Loading...
SR-6-D (116) ~ .. 6-/) GS:SES:LR:caJ/CC1158.7.word.englne APR 1 4 1991 Councll Meetlng: Apri 1 14, 1992 Santa Monlca, Californla - TO: Mayor and City Council FROM: Clty Staff SUBJECT: Recommendation to Allocate Add it lona 1 Funds 1n the Amount of $17,453.00 to Provide for the Plumblng. Smoke Oetectlon. and Sprinkler System at the C1V1C Auditorlum Introduction Th1 s report requests that City Councl1 approve an add 1 t lOna 1 alloeatlon of 517,453.00 to provlde for the plumblng, smoke detectlon, and sprlnkler system at the C1V1e Aud1torlum. Background The C 1 ty Counell approprlated funds 1 n the FY 1989 - 90 Budget to replace the Clvic Auditor1um plumblng system as well as 1nstall a smoke detect10n and fire spn nkl er system The eXlstlng plumb1ng had deterlOrated over time and was the cause of slgnlfleant leaks and water damage. Replacement of that system was needed to avoid future damage to the bUlldlng lnterlors and any dlsruptlon of scheduled activ1tles 1n the C1V1C Audltorlum. There was no f1re sprlnkler or smoke detectlon system serv1ng the ent1re bU1ldlng, so a new flre sprlnkler system, a comprehensive smoke detectlon and a flre alarm system were lnstalled to protect all major areas of the buildlng. A contract was negotiated with West World, Inc. on August 8, 1990. A design build contract was executed for the Contractor to begln work ln late August, 1990. The approved contingency was spent on unanticipated work durlng constructloo of th 1 S proJect Whl ch included replacing the eXlStlng underground domestic - 1 - 6-/) APR 1 ~ ]992 -- - - - ~ water serVlce line, replacing rusted and deteriorated metal partltlons ln the shower stalls wlth longer lastlng ce r..am 1 c tlles, and lnstalllng a new communlcations serVlce llne from the Flre Department. In addltlon, a combl nat 1 on of delays In the construct 1 on process and the lncorporation of the unanticlpated work pushed the completion date beyond the December 1990 deadline. ThlS made lt necessary for the contractor to repalr open walls and ceil 1 ngs and remove thelr operations from the Slte to accommodate a scheduled maJor tradeshow ln February 1991. Finally, the Santa Monlca tlre Department requested that the maln fire alarm panel be upgraded to meet addltlonal public safety standards The new panel 1S a zoned system that lncludes a delay factor ln the flre alarm. It assures that the C1V1C security personnel and the stand-by flre fighters have enough t lme to verl fy whether the alarm 1 s a false alarm or an actual fwe before evacuatlng everyone. Although an alarm panel was requested ln the ongwal speclflcatlons, the Contractor had lncluded a 1 ess expenslve and less efflClent system in thelr bld. The additional work as descrl bed above caused the contract to exceed the contlngency by $17,453. Budget/Flnanclal Analysls Initlal Contract...... ... ... ....... .. ....$526,000.00 Cont 1 ngency ............................ ....S 60,000.00 Sub- Total ...$586,000.00 Additional Contingency Funds Requested ......$ 17,453.00 Total. .5603,453.00 ~ - 2 - -- - ~ - - " Funds 1n the amount of $17,453.00 for the completion of th1S proJect, are ava1lable 1n Account No. 32-740-621-25890-8911-99184, II Aud 1 ton urn Plumb1ng Repa 1 rs." No add 1 t 1 ona 1 appropn at i on 1 s necessary. Recommendat lOns It lS recommended that City Counc11: 1. Allocate addit10nal funds 1n the amount of $ 17,453.00 to prov1de for the p 1 umblng, smoke detect 1 on , and spn nkl er systems at the C1V1C Aud 1 ton urn. 2. Authorlze the C1ty Eng1neer to lssue a change order 1n conformance w1th the Adm1n1strat1ve Instruct10n on change orders. Prepared By: Stanley E. Scholl, D1rector of General SerV1ces Barbara Frankl1n-Moran, Director of Cultural and Recreat10nal SerV1ces Anthony Ant1ch, C1ty Eng1neer Carole Curtin, CiV1C Aud1tor1um Manager Craig Call1er, Battal10n Chief/Fire Marshal Steve Lacati, Fire Protect1on Eng1neer A - 3 - - -- --- -- -