intersection of 4th street and Broadway. The technology installed will accommodate potential changes to the traffic circulation requiring only minor traffic signal modifications which can be completed by Clty staff. This project was approved by the Los Angeles County Metropolitan Transportation Authority (MTA) through the submission of the City's Fiscal Year 1995-96 proposition A and C Local Return Annual Plan. Following the published advertisements, bidding packages for the installation of these signals were requested by ten (10) contractors. Eight (8) bids were received, and read by the Deputy City Clerk on December 20, 1995. The bids received were as follows: steiny and Company, Inc. $165,061.00 L & R Electric service Co., Inc. $166,800.00 Paul Gardner Corporation $169,887.00 C. T. & F., Inc. $173,430.00 2 California Electrical Services $175,000.00 De La Cruz Construction Inc. $178,205.00 Los Angeles Engineering, Inc. $180,485.06 Comet Electric $202,000.00 Englneering Estimate $150,000.00 Staff has checked the eighteen (18) references provided by steiny and Company, Inc. , the low bidder, and found their work to be satisfactory. Budqet/Financial Impact Funds required: Contract $165,061.00 Contingencies (18%) 29,939.00 Contract Total $195,000.00 Sufficient funds are appropriated at account number 20-770-415- 20096-8905-99618. The slightly higher than normal percentage for contingencies is to accommodate SMART Corridor project modifications during construction at Pico Boulevard and 4th Street. These modifications are currently being designed and will be incorporated into this project, saving time and money when the SMART Corridor begins full construction later this year. 3 Recommendation It is recommended that the city council: 1. Award a contract to steiny and Company, Inc. , the lowest responsible bidder, in the amount of $165,061.00 for the modification of two intersection traffic signals at 4th street and Broadway, and 4th street and Pica Boulevard. 2. Authorize the city Parking and Traffic Engineer to issue any change orders necessary to complete additional work to the extent of funds available in accordance with the Administrative Instruction on Change Orders. Prepared by: Suzanne Frick, Director of Planning & Community Development Ron Fuchi waki , City Parking & Traffic Engineer Jamal Rahimi, Senior Traffic Engineer Rocky Nungester, Project Engineer 4