Loading...
SR-6-C (115) ~ar:f:iF 7f(t(O (f;S <De PCD TM SF RF F \PCD\SHARE\NEILMONT MSW JAN 2 6 1999 CouncIl Meetmg January 26, 1999 Santa MOnica, California To Mayor and City Council From City Staff Subject Recommendation to Award a Contract to B A Construction for the Asphalt Berm, Striping and Signing Modifications Neilson Way and Montana Avenue I ntrod UCtlO n ThiS report recommends that the City Council authorize the City Manager to negotiate and execute a contract In the amount of $110,00000 to B A Construction, the lowest responsible bidder, for the asphalt berm, striping and signing modifications for Neilson Way and Montana Avenue DISCUSSion Neilson Way ThiS project Installs a temporary raised median and two-way left-turn lane along Neilson Way from Pica Boulevard to the south CIty limits, and allows nighttime parking on the west side of Neilson Way The temporary raised median, constructed uSing extruded asphalt berms. would be placed In areas that Will not block turn access to street intersections and selected dnveways At some dnveway and street mtersectlon locations, a pamted two-way left-turn lane Will be provided 1 c,c, JAN 2 6 1999 As mentioned In the prevIous Information Item, these changes should address resident Issues by, first, helping reduce vehicular speeds This IS accomplished by adding the temporary raised median WhiCh, In turn, narrows the eXisting through lanes Second, by creatIng the two-way left turn lane, this should reduce the sIgnificant number of left turn and rear end colliSions occurring along Neilson Way Since nighttime traffic volumes are low enough to be accommodated In one lane, this project would allow nighttime parking (8 OOpm to 8 OOam) along the west Side of Neilson Way Montana Avenue This project also narrows the eXisting painted two-way left-turn lane along Montana Avenue from 7th Street to 20th Street to allow for a Wider travel lane and a bike lane ThiS should further reduce fnctlon caused by vehicles that are attempting to parallel park along Montana Avenue FollOWing the published advertisements, bidding packages for the modification of these streets were requested by five (5) contractors Two (2) bids were received, and read by the Deputy City Clerk on Wednesday, December 3D, 1998 The bids received were as follows 8 A Construction $110,00000 Sequel Contractors, Inc $139,629 00 Engineering Estimate $100,00000 Staff has checked the four (4) references provided by B A Construction, the low bldder, and all references found B A Construction's work to be satisfactory The Contractors' 2 State license Board verified that the Contractors and his subcontractor's licenses are current and active BudgeVFmanclallmpact Funds required Contract $110,00000 Contingencies (10%) 11,000 00 Contract Total $121,00000 Funds for this project are available at account number 01-770-415-20099-8900-99841 (NeIghborhood TraffIc Measures) Recommendation It IS recommended that the City Council 1 Award a contract to B A Construction, the lowest responsible bidder, In the amount of $110,000 00 for the asphalt berm, striping and slgnmg modifications to Neilson Way and Montana Avenue 2 Authorize the Director of Planning and Community Development to Issue any change orders necessary to complete additional work to the extent of funds available In accordance with the Admmistratlve Instruction on Change Orders Prepared by Suzanne Fnck, Director of Planmng and CommunIty Development Ron Fuchlwakl, City Parkmg & Traffic Engineer Jamal Rahlml, Semor Traffic Engmeer Rocky Nungester, Assistant Traffic Engineer 3