Loading...
SR-6-M (52) ~'U t~ L 2 ;'~"-~ ~m EPWM CP AA RS S \sp1696\cc1696aw doc Council Meeting June 22, 1999 Santa Momca. California TO Mayor and City Council FROM City Staff SUBJECT Recommendation to Award Contract for the 1997-98 Federal Street Resurfacing Project #2 to PALP, Inc (DBA Excel Paving Company), and Authonze the City Manager to Negotiate and Execute a Professional Services Contract with DMR Team Inc for Construction Management Services Introduction ThIs report recommends that the CIty Council award a contract for the construction of the 1997-98 Federal Street Resurfacing Project # 2, Federal Project # STPL-5107 (008) to PALP Inc (DBA Excel Paving Company). the lowest responsible bidder. In the amount of $716.167, find that PALP Inc's (DBA Excel Paving Company) failure to acknowledge Addendum 1 In their bid proposal IS a minor bid Irregulanty, and authOrize the City Manager to negotiate and execute a professional services contract With DMR Team Inc for construction management services In the amount of $58.257 The locations of the project are 14th Street from Wilshire Boulevard to PICO Boulevard and 11 th Street from Wrlshlre Boulevard to Colorado Boulevard Back!=lround Each fiscal year. the City CouncIl authorlzes the Implementation of a one-year program of street Improvements IdentIfIed by the Department of Environmental and Public Works 1 u>frl JUN 2 2 fQC~ Management Including street resurfacing, slurry sealing. and repairs to curbs. gutters. curb ramps, bus pads, and sidewalks The pnonty projects for the year are selected from among those streets that rank highest In the need for repair In the Pavement Management System Report This report has been required since 1989 to qualify for federal funding and IS updated penodlcally It ranks the condition of all streets In the City DUring the annual on-site Inspection of these pnonty locations, staff further evaluates streets for type and schedule of repair by age, surface and subsurface conditions, complaints received, type of use (I e , commercial, Industnal or reSidential), current traffic volume, and projected change of use or volume The federal government, through vanous legislation, proVides aid for the development of surface transportatIon projects A portion of these funds are set aSide for the maintenance and upgrading of local streets In Santa Momca, 14th Street from Wilshire Boulevard to PICO Boulevard and 11 th Street from Wilshire Boulevard to Colorado Boulevard qualify for these federal funds The federal government requires projects uSing these funds to follow federal contracting procedures For thiS reason, thiS project was bid separately from the City's annual street resurfacing project ThiS project Will use all of the $589,615 currently available Every effort IS made to repair and recycle eXisting pavement rather than unnecessan Iy Incur the expense of total pavement replacement These streets WIJJ be resurfaced by heating and sconng the top one Inch of thickness, adding 011 to rejuvenate the pavement. 2 and then applYing an overlay with rubberized asphalt One of the benefits of uSing the rubberized asphalt means that more than 15,000 old tires Will not be placed In a landfill DIScussion The Notice Inviting Bids was published In the Argonaut on April 19, 1999 and April 26, 1999 A Notice InvitIng Bids. along with the plans and specifications. were also submitted to seven construction Journals, and were sent to five women/mlnonty business enterpnse (WMBE) associations Twelve contractors requested bid packages The City Clerk's Office received five sealed bids which were publicly opened and read aloud on May 25, 1999, by the Deputy City Clerk The bid results were as follows 1 Excel Paving Company $ 716.167 2 Sully-Miller Contractmg Company $741,141 3 Sequel Contractors, Inc $ 751,834 4 SilVia Construction. Inc $ 769,513 5 Los Angeles Englneenng, Inc $ 830,609 City Engineer's Estimate $ 745,000 The lowest bidder, Excel Paving Company. failed to acknowledge Addendum 1 In their submitted bid proposal Addendum 1 contained an updated federal wage rate schedule None of the revised wage rates affected labor classifications that Will be used on thiS project The Contractor's representative stated after the bid opemng that they were aware 3 of the addendum and that the addendum did not affect their bid amount Because the bid addendum did not affect the bid price and because failing to acknowledge the addendum did not provide the contractor any unfair advantage over other bidders, the City CouncIl can determme that failure to acknowledge the addendum IS a minor bid Irregularity Excel Paving Company supplied the City with a list of recent similar projects City staff contacted representatives from the City of Culver City, the County of Los Angeles and the City of Long Beach Projects for those organizations Include Sepulveda Boulevard Resurfacmg, FoothIll Boulevard Resurfacing, and 2nd Street Resurfacing, respectively All references reported that the Contractor's work was very good Excel Paving Company has also completed projects for the City of Santa Monica Their work for the City has been very good The State Contractors' License Board verified that the Contractor's license IS current. active, and m good standing To be eligible for federal funding. the selected contractor must meet the 14% DBE goal established for thiS project Excel Paving Company has committed to uSing AM Concrete, a federally listed DBE firm, for approximately 19% of the project Construction ManaQement The professional services construction management contract Includes inspection and management of the construction work detailed above Requests for Proposals were sent to SIX fIrms The City received four replies and each firm was Interviewed by a staff commrttee of three englneerslrnspectors resultrng In the selectIon of DMR Team, 4 Inc DMR Team. Inc IS successfully providing simIlar services for the PIca Streetscape PrOject Bud~etlFlnanclal Impact Construction funds required are as follows Contract Construction Contract Contingency Construction Management Construction Management Contingency $716,167 $ 75,576 $ 58,257 $ 6,000 $856,000 Total Funding IS available In the following accounts ACCOUNT CONTRACT CONTINGENCY TOTAL 43-770-402-20098-8905-99453 (Street Resuriaclng, Federal $589.615 SO $589.615 Match 1) 01-770-402-20098-8905-99453 (Street Resuriaclng, Federal $75,629 SO 575,629 Match 1) 01-770-402-20098-8905-99152 (Street Repair/Resurfacing) $109,180 $81,576 5190,756 TOTAL $774,424 $81,576 $856,000 5 RecommendatIon Staff recommends that the City Council 1 Find that PALP Inc's (DBA Excel Paving Company) failure to acknowledge Addendum No 1 IS a minor bid Irregulanty, 2 Award a contract for the constructIon of the 1997-98 Federal Street Resurfacing PrOject # 2 to PALP Inc (DBA Excel Paving Company), the lowest responsible bidder, In the amount of $716,167. 3 Authorize the City Manager to negotiate and execute a professional services contract with DMR Team Inc for construction management services In the amount of $58,257, and, 4 Authorize the City Engineer to Issue any necessary change orders to complete additional work wIthin budget authority Prepared by Craig Perkins, Director of EnVironmental and Public Works Management Anthony Antlch, P E , City Engineer Dave Bntton, P E, Senior CIVil Engineer Neil Cole, P E . CIVil Engineer 6