Loading...
SR-7-4 I-A DEe ~ 1 1993 LUTM:SK:DKW:SHK'f:\plan\share\council\strpt\adr92002 Council Mtg. December 14, 1993 Santa Monlca, California TO: Mayor and Clty Council FROM: City Staff SUBJECT: Appeal of Plannlng Commission Approval of Development Review 92 - 002, 1919 Santa Monica Boulevard, to Allow 16,000 sq.ft. of General Office Space in an Existlng 46,832 sq. ft. Offlce Buildlng to be Converted to Medical Offlce Use. Applicant: 9th and 34th Street Partners. Appellants: Ken Genser and Kelly Olsen, IrWln Zeke Warsaw. INTRODUCTION This report recommends that the City Councll uphold the decision of the Planning Commission and approve Development Review 92-002 to amend Development Review 441 and allow 16,000 sq ft. of general office space to be converted to medical offlce use in an existlng office building located at 1919 Santa Monlca Boulevard. An updated traffic analysls prepared utillzlng the 1993 Master Environmental Assessment (MEA) concluded that no signiflcant traffic impacts would result from the converSlon In addi t lon, staff recommends that Conditions 25 and 26 of DR 441, which required restriping of Santa Monlca Boulevard east and west of 20th Street, be eliminated and the improvement fee refunded to the appllcant Slnce the mltlgatlon is no longer requlred as the original buildlng size was reduced. On Aprll 7 I 1993 I the Planning Commission voted 4-1 to approve the appllcant's change of use request. The determlnation has been appealed by Council members Ken Genser and Kelly Olsen and by Irwin Zeke Warsaw. The appeal statements are contalned in Attachment A. - 1 - DEe ~ 1 1993 7-A ThlS item was scheduled to be heard by Council on September 21, 1993. At that meetlng, the applicant requested the continuance of this item. Appellant Warsaw was opposed to a contlnuance because he would be unable to attend another meetlng. Council approved a motlon to continue the ~tem to December 14, 1993 and to allow Mr. Warsaw and other members of the publlC who would not be able to attend another meetlng, to speak. Mr. Warsaw consented to waive his rlght to rebuttal while acknowledglng that new informatlon may come up at subsequent meetlngs. BACKGROUND The City Council approved Development Review 441 on Aprll 11, 1989. In its approval, the City Council reduced the square footage of the project by 5,000 sq. ft., from the 51,832 sq. ft. proposed, to a maXlmum of 46,832 sq. ft, and therefore the requlrement to restrlpe Santa Monlca Boulevard at 20th Street was no longer necessary to mitigate the traffic lmpacts The 1919 BUllding was completed and recelved lts Certlflcate of Occupancy on Aprll 15, 1991. During the past two years, the owners of the 1919 BUllding have received requests from doctors wantlng to locate In the 1919 BUllding. Accordlng to the appllcant, Slnce the 1919 BUlldlng is located close to St. John's Hospital, doctors could V1Slt patients by walklng across the street rather than drlvlng thelr cars to the hospital, thus reducing traffic generated by doctors. However, patient trips to thlS location would lncrease. - 2 - The appl1cant is proposing an amendment to Cond1tion 35 of Development Rev1ew 441. Cond1t1on 35 states that "no retail, reta1l f1nancial institution or med1cal office occupanc1es shall be permitted in the development due to the related traff1c generat10n rates wh1ch are h1gher than general office occupancies II The appl1cant 1S proposing to convert 16,000 sq. ft. of the exist1ng general office use to medical use. Traffic and Circulation The original traffic analys1s for the proJect found that, prior to m1t1gation, a significant traffic impact would be expected at the intersec~lon of Santa Mon1ca Boulevard and 20th Street dur1ng the p . m . peak hour The 1919 Building was not projected to create a slgn1f1cant 1mpact on any of the other study intersections in either morn1ng or even1ng peak hours. Based on revisions made to the project, an addendum to the original traffic study was proposed that concluded a significant impact would occur at Santa Mon1ca and 20th Street The or1g1nal EIR and addendum traffic analysis utilized the Cr1t1cal Movement Analysis (CMA) methodology and relied on the City's old def1n1t1on of a significant impact. As a result of this analysis, the following mitigation was identified for the significant 1mpact Santa Monica Blvd. east of 20th Street shall be re-striped at the developer's expense to accommodate a total of SlX lanes, 1nclud1ng the addition of an exclusive right-turn pocket on the westbound Santa Mon1ca Boulevard approach to 20th Street 1f requested by the City Parking and Traffic Eng1neer. - 3 - The orlglnal ErR traffic study and the subsequent Addendum used the applicant's proposal of 51,832 square feet which was later reduced by the City Councll to 46,832 square feet. Since a trafflc study was not prepared to analyze the lmpact of the reduced square footage, lt was not known untll the new traffic analysis, prepared in 1992 for the subject appllcatlon, that the reduction in square footage eliminated the significant impact at the Santa Monica Boulevard and 20th Street intersection. Therefore, staff 1S recommending that the trafflc 1mpact fee paid by the appl1cant, which has been held 1n a reserve account, be refunded. Staff also recommends ellffilnation of Conditions #25 and #26 of DR 441, which read as follows' 25. Santa Mon1ca Boulevard east of 20th Street shall be re-striped at the developer's expense to accommodate a total of six lanes, lnclud1ng the addition of an exclUS1ve r1ght-turn pocket on the westbound Santa Mon1ca Boulevard approach to 20th Street if requested by the Clty park1ng and Traffic Engineer. 26. The existing trafflc lanes on Santa Monica Boulevard west of 20th Street shall be restr1ped and shlfted southward to m1n1m1ze the potential offset resulting from the restriping required on Santa Mon1ca Boulevard east of 20th Street lf requested by the City Parklng and Trafflc Eng1neer. A new Trafflc Study for 1919 Santa Monlca Building was prepared by Kaku Associates per the request of the C1ty ln June 1992 to evaluate the potentlal 1mpacts of convertlng 16,000 sq.ft. to medical use. The report analyzed trafflC conditions at the same intersections as the orlglnal ErR. This trafflc study used the 1992 Master Environmental Assessment (MEA) for 1nformatlon on - 4 - baseline conditions and the Hlghway Capacity Manual (HCM) method for the level of service analysis. ThlS study concluded that the proposed change to medical use would aggravate traffic conditions at a level that would create a slgnlficant impact at the 20th Street and Santa Monica Boulevard intersectlon. However, since that time, the 1993 MEA was approved and then used as a baseline for a new traffic analysis (Attachment J). This supplemental analysis re-examined the intersections at 20th Street and Wilshire Boulevard and 20th Street and Santa Monica Boulevard. The concluslons of this updated supplemental traffic analysis are as follows: 1. Using the City's definition of a significant impact, the converSlon of general office space to medical office space does not result in a slgnlflcant traffic impact at either one of the two intersectlons. 2. Using the City's significant impact criteria, the lntersectlon of Santa Monlca Boulevard and 20th Street would no longer be significantly impacted under either the all general offlce scenarlO or the proposed general office/medical use scenarlO. 3. USlng the Clty'S revlsed traffic methodology and significant impact crlteria, the intersectlon of Wllshire and 20th becomes slgnlflcantly impacted under both proJect scenarios. However, the trafflC lmpact of the proposed general office/medical offlce use scenarlO compared wlth the existing approved all general offlce use scenario, has an lncrease in volume capacity [v/c] ratio of .002, would not be considered slgnlflcant under the current City significance crlterla. Parking The parklng requirements for this project were based on Code - 5 - park~ng requirements of 1 space for every 300 sq.ft. of floor area for general office and retail uses for a total of 138 spaces A total of 158 spaces were provided with a variance approved to allow 40% of them to be compact spaces. The current application shows 158 spaces with 35% of them being compact. Code parking for medical use is 1 space for every 250 sq. ft. of floor area. Converting 16,000 sq.ft. to medlcal use would require an addltlonal 10 parking spaces. The total required for this revised proJect would be 148 spaces, which lS already avallable. PLANNING COMMISSION ACTION In approving Development Rev~ew 92-002 the Plannlng Commlssion noted that the proj ect is not conslstent with the Circulatlon Element of the General Plan Slnce, based on the 1992 traffic analysls then avallable, it would create a slgnificant envlronmental lmpact WhlCh cannot be mltlgated. However, the Plannlng CommlSSlon belleved the need and demand for medical offlces In close proX1IDlty to local hospitals, wh~ch beneflts the public health, safety and welfare and lmproves patient care, were conslderations which overrlde the potential negatlve impact of addltlonal traffic at the lntersection of Santa Monica Boulevard and Twentleth Street. ANALYSIS Based on the updated Kaku Traffic Study of September 21, 1993, - 6 - (" Intersection Configurations WITH YEAR 2002 PROJECT EXISTING CUMULATIVE BASE M ITIGA TION (2) 4~ o::'R... ffi to 1 17th St & ( <.> ~ " SAME AS 0 SAME AS Santa Monica BI ~ EXISTING .-/ It to EXISTING > c: " '" r.J> 17th $l (2) CV 4~ <-' 4~ <'", ( ffi 2 20th St & ( ffi ~ ~ SAME AS ~ ~ i: Wilshire BI. E I ii( !t! EXISTING -...? li( l!1 -...? j j ) ) -; " 20th 5t 20th St (2) '-- @ 0[ 4!~ (..... ffi 41~ ( ffi .. 3 20th St & ( .., ~ .. or- " SAME AS u 0 E Santa Monica Bl ~ EXISTING 0 -...? lit .. -...? lit ::! c ) !! ~ ~ c y y ~ 20th St 20th 5t (2) 41~ c" CD 0( 4 20th St & ~ c SAME AS -c:: SAME AS '" Color ado 8: lit 13 EXISTING EXISTING -'" '0 > u ) -..,. 20th 5t Q) Q) ffi 0( ffi <- to '" ( <.; Cloverfleld Bl & c <.> ,r- " 5 ~ c 0 SAME AS 0 ~ Santa MOnica Bl ;IW( ~ ) 11(( ., EXISTING !! ...; C C <II '" <Il 1J) Cloverf teld BI Cloverfleld BI Legend (2) Total :SIgnal pha:se r<J\lm ^s sacl ^ TE S 0008e " APPENDIX B PEAK HOUR INTERSECTION TRAFFIC VOLUMES 00087 Santa Monica Boulevard and 17th Street Santa Monica Boulevard and 20th Street Santa Monica Boulevard and Cloverfield Boulevard Wilshire Boulevard and 20th Street Colorado Avenue and 20th Street The November 1988 Addendum clarified certain discrepancies between the original EIR and other EIRs which previously had been prepared for nearby projects. These revised traffic counts found that, prior to mitigation, a significant traffic impact would be expected at the intersection of Santa Monica Boulevard and 20th street during the p.m. peak hour. The 1919 Building was not projected to create a significant im- pact on any of the other study intersections in eithe~ morning or evening peak hours, but this Addendum did reveal that a signifi- cant impact would occur at 20th Street and Santa Monica Blvd. under unmitigated conditions. The Addendum proposed feasible traffic mitigation measures which were incorporated into the Con- ditions of Approval. The following improvement was included as a condition of approval: Santa Monica Blvd. east of 20th street shall be re-striped at the developer's expense to accommodate a total of six lanes, including the addition of an exclusive right-turn pocket on the westbound Santa Monica Boulevard approach to 20th street if requested by the City Parking and Traffic Engineer. The applicant paid for this improvement, but the improvement has not yet been implemented. The need for mitigation is based on full capacity and since the building is only 50% occupied, the city is monitoring the situation. The fee paid by the applicant is being held in an account by the city. The EIR traffic study and the subsequent Addendum used the appli- cant I s original proposal of 51,832 square feet which was later reduced by the city Council to 46,832 square feet. There was no traffic study done which analyzed the impact of the reduced square footage. A Traffic study for 1919 Santa Monica Building was prepared for the applicant per the request of the City by Kaku Associates in June 1992 to evaluate the potential i~pacts of converting 16,000 sq. ft. to medical use. The applicant hoped to show with this study that no significant impacts would result from the change of use. The report analyzed traffic conditions at the same five intersections as the EIR. This traffic study uses the 1992 Master Environmental Assessment for information on baseline con- ditions and the Highway Capacity Manual (HCM) method for the level of service analysis. The Traffic Study Report is in this report as Attachment F. The traffic study report concluded that the proposed change would aggravate traffic conditions at a level that would be considered - 4 - · 00143 satisfactor1ly meet the goals of the mitigation program, in that Development Review 441, the or1g1nal proJect approval, required payment of an in lieu fee for housing and parks mitigation, thereby satisfying compl1ance with this requirement. 5. The project is generally cons1stent w1th the Mun1c1pal Code and General Plan in that adequate parking per Code requ1rements is provided and that, based upon the September 1993 project traffic analysis which ut1l1zed data from the 1993 Master Environmental Assessment, no slgn1f1cant traff1c lmpacts will result from the 16,000 square feet of med1cal office space. Amended Prolect Condit1ons of Approval Conditions Plans 1 This approval is for those plans dated July 7, 1990, a copy of which shall be mainta1ned 1n the files of the City Plann1ng Division. Project development shall be cons1stent with such plans, except as otherwise specified in these cond1tions of approval. 2 The Plans shall comply with all other prov1s1ons of Chapter I, Art1cle IX of the Municipal Code, (20n1ng Ord1nance) and all other pert1nent ordinances and General Plan pol1c1es of the City of Santa Monica. 3. Final park1ng lot layout and specifications shall be subJect to the review and approval of the Parking and Traff1c Eng1neer. 4 Minor amendments to the plans shall be subJect to approval by the D1rector of Plann1ng. A slgnlf1cant change 1n the approved concept shall be subj ect to Plann1ng Comm1ssion Review. Construct1on shall be in conformance w1th the plans subm1tted or as modif1ed by the Planning commiss1on, Architectural Review Board or Director of Plann1ng. 5. Plans for f1nal des1gn, landscaping, screening, trash enclosures, and signage shall be subJect to review and approval by the Architectural ReVlew Board. 6. The Arch1tectural ReV1ew Board, 1n lts reV1ew, shall pay part1cular attentlon to the project's pedestrlan or1entation and amenlt1es i scale and articulat10n of design elements; exterlor colors, textures and materlals; window treatment, - 10 - glazingj and landscaping. Fees 7. The C1ty 1S contemplating the adopt1on of a Transportatlon Management Plan Wh1Ch 18 lntended to mltlgate trafflc and alr qual1ty lmpacts resulting from both new and eXlstlng development. The Plan wlll llkely lnclude an ordinance establlshing mitigation requirements, including one-time payment of fees on certaln types of new development, and annual fees to be paid by certain types of employers in the City ThlS ord1nance may requlre that the owner of the proposed proJ ect pay such new development fees, and that employers Wl thln the pro] ect pay such new annual employer fees related to the City's Transportatlon Management Plan. Constructlon 8 Unless otherw1se approved by the Department of General Services, all sidewalks shall be kept clear and passable durlng the gradlng and construction phase of the project. 9. Sidewalks, curbs, gutters, pavlng and drlveways whlch need replaclng or removal as a result of the project as determined by the Department of General Services shall be reconstructed to the satlsfaction of the Department of General SerVlces. Approval for this work shall be obta1ned from the Department of General Services prior to issuance of the building permits. 10. Vehicles haullng dirt or other construct10n debr1s from the site shall cover any open loan with a tarpaulin or other secure covering to m1nlm1ze dust emlSSlons. 11. Street trees shall be malntalned, relocated or provlded as required 1n a manner conslstent with the City's Tree Code (Ord. 1242 CCS) , per the speclf1cations of the Department of Recreatlon and Parks and the Department of General Services. No street tree shall be removed wlthout the approval of the Department of Recreat10n and Parks. 12. A construction perlod mltlgatlon plan shall be prepared by the applicant for approval by the Department of General SerVlces prior to issuance of a building permit. As appllcable, this plan shall 1) Speclfy the names, addresses, telephone numbers and business llcense numbers of all contractors and subcontractors as well as the developer and architect; 2) Describe how demolition of any eXlsting structures is to be accompllshed; 3} Indlcate where any cranes are to be located for erectlonjconstructlon: 4} Descr1be how much of the public street, alleyway, or sidewalk 1S proposed to be used 1n conJunction with constructlOnj 5} Set forth the extent and nature of any p1le-dr1ving - 11 - operatlons; 6) Describe the length and number of any tlebacks which must extend under the property of other persons; 7) Speclfy the nature an extent of any dewatering and its effect on any adjacent buildings; 8) Describe anticipated construction-related truck routes, number of truck trlps, hours of haullng and parklng locatlon; 9) Specify the nature and extent of any hellcopter haullng; 10) State whether any constructlon actlvlty beyond normally permitted hours is proposed; 11) Descrlbe any proposed constructlon noise mitigation measures; 12) Describe construction-perlod security measures including any fenclng, lighting, and security personnel; 13) Provlde a dralnage plan; 14) Provide a construction-period parklng plan whlch shall minlmlze use of publlc streets for parking, 15) List a deslgnated on-slte constructlon manager. 13. A copy of these condltlons shall be posted ln an easlly vlsible and accesslble locatlon at all times durlng construction at the project site. The pages shall be lamlnated or otherwise protected to ensure durability of the copy. Environmental Mltlgatlon 14. Ultra-low flow plumbing fixtures are required on all new development and remodeling where plumblng lS to be added. (Maximum 1.6 gallon tOllets and 1 0 gallon urlnals and low flow shower head.) 15. Prior to lssuance of a Certificate of Occupancy I proj ect owner shall present documentatlon to the General Servlces Department certifying that eXlstlng Santa Monica occupancies with tOllets installed prior to 1978 have been retrofitted with ultra low-flow toilets (1 6 gallons per flush or less) such that development of the new proJect wlll not result in a net lncrease in wastewater flows. Flow from existlng occupancies which will be removed as part of the new development may be deducted from flow attrlbutable to the new development lf such occupancies have been occupled wlthln one year prlor to issuance of a BUlldlng Permit for the proposed project. Flow calculations for new development and eXlsting occupancies shall be consistent with gUldellnes developed by the General Servlces Department. 16. To mitigate solld waste impacts, prior to lssuance of a Certiflcate of Occupancy, proJect owner shall submit a recycling plan to the Department of General Services for its approval. The recycllng plan shall lnclude 1) list of materlals such as Whl te paper, computer paper I metal cans I and glass to be recycled; 2) locatlon of recycling bins; 3) designated recycllng coordinator i 4) nature and extent of internal and external pick-up serVlce; 5) pick-up schedule, 6) plan to lnform tenants/occupants of serVlce. - 12 - Miscellaneous Condit1ons 17. The bU1ldlng address shall be painted on the roof of the building and shall measure four feet by elght feet (32 square feet) . 18. The operation shall at all times be conducted 1n a manner not detr1mental to surrounding properties or res1dents by reason of lights, noise, activities, parking or other act1ons. 19. The exterior parking area shall be used for employee and customer parking only and not for repair or finishing work or long-term (over one week) storage of vehicles. Validlty of Permits 20. In the event permittee violates or fails to comply with any cond1tions of approval of this permit, no further permits, 11censes, approvals or certif1cates of occupancy shall be 1ssued until such violation has been fully remedied. 21. Wlth1n ten days of Planning Division transmittal of the Statement of Offlclal Actlon, proJect appllcant shall slgn and return a copy of the Statement of Official Action prepared by the Planning Divlslon, agreeing to the Conditions of approval and acknowledging that failure to comply with such conditions shall const1tute grounds for potential revocation of the perm1t approval. The slgned Statement shall be returned to the Planning D1V1S1on. Failure to comply w1th this condit1on shall constitute grounds for potential permlt revocation. 22. Th1S determination shall not become effective for a period of fourteen days from the date of determination or, if appealed, until a final determination is made on the appeal Spec1al Conditions 23. On-site parklng shall be made avallable w1thout cost to building customers and employees untll such t1me as a preferent1al park1ng d1str1ct 1S established in the vic1nity of the slte. 24. The proJect shall comply w1th the South Coast Air Qual1ty Management Distrlct (SCAQMD) Regulatlon XV, as contained in Append1x D of the EIR, ErA 870, (Mandatory rldesharlng for employers employing more than 100 persons) . 25. All internal bUlldlng systems and appliances shall be energy efficient models to the sat1sfact1on of the Building and Safety Division. 26. When and where reasonable feaslble, construction activities - 13 - shall homes r rooms. be screened from residential land uses r convalescent medical treatment facllltles and hospital recovery 27. Construction related vehicles shall avoid uSlng residentlal streets. 28. All construction equipment shall conform to the nOlse standards establlshed by the State Occupational Safety and Health Agency (OSHA). 29 Mulch shall be used in landscaped areas to improve water retentlon capaclty of sOlI, reduce evaporation and mlnlmlze sOlI compactlon and an efflcient lrrlgation system shall be installed In all landscaped areas WhlCh mlnlmlzes runoff and maximizes retentlon of water In plant roots. 30 If any archaeological remains are uncovered during excavatlon or constructlon, work in the affected area shall be suspended and a recognlzed speclallst from an established institution (e.g. : UCLA Department of Archaeology) will be contacted to conduct a survey of the affected area. A prellmlnary determinatlon shall then be made by the City and the speclallst as to the slgnificance of the survey findings. All actions taken under thlS measure shall be ln accord with Appendlx X of the State CEQA GUldelines. 31 The final working drawlngs shall lnclude a seetlon showing the building not to exceed a helght of 56 feet above average grade as measured from the average level of the hlghest and lowest pOlnts of that portlon of the lot covered by the bUlldlng. 32 Plans shall be submltted to the Architectural Review Board showlng details of the roof equlpment screenlng r lncludlng colors, materials and height of screen The appllcant shall endeavor to reduce the height above parapet of the mechanlcal equipment and related screenlng. 33. That no retail or retail financial lnstltutlon occupancies shall be permltted ln the development due to the related traffic generatlon rates whlch are higher than general offlce occupancies. 34. That the project shall be redeslgned to provlde on-site circulation between the surface level parklng area and the subterranean parklng garage. The revlsed parklng and circulation layout shall requlre approval of the City Parklng and Traffic Englneer. Any related modificatlon of the bUlldlng footprint or plans shall require approval of the Plannlng Dlvlsion. 35. That the surface parking level shall be reserved for use by - 14 - visitors to the proJect and occupants of the project shall be d~rected to park w~ thln the subterranean garage. Building occupants shall use the surface parking level only in the event of overflow park~ng demand w~thln the subterranean garage. 36. The duties of at least one employee in the proposed building shall include promotion and coordination of carpooling by occupants of the building. 37. The project shall be reduced in size by 5,000 square feet of rentable floor area, reducing the overall project to a maximum of 46,832 square feet. The revised plans shall require approval by the Planning Division. 38. Northbound trafflc on Twentleth Street shall not be permitted to make left turns lnto the proJect Vla the project driveway located on Twentieth Street. Prlor to lssuance of a certlflcate of occupancy for the project, the appl1cant shall pay to the Clty of Santa Monica a sum to be determlned by the Parklng and Traffic Engineer not to exceed $10,000 for use by the Park1ng and Trafflc D1V1Slon for mitigation of the traffic impacts at the lntersectlon of Twentleth Street and Santa Monlca Boulevard, including, but not limited to, the installa~~on of a medlan lsland or stanyards to preclude left turns into the proJect by drlvers travelllng northbound on Twentleth Street Any portion of such sum not so utllized wlthin two years after lssuance of the certificate of occupancy for the project shall be refunded to the appllcant. 39. The existing bus stop located 1n front of the proJect on Santa Monica Boulevard shall be relocated towards the alley to the satlsfactlon of the Clty Parklng and Traffic Engineer and Transportat~on Department 40. The rlghts granted herein shall be effect~ve only when exercised wlthln a period of one year from the effective date of approval. No tlme extenslon shall be granted. Prolect Mltiqation Fee Condltlon 41. In accordance wlth Sections 9046.1 9046.4 of the Santa Monlca Municipal Code, prlor to lssuance of a building permit the developer shall execute an lrrevocable letter of credlt or other form of security acceptable to the City for the payment of an In-Ileu fee for housing and parks equal to $2. 25/sq. ft. for the first 15,000 sq. ft. of net rentable offlce floor area and $5. DO/sq. ft. for the rema1n1ng net rentable office floor area. ThlS fee shall be adjusted for inflat10n by the percentage change 1n the Consumer Pr1ce Index (IICPIII) between October 1984 through the month in WhlCh - 15 - the payment ~s made. Upon mutual agreement of the developer and the City, the developer may satlsfy the Project Mitigation measures by provlding low and moderate income housing or developlng new park space on or off the project slte. To fulfill this obl~gatlon an agreement shall be secured in writlng by the developer and approved by the City Attorney and City staff prior to issuance of a building perm~t. This fee prlor to adjustment w~ll be $164,800, based on a net rentable offlce floor area of 41,210 square feet. Prepared by: Suzanne Prick, Acting Director, LUTM D. Kenyon Webster, Plannlng Manager Susan Healy Keene, Assistant Planner Planning D1V1Slon Land Use and Transportatlon Management Department Attachments. A. Appeal Statements B. Notlce of Public Hearlng C. Radius and Location Map D. Photographs of Site and Surrounding Properties E. Clty Councll Statement of Official Actlon for Development ReVlew 441, April 11, 1989 F. Traffic Study for the 1919 Santa Monlca Blvd. Buildlng, prepared by Kaku Associates, June 1992 G. Memo from Tom Gaul, Kaku Assoclates to Ron Fuchlwaki, Parking and Traff~c Engineer, dated June 2, 1993 H. Planning CommlSSlon Staff Report, April 7, 1993 I. Plannlng Commlsslon Statement of Official Actlon, April 1993 J. Memo from Kaku re Updated Traffic Impact Analysis with 1993 MEA Base, dated September 21, 1993 K. Plot Plan, Floor Plans and Elevations SHK/k f:\plan\share\councll\strpt\adr92002 - 16 - ATTACHMENT A nnrJ1'" "_.. .. ....Ii...- ~ Cl!}' of Santa Monica CommUfllty and Economic Development Department Planning and ZOning Dlvtslon (213) 45a-8341 APPEAL FORM - .... ~ I l __-..r I_~-;l_~ p .93 APF 21 A 7 51 FEE: $100.00 Date Flied S /i.N l !--. Recewed by Receipt No. t- "I ~ - 9C '1 Name KEN GENSER and KELLY OLSEN ~~~ Room 200, Councl1 Office? 1685 Maln Street, Santa Monica. CA 90401 Contact Person KELLY OLSEN or KEN GENSER Phole (310) 458-8201 Please descnbe !he pl'OJeCt and ~93n m be appeillecl Modiflcation of development reVlew permit to allow medical office use. Case Number DR 92-002 Address lqlQ c,,,nti'l MnnH:a Blvd, Applicant gth i'I nrl 14th S t. Partners Ongmal heanng date Apr11 7, 1993 Onglnal actIOn An["lrnvrll Please state the spectfic reason(s) tor \t'e~!i The ana lY5 1 s of the p 1 annl ng staff and recommenda~lon for denlal of the appllcation should be upheld. . o':..! -- ..0 ~...c -- ,,0 -....... ~ ]-- t ~ t :;.... ~ "'Q ::; - 11, .-, ...... -- \..- J- If adddlanal spDI. needed. ...... of Iann. Signature ~~~.~..... DaB 4!-w!c,-s -JAP'P. ~ i/~ /2 I~r I u tr : 0001~ -/r1T1tCfIYIIr fNT It. > I U v 00011 A- q3-00~3 I~7JN ZElili WARSAW P.O. Box 3512 Santa Monlca, CA. 90408 Tele. (310) 393-2977 Apn.1 16, 1993 Santa Mom.ca C~ty Plaruung Camuss~on Hon. Ralph Mechur, Chauman 1685 Main Street Santa Momca, CA. BE: Developnent Rev~ew #92-002 1919 Santa Monica Blvd., S.M. Dear Cullll.l.SS~Oner Mechur: Enclosed is check m.11\ber 4699 dated today l.Il the sum of $100.00 for my appl~cat.lon for an 3.ppeal to the C~ty Council of the above- 11Sted property. I believe the staff report denY1ng the appl.lcatlon should have been affl..l:Tlled; and when I have !tOre t:une, I w~11 deta~1 my CMn ob- )ect.lons. Respectfully yours, ~/" -? {dZ,~1 I~.rrN ZEKE WARSNv ..0 nS::' ::::;- UJ , -< -nC':- :;b ::0 r-...= C ........ -- - ~ f. 0 ". - w- /tWttlf/v1cUJT A 000l~ SANTA MONICA ~~~.:i~~~~-~_.- -- _.~- ------ -------------1 Planning and Zoning DIvIsion (310) 458-8341 1685 Main Street, PO Box 2200 Santa Momca. CA 90407-2200 April 20, ~993 Mr. Irwin Zeke Warsaw P.o. Box 3512 Santa Monica, CA 90408 RE: Appeal of Development Review 92-002 1919 Santa Monica Blvd. Dear Mr. Warsaw: I have received your letter and check for appeal of the Planning Commisssion approval of DR 92-002. Enclosed is the appeal application form which we need to have filled out and signed by you. This item will go to the city Council on July 13, 1993. Please return this form to my attention as soon as possible. Thank you. Sincerely, f?u~~/!~~ Assistant Planner -/ pcword.letter2 - 1 - '-, 0 0 0 L J ~ffMWT It ATTACHMENT B ~.. 0 0 J 2 1 NOTICE OF DEVELOPMENT PROPOSAL To: Concerned Persons From: The Cit}' of Santa Monica Subject of Hearing: Appeal of Development Review 92-002 1919 Santa Monica Blvd., C4 AppHcant: 9th & 34th Street Partners Appellant: Irwin Zeke Warsaw Appellants: Ken Genser & Kelly Olsen A PublIc Hearmg WIll be held by the CIty Counell on the followmg requ:.st Appeal of Pbmmng ComnusslOn Approval of Development Revlew 92-002, 1919 Santa MOllica Boulevard, to allow 16,000 sq.ft of General Office Space in an EX1Stmg 46,832 sq ft Office BUlldmg to be Converted to Medical Office Use (planner S. Keene) TIME TUESDAY, December 14 , 1993 AT 6:30 P M LOCATION COUNCIL CHAMBER, ROOM 213. CITY HALL 1685 MAIN STREET, SANTA MONICA HOW TO COMMENT The CIty of Santa Moruca encourages public comment on thIs and. other projects Y Oll or your representatlve, or any other persons may comment at the City Council's publ1c hearmg, or by wntmg a letter Letters should be addressed to CIty CouncIl. CIty Clerk's Office 1685 Mam Street, Room 102 Santa Momea. Califorma 90401 MORE INFORMA nON If desIred. further Informauon on any applIcatIon may be obtamed from the City Plannmg DIVIsion at the address above or by callmg (310) 458-8341 The meetmg faCIht}' IS handIcapped accessIble If you have any special needs such as SIgn language lnterpretmg. please contact the Office of the Disabled at (310)458-8701 Pursuant to Cahforrua Government Code SectIon 65009(b), If thIS maner IS subsequently challenged In Coun. the challenge may be lunned to only those Issues raIsed at the Pubhc HearIng deSCrIbed In thiS noUce. or In wrItten correspondence dehvered to the Cm: of Santa Moruca at. or prIor to. the PublIc Heanng ~ Esto es un aVISO sobre una audenCla publIca para reVisar apphcaCIOnes propomendo desarrollo en Santa Moruca EstD puedo ser de mteres a usted SI deseas mas mformaclOn, favor de Hamar a Elsa Gonzalez en la DIVISIOn de PlantificaclOn al numero (310) 458-8341 OOD22 ATTACHMENT C 0002~ eoo~ Aa!!:3 .' I ,I I o r- "< :t Q;t 8 ~ I I ~ : II ,I " " r. I' " .. "" ..': g "~,' .h. ". U, " , ,',': ': ~; J' , , .,1 J ,,' " .' I ,l J., ,"/. f'l .' " J" ,I I 'tl , J '.. ,. ,: ~ /:: / . , ., , r I ~. : ' / /1 " I: " l,f"J fJ I,"" J ... _L ", . I . lOOW ! 01 .... r- I T-' r ~ ' "/ I~ ,'/ ,'. "{ r' , ri I I I I I III 8 " ,. '" 01 CD " n - r; . -< 0 ""TJ (j) :Po Z ~ -I '" po '" ... ... .. ~ .. . 0 - - .. JZ Z - . iiii" (") I l> i ~ - - ----"- --, m ~( / ItC(1 1'-'( iIJT C r z ~O ~", t""lX Z I ;'.J;:. gN ~'-J Or 0002~ I I r II BOOK 4 a82 I I IL $7'- ),. <:: Cl n5:]'" c- O ,... rv ~en::5~" ~ {.,' .ttHHAU ,""",. lit ... .. - IS .. I. -f :0 Pf?\ ("l\$' ~ z p (J) " ~@ 26 T'" e' ':Q ? ..,. "I ,..,,1 ST I r In I I I BOOK 4267 ~ CP o o ;:K: A I\) " 01 T 16 ... : ~ .. i "if PI I ;. ~ ~ ~ . L ] ] ~J ,. N .... UI ~ .. J ] J ] JCb J~ ---- I () - -l -< 0 ~ V> )> Z .. -l .. ... l> ~ . .. -n - .. - . ~ .. == . 0 -~ Z -.. - n ;po It I rlr'- r, l~ttJ'- r '- aCOK 4262 Boor, 4281 Irl r BOOK 4267 l1uO" 4?6B " ~ ,. IV .... .... lIlZ ~O ~m iX I I 6~ ~f\> -..J 0> OOO?~ I, 1 ' I, I, I. Ii I, [: I · I I t I . il' . f J _ ; .' ( - I L I .. t , r-.} -" ATTACHMENT D h OOCl2C 1 If _ i ( PArf}!/ij1u'"1rt. .I - I . t/ L" V t": f VL.../ t \../.. -- , A' SUbJect - Northwes~ 1919 Santa M::rru.ca Blvd. ti!? ._:~ ___~ ;s:::- ..... . "~.,> --~ ~ ~ ~/--;~~:-- --;p..-~-~-~~-'=~'-- ~\ ~.D=..- '--. _~ _,;;-~'_~ - - r -- -:....~ - -- ~~-=~- -: ~-._"O---., ---~ ~...._~ --=: SubJect - Northeast 1919 Santa M:>n.1.ca Blvd. ,. OOCl27 '- ~ , East Ne~ghbor St. John I s MedJ.cal &uld1ng 'i ~ - ~ ~ ... Southeast Neighbor Offlce Bw.lding - f , :l'- [-=~1 -_ I -'--..~ - ~ J~_t 00020 i I '" \ , , t If ;~ I I . I ! 1 I \ \i I I I ", ! ~ - - - ~- - - -- . .~-- - - -~L . --- - _1:- i~~~iI~;_ .-. West Ne1ghb::>r Car lDt Southwest Ne1ghbor lwEchcal Bm.ldmg 0002S ~ santa ~ica Hotel a O( ...-=-"- -=- ~:.E==-- F hi ~ ~ T -- ~--.! ;. -...... ---.- ~~:. ==---""--JIF_",- ~" ._-~..-.::--"JlIF West Ne1ghbor Retall BLuldmg ~ 00031 , ,. I ::~~~~~-:. North Ne1.ghbor Convalescent Hosp1.ta1 ~ 00032 ATTACHMENT E H 0003: /Jr117tCffM ~-1JT E STATEMENT OF OFFICIAL ACTION PROJECT NU~BER: DR 441, VAR 88-016, EIA 870 LOCATION: 1919 Santa Monica Boulevard APPLICANT: 1919 Associates REQUEST: To construct a four-story, office/retail structure with two levels of subterranean zone. 51,832 square-foot surface parking and parking in the C4 CITY COUNCIL ACTION 4/11/89 Date. x certification of the EIR and approval of project based on the fOllowing findings and subj ect to the conditions below. Denied. Other. DEVELOPMENT REVIEW FINDINGS 1. The development is consistent with the findings and purpose of Ordinance 1321 as set forth below. 2. The physical location and placement of the proposed structure on the site is compatible with and relates harmoniously to surrounding si tes and neighborhoods in that the structure will exceed required setbacks on all sides and is of a com- patible height and scale with surrounding development. The site is currently vacant and graded; therefore, no landscap- ing currently exists on site. The development includes a 15' strip of landscaping along Twentieth Street and potential landscaping on terraces facing Santa Monica Boulevard. 3. The existing and/or proposed rights-of-way and facilities for both pedestrian and automobile traffic will be adequate to accommodate the anticipated results of the proposed develop- ment including off-street parking facilities and access thereto in that the location of access to surface and subter- ranean parking on Twentieth Street and the alley will provide adequate circulation, pedestrian walkways will be maintained and adequate parking will be provided to meet the anticipated parking demand. - 1 - ,... ., ,~, ... 1 t t ~ r .. ~ ... '-- ...' ...J- .....~ The Ordinance specl.fies that deed restrictlons be utill.zed to restrlct prapertles sUbJect to thls ordlnance. On June 9, 1992, the City Councll adopted a resolutlon establlshlng a base price for In-lleu fees to be pald under thls Program. DISCUSSION The Inclusionary Housing program Guidelines provide administrative procedures far implementation of Ordinance 1615, as amended. The GUldelines are based on (I) the framework establlshed by Ordinance 1615 and subsequent amending ordlnances; (2) comments on a draft of these GUldelines received at a Housing Commission meetlng of November 18, 1993; and (3) the followlng POllCY objectives: · To ensure that eligible tenants can afford to rent or buy incluslonary unlts. · To provide predlctable rents and sales prices to developers at commencement af constructlon. · To provlde conslstency between program requirements and typical flnancing requirements. These Ob]ectlves gUlded staff in consldering several questlons, which are dlscussed 1n Attachment A. SUMMARY OF PROGRAM GUIDELINES ThlS sectlon descrlbes the maJor features of the proposed Program GUldellnes WhlCh are attached to thlS report as Attachment B. 3 ~ONDI:':ONS Plans This approval is for those plans dated January 3, 1989, a copy ot which shall be maintained in the tiles of the C:~y Planninq Division. Project development shall be consis- tent w~th such plans, except as otherwise specified in these conditions ot approval. 2. The Plans shall comply with all other provisions of Chap- ter 1, Article IX ot the Municipal Code I (Zoning Or- dinance) and all other pertinent ordinances and General Plan polici.. at the City ot Santa Honiea. - 3. Final park1nq lot layou~ and .p.cltlca~ion. shall be sub- ject to the review and approval ot the Parkinq and Traffic Enq!n..r. 4. Minor amendment. to the plana shall be subject to approval by the Director of Planninq. A significant chanqe in the approved concept shall ba aubject to Planning Commission Review. construction ahall be in contormance with the plans submitted or as moditied by the Planning Commi..ion, Architectural Review Board or Oirector ot Planning. 5. Plana tor tinal d..1qn, landacaping, screening, trash en- closure., and .iqnage shall b. subject to review and ap- pre ~l by the Architectural Review Board. 6. The Architectural Review 8oar~, in ita review, shall pay particular attention to the project'. ped..trian orienta- tion and ..eniti.s: .cale and articulation ot de.1qn ele- ments1 exterior colors, textur.. and material. 1 window treatm.nt: qlazing1 and landscapinq. Fees 7. Th. Clty is contemplatlnq the adoption of a Transportation Manaq...nt Plan which i. intended to mitiqate traffic and air quality t.pacts resulting trom both new and existinq cl.v.lopa.n~. The Plan will likely include an ordinance e.tGliahinq aitiqation requirement., inCluding ona-time payaent ot tee. on certain typ.. ot new development, and annual f... to b. paid by certain typ.s ot ..ployers in the City. This ordinance lIay require that the owner of the propo.ad proj ect pay such new develop.ent te.., a.nd that employers within the project pay 8uch new annual em- ployer t.e. related to the City.. Transportation Manage- ment Plan. - 3 - 0003: Cons~t""'.Jction a. t:nless otherwl.se approved by the Depar":ment of General Services, all s~dewalks shall be kept clear and passable durl.ng the qradl.ng and construction phase of the proJect. 9. Sidewalks, curbs, qutters, pavinq and driveways which need replacing or removal as a result of the proJect as deter- ~l.ned by the Department ot General Serv~ces shall be re- constructed to the satistaction ot the Department of General Services. Approval tor this work shall b. ob- tained trom the Department ot General Service. prior to issuance of the bUl.lding permita. 10. Vehicles haulinq dirt or othar constructi-on debris trom the site shall cover any open load with a tarpaulin or other ..cure coverinq to minimize dust ami..iona. 11. street tre.. shall be maintained. relocated or provided as required in a manner consistent with the city's Tre. Code (Ord. 1242 CCS), per the .pecitications ot the Department ot Recreation and Park. and the Oepartment ot General Ser- vic.s. No str.et tr.. shall b. r..cved without the ap- proval ot the Department ot aecreation and Parka. 12. A construction period mitigation plan shall be prepared by the appl ic:ant tor approval 1)1 the Depart.ant ot General service. prior to iaauance of a building permit. As ap- plic~~l., this plan ahall 1) Specify the name., addresses, t.l.1-!.~ne nnlll~.r. and busin... licen.. nUJDl)ers ot all con- tractor. and subcontractors a. well as the developer and architect; 2) oescribe how d._olition ot any existing structur.. is to b. acco.pliah.d~ 3) Indicate where any crane. are to be located for erection/construction; 4) O.scrib. how much at the public atreet, alleyway, or side- walk i. proposed to be used in conjunction with construc- tion; 5) set forth the extent and nature of any pile- driving operations: 6) Describe the length and nWllber ot any tiebacks which auat extend under the property ot other peraona; 7) Specity the nature and extent ot any dewatar- inq and it. ettect on any adjacent bul1dinqa; 8) oascribe anticipated contruction-relatad truck route. , nmtlk..r ot truck trip., hour. of haulin9 and parking location: 9) specify the nature and extent at any helicopter hauling; 10) State whether any con.truction activity beyond normal- ly permitted hour. i. propo..d; 11) C.scribe any propo..d contruction noi.. mitigation .eaaur..; l2) De.cribe con- struction-period ..curity me.aure. inCluding any tencing, lighting, and ..curi ty p.rsonnel: 13) Provide a drainage plan; 14) Provide a construction-period parking plan which shall minimize use ot public .treets tor parking: 15) List a designated on-sit. construction manager: - 4 - 00037 :'3. A copy of these cond1.tl.on& shall be post.ed in an eas::'v visible and accessible location at all times durlng con: struction at the proJect Slt.. The pages shall be :a~:- nated or otherwlse protected to ensure durability of tbe copy. Envl.ronmental Mitiqation 1tt. Ultra-low flow plumbing fixtures are required on all new development and remodelinq where plumbing is to be added. (Maxl.mum 1.6 gallon toilets and 1.0 gallon urinals and low flow shower head.) 15. Prior to issuance ot a Certiticat. ot Occupancy, project owner shall pre.ent documentation to the ~.neral Sarvl.ces Department certifying that existinq Santa Monica occupanci.. with toilet. installed prior to 1978 have been retrotitted with ultra low-flow toilets (1.6 qa1lons per tlu.h or 1...) such that development ot the new proj act will not r..ul t in a net. increaae in wastewater flows. Flow troll existinq occupancies which will be r..ovad &s part ot the new develop.ent a.y be ded.ucted from flow attributable to the new development it auch occupancies have b..n occupied within one year prior to ia.uance ot a Building Permit for the propo.ed project. Flow calculation. for new development and exi.tinq occupancies shall b. conaistent witb quid.line. developed by the General Services Department. 16. To mi tiqat~ aolid waat. impact. t prior to i..uance of a Certiticate ~ Occupancy, project owner shall submit a recyclinq plan to the Department of General Servic.. for ita approval. The recyclinq plan ahall include 1) list ot materials such .. white paper, computer paper, metal cans, and gla.. to be r.cycled; 2) location of recylinq bins: 3) d..iqnated recycling COOrdinator; 4) natura and extent ot internal and external piCk-Up .ervice, S} pick-Up schedule; 6} plan to intora tenanta/occupant. ot ..rvice. Miscellaneoua condition. 17. The bul1dlftCJ ad.dre.. ahall be painted on the roof of the bulld1nq and .ball ..aaur. four teet by eight r..t (J 2 .quare t.et). 18. The operation ahall at all tim.. be conduct.d in a manner not detrimental to aurroundinq properties or r..1dents by reason of liqht., nois., activiti.., parkinq or other action.. 19. The exterior parking area shall b. used for employ.. and customer parkinq only and not tor repair or tinishing work or lonq-term (over ona week) storage ot vehicl... - !5 .. 00033 Val~dlty of Permits 20. In the event permittee violates or tails to comply wlth any conditions of approval of this permit, no fur~her per- mits, license., approvals or certificate. ot occupancy shall be issued until such violation has been fully remeaied.. 21. Within tan clay. ot Planning Division transmittal of the statement ot ofticial Action, project applicant shall sign and return a copy ot the Statement ot Official Action prepared by the Planninq Division, aqr.einq to the Condl- tlon. ot approval and acknowlec1qinq that _tailure to comply with auch condition. .hall constitute ground. tor poten- tial revocation of the permit approval. The siqned Stat- mane ahall be returned to the Planninq Division. Failure to comply with this condition shall constitute qround. for potential permit revocat1on. 22. Thi. determination ahall not beco.e etfective tor a period of fourte.n day. fro. the date or determ.ination or, it. appealed, until a tinal determination i. ..de on the appeal. Special Condition. 23 . On-ai te parkin';t ..hall be sade available without coae. to building cu. tamer. and. ..ploy... until auch time aa a preferential parking district i. e.tablished in the vicinity of the ait.. 24. The project ahall comply with the South Coaat Air Quality Hangag..ent District (SCAQKD) Requlation XV, .. contained in Appendix D of the EIR, EIA 870, (Handatory rid.sharing for ..ploy.ra employing aore than 100 per.ona). 25. San" Monica Boulevard east of 20th Street .hall be r.... .triped at the developer'. expen.e to accommodate a total of .ix lan.., including the addition of an exclusive r19ht-turn pocket on the we.tbound Santa Monica Soul.vare approach to 20th Stre.t it reque.t.ed by the City Parkinc and Traffic Znqineer. 26. The axiatinq traffic Ian.. on Santa Monica Bculevard wes of 20th Str.et ahall b. re.tr1ped and .hitted southward t mini.i:a tha potantial ott.et r.ault1nq trom the restrif in9 required on Santa Xonica Boulevard east of 20th Strel it reque.ted by the City parkinq and Traffic Engineer. 27. All internal build1nq .y.t... and appliance. shall be e erqy efticient modal. to the satisfaction ot the Bu~ld: and safety Division. - 6 - ~l 0003~ 28. Wher. .:.nd. where reaaQnaklly teaaible, construction activl.- tie. sha.ll be scr..ned trom. residential land '.lses, co~- val..cent hom.., medical treatment facilities a.nd hosp~~a: recovery rooms. 29. Construction related vehicles shall avoid. using reslden- tial streets. 30. All construction equipment shall conform to the no~se standards esta~li.h.d by the Stat. Occupational Safety and Health Ageney (OSHA). 31. Mulch shall be u..d in landscaped areas to improve water retention capacity ot soil, reduce evaporation anmd mini- mize 8011 compaction and an etticient lrrlqation system ahall be in.talled in all landacaped ar.a~which .inimizes runoff and ..ximiz.. retention ot water in plant roota. 32. It any arch.eoloqical reaain. are uncovered dur1nq excava- tion or con.truction, work in the attected are. shall be suspended and a racoqnizad specialist fro. an e.tablished inati'Cution C..q: OCLA Departaent ot Archaeoloqy) will be cent.act.ed t.o conduct a survey of 'the affacted are. . A preliminary detarmination .hall 'than be 1I&d. by the City and the specialist aa to the aiqniticance at the aurvey findinga. All act.ion. ~ak.n under this ..aaura ahall be in accord with Appendix X of the State CEQA Guideline.. 33. The tinal warkinq drawinqa .hall include a .ection Showing the buildinq not to exceed a height ot 56 te.t above average qrad. as J ,aurad tr=- the average level ot the h1qh..t and loweat point. ot that portion ot the lot covered by ~e building. 34. Plana ahall be .~itt.d to the Architectural Review Board ahowinq d.tail. ot the root equ1paent acre.n1nq, includinc; color., ..terial. and heiqht ot acr..n. The applicant ahall endeavor to reduce the height above parapet. of the ..chanical equipaent and ralated .cr..ning. 35. That no retail, retail financial inatitution or medical ottice occupancies ahall be panaitte4 in th. develop..nt due to a. relatad traffic g.neration rata. which are h1;ber than 98ft.ral ottice occupanci... 36. '1'ba1: the project: ahall be rede.iqned to provide on-.ite clrcul.~ion between the .urtac. level parkinq ar.. and the subterranean park1nq qaraqe. The revised parking and cir- culation layout shall raquire approval ot the City parkinq and Tratfic Engineer. Any related lIod.itieation ot the buildinq footprint or plan. ahall require approval ot the Planninq Division. 37. That the aurface park1nq level ahall be re..rved tor u.. by visitor. to the project and occupant. of the project snall be directed to park wi~in the subterranean q~aq.. - 7 - . 'I :"1 {1 ..1 II L!,__ .~ Building occupants shall use the surface parking level only in the event of overflow parking demand wi thin the subter- ranean garage. 3B. The duties of at least one employee in the proposed building shall include promotion and coordination of carpooling by occupants of the building. 39. The project shall be reduced in size by 5,000 square feet of rentable floor area, reducing the overall project to a maxi- mum of 46,832 square feet. The revised plans shall require approval by the Planning Division. 40. Northbound traffic on Twentieth street shall not ~e permitted to make left turns into the project via the project driveway located on Twentieth street. Prior to issuance of a certifi- cate of occupancy for the project, the applicant shall pay to the City of Santa Monica a sum to be determined by the Park- ing and Traffic Engineer not to exceed $10,000 for use by the Parking and Traffic Division for mititgation of the traffic impacts at the intersection of Twentieth Street and Santa Monica Boulevard, including, but not limited to, the instal- lation of a median island or stanyards to preclude left turns into the project by drivers travelling northbound on Twenti- eth street. Any portion of such sum not so utilized within two years after issuance of the certificate of ocoupany for the project shall be refunded to the applicant. 41. The existing bus stop located in front of the project on San- ta Monica Boulevard shall be relocated towards the alley to the satisfaction of the City Parking and Traffic Enqineer and Transportation Department. 42. The rights granted herein shall be effective only when exer- cised within a period of one year from the effective date of approval. No time extension shall be granted. PROJECT MITIGATION FEE CONDITION 1. In accordance with Sections 9046.1 - 9046.4 of the Santa Monica Municipal Code, prior to issuance of a building permit the developer shall execute an irrevocable letter of credit or other form of security acceptable to the City for the payment of an in-lieu fee for housing and parks equal to $2.25/sq.ft. for the first 15,000 sq. ft. of net rentable office floor area and $5.00/sq.ft. for the remaining net rentable office floor area. This fee shall be adjusted for inflation by the percentage change in the Consumer Price Index ("Cpr") between October 1984 through the month in which the payment is made. Upon mutual agreement of the developer and the city, the developer may satisfy the Project Mitigation measures by providing low and moderate income housing or developing new park space on or off the project site. To fulfill this Obligation an agreement shall be secured in writing by the developer and - s - 00041 approved by the city Attorney and City staff prior to ~s- suance of a building permit. This fee prior to adJustment wJ.II be $164,800, ]::lased on a net renta]::lle off~ce floor area of 41,210 square feet. VOTE Ayes: Nays: Abstain: Absent: Abdo, Jennings, Xatz and Reed Finkel, Genser and Zane NOTICE If this is a final decision not subject to further appeal under the City of Santa Monica Comprehensive Land Use and Zoning Or- dinance, the time within which judicial review of this decision must be sought is governed by Code of Civil Procedure Section 1094.6, which provision has been adopted by the City pursuant to Municipal Code Section 1400. I hereby certity that this statement of otticial Action accurate- ly reflects the tinal detera1nation of the City council of the City of santZL U ' J~ signature 0 - )--- ~Q--E.~ 4/1 ~'<'/~h/, ~PtI7T/ print name and title ( ,/ I /JJ~ ~/. /".fC; aate{ v I {, &RP I - , I hereby aqr.. to the above conditions of approval aDd acknowledge that failure to comply with such conditions shall constitute qrounds tor potential revocation ot the permit approval. Applicant's Signature Print Name and Title PC/stcdr44l SL: nh 04/28/89 - 9 - O""~4"" ~ 1 t r' / '-"..... 1- ATTACHMENT F n..;nnJ,' ..... J Ji t ~W<U^SSOCI^TES A Cor:-orar,o,. - r,ansoor/a'o' Piarlnlrlg rraH ~ E";'-"5-~":'lg Park,,.,; Slud ~s MEMORANDUM TO: Evan James, Dominion Property Company cc: Ron Fuchiwaki, City of Santa Monica FROM: Snnath Ralu Tom Gaul SUBJECT: 1919 Santa MOnica Boulevard Office BUilding - Updated Traffic Impact Analysis With 1993 MEA Base DATE: September 21, 1993 REF: 700 This memorandum summanzes the supplemental traffic impact analysIs performed by Kaku AssocIates, Inc. for the 1919 Santa Monica Boulevard Office Building Project. The traffic study we prepared in June of 1992 evaluated the potenbal impacts of converting 16,000 square feet of the prolect to medical office space, incorporating the City's traffic study procedures as of that time. The purpose of this supplemental analysis IS to evaluate the potential impacts of the medical office conversion using the recently updated 1993 City of Santa Monica Master Environmental Assessment (MEA) traffic projections provided by the City as the cumulative base condition Also, to be consistent with the City'S current traffic study guidelines, the project tnp generation was updated using the tnp generation rates given in Institute of Transportation Engineers' (lTE's) Trip Generation, Fifth EditIOn (1991) This supplemental analysIs IS directed at two Intersections located near the 1919 Santa Monica Boulevard Office Building. The two intersections analyzed consisted ot, · 20th Street and Wilshire Boulevard · 20th Street and Santa Monica Boulevard Both AM and PM peak hours were analyzed for the followmg two project land use scenarios 1. Scenano 1 - Project consists of 41,210 square feet of General Office use, as approved by the CIty CounCIl 2. Scenario 2 - Project consists of 25,210 square feet of General Office use and 16,000 square feet of Medical Office use (i.e., the proposed conversion). - '453 ."rd Slr~el SUIte 400 Santa ~onlca CA 90401 " n (\:0 i ::: vrJ, ':tv {31G J5e 9916 Fa;r mo. 194 766J Evan James September 21, 1993 Page 2 TRAFFIC IMPACT ANALYSIS The updated (1993) MEA traffic volume projections for the future year were used as the future cumulative base, and traffic generated by the two alternative project land use scenarios described above were added to obtain future cumulative plus project traffic volumes. The trip generation estimates used for the two project alternative land use scenariOS were computed using the ITE Trip Generation, Fifth EdItIOn and are shown in Table 1. The 1985 Highway Capacity Manual (HCM) method of intersection capacity analysis, as implemented In Traffix software, was utilized to compute the projected levels of service at the two analyzed intersections for the two project scenariOS, and the results of the analYSIS runs are shown In Table 2. The same Intersection lane geometries and traffic flow parameters utlhzed in the updated MEA traffIC analyses were used for these runs CONCLUSIONS The conclUSions of the supplemental traffic impact analYSIS can be summarized as follows. 1 It can be observed from Table 2 that the volume-to~pacity CV/C) ratio or the delay at the two analyzed Intersections under Scenano 2 do not show any Significant Impacts beyond that projected under ScenarIo 1 conditions. 2. USing the City of Santa Momca's Significant impact cntena, the intersection of Santa Monica Boulevard and 20th Street would not be significantly Impacted under either project scenario (I.e. Scenario 1 with 41 21 ksf general office only nor Scenario 2 with 2521 ksf general office and 16 ksf medical office), with the updated MEA future projectIons used as cumulative base projectIons. 3 Using the CIty of Santa Monica's slgmficant Impact cntena. the Intersection of Wilshire Boulevard and 20th Street would be Significantly Impacted under both project scenarios. WIth the updated MEA future projections used as cumulative base projections The project traffiC Impact under Scenario 2 at thiS IntersectIon, beyond that of Scenario 1, IS an Increase In vie ratio of +0002, WhiCh, by Itself, would not be significant 0004S TABLE 1 PROJECT TRIP GENERATION AM Peak Hour Tnps PM Peak Hour Tnps Project Size Dally Scenano (ksQ Trips Out Total In Out Total In Scenario 1 General Office 4121 718 85 11 96 16 81 97 Scenario 2 General Office 2521 495 58 7 65 11 56 67 Medical Office 16.00 547 ~ -1Q 43 19 46 65 Total 41.21 1,042 91 17 108 30 102 132 00047 en iii ~ <( z <( w o 5= a: w Nen W&&. ..JO ED..J ~~ W ..J Z o ~ o w en a: w .- Z:; , lEe'> 0 0 0 0 N c:- ..... OlC Z Z Z Z 0 (/)0 008 ~ :3'.: <<I (/) (IS c .... c 8 C\l CD CD (I) , 0> 0 .... lD 8 ..... 0 v 0 CJ) (/) ~ 0 0 (l) 0 Q) 6 c: 0 d + (/) + (/) CD + + , '0 (/) (/) 0 0 _ Ce'> CD Q) - c: 0 CD >- >- z z 0 ctl >- II) Q) o Q) co 0' ;,:com .... 20 . (') 0 Q..C\l OleoE .... ..... C\l 0 V 0 (/) 0 00 C. :3 0 0 0 Q) ..... Q) :3 _ EO 0 0 + (/) + (I) - .... + + Q..co <DC > (I) en -0 mW 0 LL LL m co S -l E :3 () () >- ..... v en .... ctl N N 0') 0 0 >: 005 ~ ~ oj Q) ..... Q) 0 (/) ..... (I) ..... ..- . '0 (/) ", 0 0 _ c: e'> CD ~ Z Z c 0 CD >- 0 <<I >- (/) CD 0(1)<<1 '0 l,':CDal .... "g, 0 E (') co n. ,... 8 ,... 0 ~ 0 ,... - <<I :3 0 11)0 (/) c.. 0 0 Q) ,... Q) :3 _ E 0 0 + II) + (/) - .... + + n.a:I Q) c: > CD - 0 en iV(/) 0 L1.. LL m m "3 -l E ::J () >- ..... ~ 10 0....(0 C\/ co 0 0 >:O'Q) (') M C) Q) ..... Q) Ul ..... (/) c ..... ..... . ~ E<, en 0 u. u. CD CD ;ow -l m'::::E "5";(') >- co v E(/)CJ) () .... <<l 0 ..... "-: II) :JIU(J) >: O'Q) ~ ~ d OCO- rn 0 ..... ..... T'" . .:!:L .... eo ::J ~ ~ ~ ~ Q) 0 <( n. <( n.. n.I . C 0 CD_ iX)- .;: 0 CD(/) en Q) ,: s=. <<Is=. C/) s=.s C'CI .2 ~ .... -c lD ~C\l a 0 - c 3:06 W~c(5 0004~ '. TRAFFIC STUDY FOR THE 1919 SANTA MONICA BOULEVARD OFFICE BUILDING l ' r c- , ~'.......~. -- "...- -. '-1,--. ~~~_I' ~~~~E ~:~."'"= _ ~ \ :~~~ .. . I Prepared for: DOMINION PROPERTY COMPANY Prepared by: KAKU ASSOCIATES, INC. 1453 Third Street, Suite 400 Santa Monica, California 90401 (310) 458.9916 Ref: 622 ., 0004: .. .... r r i . TABLE OF CONTENTS I. . INTRODUCTION ............. .... . .. . . . . . . . . . . . . . . . . . . . . . . . . . . 1 SCOPE OF ANALYSIS ......... ............................ 1 ORIGINAL CONDITIONS OF APPROVAL ........................ 2 CURRENT METHODOLOGY, STANDARDS, AND CRITERIA. . . . . . . . . . . 3 CONTENTS OF REPORT .................................... 3 EXISTING CONDITIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 ENVIRONMENTAL S~ I liNG . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 EXISTING STREET SYSTEM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 EXISTING TRAFFIC VOLUMES. . . . . . .. . . . . . . . . . . .. . . . . . . . . . . . . 8 EXISTING INTERSECTION LEVELS OF SERVICE .................. 8 PUBLIC TRANSIT SERVICE . . . . . . . .. ......................... 11 II. III FUTURE TRAFFIC PROJECTIONS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 14 TRAFFIC FORECASTING METHODOLOGY . . . . . . . . . . . . . . . . . . . . . .. 14 PROJECT TRAFFIC VOLUMES .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 15 CUMULATIVE BASE PROJECTIONS.. ... . . . . . . . . . . . . . . . . .. . . . .. 18 CUMULATIVE PLUS PROJECT TRAFFIC PROJECTIONS. . . . . . . . . . . .. 21 IV. TRAFFIC IMPACT ANALYSIS ....................................... 25 CRITERIA FOR DETERMINATION OF SIGNIFICANT TRAFFIC IMPACT.. 25 ANALYSIS OF FUTURE TRAFFIC CONDmONS ................... 27 COMPARISON OF IMPACTS. .. ............. ................ 29 V. MITIGATION MEASURES. .... ................................... 32 APPENDIX A - INTERSECTION CONFIGURATIONS APPENDIX B - PEAK HOUR INTERSECTION TRAFFIC VOLUMES APPENDIX C - PEAK HOUR LEVEL OF SERVICE WORKSHEETS ~ 0005J NO. f NO. UST OF FIGURES 1 2 3 4 5 6 PROJECT SITE AND LOCATIONS OF ANALYZED INTERSECTIONS.......... 6 EXISTING PEAK HOUR INTERSECTION TRAFFIC VOLUMES . . . . . . . . . . . . . . . 9 TRIP DISTRIBUTION PAlTERN ..................................... 17 SCENARIO 1 PROJECT GENERATED TRAFFIC VOLUMES ................ 19 SCENARIO 2 PROJECT GENERATED TRAFFIC VOLUMES ................ 20 YEAR 2002 CUMULATIVE BASE PEAK HOUR INTERSECTION TRAFFIC VOLUMES ........................................ 22 YEAR 2002 CUMULATIVE PLUS SCENARIO 1 PEAK HOUR INTERSECTION TRAFFIC VOLUMES ........................................ 23 YEAR 2002 CUMULATIVE PLUS SCENARIO 2 PEAK HOUR INTERSECTION TRAFFIC VOLUMES. . . . . . . . . . . .. ........................ 24 7 6 UST OF TABLES 1 LEVEL OF SERVICE DEFINITIONS FOR SIGNALIZED INTERSECTIONS . . . . . .. 10 2 EXISTING INTERSECTION PEAK HOUR LEVELS OF SERVICE. . . . . . . . .. ... 12 3 PROJECT TRIP GENERATION. . .. . .. . . . . . . . . . . . . . . . . . . . . . . . .. ..... 16 4 CrN OF SANTA MONICA SIGNIFICANT IMPACT CRITERIA.. ... ... .. ...... 26 5 INTERSECTION LEVEL OF SERVICE ANALYSIS, YEAR 2002 CUMULATIVE BASE AND CUMULATIVE PLUS SCENARIO 1 .......... 26 6 INTERSECTION LEVEL OF SERVICE ANALYSIS, YEAR 2002 CUMULATIVE BASE AND CUMULATIVE PLUS SCENARIO 2.......... 28 7 INTERSECTION LEVEL OF SERVICE ANALYSIS, YEAR 2002 CUMULATIVE BASE AND CUMULATIVE PLUS SCENARIO 2 WITH MITIGATION MEASURES. . . .. . .. . . . . . . . . . . . . . . .. . . . . . . .. 33 fi 00051 f" 1 [ [ \ I , r L f f ; r L (- I. INTRODUCTION The 1919 Building is located at 1919 Santa Monica Boulevard in Santa Monica, California, which Is across the street from St. John's Hospital and Medical Center. The 1919 Building was completed and received Its Certificate of Occupancy on April 15, 1991. At the present time, roughly one-half of the buildmg is occupied. The City Council approved this project on April 11, 1989. As part of the approval, there was one condition which restricted the 1919 Building from leasing space to either retail, financial institutions or medical tenants. During the past two years, the owners of the 1919 Building have received numerous requests from doctors wanting to locate In their building. By locating in the 1919 Building, the doctors will be able to quickly respond to hospital emergencies by walking across the street rather than by driving their automobiles to the hospital This will allow doctors to improve the quality of service to the medical community and reduce traffic by eliminating their need to drive to the hospital. As a resuh, the buildings owner has submitted an application to the City of Santa Monica to convert 16,000 square feet from office to medical tenants. To assess the impact of this application, the City of Santa Monica requested a traffic study be conducted. This report, prepared by Kaku Associates, Inc. documents the resuhs of that study. SCOPE OF ANALYSIS The scope of work for this study was prepared in conjunction with the City of Santa Monica Traffic and Parking Engineer and the staff of the Planning Division. It addresses all the key issues identified by the City of Santa MOnica staff as necessary to allow the City Council to make an informed and reasoned decision. The study includes the following elements: · Review all traffic related requirements which were conditions of approval for the project. · Identify all current City of Santa Monica requirements for traffic Impact analyses including methodology. standards, and criteria. 1 t~ 0 0 0 5 2 r ... , . t l f: i- ~ ; [ f ' r .. . { . Assess impact of project under conditioned use, i.e., general office, and proposed use, i.e., medical office. . Determine impact of proposed change in use of office building on the local street system. ORIGINAL CONDITIONS OF APPROVAL The Environmental Impact Report (EIR) was certified on April 11, 1989 at which time it received its approval from the City of Santa Monica City Council. The traffic study for this EIR determined that the proposed project would have a significant impact at one location, the intersection of 20th Street and Santa Monica Boulevard during the afternoon peak hour. The analysis Indicated that this Intersection would have a volume/capacity (V/C) ratio of 0.95, Indicating a LOS E operational condition, under future conditions without the project, i.e., Cumulative Base. The intersection was projected to have a VlC ratio of 0.99, LOS E, under Mure conditions With the project, Cumulative Plus Project. The incremental increase of 0.04 in the VIC ratio was determined to be a significant impact based on standards used by the City at the time of project approval. It was also determined that an improvement could be Implemented that would mitigate these project impacts. This improvement involved the re-striping of Santa Monica Boulevard east of 20th Street to accommodate a total of six lanes, including an exclusive fight-turn pocket on the westbound Santa Monica Boulevard approach to 20th Street. The traffic analysis indicated that the intersection would have a VIe ratio of 0.93 after implementation of this proposed improvement under Cumulative Plus Project conditions, mitigating the project impacts. A condition of approval for thiS project was, therefore, the requirement that the project proponent pay for the implementation of this improvement. However, there are two Important distinctions that should have been made at the time thiS project was approved by City Council: · That the project's original traffic study was based on a building that was 46,210 square feet when In fact City Council's approval was based on a building which was 5,000 square feet smaller, or 41,210 square feet. Based on the approved 41,210 square feet, this project would have resulted in no significant impact to the five studied intersections 2 Onns':' \.......... ....1 · Although the building based on its approved size would not have had a significant Impact, the owners were still required to pay the City a fee for implementing the mitigation measures ,< . i CURRENT METHODOLOGY, STANDARDS, AND CRITERIA ~-. ! ' ( . , The City of Santa Monica City Council adopted a new set of requirements for traffic studies conducted to analyze proposed development projects within the city in April. 1992. These requirements include the following elements: r i r f: r . The MOperational AnalysisM method from the Highway Capacity Manual (Transporta- tion Research Board. 1985) shall be employed for signalized intersection level of service analYSIS. . The Santa Monica Master Environmental Assessment (MEA) study shall be used for all information regarding existing and Mure base conditions. r i . Trip generation rates from the San Diego Association of Governments (SANDAG) publication Traffic Generators, January 1990, shall be used. . The significant impact criteria based on average vehicle delay and V IC ratio indicated in Table 4 shall be employed. CONTENTS OF REPORT The remainder of this report is directed at the traffic study conducted for the revised project deSCription proposed by the building's owner, The 1919 Building. Chapter II of this report ~ provides a deSCription of the existing conditions In the vicinity of the project site. It concentrates ( on those streets and Intersections that are Included in the study area for this analysis. Chapter III includes a discussion of the development of traffic prOjections for Mure conditions with and without the proposed proJect. Chapter IV provides an analYSIS of these Mure conditions and assesses the potential impact ofthis change in use. Chapter V identifies the additional mitigation measures which would be required in the conditions of approval to ensure that proposed change in the use of the office building would not generate additional impacts. 3 ,~ 0005,: r' I f- r- r II. EXISTING CONOmONS A comprehensive data collection effort was undertaken to develop a detailed description of existing conditions in the surrounding areas of the 1919 office building on Santa Monica Boulevard. The assessment of existing conditions relevant to this study includes land use, street system, traffic volumes and operating conditions, and public transit services. ENVIRONMENTAL SETTING The 1919 Santa MOnica Boulevard building is located in the northeastern portion of the City of Santa Monica, situated on the northwest corner of the 20th Street/Santa Monica Boulevard intersection The Santa Monica Freeway (1-1 0) is located approximately 0.5 miles to the south, while the San Diego Freeway (1-405) is about 2.4 miles to the east. A mixture of commercial, residential, and institutional land uses exist adjacent to the project site on all sides. Saint John's Hospital is located directly east and Santa Monica Hospital is located west of the site. Further to the west is downtown Santa Monica. EXISTING STREET SYSTEM This section presents a deSCription of the eXisting Circulation system infrastructure serving the study area, Including number of travel lanes, street claSSifications, traffic control devices, on-street parking, and adjacent land use The traffic study area is bounded by Wilshire Boulevard on the north, Colorado Avenue on the south, 17th Street on the west, and Cloverfield Boulevard on the east 4 0005:; ('. r. r f r - Regional Acces~ Primary regional access to the study area is provided by the Santa Monica Freeway, which runs In the east-west direction to the south of the project SIte. This facility provides access from the study area to Los Angeles and points 10 the east. To the west, it continues as Pacific Coast Highway (SR-1) beyond the McClure Tunnel, serving beach-related uses. In the vicinity of the study area, the freeway provides eight travel lanes with grade-separated Interchanges at major arterials Access to the study area is obtained via the Cloverfield Boulevard Interchange and 20th Street. Local Street System Figure 1 illustrates the local street system serving the study area. The majority of the streets in the study area are designated as arterials in the Master Environmental Assessment for the City of Santa Monica (1992). Major arterials are intended to provide four or six travel lanes plus left- turn lanes. Minor arterials provide four lanes and mayor may not have left-turn pockets. These arterials can accommodate daily design traffic volumes between 30,000 and 60,000 vehicles per day (vpd). Arterial streets In the study area are: Wilshire Boulevard, Santa Monica Boulevard, Colorado Avenue, and Cloverfield Boulevard Collector streets are Intended as two-lane roadways accommodating a maximum average daily traffic (ADT) volume of 15,000 vpd. Broadway and 20th Street are the two collector streets in the study area. Anzona Avenue and 17th Street are designated as feeder streets intended to carry lower volumes than collector streets, usually below 7,500 vpd. Figure 1 shows the existing pnmary access pOints to the 1919 bUIlding at Santa MOnica Boulevard from the focal street system. Major north-south roadways within the study area are: 17th Street, 20th Street, and Cloverfield Boulevard. Wilshire Boulevard, Arizona Avenue, Santa Monica Boulevard, Broadway, and Colorado Avenue comprise the primary east-west facilities in the study area. Brief descriptions of the pnncipal streets serving the study area follow: . Wilshire Boulevard - Within the study area, this east-west major arterial provides four through lanes with a continuous left-turn lane and left-turn pockets at 5 ~.. 0 0 0 5 S ------ ~ ( ~ I I CAliFORNIA AV I NOT TO SCALE l- I- f""''''' U') </l LEIiEt{) r r r I-- I-- o ""....vlED NTERSECTIQoj ::: 0 '" .. El:lSTlN;; ACCESS POINTS I ' WILSHiRE 8L CD r 21 l I , f ARIlONA AV f r- ~ PROJECT SITE SANTA MONICA BL 1 3 5 BROADWAV 1_ COLORA;)O AV ...J (I) Cl ...J W u: a: w 61 ...J, u, i I I o 41 [(JU(UASSOCI^ TES FIGURE 1 PROJECT SITE AND LOCATIONS OF ANALYZED INTERSECTIONS 6 j 00057 r , signalized intersections Signalized locatIons along Wilshire Boulevard in the study area are: 17th Street, 20th Street, and 23rd Street Two-hour and three-hour metered parking between 9 AM and 6 PM is provided, but parking Is prohibited between 3 AM and 5 AM west of 20th S1reet. Primarily commercial land uses front WIlshire Boulevard. · Arizona Avenue - Arizona Avenue, designated as a feeder street, provides two travel lanes and a double yellow stnped median. Within the study area, a bike lane is provided on both sides of the street. The 17th Street and 20th Street Intersections along Arizona Avenue are signalized. West of 20th Street, two-hour parking is allowed between 9 AM to 9 PM on weekdays. Residential areas and some office exist adjacent to Arizona Avenue. . Santa Monica Boulevard - Santa Monica Boulevard, which provides direct access to the project site, is a four-lane, east-west arterial with left-turn pockets provided at signalized intersections. These signalized locations are: 17th Street, 20th Street, 23rd Street, and Cloverfield Boulevard. Two-hour on-street parking is allowed west of 20th Street, while parking is prohibited along Santa Monica Boulevard east of 20th Street. Office and commercial land uses front this facility. I r . Broadway - Within the study area, Broadway Is a four-lane, east-west collector street with a double yellow-striped median. Signalized locations along Broadway are' 17th Street, 20th Street, and Cloverfield Boulevard. Two-hour metered parking between 9 AM and 6 PM is provided west of 20th Street and west of Cloverfield Boulevard. East of 17th Street, parking with the same time restrictions is allowed. Commercial and some office land uses front Broadway. f . · Colorado Avenue - Colorado Avenue Is a four-lane, east-west arterlal. left-turn pockets are provided at the following signalized intersections: 17th Street, 20th Street, and Cloverfield Boulevard. Ten-hour metered parking between 7 AM and 6 PM is provided west of 20th Street, while it is provided on the southern side of Colorado east of 20th Street Offices and some commercial land uses currently exist adjacent to Colorado within the study area · 17th Street - ThiS faCIlity is a two-lane, north-south feeder street with a continuous left-turn lane Signalized locations along 17th Street are: Wilshire Boulevard, Anzona Avenue] Santa Monica Boulevard, Broadway, and Colorado Avenue. Between Arizona Avenue and Santa MOnica Boulevard, two-hour metered parking is provided between 9 AM to 6 PM on the eastern side of the roadway, and 36- minute parking is provided on the western side. Two-hour parking IS allowed south of Wilshire Boulevard Residential areas and some commercial and office land uses front 17th Street · 20th Street - This roadway is a four-lane, north-south collector street which provides direct access to the project site. North of Santa Monica Boulevard, 20th Street provides a double yellow striped median, while it provides a continuous left- turn lane south of Santa Monica Boulevard. Within the study area, the following are signalized locations along 20th Street: Wilshire Boulevard, Arizona Avenue, Santa Monica Boulevard, Broadway, and Colorado Avenue. Two-hour metered parking between 9 AM and 6 PM is provided along this roadway. A mixture of 7 0005[: office, residential, and commercial land uses currently exist adjacent to 20th Street. · Cloverfield Boulevard - Cloverfield Boulevard is a four-lane, north-south arterial which provides access from the project site to the Santa Monica Freeway. Within the study area, on-street parking is prohibited. The Intersections with Santa Monica Boulevard, Broadway, and Colorado Avenue are signalized. Commer- cial/office land uses front Cloverlield Boulevard. EXISTING TRAFFIC VOLUMES c ~ f- Figure 1 illustrates the five intersections identified by City of Santa Monica staff for detailed level of service analysIs. All five locations overlap wrth intersections evaluated in the Santa Monica Master Environmental Assessment (MEA) study. These intersections are: ( I I 1. 17th Street and Santa Monica Boulevard 2. 20th Street and Wilshire Boulevard 3. 20th Street and Santa MOnica Boulevard 4. 20th Street and Colorado Avenue 5. Cloverfield Boulevard and Santa Monica Boulevard f l Peak hour traffic counts taken in April and May of 1991, as well as other applicable intersection data needed as inputs into the signalized Intersection operational analysis (e.g. saturation flow rates, signal timing data, peak hour factors, etc.), were obtained from the MEA study. Figure 2 Illustrates the A.M and P.M peak hour intersection volumes at each of the five locations in the study area. EXISTING INTERSECTION LEVELS OF SERVICE Intersection level of Service MethodoroSJV level of seMce (LOS) is a qualitative measure used to describe the condition of traffic flow, ranging from excellent conditions at LOS A to overloaded conditions at LOS F. LOS 0 is the typically recognized minimum acceptable level of service In urban areas. Level of service definitions for the signalized intersection operational analysis is included In Table 1. 8 ~o# 0005: ~ / ( -........, c f' L CALIFORNIA AV t- '-"! I, t- O C\J l- V) I t- t:: WILSHIRE BL ARllONA AV -go 0.....- 'T -.:::. ~ * ~ L50 idS' .J j l ~ 755 IBOOI " rll0 (85) () 35 (351 J l 985 (1,0201 -+ i r 110 i45) -. 10<:05 <ON"" - M- 8;;;; --lO> C\l €) NOT TO $CoOLE - );;I;c Cl:(lJ ......... PEArt .......1I<lL_S NEGU:lllLE WUME IoU. 'oOUMES_D 10 NEAIll:St 0'Nf \lEt<U's o "';:;;;:;:; >':>;:;:;E ~ ~ :2 L90 (701 .J ! l --635 1810] .35/401 () 55 (35) J 1 620 [9901 i i 40 (WI. :g g ~ -N- o-a <OOM <D (\J BROADWAY U'i O~l?5 :::-'" -0- ~ ~ ~ L220 (220l .J It... 750 (1315) SANTA MONICA BL " .50 180J CD 50 (35) J i 635 (1,300) -+ i r 25 190) -. <;5 g ~ ~-.;:r- R;;~ "" - <D -875 (9501 .140 (15) 705 (9101 -+ Ii r 330 (270J -. 5 ' ;:n L('l ..., !:1 !l! o '" C\I IX) .... - CiS COLORADO AV L? '" Lnt::.LJ)~ == U' == : ll"" a::- c ~ C\J"'<,"",] .J:L.. , l 6 30 140) -1! .. 505 (5801 -+; "1 j r 55il001. ~ ~ 0 -",,- *;;:;:2 o <D ~20 125: 36C (3751 r 30 '60: C. ....J W i:: c::: u.J > o ..J Ul KJ\((U AS SOCI ^ T E S FIGURE 2 EXISTING PEAK HOUR INTERSECTION TRAFFIC VOLUMES 9 \ \ I I j ~'J 0 0 0 GJ All five analyzed intersections are controlled by traffic signals. Based on policies established by the City of Santa Monica, the .Operational Analysis" method from the Highway Capacity Manual (Transportation Research Board, 1985) was employed to perlorm the intersection level of service analyses for the selected intersections. The Highway Capacity Manual operational method determines the average stopped delay incurred per vehicle and the volume/capacity N/C) ratio. The Intersection level of service is then related to the average vehicular stopped delay as indicated on Table 1 A key element of the analysis of existing operating conditions Is the lane configurations for each Intersection. Diagrams of the existing lane configurations and traffic control devices at the five analyzed intersections appear in Appendix A. r Existing Peak Hour Levels of Service The year 1991 existing traffic volumes illustrated In Figure 2 were used In conjunction with the level of service methodology described above to determine the existing operating conditions at the analyzed Intersections selected for detailed capacity analysis. Table 2 summarizes the existing (1991) average stopped delay per vehicle. VIe ratio. and corresponding LOS for the morning and afternoon peak hours. As can be seen, four of the five analyzed intersections operate at acceptable levels of service of C or better. However, the 20th Street and Santa Monica Boulevard Intersection currently operates at an unacceptable level of service (LOS F) during the afternoon peak hour. PUBUC TRANSIT SERVICE The study area is currently served by several Santa Monica MuniCipal Bus Une (SMMBL) and Southern California Rapid TranSit District (SCRTD) bus routes. The SMMBL bus routes primarily operate along 20th Street, Wilshire Boulevard, and Santa Monica Boulevard, while SCRTO bus routes prOVide service along Wilshire Boulevard and Santa Monica Boulevard within the study area. Brief descriptions of these routes follow: 11 ,~ 0 0 0 G : r - ) w o :;: a: w en 11. o ~ l1.I [ij ..J a: ::> NO J: W:;:.:: ffi~ ~ll. Z o i= @ en c:c w ~ ~ CJ Z ~ en X w , i [ i~ .:Mt l l I ~ 8 & J:~ ~ l :E <I ~ a (/) 9 o <0 IX) ,.. o ,.. <n .... (/) 9 ID ,.. ~ o ~ CO) .... ~ i III S 'E ~ :; o ID 011 ~ Gig ~:E (J) as ,e- F::. ~ ....(/) o C") N m o lot) C') N o N .... m c::i It) ~ '0 ~ as ~ all:; - 0 :BID ~ Cl) U5~ s::. ,e II) 5= N:: N u. CX) 8l ID ~ ,... ci m C') .... 'E ell ~ ::l o co od ~ Gig ~~ (1) l'lI ,e- o~ NU) C') m .... ,.. It) c::i .". ci .... ID ~ . ci N m Ql ::J C od Ql :> Gi< Cl) 0 -=1i U)~ ,e 0 0- N8 .,f 12 CD o f6 o <0 ...: m .... N <0 ci CO') co oIl"E l'lI 'E ~ l'lI- ~ 5 :;ID o l'lI co () '0'2 - 0 ~:E CD~ ~ c _ l'lI 00 ui i 1ii "5 u iij U III .c o c c as u :>.. nI ~ '0 G) o ell 4i ~ in c o ;;; i5 c o u i ':;j ~ i ~ G) rOd CD <5 z << 00062 TABLE 1 LEVEL OF SERVICE DEFINITIONS FOR SIGNALIZED INTERSECTIONS Level or Service Average Stopped Delay Per Vehicle (seconds) Definition A less Ihan or equal 5 0 Occurs when progression IS extremely favorable Most vehicles arrive dunng the green phase and do not stop at all Short cycle lengths may contribute to low delay [ , B 5 1 to 15 0 Occurs Wllh good progression andlor short cycle lenglhs More vehicles Slop than for LOS A, caUSing higher levels of delay c 15 1 10250 Higher delays result from faIr progression and/or longer cycle lengths The number of vehIcles stopping Is significant al thIs level, allhough many SIIU pass through the Intersection without stopping Individual cycle failures may begin to appear o 25 1 10 40 0 CongestIOn becomes more noticeable Longer delays may result from some combination of unfavorable progression, long cycle length, or high vIe rallOS Many vehicles stop, and the proportIon of vehicles nol stopping dechnes IndiVidual cycle failures are noticeable E 40 1 to 60 0 ConSIdered to be the Irmlt of acceptable delay These values Indlcale poor progreSSion, long cycle lengths, and high vIe ratIos IndiVidual cycle failures are common occurances F greater lhan 60 0 ConSidered to be unacceptable to most dnvers ThiS condition often occurs Wllh oversaluratlOn, Ie. when arnval flow rales exceed the capacity 01 the intersecllon It may also occur al high vlc ralios above , 00. WIth many individual cycle failures Poor progression and long cycle lengths may also be contributing factors Source Transportation Research Board, '"Highway CapacIty Manual-SpecIal Report No 209,'" 1985 L-- 10 M 00063 [ r- ,- . SMMBL Une 1 - Une 1 proVIdes direct service from the study area to Venice and the University of California at Los Angeles (UCIJ\) along Santa Monica Boulevard. . SMMBL Une 2 - Une 2 provides service from the study area to Venice and UCLA along Wilshire Boulevard. . SMMBL Una 11 - Une 11 provides intra-city bus service within Santa Monica. This crosstown loop provides direct service to the study area via 20th Street. . SCRTO Unes 20 and 320 - These bus routes operate along Wilshire Boulevard to provide service to downtown Los Angeles from the study area. . seRTO Lines 4 and 304 - These bus lines provides service between the study area and downtown Los Angeles along Santa Monica Boulevard. 00064 13 III. FUTURE TRAFFIC PROJECTIONS In order to evaluate the potential Impact of the proposed change in use of the 1919 Santa MOnica Boulevard building on Mure traffic conditions, it was necessary to develop traffic forecasts reflecting the full occupancy of the building under the existing approved use as well as the proposed converted use. As previously indicated, the two scenarios analyzed in this study are. i · Scenario 1 - Project as It was approved by the City of Santa MOnica, reduced in size by 5,000 square feet (sf) from its original size analyzed in the 1988 EIR and limited to 41,210 square feet of general office use. , , , . Scenario 2 - Project as it is currently proposed, with 16,000 sf converted to medical office use and the remaining 25.210 sf in general office. TRAFFIC FORECASTING METHODOLOGY The traffic forecasting methodology for thiS analysis, which Is consistent with the methods required by the City of Santa Monica, include a three step process "was first necessary to estimate the total amount of future traffic expected to be generated by the project under the two approved use and under the proposed use. The project traffic for each scenario was then distributed geographically based on a pattern approved by the City. The third step IOvolved the assignment of thiS traffic to the local street system. The resulting traffic volumes represent the total increase in peak hour traffic expected to be added to each of the five intersections in the study area by the two scenarios The incremental proJect-generated traffic was then added to the Cumulative Base traffic. This Cumulative Base traffic, which is obtained from the City of Santa Monica, represents future traffic conditions in the City without the addition of traffic from the project. The addition of the project traffic (under either scenario) to the Cumulative Base traffic results In the Cumulative Plus Future traffic proJect, Ie, future conditions with the proJect. 14 ~1 0 0 0 6 5 PROJECT TRAFFIC VOLUMES Prolect Traffic Generation Estimates of potential traffic generation for the general and medical office uses were developed using standard trip generation rates as prescribed by the City of Santa Monica. Table 3 summarizes the trip generation factors employed and the resulting estimated vehicle trip generation for the project site As indicated in the table. a total of about 824 net new daily vehicle trips are projected to be generated under Scenario 1, the approved general office use, of which 115 vehicles per hour (vph) are projected during the A.M peak hour and 107 vph during the P.M. peak hour. Under Scenario 2, the proposed general and medical office mix, the project is expected to generate a total of 1,304 daily trips, of which 119 vph are expected during the A M f peak hour and 146 vph during the P.M. peak hour. I The table Indicates that the proiect under Scenario 2 is expected to generate about 58% more daily trips and 36% more P.M. peak hour tripS than Scenario 1. The trip generatIon during the A.M peak hour does not vary conSiderably between scenarios. Prolect Traffic Distribution The geographic distribution of traffic generated by development at 1919 Santa MOnica Boulevard would be dependent upon several factors, Including the geographiC distribution of existing and future population, the location of commercial and employment centers, the location of site access points relative to the surrounding street system, the physical characteristics of the surroundmg street network, and the level of congestion on the local and regional street system. Information from a variety of sources, including the Santa Monica MEA and the 1984 Santa Momca Circulation Element, was analyzed to estimate the directional distribution of proJect- generated traffic Figure 3, which Illustrates the trip distribution pattern developed for the project, indicates that the majority of the traffic is expected to travel directly east or west on Santa Monica Boulevard. The remainder is expected to use the ky north south streets including 20th Street and Cloverfield Boulevard. 15 \,.10006S TABLE 3 PROJECT TRIP GENERATION SIZE DAILY AM PEAK HOUR PM PEAK HOUR LAND USE (SF) TRIPS IN OUT TOT IN OUT TOT SCENARIO 1 GENERAL OFFICE 41,210 824 104 " 115 21 86 107 SCENARIO 2 GENERAL OFFICE 25,210 504 64 7 71 13 53 66 MEDICAL OFFICE 16,000 800 38 10 48 24 56 80 TOTAL 41,210 1,304 102 17 119 37 109 146 PROJECT TRIP GENERATION RATES DAlLY AM PEAK HOUR PM PEAK HOUR LAND USE UNITS lFUPS IN/OUT RATIO TOT INJOlIT RATIO TOT GENERAL OFFICE KSF 20 9 : 1 14% 8 : 2 13% MEDICAL OFFICE KSF 50 2 8 6% 3 7 10% SOURCE San Dtego AssOCIation of Governments. .San Diego TraffIC Generators.. June 1991 Brief Guide 00067 16 / t1O% ~ '" \ { I , (F; ; J CALIFORNIA AV l ..oT TO SCALE l- t/) I ~ l- t:: 0 N W'LSi--'IRE BL 25% ,ARIZONA AV ~ PROJECT SITE SANTA MONICA BL BPOADWA Y COLOHADO AV , I I '20% 1 J IDI 01 --', ~~ l..o...:i rr:~ w' >' 0' --,' ul I I i 35% 10% ({J\f(U^SSOC!^ TES FIGURE 3 TRIP DISTRIBUTION PATTERN 17 ./ ~. 0006: Prolect Traffic AsslQnment The trip distribution patterns developed above were used to assign the project traffic from Scenarios 1 and 2 to the local street system. The resulting forecasts of project-generated traffic volumes are summarized In Figures 4 and 5 for Scenarios 1 and 2. respectively. The figures Illustrate the intersection traffic volumes for each of the five intersections in the study area during the morning and evening peak hours for these two scenarios. CUMULATIVE BASE PROJECTIONS The Crty of Santa Monica has established a Master Environmental Assessment (MEA) encompassing the entire city. The Santa Monica MEA includes a comprehensive analysis of existing and projected cumulative traffic conditions throughout the city and Is intended to provide a uniform base for subsequent project-level studies such as this traffic study. As such. and In accordance with recently established City procedures. cumulative traffic projects were obtained from the MEA ad used as the basis for the cumulabve analysis. The MEA cumulative projections explicitly incorporate projected tnp generation for 41 approved and/or planned development projects throughout the City of Santa Monica. as well as five major development projects (Channel Gateway, Marina Place Shopping Center, Playa Vista, Hughes Office Tower, and lAX Northside) located outside the City. The MEA cumulative projections also incorporate a background ambient growth factor of 1.5% per year to the year 2002. representing other potential regional and local growth not explicitly accounted for in the currently-known projects. More informatIon regarding the cumulative forecast methodology. description of cumulative projects, and the estimated trip generation for each, is contained in the Final Master Environmental Assessment for the City of Santa Monica (Michael Brandman Associates, February 1992). It should be noted that the roadway improvements at the 20th Street/Santa Monica Boulevard intersection that were included in the MEA are not included in the analysis of future traffic conditions in this study. Since these roadway improvements, which were initially identified in the 1919 Santa Monica Boulevard project EIR, have not been implemented, it would be more useful to identify any new improvements which may be necessary as a result of this analysis under the two land use scenarios. 18 ~ 0006: ," r I I I \-. 15 (5)- r ~ ~ .... 0./). CAlIFORN!A AV -'-! ....; Q. <"-.Ii 1 @ NOT TO SCALE" t- V) :r t- ....... i.~~ xo. 000li .iMF'4 PEAK -mo ..-olJ.O.t:S NE":iLIQ8\..E YOl\JloE WiLSH"lE BL I: $2 i oj. ......~S""""CEO To i'EIAEST ~I~ VEHrCl..fS r ; , iB * ARIZONA AV .!. * l. ~ --6 ~~~ lk U""j * Jjlt1 . 10 (*1 · ~,- i I . ,tl, --. I ~ i I ! 2015i If 115i SANTA MONICA 8L Q " BROADWAY as COl()FAJ-O A\/ ~ s I :- -: I . I I .' '-+ I ~20i5! S :..U ~I :;; O~ -' 0: o 1 ~ ~~ C\; r<M(UASSOCIATES FIGURE 4 SCENARIO 1 PROJECT GENERATED TRAFFIC VOLUMES 19 'I I ! I I , ) aDOre / ( f l ( I ~ - I ~ CAU::ORl\IIA AV I- if:, II ~I I I I I WILSI"IRE BL l- f./) ~ \ \1 i I ARIZONA AV .!: * L -5115: SANTA MONICA BL I I- o C'-.. (y NO' TO SCALE - I ~! ; 71 tf 1 ! ; 'Oi"X DODO ......... PE...... ~vOl.:Uh4Es. "ECilOBLE'Io'OI..\..-.E BROACWAY CO~ORAOO AV lr'6 '2~ -.r- L..'") ll. "-'- ><:>u.o<e. A~CEO TO NE,lrftEST FIVE 'lr'E~'S 9 " , ~~Uil ~ - N :;;S:;;; ~ 1 ~ t 120 <51 Cl " _lOtS) * In, -Ii 5115). ~ I ~ ! I 15 (5) r ![j ~ -' (Il L15(Si L.Lj U- ~I o. -': V~ 1 $2 Cl C\. I [(J\f(UASSOCIATES ~ FIGURE 5 SCENARIO 2 PROJECT GENERATED TRAFFIC VOLUMES 20 0007: The projected year 2002 cumulative base peak hour traffic volumes are illustrated in Figure 6. Cumulative Base Street System The cumulative projections 10 the Santa Monica MEA assume that roadway or intersection Improvements either (1) listed in an environmental impact report or initial study for approved development projects, or (2) either currently funded or likely to be funded by the City or Caltrans. are implemented. Two specific improvements assumed in the MEA cumulative base projections affect Intersections analyzed in this study. These are the following: · 20th Street and Wilshire Boulevard - Re-stripe northbound 20th Street at Wilshire Boulevard to provide an additIonal through lane. · Cloverfield Boulevard and Santa Momca Boulevard - Provide one additional exclusive left-turn lane on northbound Cloverfield Boulevard at Santa Monica Boulevard CUMULAnVE PLUS PROJECT TRAFFIC PROJECTIONS The estimates of project traffiC summarized in Figures 4 and 5 were added to the year 2002 cumulative base volumes illustrated in Figure 6 to develop forecasts of future traffic with the project. Figures 7 and 8 Illustrate the Cumulative Plus Project traffic volumes for Scenanos 1 and 2, respectively. 00072 21 ( I WILSHIRE BL - ~1 81 1 i -~~ ;,,[l~N .....~.:=. ;2g ..,{)"'>"- Jil. . ~ \ \ CALIFORNiA AV ~ NOl TO SCALE .... <f) I l- t:; !.!II!!!! lCXX OllOC} AIoIFI4- OlE...... >Ol.<'o!lI._~ ~Gl..1GI&.f "vCL~ L 60 :SO) _1 030 l1,135) .16(1260) ALL 'IOl.'.AlES RD.INlED 10 ~E.lAES' R>'E >1:tCfS 40 i45! j , 245 11,40GI---- 130 l60i -. iir U)oc ooro..... - '"'- L<)~- -- L...... 0 ......."'Q";:: N ARIZONA AV , 0- g ~~ ~cc g~~ ~~E ;; ~ 8 Lt05 (BOj ; 2 0 .. 260 1260\ -c:t ('1')......... IJ"} i..C :::: -- J ! t. 670 (l,07Ql J I t. ~ -1005 (1660; r 40 155i SANTA MONICA BL . .55 (9Oi () 65 (40) .J 1 60 ISO) .J i 770 (1,3501 -+ i r 795 11,710) -+ i r 45 (65) t g ~ W 50 (1451 -. g ~ "2 -~- NL<)~ g;~ ~~~ o N~""'" ~ -..... _1,185 11,2551 r 435 \2951 ( 875 [1.29QI -+ i r 395 0551 -. on 5 o co If:! 8 '" 0 ..... ..... ..., N BROAJWAY I I -' OJ COLOPADO AV 2 _ c _. o - u~ ; ('.J - N ---...., - I ...... 0 U) ~ N l.O ~: .lIt.: . f.'i 40 r.e::51 --' ~ 1,025 (1 (20) -+ : 65 (tiS) -. ~25 ~3C'1 ----585 (9951 o -' L.1J "- a: UJ > o .- 5G '-i6e' dr ~ i l 4 j:r oeo n....u:. - ""- ..-0 ".[" Ij) "" - ..... r<JU(U/\SSOClt\TES ~ FIGU RE 6 YEAR 2002 CUMULATIVE BASE PEAK HOUR INTERSECTION TRAFFIC VOLUMES 22 (If)r7"'' v U'...: 'L.l' _/ / 0_ ...... ,,~ ~"'=TN 'Q-= -0 5! '; & L60 (SO! J ll.. _1030 l1,135) ! r160 (260) o i i f r i11?6 ro ro t--- -- ('F) =- ~;;:;o --"'I:;J':= N CAU;:-ORNtA AV I- <J) I' t-' -- WiLSHIRE 8L 40 :<t5J J 1.245 11 400J - 130 l601 -. ARIZOi'<A AV ~ <.f) I t- O N €I NOT 10 SCALE: - Uk"OClOO ~~~"" ..,.... "'1I.1ES IlEGlDIIl.E "'1LOE AlL \oC<UlolES IOJta:D 10 NEAREST fIVE VEtoCl.ES 0- 5~~ ..... -- ;;:eO 'V..-.!2 ..J!l 65 140) .J 790 11,355) -+ 45 1651 -. '--. in ~~~ ~-::::;:t L 105 (801 0 '!2 0 1- L260 12601 -875 (1,0801 J IE: -1025 (1665) .40 i55) SANTA MONiCA 8l. .. .55 (90) 60 (50) -..! i + 795 (1,710) - I 1 I r 50 (145i -. I 8" ~ 52 :('I")'IoD= ;~;~ ~~- ill 6;:nin <.DO..,- - rr-~- 0-0 "-OU> o ...., BJ=;OACWAY CO~ORADO AV c -~- c......o 0.;-==--':: ;:2; ("'..:..J.j .-.. j , I ~ l. I 6 40 '45' ~ , ~ 025 11 G2G; ----+ ' 65 {1151 ----.. L"";(35i +--585 :9-951 .50 i160i . 1;j c:?i5 (")""'lO - 'V - x ;; g ~ - 1,190 t1.2551 r 435 (2951 880 ll,2951 -Ii I 395 (3701 -. in 0: o ro ~ ~ r ~ ~ I I I --,I all Si u.; :. '--L. a:; ~l ~J [(J\[(U !\SSOCl^ TES FIGURE 7 YEAR 2002 CUMULATIVE PLUS SCENARIO 1 PEAK HOUR INTERSECTION TRAFFIC VOLUMES 23 ~, \ I ) ../ OOOi ~ / ( CALIFORNIA AV .... ~~ I t- O N (i) I- ,f) ~ t:: o- N'" u=>~(\,; q-=- ~gg o.L: "" - J!l. NOT TO SCALE ~ :o:x co;x:. AUPt4 PEAl( ><)LI>......_~ t<EGl.IiIBLf YOlIArE L. 60 {50) __1.030 111351 .160 Q601 AU. .........ES I'lO.ifUD TO fi:EARES. I=I'r'E \l'EI4Cl[S WILS"iIRE BL 8- i5~~ ,., -- ;;~8 ""..., - J!l. 40 1451 ---1 1245 {1 ~OOI -+ '30 1601 -; ARIZONA AV L. 105 180i ~ 875 i1 085) .40 {55) SANTA MONICA BL "6 <!' 80iO 10="" =0= 1,()('\J1.f":; Lo'"1 1J) ::: J!l. & Ii! r j--- 1"''''0 00 CC ..... l;o.!::!'='- :;::",2 "" - N L.260 (2601 1 025 (1 6651 .55 (90) 1,190 {1.2551 .435 (295) 65 1401 j 790 (1,355J - 45 (65)---. ilr 60 601 ---1 795 !1 7101 -+ 50 (1451 -. 5~6 ..00'" - ...,- 0-0 .....O<.D o ,.., BROADWAY COLORADO AV i?i 0' -0- R~~ :;.;S; (\JU)~ .ill. 880 (1300J- 400 mOl. i i LO S a 00 ~ ~ L,() 0 ex: ...... I U) N ! ilr 8~Q ('")L('= ;;~~ 'E~- .. 45 i35-;' ffil 01 -II w: lL . a:) u...:j >1 01 .' 0i 4---- 555 !9951 r 50 (1601 6 40 1451 ~: 1 1 025 11 0201 -+! 1 i 65 Ili51, I, 6 i5 6 ,.,00<.0 i ;: ~ ;; ... <.D ::e- (W(UhSSOClATES - FIGURE 8 YEAR 2002 CUMULATIVE PLUS SCENARIO 2 PEAK HOUR INTERSECTION TRAFFIC VOLUMES 24 ~, , \ ) i j ./ 0007~ IV. TRAFFIC IMPACT ANALYSIS The Mure year traffic projections developed in the previous section were analyzed to determine the potential incremental change in the impact expected to result from the change In the use of the project from general office to general/medical office. In order to accurately assess the impact of this proposed change, It was necessary to conduct the impact analysis in two steps: · Step One - Each traffic scenario, Scenario 1 with the project under the approved use, and Scenario 2 with the project's proposed use, is compared to the cumulative base to determine project-related impacts using the significance criteria established by the City of Santa Monica. · Step Two - The relative impacts caused by Scenario's 1 and 2 will be compared and analyzed. The incremental increase in the Impact of the project caused by the change in its use will be identified CRITERIA FOR DETERMINATION OF SIGNIFICANT TRAFFIC IMPACT The level of Significance of project-related impacts on traffic conditions is determined through the application of signIficance criteria established by the City of Santa Monica. Table 4 summanzes the significance crltena. As indicated in the table, the significance criteria to be used depends upon whether the subject location is an arterial or collector street and upon the projected base operating condition prior to the addition of project traffic The Significance of an impact is measured by either a change In the LOS to an unacceptable condition or a change in the average vehicular delay of a given amount dependent upon the base LOS. If the base LOS is F, slgmficance is defined in terms of a change in VlC ratio (as calculated by the HCM operational method), not average vehicular delay, as average delay cannot be calculated using the HeM operational method under over-saturated conditions. Each of the analyzed intersections are intersections of one or more arterial streets. Thus, the artenal significance cnteria is used In this study 25 0007-: CITY OF SANTA MONICA SIGNIFICANT IMPACT CRITERIA TABLE 4 FUTURE BASE SCENARIO IF LOS = At Bt OR C ==> AND IS A COLLECTOR STREET INTERSECTION ==> AND IS AN ARTERIAL INTERSECTION IF LOS = 0 ==> AND IS A COLLECTOR STREET INTERSECTION r ==> AND IS AN ARTERIAL INTERSECTION IF LOS = E = => AND IS A COLLECTOR OR ARTERIAL INTERSECTION IF LOS = F = = > AND IS A COLLECTOR OR ARTERIAL INTERSECTION FUTURE PLUS PROJECT SCENARIO SIGNIFICANT IMPACT IF: AVERAGE DElAY (sec/veh) INCREASE IS ~ 15 Seconds OR LOS BECOMES 0, E, OR F AVERAGE DELAY (sec/Veh) INCREASE IS ~ 15 Seconds OR LOS BECOMES E OR F SIGNIFICANT IMPACT IF' AVERAGE DELAY (sec/veh) INCREASES BY ANY AMOUNT AVERAGE DELAY (sec/Veh) INCREASE IS t 15 Seconds OR LOS BECOMES E OR F SIGNIFICANT IMPACT IF: AVERAGE DELAY (sec/vell) INCREASES BY ANY AMOUNT SIGNIFICANT IMPACT IF: HCM V/C RATIO NET INCREASE IS! 005 00077 26 ANALYSIS OF FUTURE TRAFFIC CONDITIONS The analysis of future impacts of the two scenarios assumes that the base street system improvements included in the Santa Monica MEA as described In the previous chapter have been implemented. Cumulative Base Traffic Conditions The year 2002 cumulative base traffic volumes illustrated in Figure 6 were analyzed using the previously described level of service methodologies at the fIVe study area intersections. As indicated in Table 5. two of the Intersections are expected to operate at LOS F under these Mure conditions without the project. These intersections are: . 20th Street and Wilshire Boulevard (both peak hours) 20th Street and Santa Momca Boulevard (PM peak hour) . ( " ( Cumulative Plus Prolect . Scenario 1 The year 2002 cumulative plus project traffic volumes for Scenario 1 illustrated in Figure 7 were analyzed to determine potential Mure operatmg condrtions and traffic impacts with the addition of project~enerated traffic The results of this analysis are summarized in Table 5. Using the previously described significance criteria of the City, it is determined that Scenario 1 would have a Significant impact at the following two Intersections \ l . 20th Street and Wilshire Boulevard (both peak hours) 20th Street and Santa Monica Boulevard (PM peak hour) . As previously indicated, both intersections are projected to operate at LOS F under cumulative base condItions. 27 00073 r Q a: < z w () CIJCIJ wen >;:) ...J...J <0. Zw <> UJ- u..... -:) >=> ffi:E lOCI);:) WLLO ...JOO m...JZ <w< ....>W UJcn ...J< zm Ow -> t>~ ~:5 a::J W:E .....:J ~O N o o N a: <( w >- f I , \ \ r c: ~jd '= a. 5.E c;; mo cu- CIl> (:) 5: c Q) >. I/) CIS cu- ll) Q) (:)0 C c: ..... CIl ....0 g....J m i~ eX> I/) ;:) 0::2 Gl CIl ~..c: ftj &l ":is E i;' ;:)- 08 l&o ~> CIl > - ...... ..!S!~ ;:)..c: 5 &l os >- <II Q) o o 0 zz 08 00 00 ..,.,... 00 00 on ,... ~8 0.... C1l C1l "":cn ....cn U) o ...J oc g~ coo 0.... U')e\! ,... (') ....(') .... ;:) o J: .:.:: .:.:: nI <II Il) CIl D...D... :E~ <D... c: o g rIl Qi ~ 1:l m ~ ;; o (]) oi:I ~ Gi c ~ 0 m~ .cE ;::::. <<l ....CI) co Gl 0 >-z co N 88 00 << zz u..u.. M 0 M .... ..... C") u.u.. ,...co C\lO ....1") .:.:: .:.:: nI CIS Q) CIl D...D... ~~ <CD... 'E nI > ~ oi:I ;:) (jj~ ~ ! m,E J;:.!!l ~~ ('IJ o l8 z> C1lC1l 8~ 00 U')<C .....z Ou.. ,... M ai~ 0.... C1l . N e\! Uu. ~~ 0)..,. 0- ..,. . (\j .:.:: .:.:: CIS <<l CIl Q) D...D... ~~ <cD... 'E <lI > CIl 3 o !D .., ~ Q) C ~ 0 m: .r;;- 5 ~ (\jU) M o 0 zz 0"" :;8 00 C'J ,... 00 !DO 0) 0 0..,. co 0) 00 ..,.,... ~~ CDU 0)1;") o)M ,...0) 00 ....0 MO ....C\I .:.:: ~ nI CIS CIl Q) D...D... ~~ <0. Q) :::J C oi:I ~ Qj<C ~.g m <<l .r;; <5 28 ..,. 28 o 0 zz U')(O 00 00 00 C1lCO 00 00 U')(O .... co om ....0 ,...,... ~~ CU 00 ....co o C1l ....0 co C1l co N C\J C'\l .:.:: .:.:: nI CIS Q) CIl D...D... :E~ <0.. "0 oi:I ~ 1:l > m Q) >3 (I) 0 ;:)In o CIS In ~ "0 c: ~o -:::2 CIl <'II j5c: [j~ it) if ii "5 o (ij o Q) n '5 c: c: CIS o >. <'II (jj "0 Gl 01 nI Qi > <II III c: .g '5 c o o i ~ :;) ii I/) CD > o III CIl . '5 z 00079 Cumulative Plus Prolect - Scenario 2 The year 2002 cumulative plus project traffic volumes for Scenario 2 illustrated in Figure 8 were analyzed to determine potential future operating conditions and traffic impacts with the addition of proJect~enerated traffic. The results of this analysis are summarized in Table 6. Using the previously described significance criteria of the City, it is determined that Scenario 1 would have a significant Impact at the following two Intersections: · 20th Street and Wilshire Boulevard (both peak hours) · 20th Street and Santa Monica Boulevard (PM peak hour) As previously Indicated, both intersections are projected to operate at LOS F under cumulative base conditions. f COMPARISON OF IMPACTS As described, the second step in the analysis was to compare the relatIVe impacts of the two scenarios. The results in Tables 5 and 6 were used to conduct thiS comparison. At the intersection of 20th Street and Wilshire Boulevard, the results indicate that the project causes an increase in the vIe ratio of 0.006 under both scenarios. Therefore, the change in use does not have a significant impact at this location. Although the proposed project is expected to have a significant Impact at the Intersection of 20th Street and Wilshire Boulevard under both . scenanos, thIs impact was not identified In the prevIous analysis and was not, therefore, included as one of the locations which required mitigation in the origmal condition of approval Because the change in use from general office to general/medical office does not aggravate this condition, the change in use does not have a Significant Impact Therefore, no mitigation measures are required for thIs location At the intersection of 20th Street and Santa MOnica Boulevard, the increase in VIe ratio between cumulative base and cumulative plus Scenario 1 conditions IS 0.029 at LOS F, while the VlC ratio increase between cumulative base and cumulative plus Scenario 2 conditions is 0.040. This results in an increase in vie of 0011, an increment that would be deemed to produce a 29 ~ aoose " C\I o a: <C Z LU U (j)(/) en(/} >-~ ...J...J <a. ZLU <> W- 01- -:5 >:::> ffi:: U)(/}~ LUtLU ...JOe lD...JZ <UJ< I->LU LU(j) ...J< ZlD OLU -> 1-- 01- LLJ< (j)...J cr:::> LU::!: 1-::> ~o C\l o o C\l cr: <( w >- f ! > E' IIltj !:l III :=0. &S en O)u ~> U 5 .5 Cl) >. (/) (II l'll- Cl) CIl tiC .5.5 CIJ NO 0....1 -.:: III mQ ~> (/) :J 0:::2' Q) II) 2;<: s~ :J...., E 1;- :J_ 0c3 ~Q al> Q) .2: 12~ :J<: 5 ~ u...., >- III (j) Cl o 0 zz - co 88 00 '<tM 0- oc 100 0- coo 0_ 0110 ~~ CIJ o ....I uc ~(O./ co8 0"; 10 N ,... (') _M ... :J o I ..>&. .,., <0 III Q) Cl) 0..0. ::E~ <a.. c 2 ~ Ii) ... Cl) g 'E ro > Cl) "'5 o lD oll ~ a>g ~:: W (II 5E ~~ Ii) Cl) 0 >z to N 88 00 << zz u.u. MO ~c;) u.u. ""0::1 ('II 0 -M - ... .x .,., III III Cl) II) 0.0. ::E::E <a. u ... III > Q) od"'5 ~~ ~ Cl) WE .c (/) 0-= N:1: N Ii) o Cl) z> 00 c;C!; 00 to<c -z Ou. co"t - ,... m'<t 0_ o . M N Uu. co~ OM O)~ 0- ~ . C\i .,., .,., III <II Cl) Cl) 0.0. ::E::E <co.. u ro > ~ :J o lD oll ~ (jj C ~~ (f) III .c- o ffi NW M 30 o 0 ZZ om _ 0 00 00 MOl 00 alO (j)N o ~ com 00 ~O'l M 0 _N alU 01 (') mM ,...01 00 -0 M 0 ...N .,., .,., <II III II) Cl) 0..0. ::E::E <co.. 41> :J C od~ (jj<C Cl) 0 ':::-0 (f) " ... .cO 0'0 NU '<t o 0 ZZ 88 00 --:... - - co Q;l eo - eo o (j) _0 mo 0'1.... NN CQ 00 ...eo o 01 ...0 eo 0'1 eoN NN .x. .,., III (II (]) II) 0..0.. ::E~ <co.. '0 oll ro 1:' a; " ~g :::JlD o III al~ '0 c ~~ is (II i)E - III ow 10 al m "3 (.) (ij (.) ID D 0: c C a:I (.) >- a:I Q) '0 Cl) CIl l'll Q; > III tij C o '0 C o u a1 r! ::J m (/) is 3 lrJ '0 z 00081 significant impact based on the City of Santa MOOlca standards. Therefore, the change in use from general office to general/medical office would have a significant impact at this location. The onginal EIR had also identified an Impact at this location and had this impact be mitigated. ,- , .. ,- 31 ZoI 00082 ,. ~ v. MmGATlON MEASURES As indicated, the analysis indicates that the proposed change would aggravate the projected condition at a level that would be considered significant. The proposed mitigation measure for this location is as follows: 20th Street and Santa Monica Boulevard - Santa Monica Boulevard east of 20th Street should be re-striped to accommodate a total of six lanes, including the addition of an exclusive nght-turn pocket on the westbound Santa Monica Boulevard approach to 20th Street. Because of the potentIal offset resulting from this re~striping. the eXIsting traffic lanes on Santa Monica Boulevard west of 20th Street must be re-striped and shiited southward. The implementation of thiS measure, which was originally identified in the project EIR, was a condition of the approval of this project. The project proponent agreed and paid the City of Santa Monica for this improvement. The results of the analysis of its effectiveness, which is summarized in Table 7, indIcates that the measure would not mitigate the impacts of this project. No additional improvements can be made at this location without the acquisition of additional right-of-way, malor capital construction, or both. Therefore, the change in use at this location would result in an unmltlgatable impact at this locatIon 32 00083 C/J W II: ~ C/J L5 ::E Z (/)0 -~ ~< -.JC) 011(- Z!::: OII(::E w~ O~ >;: e:N W ....Cf.l0 Wu.ji ..JO< IIl...JZ ~WLU '-Gi~ ...Jcn Z::;I O...J -0.. I-W @> C/J- e:}- LU:5 1-::1 Z::E -~ o N o o C\I II: OIl( LU > 'iij ! III ~ 0 8 '0 Z > J ~ "i g 9 II) i 0 II.. .2 'iij Il. u ~ "i ,.... v f 0 C\I ,.... - co V l'I:I :> "5 ~ ~,!. ~,!. 0 .,.... ..!!..!!. ~~ E j ~ (.) N .2 iI (ij 01 . c:: CD G) ..... ~ ~ CIJ 0. 0 1.1.. 1.1.. (,) II.. CD (,) C (,) 0 i ...l II) n; 8 0 M 0 co ~ ~ N CD ~ ~ 01 ~ 0 C') ..... .,.... a; ..... CC ;; co .,.... M In V co C! 01 j 'E ci .,.... ~ ..... 0 .,.... ci ci ..... ci c:: n; 2- 'S N .-. E 0 !I 01 It) 0 .., 01 In 0 ~ -.: ,.... ~ . - C') - CO) @ gj :t 0 l'I:I ..... N ..... c:: G) ~ ~ 9 (,) 0 u.. u. C) u. !Xl (,) 0 0 ! ~ ~N ,.... co 8 ~ m CO) 0 0 N 0 m CO) ..... co !Xl co8 "': M m v " m 0 m 0 ..... ..... .... 0 ... 0 0 .- 0 t ~ .-. '3 >-~ E I'll G) It) C\/ V .,.... 0 co m . . << ~ 81 ,.... CO) (\j M 0 co N <.> ... M .,.... N N N ..lo:: .... "' ~ :t:t ~ ~ ~ :t ~ :: ~ :t l. 0 <Il. 4( c.. 4( c.. oc( c.. 4( Il. J: ~ "2 ell 'E ... l'I:I 1\:1 l'I:I ~ ~ "E ~ "5 'E l'I:I "5 ~ ill 0 l'I:I 0 G) 0 to ~ CD ~ "5 CD c:: g Ill\ l'I:I Ill\ lid 1\:1 ell J 0 C'll .2 ::I U to u i a; c:: a; 0 ~ c ~ oc( '0 'E G) 0 Q) Ul 0 0 ~ 0 ... :i:" ... ! ::t al ;:: :E G) CiS I'Cl CiS :2 CiS ClI en G) ClI :E ~ c: .c: !!l .r:. c: ~ 0 ~ c: r:::. ~ 0: ~ 0: ~ ~8 5~ .- N C\I .- C\l (') ...t It) 33 i ~~ "5~ g u ... G) c: .0 EO: as ~ SPill .::: u E >. - III ~ CD cOO ... G) Q.OI o ~ Z Cl) fa c 1\:1 0 U c: ~ ~ 01'0 U) g .E u u'i &ii E ... - ~ - ~ ~ ... O'G) l6~3 G) 0: z,!.- 0008.i r' APPENDIX A INTERSECTION CONFIGURATIONS ~ 00085 (" Intersection Configurations WITH YEAR 2002 PROJECT EXISTING CUMULATIVE BASE M ITIGA TION (2) 4~ o::'R... ffi to 1 17th St & ( <.> ~ " SAME AS 0 SAME AS Santa Monica BI ~ EXISTING .-/ It to EXISTING > c: " '" r.J> 17th $l (2) CV 4~ <-' 4~ <'", ( ffi 2 20th St & ( ffi ~ ~ SAME AS ~ ~ i: Wilshire BI. E I ii( !t! EXISTING ---../ li( l!1 ---../ j j ) ) -; " 20th 5t 20th St (2) '-- @ 0[ 4!~ (...... ffi 41~ ( ffi .. 3 20th St & ( <.> ~ .. or- " SAME AS u 0 E Santa Monica Bl ~ EXISTING 0 ---../ lit .. ---../ lit ::! c ) !! ~ ~ c y y ~ 20th St 20th 5t (2) 41~ c.... CD 0( 4 20th St & ~ c SAME AS -c:: SAME AS '" Color ado 8: lit 13 EXISTING EXISTING -'" '0 > u ) -..,. 20th 5t Q) Q) ffi 0( ffi <- to '" ( <.; Cloverfleld Bl & c <.> ,r- " 5 ~ c 0 SAME AS 0 ~ Santa MOnica Bl ;IW( ~ ) 11(( ., EXISTING !! ...; C C <II '" <Il 1J) Cloverf teld BI Cloverfleld BI Legend (2) Total :SIgnal pha:se r<J\lm ^s sacl ^ TE S 0008e " APPENDIX B PEAK HOUR INTERSECTION TRAFFIC VOLUMES 00087 -7'19SM. IN MDn May 11 , 1qq:2 1~:49:'3:' F'age 1-1 ------------~~~-~~~~~~----~---------------~-------~------~~--~-~---------------- 1919 SANTA 1"10N I CA BOULEVARD UPDATE EXISTING BASE AM PEA~ HOUR -----~----~--~---~------~--~---~~-------------------------~----~-~--~~------~-~~ Turnlng Movement Report Volume Northbound Southbound EastboLtnd Westbound Total < ype Left Thru Rlght Left Thru RIght Left Thru Rlght Left Thru Rlght Volume #1 17TH STREET ~J SANTA MONICA BL ase 59 :260 31 87 ~"..,. '39 57 6:0 38 -- 636 91 :2:274 -.......... . , jded 0 I) I) I) I) (I 0 {) <) <) 0 (l I) Total 59 :'6(' :'1 87 ~"..,. 7q 57 6:'0 ,r; 33 636 91 :':'74 ...:............ -' , ___'Ci- I -. :'(lTH STREET ~< WILSHIRE BL ~ base 98 :' 11 90 1"'""'" ::63 "'"" :'6 98:' 110 11:' 757 51 3018 ...J...J _'~ Added I) 0 0 0 0 0 (1 (I 0 0 I) 0 (I otal 98 :'11 90 155 "36"3 "'"" 36 98:- 110 11:' 757 51 3018 ...J~_ #3 :'OTH STREET t-J SANTA MONICA BL - ase 68 6:'8 1:'3 9: 500 38 49 637 26 48 748 "" " 3189 ~....... :lded 0 (I 0 I) 0 (\ (I 0 (I (1 (1 I) 0 Total 68 6:'8 123 9:' 500 :'8 49 637 :'6 48 748 "".... :'189 , 4 21)TH STREET ~o( COLORADO BL coase " 606 65 :'8 485 ....,- ..,." 504 55 :'1 359 19 ~~1)9 ~ ~-' -'~ Added I) 0 0 0 0 0 I) I) 0 0 0 0 (I otal " 606 65 :8 485 ,,~ -" 504 55 31 359 19 :209 ~ ~-' ~,~ #5 CLO'v'ERFIELD BL ~< SANTA MONICA BL r~ase 4:20 0 183 0 0 0 I) 707 329 141 874 0 ~654 i dded 0 0 0 0 0 (I (I 0 0 0 0 (I 0 I T at a 1 4:'0 I) 183 0 0 I) I) 707 J~9 141 874 (I :'654 TraffiX System Version 6.3 (c) 1991 DA Licensed to Val<u ASSOCiates { . t 00088 ';l19SM.IrJ Mon May 1 1 , 1992 16:58:42 Page 1-1 --------~---~------------------------------~-~--------~----------------------~-- 1919 SANTA MONICA BOULEVAF..D UPDATE EXISTING BASE PM F'EA~~ HOUR -~-------------------------~--~-~----------~----------~----------------------~~- TLlrnl ng Movement Report Volume Northbound SouthboLlnd Eastbound Westbound Total Ipe Left Thru RIght Left Thru RIght Left Thru RIght Left Thru RIght Volume #1 17TH STREET t... SANTA MONICA BL "se c- 262 34 116 ::10 ~7 :'6 992 58 42 808 68 2806 -J :;, jded I) 0 <) 0 I) 0 0 0 \) 0 0 (1 (1 Tot a 1 0;-- 262 ::4 116 310 27 36 992 58 4: 808 68 28(l6 -' ::~ ..... 20TH STREET ~~ WILSHIRE BL - base 67 <......c 140 108 :-59 :'8 37 1019 46 86 800 44 :'069 __~ _.,J ~dded 0 0 0 I) I) 0 0 (l 0 0 0 0 0 ::It a 1 67 -.-,=- 140 108 359 ::::8 :'7 1019 46 86 800 44 ::('69 .J.J...U #3 20TH STREET f... SANTA MONICA BL ;\se ~17 448 95 96 747 110 37 130: 92 78 1:::13 2:1 4756 1ded I) (I 0 I) 0 I) 0 0 0 (I (I (I (> Total :217 448 95 96 747 110 37 1302 92 78 1313 2:1 4756 4- ~OTH STREET t< COLORADO BL case ~6 374 17 17 7=-- 17 38 579 98 60 376 ......- :378 ..J _" ~-' Added (I 0 (I (I I) (I 0 (I 0 0 (I (I (I ::Ita 1 26 374 17 17 7C- 17 38 579 98 60 376 ......~ :378 , -J... -.:> #5 CLOVERFIELD BL &: SANTA MONICA ElL "'~se 350 (I 236 0 I) (I 0 909 ~69 117 95~ I) :833 t jded (I I) (I (I (I I) (I (I (I (I 0 I) (J T at a I 350 (I 236 (J I) I) (I 909 ':.69 117 9<::"...... (I :83:- ...J..:.. TrafflX System VerSIon 6.3 ( C ) 1 991 DA LIcensed to .aku ASSOCIates 00089 !.... 919SM. IN TllE' May 1~, 199~ F': 1 1 : 1 8 Page 1-1 --~------------------------------------~---~-----~--------~~-------~------------ 1919 SANTA MONICA BOULEVARD UPDATE YEAR ~OO: CUMULATIVE BASE PM F'EA~ HOUR --------------------------------------~--------------~--------------------------- TurnIng Movement Repor-t Volume Nor-thboLlnd Southbound E.astboLlnd Westbound Total ype Left Thru RIght Left Thru RIght Left Thrt.l RIght Left Thru RIght Volume #1 17TH STREET ~, SANTA MONICA BL ase 61 ::04 43 1-0= 360 -,...., 4: 1350 67 55 1069 79 3597 .;:o,J -'~ dded 0 (I I) I) I) I) (l (I 0 I) I) l) (I Total 61 ::04 4:: 135 360 3:2 4: 1350 67 o=c 1069 79 :-597 ,J",) .... ~OTH STREET 9. WILSHIRE BL . ~ - tlase 83 378 168 1......c 417 44 43 1401 58 261 1134 51 4163 ~,J Added 0 0 (I (l 0 (I I) (I l) 0 0 I) 0 otal 8~ 378 168 125 417 44 4- 1401 58 261 1134 51 416:: -' -' #, ~OTH STREET ~" SANTA I'lONICA BL -' .ase ~91 c .... e- 111 11: 1029 1:::;3 49 1710 147 91 1659 Z59 6116 ...J"::'...J dded 0 (I 0 (I I) I) 0 (I 0 (I 0 0 0 Tot a I :291 c......c 111 112 10:9 1~- 49 1711) 147 91 1659 :59 6116 ",)~,J -'-' I 4 ~(lTH SrREET tr COLORADO BL dase :'0 470 60 :3 1069 :'1 45 10:0 114 159 995 30 40:'6 Added 0 I) 0 I) I) I) (l t) 0 0 0 0 I) otal 30 470 60 ....- 1069 :1 45 10::0 114 159 995 30 4036 4~ #5 CLOVERFIELD BL & SANTA MONICA BL -:ase 503 0 580 (I (I I) 0 1::89 357 294 1253 I) 4276 'dded (I (I 0 (l 0 0 0 (I 0 0 0 0 I) Total 50:. 0 580 (J 0 <) I) 1~89 357 294 1:53 0 4'.276 TrafflX System Verslon 6.3 (C) 1991 DA LIcensed to Ka~u Assoclates OOO~O I r , , .;;l19SM. IN Tue May 1 ::: , 1992 . )q: 59 : =.~ Page 1-1 ~-----~~-------------~--------------~--------------------------~-~--------~~~~-- 1919 SANTA MONICA 80ULEVARD UF'DATE YEAR 2002 CUMULATIVE BASE AM PEA~ HOUR ---~~-----~~---------~-~~-----------~--------------~~--------------------~------ TurnIng Movement Report \)01 ume Northbound SouthboLlnd Eastbound Westbound Tetal .y'pe Left ThrLI RIght Left Thru RIght Left T h r- LI RIght Left Thr-u RIght Vol..!me #1 17TH STF\EET \0. SANTA MONICA BL - ase t:8 30:2 4:: 101 :::75 45 67 772 44 40 871 106 28-::4 dded (1 0 I) 0 0 (l (I 0 0 0 0 0 (I Total t:a8 ::;0: 4~ 101 375 45 67 772 44 40 871 106 :S::4 -' ..... :OTH STREET t.... WILSHIRE ElL - Base 117 :245 110 18(1 4""'''''' 60 4: 1243 132 161 1030 59 :301 -..... Qdded (I 0 (I I) 0 (I (I (I 0 (I 0 0 (l otal 117 :45 110 180 4""'''''' 60 4:2 1:24:- 132 161 1030 59 :91~11 .::..~ #~ 20TH STREET ~( SANTA MONICA BL -' ase 118 748 143 109 609 50 59 793 48 56 1005 258 :996 dded (I 0 0 (I (J 0 (l 0 (I (I 0 (l I) Tot a 1 118 748 143 109 609 50 59 793 48 56 1005 258 :996 . 4 :20TH STREET ~I COLORADO BL f:lase ...., 74:- 158 34 606 :27 39 10:24 64 50 586 :26 --<:"Q ~ _, _'.J , Added (I (l (I (I (I (I (J (I 0 0 (I 0 (I otal ...... 747- 158 34 606 '27 39 10:24 64 50 586 26 "335:t - #5 CLOVERFIELD BL t... SANTA MONICA BL ase 673 (I :27:2 0 I) I) 0 877 396 433 1184 0 3835 dded (1 (l (I 0 (I I) (J (J (I I) l) 0 (1 Tot al 67-:- 0 ~7~ (I (l (I I) 877 396 433 1184 0 :8::5 Traffix System VerSion 6.3 (c) 1991 DA LIcensed to Kaku ASSOCIates ~- ~ 00091 ~ . 9192t1. It. T~le , :1C\'y 1~. 1 C.'9: 1 ~ : :' -: : 5 6 F,;-,ge 1-1 -------------------------------------------------------------------._----------- 1919 SriNTA MONICA BOULE\,iAHD L'F DATE YEAF\ :(_r:l: CUMULATIVE FLUS GENEFiAL OFFICE AM F'EA. HOU" ---~~-~-------~----------------~~~-----~~-------~--------~~-----~_.~--~-------- Turnlng Mo....ement Repe,r t .' '01 LIme NorthbOtmd SouthboLlnd EastbOL\nd Westbound Total ype Left Thr-u F~l ght Left Thru Rlght Left Thr-u Rlght Left Thru Rlght Vol L.me \ #1 17TH STF\EET ~, SANTA 1'10N I CA ElL else 68 "3(l:: 4:: 101 ::75 4S t.7 7-;1 44 4(1 571 1 (16 =2-=:-4 .. .~ ,dded (, (, 17 1 0 I) (1 17 (; (J -, (I _.~ ~ -' Total 62 3':):: 60 1(: :;75 45 67 7SC> 44 4,:1 57:: 1 (\6 =E71 .... :?OTH STREET ~I WILSHIRE BL , - B.?se 117 :45 110 180 4........., 60 4: 1:4-:: 1::: 161 10::.0 59 38')1 ~.:. .. 4d d ed I) 1 0 I) 8 I) I) (I (I l) 0 0 9 ~ otal 117 :46 110 180 430 to 4: 1~4:' 1-" 161 10::0 59 :;21(' -'- -n- :2(1TH STREET t.. SANTA MONICA BL -' lase 118 748 14:: 109 609 50 59 ""79-:" 48 56 1005 :58 -::996 ,dded 4:2 0 (I " 6 ,..., u 0 0 I) :21 (I 7....... - - Total 16(1 748 14:- 111 615 =.-, 59 79:- 48 56 1026 :58 4069 ,J_ . 4 :OTH STF..EET t... COLORADO BL Base ..... 74:: 158 ::'4 606 :7 -:.8 HC4 64 50 586 :26 :::'59 ~ Added I) .....- (I " ..... (I (J 0 0 l) (I 18 45 --' - - otal " 766 158 36 608 :7 :'9 10:4 64 50 586 44 ::404 - #5 CLOVERFIELD BL t~ SANTA MONICA BL r l.?se 673 I) :27: I) I) (I I) 8"7, -::96 4--r 1184 I) '38'35 , , ' , ,dded 1:2 0 e, 0 (I (I 0 1 1 0 8 (I .......... -' T at a 1 625 (l :7:!. I) [) (, n 878 -::177 4----; 119: I) -'011::"-, _.......~ ~ l , t . 00092 r r ' t.;raffl~-f System Ver-SIor; 6.3 (c) 1991 DA LIcensed to haku ASSOCIates 1919SM.IN Tue, May 1:, 1Qo: 1:::4:45 F'a'~e 1-1 1919 SANTA MONICA BOULEVARD UFDATE YEAR :00: CUMULATIVE FLUS GENERAL OFFICE PM F'E A. HOUR TLlrn 1 ng Movement Report "'01 urne Northbound Southbound EastboLlnd Westbound Totel Type Left Thru Rlght Left ThrLl Right Left Thrd R:ght Left Thru n.lght Velu",e .:1 17TH STREET t SAt H A MONICA BL Base 61 :-1)4 4~ 1~1::" "360 ~,.., 4: 1'350 c7 !::"<:;" lOb=? 79 ::59~ -' _'...J -'~ .J~' '\dded {) I) ~ 1 I) (I 0 - 0 0 13 (I ..-.-., ~, -' - otal 61 :: I=' 4 46 1::6 ::60 4: 1~=~ tJ ~.". 1(>8~ ~Q ::617 -'- _'...J _, .J--! I , #: :21)TH STREET .~I WILSHII;E BL {ase 8~ "378 168 1~C= 417 44 4-:: 14':'1 1::"" :61 11 ::4 51 416:- ::' ~.J ..JC' ~dded 0 7 I) (J ~. (> 0 (; (; I) I) I) S - Total 83 "385 168 1 ,..,c.- 419 44 43 1401 58 261 11 ::4 51 417: _.J t~ :OTH STREET ~~ SANTA MONICA BL -' Base :91 1::".....1::" 111 11:: 10:29 13:: 49 1710 147 91 1659 ~59 6116 .J_.J -':idded 8 (1 0 18 48 13 I) 0 (I I) 4 <) 91 ~ otal ~9Q 1::"""'':- 111 1:'0 1077 146 49 1710 147 91 1~6:: ....1::"'"' 6~('7 _1__...J _",)7 #4 :OTH STREET ~, COLORADO BL ::ase :'0 470 61:) 1069 ....,. 45 1 {y::) 114 159 995 ::0 4,Y"'L -- _.L - - '-' ~dded I' 5 () 15 19 0 I) 0 0 0 0 : 4:: .' Total 3(l 475 60 '38 1088 ~1 45 1020 114 159 995 3: 4078 t5 CLOVERFIELD BL ~.J SANTA MONICA BL Base 503 () 580 I) 0 I) (1 1289 ~1::"7 ~94 04..-,.=--:;:- C 4~7t _.JI .L_....J.... l\dded (1 0 (J (. (I (J 7 1 . (~ ...., (l ....-, . J. - rotal S()5 5S(1 (1 I) (1 I) 1~96 -:-tS :294 "~I::"~ c) .d~q8 .i._...J...J 00093 -~0l-:~~'.~. ______ ~~!_~~~_~ ~ ~__~~=~ ~ ~i~~!_~~~_________________~C::2=_~=~__~__ 1<:;01':; SA~JTA MmHCA BOULE'.'AF\O UFCATE YE~F, :(y',::: CUMULAT I VE F'LUS GEN ~, MED OFF I CE AM PEA. HOUR TurnIng Movement ~eport volume Type Northbound Southbound Eastbound W~stbQund Total LE~t Thru RIght Left Thru Rlght Left Thru RIght Left Thru RIght Volume ~1 17TH ST;:;EET ~ Base -~dded -otal ~2 ~OTH I ~ase ridded Tot a 1 r:: ~OTH E~ase "ldded -otal #4 20TH 3ase ridded Total ~ ,:) :;f):2 .) (I 66 :C'2 STF\EET ~" 11 7 245 o 1 11 7 :46 SThEET ~. 118 748 41 I) 159 748 SANTA 4-':: 16 59 ~1ON I CA EeL 1(11 -'::75 1 I) 1 C':: 375 WILSHIRE EeL 1 1 () 1 E (I I) <) 11 (, 1 8i~.' SANTA MONICA 14-':: 1('9 (l 4 14:' 11:' STREET ~ COLORADO EeL ~ 743 158 :'4 O~: 0 3 .... 765 158 *5 CLOVEF\cIELD BL t SANTA Base 673 0 ::7~ "ldded 1~ 0 (I iotal 685 0 ::7: : Trafflx System Verslon 6.3 1 4~..... -- 8 4-:::0 EeL 609 10 619 :'7 606 4 610 MONICA EeL !) 0 (I (l o I) dE::" ...J I) 45 6(1 (1 60 5(1 C"- ..J _, ::7 o 27 (C) 1991 DA 67 (1 67 7T~ 16 788 4: 1::4:- o 0 4: 1~4:- 59 o 59 79:- o 79-::' :-9 1 CC4 (J (1 -'::9 lCC4 I) o o 877 1 878 o o o 1:::~ (1 1:::: -'::96 399 44 (I 44 4(1 (. 40 874 ~ -' 1(16 I) 106 :834 """:L _"...) :'870 59 (J 59 :::801 9 3810 871 161 10::0 (I 0 161 1030 48 (I 48 56 1 (105 o :'0 56 10:5 ~5e (I .....E::",-, ...::.....J'~ 3996 78 4074 26 ~~r59 64 o 64 50 (1 50 586 o 586 17 4""': 46 3405 "7 4"7- 1184 o 8 4-- 119.2 I) ::8'35 ,-, .' ::4 365'7 (I 00094 LIcensed to ta~u Assoclates .i. - ~ .....: r . , ~i 01- ,. 'i~ "y 1 __ . 1 '-- ':- ~ 1 ~ ;...,);- ~ ..,...., F' C< ,~ e 1919 ~qNTA MONICA 80ULEVA~D UP2A~E YEA~ :00: CUMULATIVE FLUS GEN ~ MED 2FFICE F'M F'EA~ HOIJR Ti..lr- n 1 ng Movement Report .olume NQr-thbound Southbound Ea:=tbOL'nd Westbound Total Type ~Eft Th r- Ll Flght Left ThrLl Rlght Left Thru Rlgr't Left Th.-u Rlght Volume 1 17TH STREET </ SANTA MONICA BL_ - f3ase ,:>1 3(14 4'3 1-C:- '360 4: 1'350 67 l::"l::" 1069 79 ::5q7 _...1 -'- ,,,/'...1 '\d d ed (.' (J 6 1 (l (J (- 6 n 0 16 0 29 ot.?1 .::1 :-('4 49 1'36 '360 -., 4: 1-:::56 6-' l::"C' 1085 79 -::6:6 -'- ...J....J #~ :OTt-l STREET ~ WILSHIRE BL 'y lase 83 378 168 1.....1::" 417 44 4- 1401 5E :61 11 '34 51 416-:: _...J -' .dded 0 9 <) (; ~ I) 0 (J ( (I (I <) 1: -' Total 8:- '387 168 1 .....c: 4:0 44 43 1401 58 :61 1134 51 4175 _J - :CTH STREET ~., SANTA Not..: I CA BL '-' Base :Ql e:' .-, e- 111 11: 1CCQ 1-- 49 1710 147 91 1659 .-.C',-, 6116 _1.......,-, _'_I _...J7 .l4dded 15 (1 () .....- 61 16 (l (l c. 0 7 (I 1......-, -- -' -- - otal '3(J6 c:- -'1::" 111 1-'::: 1(190 149 49 1710 147 91 1666 :59 6'"")-0 ...J_...J -',,", _ -'-' #4 :OTH STF.EET </ COLOF-ADO BL ~a~e -:(1 470 bel .-,- 1069 :1 45 10:0 11~ 159 995 ::() 4('::6 -~, \dded <) 0 (l 20 ::4 (; (J (I (, (I 0 L 58 '..J I..J Total ::C' 478 60 4~ 109:- :1 45 1(':0 114 159 995 36 4094 -' ! ; t5 CLOVERFIELD ; BL t-J' SANTA MONICA BL Pase 5(,:: I) 580 0 I) f) I) 1:89 -<:7 :94 1:25::: (I 4::76 ~'...J . Added 4 I) 0 I) 0 0 I) 9 14 I) 3 0 :-0 , - I otaI 507 {) 580 0 I) (J () 1~98 ::71 294 1::56 (1 4306 DOD9e; (Traffix System Ver-Slon 6.3 I (c) 1991 DA Llcensed to ~aku Assoclates APPENDIX C PEAK HOUR LEVEL OF SERVICE WORKSHEETS f ~ '- t- l l "" 00090 J. .y19SM. 1"'1 Mon May 11, 199~ 16:49:39 Page 3-1 1919 SANTA MONICA BOULEVARD UPDATE EXISTING BASE AM F'EAk HOUR Level Of ServIce ComputatIon Report 1985 HCM OperatIons Method ****************~************ * Base Volume Alternatlve * ^.********************************~*~******************************************* IntersectIon #1 17TH STREET & SANTA MONICA BL t****************************************************************************** I Icle (see): 60 CrItIcal Vol./Cap. <X): 0.647 Loss Tlrre (see): C) Average Delay (sec/veh): 1:'.4 f""1tlmal Cycle: 65 Level Of ServIce: B , t*****************************************************************~***********. Approach: North Bound South Bound East Bound West Bound Movement: L T R L T R L T R L T R -------~---:-~~------------: :---------------: ~---~--------~--: :---~--------~~-: _:mtrol: Left Phase Left F'hase Left Phase Left Phase RIghts: Include Ioclllde Include lncI ude , In. Green: (I C) 0 0 (J I) 0 0 I) 0 0 l) ;!.nes: 1 0 0 1 <) 1 0 0 1 0 1 0 1 1 0 1 (I 1 1 0 ----~-------:-~-------------: :------~---~-~--: :---------------~ :-------------~-: : :llLlme ~Qdule: J.nltlal Vol: Growth AdJ: : :E Ad J : _F Ad J : User Ad;: '-1 nal Vol.: 59 1 . (ll) 1.00 1.00 1.06 63 :260 1.00 1. 00 1.00 1.06 276 31 1.00 1.00 1.00 1. 06 33 87 ~............. -::'9 57 620 -::'8 _I _"It 636 91 _4___- 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1. 00 1.00 1.00 1. 00 1.00 1.00 1.00 1.00 1.00 1.05 1.00 1.00 1.05 1.00 1. 06 1. 06 1. 06 1. 06 1.06 1. 06 1.06 1.06 1. 06 92 34~ 41 60 690 40 35 708 96 ----------~~---~-----------: :-~-----~-------~ :--~----------~-: :---------------: rc.~tLlrat 1 an Flow Modlll e: :It/L~ne: 1800 1800 1800 1800 18(1c) 1800 1800 1800 1800 1800 1800 180(1 hdJustment: 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 Lanes: 1 . 00 ().89 O. 11 1.00 0.89 O. 11 1.00 1. 89 o. 11 1.00 1. 76 O.~4 f Inal c-.... . 1404 1:54 150 1404 lr""l~- 151 1404 ::653 155 1404 :2471 -::37 I .......;: =-. . -'-'- ~ --------.....--.....: -....-.......-......---------- : I . I I ! I I---~~~---------t f----~----------I I---~-----------. rapaCIty h~~lYSIS Module: loI/Sat: 0.04 O.~:2 ('.:?: 0.07 0.::7 0.:7 Lrlt Mo\e~: *+** ,Green/C1cle: 0.C7 0.-::8 (1.38 0.11 (l.4: (1.4:2 i olume/:a,c= 0.65 0.58 0.58 0.58 0.65 0.65 i \ --------~-~:------~------~-: :---------------: :-----~---------: :------------~-~: O.::t O.~6 0.0: 0.:9 (1. ~9 ***. 0.04 **** 0.07 0.65 **** 0.46 0.46 0.56 0.04 0.44 0.56 ('.65 (1.44 0.56 0.65 r-evel 0": ServIce Module: i elay/Veh: -:;0.-::' 12.8 ::1.1 :2:'.3 1:2.6 :2:'.9 30.7 9.4 15.7 29."3 11.0 16.4 Delay Ad): 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 .^dJDel/Veh: 30.3 12.8 21.1 23.3 1:.6 :2:'.9 30.7 9.4 15.7 :29.3 11.0 16.4 ueue: 1 4 1 ..... 5 1 1 8 1 1 9 ~ '******************************************************************************** 00097 , Trafflx System VersIon 6.3 f.c:: ,- ( c ) 1991 DA LIcensed to Kaku Assoclates L919SM. IN Mon May 11, 199~ 16:49:40 Page 4-1 1919 SANTA MONICA BOULEVARD UPDATE EXISTING BASE AM PEA. HOUR Level Of ServIce ComputatIon Report 1985 HeM OperatIons Method ***************************** * Base Volume AlternatIve * A********~+**************~****************~*~*****************************~***** Intersectl~n #~ :OTH STREET ~ WILSHIRE BL ********~.********************************************************************* ycle (see': 60 CrItIcal Vol./Cap. <X): 0.912 Loss TIme (sec): 0 Average Delay (sec/veh): ~~.5 ~ptImal Cycle: 180 Level Of ServIce: C *****.*******~***********************************************************~***** Approach: North Bound South Bound East Bound West Bound Movement: L T R L T R L T R L T R -----------:-------~----~~-: :~--------------: :-~-------~-----: ~---------------~ .....entrol: Left Phase Left Phase Left Phase Left Phase RIghts: Incl ude Include Include Incl Lide 1 n. Green: 0 0 I) 0 I) 0 0 0 0 I) 0 0 ~ anes: 1 0 1 0 1 1 0 (1 1 0 1 0 1 1 0 1 (I 1 1 0 -------~----:---------------: :---------------: :---------------: :---~~----------: elume Mod Jl e: inItlal Vol: 98 :11 90 II:"I::" 36:' 1:"..... 36 983 110 11: 757 51 ...J-J ...J_ Growth Ad]: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1. 00 1.00 1.00 1 . 00 CE AdJ: 1 . 00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1. 00 1.00 1. 00 1.00 LF Ad] : 1 . 00 1.00 1.00 1.00 1.00 1.00 1.00 1.05 1. 00 1. 00 1.05 1.00 User AdJ: 1. 07 1.07 1. 07 1.07 1.07 1.07 1. 07 1. 07 1. 07 1. 07 1.07 1.07 [ InCl.I Vol.: 105 ~26 96 166 388 56 39 1104 118 120 850 55 ~ -----------:--------------- ~ ;---------------: :-------------~-~ :---------------: C:aturatlon Flow ModLlle: at/Lane: 18(l0 1800 1800 1800 1800 1800 1800 1800 18(10 1800 1800 1800 MdJLlstment: 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 ('.78 Lan e 5 : 1 . (H) 1.00 1.00 1.00 0.87 0.13 1.0(' 1. 81 0.19 1.00 1.88 0.1:: lncal Sat. : 1404 1404 1404 1404 1::8 176 1404 ~5:-8 270 1404 :6::9 169 . ~----------~~--------------: :---~-------~---: :~-----~~~------: :------~--------~ r-apaclt~ ~-alysls Module: I Ql/S~t: 0.07 0.16 0.07 0.1~ O.~= 0.3= 0.03 0.44 0.44 0.09 0.:': 0.~~ 'Cr 1 t Moves: ***iI- ***..,. **** **** ~reen/Cycle: 0.08 0.:5 0.:5 0.18 0.35 0.:'5 0.04 0.48 0.48 0.09 0.5:' 0.5:' l olLlme/Ca~: 0.91 0.65 0.:8 0.65 0.91 0.91 0.61 0.91 0.91 0.91 0.61 0.61 -----------:~---~----------: ~---------------~ :----------~~---: ~-----------~---: ['evel Of SerVIce Module: elay/Veh: 61.1 18.6 14.2 21.5 31.~ 7:'.2 3~.4 18.7 48.5 57.6 8.~ 15.6 Delay AdJ: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 '^dJDel/Ve~: 61.1 18.6 14.~ :1.5 31.~ 7~.2 ~~.4 18.7 48.5 57.6 8.2 15.6 , ueue: - 4 1 3 8 2 1 18 3 4 9 1 *********+********************************************************************** ~- 00098 TrafflX System VerSIon 6.3 <c) 1991 DA Llcensed to Kaku Assoclates 1'7'19SM.IN Mon May 11, 199: 17::'9::9 PClge ::;-1 1919 SANTA MONICA BOULEVARD UPDATE EXISTING BASE AM PEAt-=- HOUR Level Of Servlce Computation Report 1985 HeM Oper~tlons Method ***************************** * Base Volume Alternatlve * ~**~***.*.~******~*****************~****~*************************************** Intersect~on #3 :OTH STREET ~ SANTA MONICA BL t*******+********************************************************************** l/cle (se.::): 60 CrltIcal Vol./Cap. ex): 0.734 Loss Tlme (sec): <) Average Del ay (sec/veh): 1::.9 rJtlmal CYCle: 86 Level Of ServIce: B ; ~********~********************************************************************* Approach: North Bound South Bound East Bound West Bound t1ovement: L T R L T R L T R L T R f .----------:---~-~-~~------~ :~--------~-----} :--~------------: :------------~--~ Luntrol: Left Phase Left Phase Left Phase Left Phase Rlghts: Include Include Include InclLLde I ,n. Gree-,: 0 0 l) 0 (I 0 l) 0 0 I) 0 (; i ~nes: 1 0 1 1 0 1 0 1 1 0 1 0 1 1 0 1 0 1 1 0 ---------~--:~~-------------: t---------------: :-------~-------: :------------~--: I )lurne Mo:jule: Inltlal Vol: 68 638 1.....~ 9~ 500 38 49 637 :6 48 748 ............ --' ---- Growth AdJ: 1.00 1 . 00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1. 00 1. 00 1.00 I :E AdJ: 1.00 1.00 1.00 1.00 1 . (H) 1.00 1. 00 1.00 1. 00 1.00 1.00 1.00 ;.~F AdJ: 1.00 1.05 1.00 1. 00 1.05 1.00 1.00 1. 05 1. 00 1.00 1.05 1.00 User AdJ: 1.04 1.04 1. 04 1. 04 1.04 1. 04 1.04 1.04 1. 04 1.04 1.04 1. 04 lnal Vo 1 a : 71 697 128 96 546 40 51 696 27 50 817 231 -----------:~---~-~--------: :-------~-------: :--~------------: :---------------: C~turatlo-' Flow Module: ,t/Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 180f) HdJustmei1~: O.8~ 0.8~ 0.8: (J.8~ 0.8: 0.8::::' 0.8: 0.82 0.8: 0.8: 0.8::::' 0.8:' Lan e s : 1.0(l 1.69 0.31 1.00 1. 87 0.1:: 1 . 00 1. 9:: 0.07 1.00 1. 56 0.44 Lnal Sat. : 1476 24C74 458 1476 2753 199 1476 2842 11 (I 1476 :301 651 -----~-----~-----------~~--~ I I I IF. I---~------~--~-I 1---------------. ~--~-~--~-----~-1 -;paclty ~nalysls Module: ; Jl/Sat: 0.0'50.::::'8 (\.:'8 0.06 ('.:'0 0.:'0 0.(")': 0.:4 0.:'4 ().(\:. (1.:'5 0.:'5 ~t-l t Mo\. E:: **** **** **** **** freen/Cycle: 0.09 0.38 0.:'8 0.09 0.38 0.38 0.05 0.47 0.47 0.06 0.48 0.48 ~lume/C~=: 0.5: 0.7: 0.7~ 0.7:: 0.5: O.5~ 0.7: 0.5~ 0.5: 0.5: 0.73 O.7~ L___________:~~_________~_~_: :________~__~_~~: :______~______~_: :_______~___~___; r ~vel Of SerVlce Module: L?lay/Ver-;: ::'.<) 14.4 2~.1 33.1 11.6 16.~ 4:.6 9.0 15.8 ~5.(' 11.::: 15.4 Delay Ad]: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ^-dJDel/Ve-d :-:::.0 14.4 22.1 3::.1 11.6 16.:' 4:2.6 9.0 15.8 :25.01t.::: 15.4 _Leue: 1 10 2 2 7 1 1 8 0 1 11 4 *************************************************~****************************** 00093 TrafflX System Version 6.3 ( C ) 1991 DA Llcensed to Kaku ASSOCiates J.919SM. IN Man May 11, 199~ 16:49:4: 1919 SANTA MONICA BOULEVARD UPDATE EXISTING BASE AM F'EA~, HQUFi. F'.3ge 6-1 Level Of ServIce ComputatIon Report 1985 HCM OperatIons Method ****************~************ * Base Volume AlternatIve * ~**************************************************.**************************** IntersectIon #4 :OTH STREET ~ COLORADO BL **********~******************************************************************** fcIe (sec): 60 CrItIcal Vol./Cap. (X): 0.494 Loss TIme (sec): 0 Average Delay (sec/veh): 9.~ "~jtlmal Cycle: 45 Level Of ServIce: B r ~*********************************************************~******************** ~pproach: North Bound South Bound East Bound West Bound ~ovement: L T R L T R L T R L T R -----------:~--------------: :---------------: ~---------------: :----~----~-----: \"'ontrol: Left Phase Left Phase Left Phase Left Phase rRIghts: Include Include Include Include In. Green: (I 0 0 0 0 0 (I 0 I) I) 0 0 3.nes: 1 0 1 1 I) 1 0 1 1 (I 1 0 2 I) 1 1 0 1 1 0 ---------~--:----~---~------: :---------------~ :-----~-~-------~ :~~---~---------: 01 ume Modul e: lmtlal Vol: Growth Ad J : , CE Ad J : '..i...F Ad J : User AdJ: '-lnal Vol.: ... 606 1 . 00 1 . 00 1.05 1. 16 738 1.00 1.00 1 . 1)0 1. 16 ... - ~ -----------:--------~------: :---------------: :~--------------: :--------------- faturatlon Flow Module: at/Lane: 1800 1800 HdJustment: 0.88 v.8S Lanes: 1.00 1.81 Inal Sat.: 1584 ~874 65 1.00 1.00 1.00 1. 16 75 1800 0.88 (I. 19 ~94 :::8 1.00 1.00 1.00 1. 16 485 1.00 1.00 1.05 1. 16 591 1.00 1.00 1.00 1. 16 1800 0.88 0.09 137 ...- ,-.. -::-... -'':'' 504 1.00 1.00 1.05 1. 16 614 ee ,J,J 1.00 1.00 1. 00 1. 16 64 1800 0.88 1.00 1584 31 359 1.00 1.00 1. 05 1. 16 437 19 1.00 1.00 1.00 1. 16 2= 1800 0.88 0.1(; , , . ----------~:---------~--~--: :---------------: :~-----~--------: :--------------~: 1"'...... ...J_ -r., -'- 1800 0.88 1.00 1584 1800 0.88 1. 91 3031 1 . 00 1.00 1.00 1. 16 27 37 1.00 1.00 1.00 1. 16 36 1800 0.88 1.00 1584 1800 0.88 1.90 :'016 r-apaclty hilalysls MO,jLd e: wl/S.=.t: I). /~)() (J.~6 0.26 O.O~ O. 19 O. 19 (i.O~ 0. 19 0.04 0.0:2 (1... 14 O. 14 Crlt Move:: *'-Jot** **** **** **** .f;reen /Cyc 1 e: (1. 0(1 (, t:""r'1I (l. 5~ 0.04 0.56 (>.56 0.06 0.::9 0.::'9 0.05 (1.38 0.38 _ II ..J~ i ()l ume/Cap: <).. :;5 0.49 0.49 0.49 (\ ~c 0.35 0.38 0.49 O. 10 0.49 0.38 O.~8 I . _....J 180(1 0.88 1.0(> 1584 1800 0.88 ::.00 3168 . ---------~-:~--------------: ~---------------: :---------------~ ~---------------: evel Of ServIce Module: elay/Veh: 33.0 7.4 9.~ ::6.~ 5.7 6.8 ~2.1 10.8 8.9 ~5.6 10.6 12.6 Delay AdJ: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ^dJDel/Veh: 33.0 7.4 9.2 ~6.~ 5.7 6.8 2~.1 10.8 8.9 ~5.6 10.6 12.6 ueue: (I 7 1 1 4 II 1 6 1 1 4 (I ******************************************************************************** TrafflX System VerSIon 6.3 (c ) 1991 DA ~~ OOlOe Llcensed to Kaku AssOcIates :~':.~.I~.... 1hu :'_ r 4, lc:.'~= 1'-': 11: ~'c r -=:.,~ E- 1 - 1 1919 SANTA ~ONICA BOULEVARD UPDATE EXISTING BASE P-M F'EAt HOllR Lev~l Of eervlce ComputatIon ~Eport 1985 HeM OperBtlons Method ***~~************~***~******* * Base Volume Alternatlve ~ - ~**********.******************************************************************+ ltersectlon #5 CLOVERFIELD BL ~ SANTA MONICA 8L **************~******************~********************************~************* rycle (Ee=:: 6() Ct-ltlcal \)ol./Cap. (X): 0.6:21 :lSS Tline (;::.ec): 0 Aver...ge Delay (sec!veh): 8.:' uptlmal C.cle: 60 level Of Servlce: B **~******.***~*****~*************~**~************************************~*****+ , .Jproach: North Bound South Bound East BOt.lnd West BOLlf"'ld ; :Jvement: L T R L T R L T R L T R ---~--------:-----~---------: :---------------: ~------~------~-~ :---------------: --:mtrol : Left Phase LEft Phase left Phase Left Phase 19hts: Include Include Include Include MIn. Gre-e-: 0 I) 0 0 0 (l 0 (J I) (l I) (, I CInes: 1 (, 11 (l 1 (l i) 0 (I (: l) 0 1 1 0 1 0 ..., I) (I .. - ----~~---~-:~--------------~ :----------~--~-~ :--------~------: :-----~---------: l..'oll,me Mc~ule: nltlal Vel: 4::'0 I) lO~ 0 0 0 707 ]~9 141 874 ,-, w_ I_ row<l:.h Ad:: 1.00 1 . (10 1. 00 1 . 0(1 1 . (H) 1.00 1.00 1.00 1.00 1. (10 1.00 1.00 peE AdJ: 1 . (1(1 1 . 0(1 1.0(1 1 . .)(~ 1.00 1.00 1 . 00 1.00 1.00 1. C'O 1.00 1.0() ,"'LF Ad] : 1.05 1.00 1.05 1 . 00 1. on 1.00 1 . 00 1.05 1 . 0(1 1 . (10 1.05 1.00 ser AdJ: 1. L~ 1. 1~ L 1~ 1. 1:2 1. 1: 1. 1: 1. 1~ 1. 1: 1. 1: 1 1: 1. 1: 1. 1: .. , r-lnal Va 1 . : 494 (I :15 " (1 0 (l 831 368 158 10:8 0 :---------~~:-----~---------: :--------~------: :---------------: ~---------------: J ~~turCltlo- Flow Module: Sat IL~r'e: 1 '3('(' 1800 18r)(> 10,-",-, 15')(' 18(10 18(1(' 1800 1 90(' 1 8 (If) 1800 1S0!) w _ _ jJllstmen'":: 1).89 i).89 0.89 ('.89 0.89 ('. 8'7 0.8Q 0.89 0.89 (1 89 O. 89 0.89 ~nes: ...., ('9 f:'.OO O. 91 (j I CI(~ ,-, . (1(1 O. (I() O. (le 1. -:9 0.61 1 (1(1 ~ 00 I). OC' -. - . -. Fl ~ ~ 1 c-..... : ::::'47 0 1459 r"l (1 (, 0 2~:[) 98'1- 16'):' :':')4 I) _'C'-'- . , , ------------.-----~---------, , , , I~-~------------I ,---------------1 \....apc.: l: " -~i21 Y::l s Mcdul e: \,1.:;1/52"':. : r r 1 t Mo, E =: : ~ II 15 (:.. (1(1 (I II 15 (I I; l: I:' ~reen;Cic:e: 0.:4 0.00 0.~4 .~.alume!C~=: (~at= 0.00 O.~: ; --~----~---:--~------------: (, II r)~~l ~). \)'..' l= . " c' . ~ -\- - , {) '" (J(' {). ~...,. ~7 , 1': (\ ~~ , - '[- " . I - _' i I - , . -'- . *+** -If-**-l'- ".c-". ('. (\(! (1. OC' [ - I I - )":"1 (1. 6(1 (, ::.CI 1 6 ( . . 76 [), 7~: - . - . , " - . 0 ( -1. j (, 0(' r) ;:1(l 0 t: 0 6: { , L"'" 0 4: 1-' (1'=' . . . . . . ....~ . ..*~+ 1 1 t ~ i: 1 I-----------~~~-~ 1---------------. ---------------" L2vel Q~ =e'vlcE Module: Inel~Y!VE~: It.e 0.0 18.1 0.0 0.0 0.0 0.0 6.5 7.: :1.4 ~.O 0.0 elay Ac~: 1.00 1./)0 1.1)(1 1.(':' 1.(H) 1.0eJ 1.00 1.0(\ 1.00 1.00 1.1)(1 1.(1') 'l-Id,JDel/'/e-: 16.80.018.1 (l.l) ('.(, 1).0 ('.C' 6.5 7.~ :1.4 :.0 0.("' DLleLle: 7 f) 3 I) (1 (1 (1 8 4 ~ 5 (\ { *****"**~~*********************4**************~******************************** Traffl~ System VerSIon 6.~ ( c ~ 1991 DA LIcensed to ~a~u Assoclates 00101 (4) DIrect staff to develop approprIate forms of deed restrictions as needed to implement the Program GU1delines. Prepared by: Jeff Mathieu, D1rector of Resource Management Paula Burrier, Manager Houslng and Redevelopment Division Mary Strobel, Deputy City Attorney Barry Rosenbaum, Deputy City Attorney Robert Berry, Senior Administrative Analyst 10 1919SM. ItJ Man May 11, 199: 16~58:56 Page 4-1 1919 SANTA MONICA BOULEVARD UPDATE EXISTING BASE F'M F'EA~ HOUR Level Of ServIce ComputatIon Report 1985 HCM Operatlons Method ***************************** * Base Volume AlternatIve * ~********~********************************************************************** IntersectIon #~ :OTH STREET ~ WILSHIRE BL +****************************************************************************** '-Iele (see): 60 CrItIcal Vo1./Cap. (X): 0.9:23 Loss Tl me (see): (J Average Del ay (sec Iveh) : :3.5 ltlmal Cycle: 180 Level Of Servlce: C f****************************************************************************** Approach: North Bound South Bound East Bound West Bound ~~vement: L T R L T R L T R L T R ---~-------:-------~-------: :---------------: :---------------: :---------------: ,-ontral: RI ghts: In. Green: _ _~nes : Left Phase Include o I) l) 1 0 1 0 1 Left Phase Include I) 0 0 10010 Left Phase Include 01)0 1 0 1 1 0 Left Phase Include o 0 0 1 0 1 1 0 ------------:-------------~-r :-~----~--------: :---------------: :---------------: :Jlume Mod LII e: InltIC~l Vol: 67 -.-,,::: 14(1 108 359 38 37 1019 46 86 800 44 __I-L:::J ,Growth AdJ: 1.00 1 . 00 1 . l)(I 1 . 00 1. 00 1.00 1.00 1.00 1. 00 1.00 1.00 1.(1) ; :E AdJ: 1 . 00 1.00 1.00 1 . 00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 '.'L..F Adj: 1.00 1.00 1 . 00 1.00 1.00 1. 00 1. 00 1.05 1.00 1.00 1. 05 1. 00 User Adj: 1. 17 1. 17 1. 17 1. 17 1. 17 1. 17 1. 17 1. 17 1. 17 1. 17 1. 17 1. 17 " Inal Vol.: 78 381) 164 1=6 420 44 43 1252 54 101 98;:, 51 ~----------:------~--------: :---------------: ~~--------------: :~--------------: r"3tura.tIon Flow Module: 3t/Lc.ne: 1800 1800 180(1 1800 1800 1800 1800 1800 1800 1800 1800 1800 Adjustment: 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 Lanes: 1 . 00 1. (1) 1.00 1.00 0.90 0.10 1.00 1. 9~ 0.08 1.00 1.90 0.10 lnal Sat. : 14\)4 1404 1404 1404 1~7(l I:A 1404 2692 116 1404 :668 140 --~----~---:----~----------~ :--------------~: :----------~----: ~--------~~-----~ apClcIt')' t=.nalysls ModLrle: =,1 /Sc.t: 0.06 (\. ~7 O. 1: 0.09 r).3::: 0.3:' (I. 0:' 0.46 0.46 0.07 0.37 o. ~-. - I Cr- 1 t Move=: **** **** **** **** r-reen/Cycle: 0.06 0.:'1 0.:'1 o. 10 0.:'6 0.36 0.04 0.50 (1.50 0.08 0.54 (",54 .::11 1...\ me f Ca; : (1. 9~ 0.86 0."37 Cl.8t O.9~ (1.9: 0.69 0.9: 0.92 0.9:2. 0.69 (~. 69 ---------~--:~-----~~-~--~--: :----~----------: ~---------------: :~------~~~-----~ evel Of SerVIce Module: _elay/Veh: 7~.9 ~6.0 1~.5 45.8 ~1.8 85.5 38~8 18.4 74.5 65.4 8.8 ~~~7 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 i'djDel/Veh: 7:.9 ~6.0 12.5 45.8 31.8 85.5 38.8 18.4 74.5 65.4 8.8 22.7 ..leLle: :. 7 2 ::; 9 :. 1 20 2 :3 1 (1 1 ******************************************************************************** r ~ 00103 , - , TrafflX System Verslon 6.3 L ( c ) 1991 DA LIcensed to ~aku ASSOCIates l-,l19SM. IN Man M~y 11t 199: 17:41:37 F'~ge :-1 ----------~------------~-------~~-------------~-~---~-----------~-----~--------- 1919 SANTA MONICA BOULEVARD UPDATE EXISTING BASE F'M PEA. HOUR -------------~--~~-------------~-----~-----~-----------------------~---------- Level Of Servlce Computatlon Repo~t 1985 HeM Oper~tlons Method ***************************** * Base Volume Alternatlve * ~*********~********************************************************************* Intersectlon #3 :OTH STREET & SANTA MONICA BL , *****************************************************.************************ ( 'cle (sec): 60 CrItIcal Vol./Cap. (X): 1.098 Loss Tune (sec): 0 Average Delay (sec/veh): 6:.6 rltlmal Cycle: 180 Level Of SerVIce: F " r****************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L T R L T R L T R l T R . -----------:-----------~---: :---------------: :----------~----: :---------------: L,..mt~ol : Left Phase Left Phase Left Phase Left Phase RIghts: Include Include Include InclLlde I n. Green: 0 0 0 0 0 I) 0 0 (> 0 0 0 1 tnes: 1 0 1 1 0 1 0 1 1 0 1 0 1 1 (I 1 0 1 1 0 --~---------~----------~~---: :~~-------------: :---------------: :---------------: l ) 1 LIme Modul e: initIal Vol: :17 448 95 96 747 110 '37 1302 92 78 1:13 221 Growth AdJ: 1.00 1. 00 1.00 1 . 00 1. 00 1.00 1. 00 1.00 1.00 1.00 1.00 1.00 I, :E Adj: 1. 00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 .._F Adj: 1.00 1.05 1.00 1.00 1. 05 1.00 1.00 1.05 1. 00 1.00 1. 05 1.00 User AdJ: 1.08 1. 08 1. 08 1. 08 1.08 1. 08 1 ~ 08 1. 08 1.08 1.08 1.08 1.08 ,. .nal Vol. : 234 508 103 104 847 119 40 1476 99 84 1489 239 . ~ -----------:------~--------: :---------------: :---------------: :--~------------: ~"\turatIon Flow ModLlle: 3.t/Lane: 1800 18(H) 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 I-1djustment: 0.82 o.e: 0.82 0.8: 0.8: 0.82 0.8: 0.8: o.e: 0.8:? o.e: o.e:? Lanes: 1.00 1. 66 O. :'.4 1.00 1. 75 ().. :5 1.00 1. 87 0.1: 1.00 1. 7: (1.:8 .nal Sat. : 1476 :456 496 1476 :2589 363 1476 '2766 186 1476 :544 '::'08 ---~---~---:----------~----~ ~-~~~-----------: :--------------~: :--------------- , "p,:lCIty Ar,alysIs Modul e: JI/Sat: O. 16 0.:1 0.:'1 \:1. CY7 O. -- f) a -- (~. (I: 0.5:- ('. 5~ 0.06 0.59 (t...S9 -' - - - CrIt Move=:: **** **** **** ~~~* Green leye 1 e: n. 14 ().33 (). :;:: O. 11 ('.3() (I. -::;Cl (I. (l~ ('.. 5(J 0.50 0.05 (). 5"3 0..5-:: Jlume/Cc:;p: 1. 10 0.63 0.63 0.6'3 1. 1(1 1. 10 1. 10 1.06 1.06 1.06 1. 10 1. 10 ~-------~-~-:--------------~: :~~----~~~~-----: :---------------: :---------------~ , 2vel Of ServI ce Modul e: ?lay/Veh: 104 14.2 18.1 '24.6 75.1 1:4.: 190 48.3 107.4 124 64.1 9~.6 Delay AdJ: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ~~JDel/Veh: 104 14.2 18.1 ~4.6 75.1 124.: 190 48.3 107.4 124 64.1 95.6 Jeue: 10 7 2 2 29 6 3 41 5 4 50 11 ******************************************************************************** ~ 00104 TrafflX System Verslon 6.3 ( c ) 1991 DA LIcensed to Kaku AssOcIates 1 iI9SM. IrJ Men May 11, 199: 16:58:59 PClge 6-1 1919 SANTA MONICA BOULEVARD UPDATE EXISTING BASE PM PEAt' HOUR Level Of Servlce Computatlon Report 1985 HeM Operations Method ***************************** * Pase Volume Alternatlve * ~~****************************************************************************** IntersectIon #4 :OTH STREET & COLORADO BL ~ ****************************************************************************** C. cle (see): 60 CrItIcal Vol./eap. (Xl: 0.571 Loss Tl me (sec): (J Aver age Del ay (see Iveh) : 10.4 r~tlmal Cycle: 53 Level Of ServIce: B ~ ****************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L T R L T R L T R L T R . -----------:-------~~------: :---------------: :---------------: ~---------------: L..Jntrol: RIghts: tn. Gr eer. : l n es: Left Phase Include o (J 101 1 o o Left Phase Include (J 0 1 0 1 1 o o Left Phase Include l) o o o Left Phase Include I) 0 1 0 1 1 o o 1 ...... ~ o 1 ------------:--~------------: ~---------------~ I I' I I---~-----------. .--~----------~-I ~ ) 1 LIme Nod' ul e : lnltlal Vol: :6 374 17 17 753 17 38 579 98 60 376 ....- ~~, Growth Ad;: 1.00 1 . (10 1.00 1 . 0<) 1. 00 1.00 1.00 1. 00 1.00 1.00 1.00 1.00 F ;E Ad;: 1. 00 1.00 1.00 1.00 1.00 1.00 1.00 1. 00 1.00 1.00 1. 00 1.00 , _F AdJ: 1.00 1.05 1.00 1.00 1.05 1. 00 1. 00 1. 05 1.00 1.00 1.05 1.00 User Ad] : 1. 14 1. 14 1. 14 1. 14 1. 14 1. 14 1. 14 1. 14 1. 14 1. 14 1. 14 1. 14 r na1 Vol. : 30 448 19 19 901 19 43 693 112 68 450 26 - ----------~---------~-----: :-------~-------: l---------------: ~---------------~ f'''l.turatlor Flow ModLlle: ~ \t/Lane: 180r) 1800 1800 180('1 1800 1800 1800 1800 1800 1800 1800 180(\ t-oJJustment: 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 Lanes: 1 . 00 1.9~ ('. 08 1.1)0 1.96 0.04 1.0t) 2.00 1 . (ll) 1.00 1. 89 O. 11 I nal SCl t . : 1584 :'037 131 1584 3101 67 1584 3168 1584 1584 ~994 174 -----------:-~---~~--------~ ~------~--------: :---------------~ :-------------~-~ "pacl tf ~n~lysls Module: ~ Jl/Sat: 0.0: (i. 15 O. 15 0.01 0.:9 (1. :9 0.0:: 0.:: 1).07 0.04 O. 15 O. 15 tnt MQ.....e::;: **"** **** -It-*** **** Gr-een/C,cl e: o. (\3 0.51) 0.50 (1.04 0.51 0.51 0.07 (1. :'8 0.:'8 0.08 0.:'9 0.:'9 , )1 Llme/Ca;:. ; 0.57 0.~9 0.:9 0.29 0.57 0.57 0.:'9 0.57 0.18 0.57 0.-::9 0.39 , --~--------:~~------~~-----: ~----~----------~ :----------~---~: :---~--~---~~~--~ ~vel Of ~ervlce Module: · ~lay/Veh: -:'1.7 6.8 7.5 ::.~ 8.: :1.7 :1.7 11.8 9.5 ~5.~ 10.3 1:.0 Delay AdJ; 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ~1;Del/Veh: 31.7 6.8 7.5 22.~ 8.: 21.7 21.7 11.8 9.5 25.2 10.3 12.0 I leue: 1 4 0 0 9 0 1 8 1 1 5 (I ******************************************************************************** 00105 TrafflX System VerSIon 6.3 (c) 1991 DA Llcensed to Kaku Assoclates ~ ...: 1 C :"'-". : ~ ~ l~u ~~n 4, 100: I" :1~::= F'a';)t? 1-: lQ19 SAN1A MONICA BCULEVARD UPDATE EXISTING BASE PM PEA. I-lOUF. Level Of Service Computation Repcrt 1085 HCM Oper~tlons Method ~***************~**.++******. ~ Base Volume Alternative * ~*.**.+*********************************+********.*************************+**** -ntersectlon #5 CLOVERFIELr BL ~ SANTA MONICA BL ****.++.*~*+*~*****************+***~**.**************.*************************. r:ycle (see): 6\) Crltlc21 Vol.iCap. (X): 1).630 _05S TimE (sEe): 0 Average Delay (sec/veh): 7.6 Jptlffi~l Cycle: 62 Level Of Servlce: B *****************.*********************+***********************************+++** ~pproach: North Bound South Bound East Bound West Bou~d 1oveme;-,t: L T R L T R L T R L T R -----~-----~:--~---~--------~ :------~~-------: :---------------~ ~---~-----------, , , ''':ontrol: "1 ghts: M 1 n . GI- een : LClnes: Left F'heose Left Prl.:.se Left Ph a s e Left F'hClsE InclLlde I nc hIde Include Include (\ (I i) (I (I C' (I 0 0 (~ (. (I -' 1 c' 1 I I) 1 I) 0 (l I) (1 !) I) 1 1 1) 1 1) 2 \) (". .- -----~-~----:-----------~---: ~-----~---------: :---------------: :-----~-~-------: Va 1 LH1H2 t'l,::jule: nltlal V:::-l: ~,~(l <) ~~6 0 (\ (\ (\ 909 ':69 117 OC:I"""\ (-I - _"-- " irowth AdJ: 1 . (J(1 1 . 0(1 1. Or) 1 . 00 1.00 1.00 1.1)0 1 . (lO 1 . 0(1 1.00 1.00 1.00 FeE AdJ: 1. (1(1 1.00 1.00 1.00 1. (\0 1 . (ll) 1. (\0 1.00 1.00 1 . 00 1.00 1 . 00 "1LF AdJ: 1.05 1 . 00 1.05 1.00 1.00 1.00 1.00 1. 05 1 . 00 1.00 1.05 1.00 lser AdJ: 1. ('8 1.08 1 . oe 1.08 1 . 08 1.08 1.08 1.08 1.08 1.08 1 . 08 1.08 t=lnal Vol. : -::'97 0 :68 (I (I (I I) 1031 291 126 1080 f) ~------------:---------------: ' , :------------~--~ .---------______1 I---~-------~---l , I watureltlon Flow Module: Sat/Lane: 18(J(! 18(11) 180C' 12'0(1 180(1 18(1() 1 8(~(J 12('(1 1800 1800 1800 leC;(, ,dJustmert: 0.89 0.89 0.89 0.89 0.89 \~!. 89 O. 89 1).89 0.89 0.89 0.89 I.'. eq an E'S: 1. 79 (1. (1(1 1. :1 1).00 ,) . 00 (~. (..:, (1.00 1- =: ~. O. 44 1 . (ll) ~. (J(' '~II ()(! FlnCll c-+- . :87') 0 19::6 (1 (I C- O :5\~-.() 704 160:2 :':2(14 . '- -=' \,.. . . . ---~---~----~---------------: ------~~------- --~--~-----~--- :-------------~~ :...ep=,,= 1 t T >=,;r,i<l , =1 -:; MD.jU 1 - : \...c! .iC- ... ~ 1 - I 1 4 (1. ( - 11 - ; 1 4 - " - c. .0':) - , " - , 1 (t. .d 1 i - 05 (. ~ 4 - , - ,- _ co - - . " " . I ! . '. - , . 1 - - , - i - . .,. . - . - - - rl 4- M-' ~5 : **** *+** ..,+~* **** '- - , _ rEe" ;: 1 2: I '"' """\ ( I 00 ( - -, (J. - ~ - I ( 00 . (H i ~., l- . - ~b (, . t..b i) . 1 ~ 1 -e 7E - ) , . -- - . . -- l - . . . \ _1. -' . . \"jl UF11e .- -..... I - - i - 0' - 1 I) . t~ {) . (1(J '-j OJ) (, (~I'-~ P (ir:"' . ~ o. 6~ I", 6~ (I C Oi:. '-~i-' ~ - . - - - . . . - . - . \ " . t: - -' . -' . .... -' --~---~----~~~---~---------: --------------- --------------- l--------------- Level Of SEr~lC2 Module~ rJelay/'Jet-,: 17.8 0.0 18.4 0.0 (1.0 0.0 0.(1 5.: 6.6 ~:::.5 1.8 (i.-, 'slay Ad]: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ~dJDel/VEh: 17.8 0.0 18.4 0.0 0.0 0.0 0.0 5.~ 6.6 :23.5 1.8 0.0 Queue: 6 I) 4 () 0 (I I) 9 :. "'" 5 (I ******************************************************************************+ OOIDS TrafflX System VerSIon 6.3 (c) 1991 DA LIcensed to Vaku AssoClates l .,11 oSM. IN Tue May 12, 1992 09:59:59 Pi"ge :::-1 1919 SANTA MONICA BOULEVARD UPDATE YEAR ~OO= CUMULATIVE BASE AM PEA. HOUR Level Of ServIce Computation Report 1985 HeM OperatIons Method ******~********************** ~ * Base Volume Alternative * ~****~*******~~*~*~***************~********************************************* Intersection #1 17TH STREET ~ SANTA MONICA BL iCt**************~*********~****************.************************************ ("ele (see): 60 CrItIcal Vol./Cap. (X): 0.804 Loss TIme (see): 0 Average Delay (sec/veh): 17.5 r-,tImal Cycle: 116 Level Of ServIce: C · t***********~.*.~************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L T R L T R L T R L T R -----------:-~-------------: :-~~---~--~~--~-: :-~~~~----------: :-----------~---: l...:mtrol : RIghts; r : n. Green: I \nes: Left Phase Include o (I 0 1 (I 0 1 0 Left Phase Include l) (> (I 10010 Left Phase Include o l) 0 1 0 1 1 0 Left Phase Include 000 1 0 1 1 0 ------------:----~-~~--~----: :---------------: :--------~------: :--~------------: )1 ume Module: lnItIal Vol: 68 30~ 43 101 375 45 67 77: 44 40 871 106 Growth Ad] : 1.00 1.00 1.00 1.00 1.00 1 . 00 1.00 1.00 1.00 1.00 1.00 1. 00 , ::E Ad] ; 1 . 0(1 1 . 0(1 1.00 1.00 1 . 00 1.00 1 . (Il) 1 . 00 1.00 1.00 1.00 1.00 . _F AdJ: 1.00 1.00 1.00 1.00 1 . 00 1.00 1.00 1. 05 1 . 00 1.00 1.05 1.00 User AdJ: 1.06 1.06 1. 06 1.06 1.06 1 . (16 1.06 1. 06 1.06 1.06 1. 06 1.06 ""~nal Va 1 . : 72 320 46 107 398 48 71 859 47 42 969 112 -----------:---------------: :---------------: :---------------: :---------------: ~atLlratI on Flow ModLll e: :It /Lane: 1800 1800 1800 1800 1800 1800 1800 18(1) 18(1) 1800 1800 1800 HdJ Llstmen t: 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 Lanes: 1.00 0.88 (I. 1: 1.00 0.89 0.11 1 . 00 1.9(' O. 10 1.00 1. 79 O.~l lnal Sat. : 1404 1'2:9 175 1404 1::54 150 1404 ~663 145 1404 :516 ~9:2 I t I r << I I I -----------.--~------------I I-----------~-~-I .--~--------~---I I------------~~-I ..... ~p CI e I t y AnalYSIS I'"lod u 1 e : , :)l/Sat: 0,05 0.'26 0.::6 0.08 0.::2 o. -r-, (, II f)5 o. -r-, o. -"'" 0.0:: 0.::9 (1.39 -'- -- -'- LrIt MO'-Ie s: -4-*** **** **** ***"* ,Green/eye 1 e: 0.06 0.::5 0.::5 o. 10 0.:'9 0.39 0.06 0.5() 0.50 0.05 (1.48 0.45 "Jlume/Ca;:.: 0.8f) u.74 0.74 (.l.74 (J.8') l).81:1 0.80 0.65 0.65 0.65 0.80 0.8(1 :~---~-------:--~------------~ :----~--~~------: :~-~--~---------: ~-------~---~~--: : ",vel Of ServIce Module: : ?lay/Veh: 47.:: 17.4 35.9 31.7 18.9 47.1 47.5 9.5 :21.0 35.0 13.1 ~8.7 Delay AdJ: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ~dJDel/Veh: 47.~ 17.4 35.9 31.7 18.9 47.1 47.5 9.5 ~1.0 35.0 13.1 ::8.7 -Leue: 2 5 1 2 7 1 2 10 1 1 14 ...... '**************************~********************~******************************** 00107 f. Traffix System VerSIon 6.3 (c) 1991 DA LIcensed to Kaku ASSOCIates " . ; '~.l 919SM. IN Tue May 1:, 199: 10:00:00 Page 4-1 1919 SANTA MONICA BOULEVARD UPDATE YEAR :OO~ CUMULATIVE BASE AM PEAk HOUR Level Of Servlce Computatlon ~eport 1985 HeM Operatlons Method **************~*****~******** * Base Volume AlternatIve * ~*****~***~********************************~********~*************************** Intersectlon #~ ~OTH STREET & WILSHIRE BL ******************************************************************************* r ycle (see): 6iJ CrltIcal Vol./Cap. (X): 1.1:7 Loss T1me (see): 0 Average Delay (~ec/veh): 60.6 ......ptl mal eycl e: 180 Level Of SerYl ce: F ******************************************************************************* Approach: North BOLlnd South BOLlnd East Bound West Bo...md Movement: L T R L T R L T R L T R -----------:~--~-----~-----: :----------~----: :---------------: :-----------~-~-: ~antrol : Left Phase Left Phase Left Fhase Left Phase Rlghts: Include Include Include Include In. Green: 0 I) I) 0 <) 0 I) (I 0 0 0 I) anes: 1 0 ...... I) 1 1 0 (I 1 I) 1 I) 1 1 0 1 0 1 1 0 ... -----~~--~--:---------------: ~-------~~------: :------~~~~~----: :---------------~ alume Module: lnltlal Vol: 117 245 110 180 4........, 60 4~ 1:4::: 1-'" 161 10:;0 59 ....... ;.- Growth AdJ: 1 . (10 1.00 1.00 1 . 00 1 . 0(1 1.00 1.00 1.00 1 . 00 1. 00 1.00 1.00 CE AdJ: 1 . 00 1.00 1 . 00 1.00 1.00 1.00 1. (H) 1.00 1.00 1. 00 1.00 1.00 ; LF AdJ: 1.00 1.05 1.00 1.00 1.00 1.00 1.00 1.05 1.00 1.00 1.05 1 . 00 User AdJ: 1.07 1 . 07 1. 07 1.07 1.07 1. 07 1.07 1.07 1. 07 1.07 1.07 1. 07 - 1 na.l Vol.: 1~5 275 118 193 45: 64 45 1397 141 172 1157 6~ -' -----------:---------------: :-----~----~----: :---------------: :----------~----: C;;aturc:tlon Flow Module: a.t /Lar,e: 1800 1800 18(10 1800 1800 18(H) 18(10 18uO 1800 1800 1800 180(J HdJustrrent: 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 Lanes: 1.00 :: 'I ()(1 1 . (II) 1.00 0.88 O. 1 ~ 1 . (,(' 1. 8: o. 18 1 . 00 1.90 [). 10 Inal ~a t. : 1404 ~808 14\)4 1404 1~:9 175 1404 :55r) ::58 1404 2663 145 ----~---~--:---------------: :---------------: J ~_______________ , I (-apaclty Anc:lysls , aI/Sat: 0.09 Crlt Neves: *+** Green/Cycle: 0.08 '01 LIme/Cap: 1. I""""': 1'>1odul e: l). 1 (1 0 . (IE, ('. 14 0.37 **** 0.-::-:: 1.1:' 0.-::-:: u.-:'7 n.o-:: 0.55 u.55 **** 0.49 1. 13 0.1: 0.4-:: **** (I. 11 (1.55 1. 13 O. 78 ('.4-:: 0.17 0.58 O. 17 0.50 I). :4 0.58 1.1:: o. (14 (1. 49 0. 7e 1. 1 :. ,.).5=:. ()... 78 ---------~-:--------~~-----: :---------------~ :---~~-----~----: :----------~--~-; _evel Of Servlce Module: ~elay/Veh: 14~ 19.0 18~8 17.5 98.9 171~~ 53.9 79.9 1~9.4 1~9 10.1 33.1 Delay AdJ: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1dJDel/Veh: 14~ 19.0 18.8 17.5 98.9 171.3 53.9 79.9 1~9.4 1:9 10.1 33.1 lueue: 7 4 2 :; 19 4 1 5~, 8 9 15 2 ******************************************************************************** l 00103 TrafflX System Version 6.3 (c) 1991 DA Llcensed to Kaku ASSOCiates L -n 9SM. IN Tue May 1:, 199: 10:GO:Ol Page 5-1 1919 SANTA MONICA BOULEVARD UPDATE YEAR :uO: CUMULATIVE BASE AM PEAt, HOUR ~------------~~~-----~-----------~~----------~-~------------------------------- Level Of ServIce Computat1on Report 1985 HCM OperatIons Method *********************~******* * B~se Volume Alternat1ve * ~~****************************************************************************** Intersect10n #3 :OTH STREET & SANTA MONICA BL ********~*****************************************************~**************** /cle (se.::): 60 Cr1t1cal Vol./Cap. ex): 0.908 Loss Tlme (sec): 0 Average Delay (sec/veh): :1.4 r~tlmal Cycle: 180 Level Of SerV1ce: C .****************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L T R L T R L T R L T R -------~-~-:-~-------------: ~---------~-~---: :-~~~~---~--~~--~ :----~-~~-----~-: I....wntrol: Rights: In. Green: :'lnes: Left Phase Include (100 1 0 1 1 0 Left Phase Include I) (} 0 1 0 1 1 0 Left Phase Include o 0 0 10110 Left Phase Include 000 1 0 1 1 0 -----~-~----~---------------: :~--------------: :~---~----~-----: :--------~~-----: "Jlume Module: .Lnltlal Vol: 118 748 143 109 609 50 59 793 48 56 1005 ~58 Growth Ad): 1 . 00 1.00 1.00 1.00 1.00 1 . 00 1.00 1.00 1.00 1.00 1.00 1.00 CE AdJ: 1.00 1.00 1.00 1.00 1.00 1 . 00 1.00 1.00 1.00 1.00 1.00 1.00 ....F AdJ: 1.00 1.05 1.00 1 . 00 1.05 1.00 1.00 1. 05 1.00 1.00 1.05 1.00 User AdJ: 1.04 1.04 1. 04 1.04 1. 04 1.04 1.04 1. 04 1.04 1.04 1.04 1. 04 - lnal Vol. : 123 817 149 113 665 52 61 866 50 58 1097 268 --~--------~---------------: :~--------------: :---------------: ~---------------: C'aturat1on Flow ModLlle: at/Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 18('0 HdJLlstment: 0.8: O.8~ 0.8: 0.8~ O.8~ 0.8: 0.8: 0.8: 0.8: 0.82 0.82 0.8~ Lanes: 1 . (ll) 1. 69 0.::1 1. (II) 1. 8S I). 15 1.0(' 1. 89 0.11 1.00 1. 61 0.:9 lnal Sa t. : 1476 ~497 41::"1::" 1476 :2 T:' 8 :14 1476 :2791 161 1476 237: 580 ...J..J -----------~---------------: :---~-----------: :-----~-~~-~~---: :---------------: .~.apacl ty ~ncd )'51 S Module: ol/S2t: 0.08 Cl _"""T 0.:::: o.oe 0.:4 0.:24 (1.04 0.::1 0.31 0.04 O.4t 0.46 , -'.. Crlt Mave~: **** **** **** **** r,r-een/Cyc 1 e: 0. 11 0.:'6 0.36 O. (18 (). ~:: O. ~~ G.05 0.49 0.49 0.06 0.51 0.51 - - Dl I_tme/Ca=: O. ....,.~ 0.91 0.91 0.91 () ~ 7: ').73 0.91 0.6: 0.63 0.6-:: 0.91 0.91 I _, ----~~--~--~---------------: ~----~--~--~----: :-----~---------: :---------------: evel Of SerVIce Module: elay/Veh: 30.0 ~3.3 45.5 58.3 15.8 ::4.1 76.4 9.:' 18.5 :29.8 17.7 31.5 Delay AdJ: 1.00 1.00 1.00 1.00 1.uO 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ^dJDel/Veh: 30.0 ~3.:' 45.5 58.3 15.8 34.1 76.4 9.3 18.5 ~9.8 17.7 31.5 Lleue: _, 1 5 4 ~. 1 0 1 ~ 1 (I 1 1 18 6 ***************I**************************************************************** 00109 TrafflX System Verslon 6.3 (c) 1991 DA L1censed to Kaku ASSOCIates 1 -?19SM. 1tJ Tu~ May 1~, 199~ 10:00:u: Page 6-1 1919 SANTA MONICA BOULEVARD UPDATE YEA~ ~U02 CUMULATIVE BASE AM PE~; HOUR Level Of ServIce ComputatIon Report 1985 HeM Operatlons Metho~ *************************.~** * Base Volume AlternatIve * ~******~.*.********~****************************************~******************* IntersectIon #4 ~OTH STREET ~ COLORADO 8L ****~**********~*~************~************************************************ y'cle (sec): 60 CrItIcal Vol./Cap. (X): 0.799 Loss TI me (sec): 0 Average Del ay (sec/veh): 13. 1 n~tImal Cycle: 113 Level Of ServIce: B ******************************************************************************* Approach: North Bound South Bound East Bound West Bound Movement: L T R L T R L T R L T R --~--------:-~-~------~~~--: :---------------~ ~-------------~-~ ~----~-------~~-~ ~ontrol : Left Phase Left Phase Left Phase Left Phase hIghts: Include Include I nc hIde Incl ude In. Green: 0 0 0 0 0 0 (I I) 0 0 0 (l 3nes: 1 0 1 1 0 1 0 1 1 0 1 0 0 1 1 0 1 1 0 _______~_~__I_______________, 1_______________1 I__________~~~__. ._________~_____t [ II , t l. , :Jlume Module: InItIal Vol: '"' 74~ 158 34 606 ~7 39 1024 64 50 586 :26 - Growth AdJ: 1.00 1.00 1.00 1 . 00 1.00 1 . 00 1.00 1.00 1.00 1.00 1.00 1.00 CE AdJ: 1.00 1.00 1.00 1.00 1.00 1.00 1 . ell) 1.00 1.00 1.0(1 1.00 1.00 LF Ad) : 1.00 1.05 1.00 1.00 1.05 1.00 1.00 1.05 1.00 1.00 1.05 1.00 User- Ad]: 1. 16 1. 16 1. 16 1. 16 1. 16 1. 16 1. 16 1. 16 1. 16 1. 16 1. 16 1.16 -lnal Vol. : 2 905 183 39 7::'8 31 45 1247 74 58 714 30 -----------:------~--------: ~_______~_____~_I 1_______________4 ~---------------: I I I t ~aturatIon Flow ModL\le: at/L.!\ne: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 HdJLlstment: 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 Lanes: 1.00 1. 66 0. :A 1.0(1 1. 9: 0.08 1.00 ~. 0(1 1.00 1.00 1. 9~ 0.08 I nal Sat. : 1584 ~6::4 5"24 1584 ::039 129 1584 3168 1584 1584 ::'040 1~8 -------~---~--~-------~----: :--~------------: , , I , ,-~----------~--, 1---------------, -ap~cIt~ AnalysIs ol/Sat: 0.00 'Crl t Moves: Green/Cycle: 0.00 0.4:: olume/:a~: 0.5~ 0.80 Module: ('.:A (1.::4 **** 0.4:: 0.80 O.O~ O.~4 0. ~4 O. tY:; O. :9 ('. 05 (J . ('4 (l. ~3 (). ::: ***-jL **** *-jL+4- O. 0:: 0.4t n. 46 O. (16 ('.49 0.49 0.05 0.48 0.48 0.8(' 0.5-:: 0.5:: 0.49 0.80 O. 10 0.80 ('.49 0.49 I . . . . , I---~--------~--I .----~----~-----I .------------------- , ---~-----~-:-----~-----~~--: evel Of SerVIce Module: elay/Veh: 71.5 14.~ ~~.5 60.5 9.3 15.4 ~4.~ 11.9 6.: 51.0 8.4 1~.8 Delay AdJ: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 .^dJDel/Veh: 71.5 14.3 ~3.5 60.5 9.3 15.4 24.3 11.9 6.2 51.0 8.4 1~.8 . .ueLle: (l 12 "3 1 7 (I 1 15 1 2 7 0 .~******************~************************************************************ 00110 l> Traf.f1x System VerSIon 6.3 ( c ) 1991 DA LIcensed to Kaku ASSOCIates f_ :a 1':':!'"". 1:.1 Th L' .J un 4, 1 Q':;: 1 '): 1 ~: 1" F'2ge 1-1 1910 SANTA MONICA BOULEVARD UPDAT~ YEAR :OO~ CUMULATIVE BASE AM F'EA~ HOUR Level Of Service Co~pulatlon Re~crt 1985 HeM Oper2tlons Method **.*********..+*****~~~****** * Base \'01 L(me Al tet-natl ve * *.******~~*+~*~********.**************.***********+***+************************ ,ters2ctl~n #5 CLOVERFIELD BL ~ SANTA MONICA BL ~********~*********************~*********~***~********..************************ r'ycle (se.::): 6u Crltlcal VOl./C2:. (X): 1.010 ass TlmE ~sec): (l Average Delay (~Ec/veh): :8.8 uptlmal C,=le: 180 Level Of ServlCE: D *********~*****~***************************************~************************ pproach: North Bound South Bound East Eound West Bound "vemen t : L T R L T R L R L T f;' -~---~------:---------------: t I I I I---~~~~--------I 1---------------. antral: L~ft Phase Left Phase 19hts: InclLlde Include Mln. GreE-, : (. 0 0 (I I) 0 J Cines: ...., 0 (J 0 ...., (l (I 0 0 0 ~ Left F....ase Inc~ude (l n I) o 1 1 o o Left Phase Include C' 0 o 1 o ...., ~ (I I) I I . I ------~---~I~------~-------I t-------~-------I Volume Mod__le: ! nl t 1 2.1 Vol: i..-'~ (I ~7~ 0 (I (I r) 8-- :;96 4~- 1184 0 '-' f _' I ( , . , rowth Ad.: : 1 . (lr) 1 . 00 1.00 1.00 1.00 1.00 1 . (10 1. ( .... 1 . (l(1 1.00 1.00 1.00 peE AdJ: 1.00 1 . (Il) 1.1)0 1.00 1.00 1.00 1. (10 1. (\) 1.00 1.0(1 1.00 1.00 'LF Ad J: 1.05 1.00 1.05 1.00 1.00 1.00 1.0(1 1 . rc:: 1.00 1 . 00 1.05 1.00 _..J ser AdJ: 1- 1~ 1. 1: 1. 1: 1. 12 1. 1: 1. 1:::- 1. 12 1. 1:: 1. 1: 1. 12 1. 12 1. 12 Flnal Vol. . 791 0 32(\ 0 [) 0 0 10:1 444 485 1:'9: 0 . --------~---~---------------t :-----~--~------~ :---------------: :---------------: ....,atur at 1 orj Flow Mwddle: Sat/Lane: 1800 18(1(1 1800 18('1) 180C 1800 1S'Xl IE. ", 1800 dJustmen":: 0.8<;- 0.89 0.89 0.E:9 \).89 \).89 (l.8Q (, c...... 0.89 -'. ..... ,. anes: ~. (l~~' (I. (l(1 2.00 (1.00 O. (ll) () . ell) ('. (1I) 1 . .: 0.6(1 FInal Eat. . 3~!:'4 (~ 3:(~4 (. (I C' 0 ......~ ~ .. 96:- . .oA.-_-_ 180(' 18(>0 0.89 0.89 1 . (H:' : II (\(. 161): ?:::'u4 1 Er:'(J 0.89 O. (1(1 C, ---~--~~~-~:---------------~ , , , , Lapaclt} ~~alY~l_ Mcd~le: Vol/Sat: (.:5 C.(lC C.10 t-It M<:h'<=:= *++~ _ree~/C~cl~' 0.:4 0.00 0.:4 V01~me;[~:: 1.Cl 0.00 0.41 .~) . t:}\- \: . l_1 ~_ I : I l 1(_ i a I (~ t-. ..... , .- \:'.46 **** i-"I. :t) \. .4: ( 't **-Jt'+ -!!-+*-II- (I. (1:1- O. (1(. (I. (l') n (1':1 (\ III t:~(l C' II i~)() ( II ill) O.tX' Co.. _= 1.1 c).. 4t. () I ::(, 1. (11 1.01 Co 76 0.58 (+'", / L~I C. Or:, ----~------:----------~-~--: :---~~~--~~--~~-: ~--~~~-------~~ ---~-~~-------- Le~el Of Eervlce Module: ~elay/Veh: 44.7 0.0 14.8 0.0 0.0 0.0 0.0 ~b.2 48.4 50.5 :.7 0.0 e 1 <3 Y Ad j : 1 . 'Y' 1. 00 1 . (In 1 . 0(1 1. 00 1 . 00 1 . 00 1.': .:' 1 . 00 1 . 00 1. 00 1 . (II) HdJDel/Veh: 44.7 0.0 14.8 0.0 0.0 0.0 0.0 ~6.S 48.4 50.5 2.7 0.0 Queue: 19 1) 4 0 (j 0 n:4 1::: 13 9 0 f .********~~****+~*-!!-***********************************+.***********************~ '. . 00111 TrafflX System VerSIon 6.3 (c) 1991 DA Llcensed to Laku Assoclates 195M.IN Tue May 1:', 1<79:' 10:11::'4 F'age 3-1 ~--~---~----~----~------~~-~-~-~~-----------------~------------------------~-- 1919 SANTA MONICA BOULEVARD UPDATE YEAR :nn: CUMULATIVE BASE PM F'EAf HOUR Level Of Servlce Computatlon Report 1985 HeM Operatlons Method ***************************** * Base Volume Alternatlve * ****************************************************************************** ltersectlor ~1 17TH STREET ~ SANTA MONICA BL -.********+******************************************************************** 'cle (see): 60 Crltlcal VOl./Cap. (Xl: 1. (H):' JSS Tlme (~ec): I) Averelge Delc?Y (sec/veh): ::::::.:' Jtlmal Cycle: 180 Level Of Servlce: D **********+**************************************************~***************** 3proach: North Bound South Eound East Bound West Bound ovement: L T R L T R L T R L T R -~-~--~----:---------------: ~---------------: :---------------~ 1-~-------------~ antrol: 19hts: In. Green: Left Ph~se Include I) 0 0 1 (I I) 1 (I Left PhasE lnclude o I) 0 10010 Left Phase Include I) 0 I) 10110 Left Phase Include I) l) 4) 1 (I 1 1 0 anes: -----------:------~--------: :-~-----~---~---: :---~-----------: :------~--------: olume ModLle: - nl b al Vol: 61 304 43 1~C' 360 ~.... 4:' 1350 67 55 1069 79 ~..J ..:>- 3,.. owth AdJ: 1.00 1.00 1.00 1 . 00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 CE AdJ: 1.00 1.00 1.00 1.00 1.00 1 . 00 1.00 1.00 1.00 1 . 00 1.00 1.00 LF Ad;: 1.00 1.00 1.00 1 . 00 1.00 1.00 1.00 1.05 1. 00 1.00 1.05 1.00 Jser AdJ: 1. 10 1.10 1. 1 () 1. 10 1.10 1. 10 1. 10 1. 10 1. 10 1.10 1. 10 1. 10 - Inal Vol.: 67 334 47 149 :;96 35 46 1559 74 61 1235 87 -----------~---------------~ :----~----------~ :---------------: :---------------: Saturatlon Flow Module: at/Lane: 1800 1800 18l'I) 1800 15CHl 181)0 1800 1800 1800 1800 18(10 1EO(1 ......dJLlstment: 0.78 0.78 (1.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 Lanes: 1.00 0.88 c).1~ 1 . (Ie) 0.9:: (1.08 1 . 00 1. 91 0.09 1 . 00 1. 87 0.1:: 1 nfl-I Sa t. : 1404 1230 174 1404 1=89 115 1404 ::681 127 1404 :6~:: 185 -----~-----:~--------------~ ~---------------: :---------------: ~---------------: ~ apilclty ~:jalysls Module: ol/Sat: 0.05 0.':7 0.':7 (1. 11 ().. ~1 C\. -: 1 0.0:' 0.58 0.58 (1.04 0.47 (1,47 Crlt Move": : **** **** **** **** Green/eye:' e:>: O. f.15 0.:'7 0.~7 (1. 11 {). :;:: o. ~~ 0.04 0.56 0.58 0.04 0.58 0.58 -~ -' 'olume/Caj:: : 0.94 1 . 0(1 1 . (Ie) 1.00 0.94 0.94 0.81 1 . 00 1.00 1 . (H) 0.81 0.81 -----~-----:----~-~--~--~-~: :~~--~~----~--~-: :--~--------~---{ :-~--~----------; evel Of Servlce Module: 'elay/Veh: 84.': 55.4 118.7 78.3 :'6.7 104.3 58.~ ~7.8 91.4 112 10.0 30.7 Delay AdJ: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ~dJDel/V~~: 84.: 55.4 118.7 78.:' 36.7 104.~ 58.3 27.8 91.4 11: 10.0 30.7 lueue: 3 10 2 5 9 ..., 1 33 3 "3 15 ~ ******************************************************************************** 00112 Traffl~ System VersIon 6.3 ( c ) 1991 DA LIcensed to Kaku Assoclates 1-?19SM.IN Tue May 1:2,199:2 10:11::5 Page 4-1 1919 SANTA MONICA BOULEVARD UFDATE YEAR :002 CUMULATIVE BASE PM PEM HOUR Level Of Service Computation Report 1985 HeM Operations Methou ~*************************+** * Base Volume Alternative * ~********.~*******~********************************4***************************~ Intersect:on #: :OTH STREET ~ WILSHIRE BL 1 .*******.********+*******************************~4**************************** 'fele (see): 60 CritIcal Val./Cap. (X): 1.::08 Loss Time (see): 0 Average Delay (sec/veh): OVERFLOW r1tlmal Cycle: 180 Level Of SerJlce: F f*****************************************************************************. Approach: North Bound South Bound East Bound West Bound Movemen t : L T R L T R L T R L T R I , I . t I I I ~ -----------.--------~------I .-~-------------~ ~--~-~~-------~-I I-----------~---I L...Jntrol: Left Phase Left F'hase Left Phase Left PhaSE Rights: Include Include Include Include In. Green: (l 0 I) (l (l (l 0 (I 0 I) 0 0 :mes: 1 0 2 0 1 1 0 0 1 (1 1 (I 1 1 0 1 0 1 1 0 ------------:-------~-------: :~-~-----~------: :-----~---------: :~--------------: Jl Llme Module: InItIal Vol: 8- 378 168 1'"'0::- 417 44 43 1401 58 :61 1134 51 -' .L...J Growth AdJ: 1 . <)0 1.00 1 . 00 1 . (1) 1.00 1.00 1 . 00 1. 00 1. 00 1 . 00 1.00 1.00 :E AdJ: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 , _F Adj: 1.00 1 . 05 1.00 1.00 1.00 1.00 1.00 1.05 1.00 1.00 1.05 1.00 User AdJ: 1. 17 1. 17 1. 17 1. 17 1. 17 1. 17 1. 17 1. 17 1. 17 1. 17 1. 17 1. 17 I nal Val. : q7 464 197 146 488 51 50 1721 68 305 1393 60 -----------~-----~---------: :----~-~-~-~--~-: :---------------: :---~-----------: ~aturatlon Flow ModLlle: at/Lane: 180(\ 18(10 1800 18(\1) 1800 1 8 () (1 1 Sell) 1800 18(1) 1800 1800 1800 I-tdJustmen~: 0.78 u.78 0.78 0.78 0.78 0.78 r).78 u.7S 0.78 0.78 0.78 0.78 Lanes: 1. (.() :. (\0 1.00 1.00 i).90 O. 1 C' 1. (IC 1. 9:2 0.08 1 . 0(- 1. 9:2 0.e8 lnal Sa t. : 1404 :::80e 1404 1404 1:270 1:'4 1404 :::701 107 1404 :::69::: 115 -----------:--------~------: :~-----------~~-~ :~~~--~~-----~~-: :---~-~---------: - Clpaclty ':"nal'f::.;ls M':ldule: :Jl/Se<t: (1.07 (}11 17 0. 14 (I. 10 0.::8 o. -c 0.04 0.64 0.64 0.:2: 0.5::: (LII 5~ ..'L. C,It MO..'E5: **-4-* **** **** **** I~reen ICyc 1 e: 0.05 ('. ::'1 ().::'1 o. 1- 0.:9 0.:9 O. (\4 0.49 0.49 O. 17 (J.bl 0.61 -' :11 Llme/C~~ : 1. 31 rJ.78 0.66 0.78 1. -::1 1. -::1 i),. 85 1.::1 1. 31 L 31 0.85 (1.85 I I I I I t I I ~----------r----------~----l ,---------------. 1---------------. I---------------t evel Of Service Module: elay/Veh: ~95 ~1.6 :20.:: ::1.7 ~:5 344.6 65.: :07 317.: :239 10.~ 45.9 Delay AdJ: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ~dJDel/VEh: :295 ::'1.6 ~0.3 :'1.7 :Z5344.6 65.: :07 317.~ :39 10.3 45.9 ueue: 9 7 :. 3 36 5 2 123 7 23 17 ...., ~******************************************************************************* 00113 TrafflX System VerSion 6.3 (e) 1991 DA Licensed to Kaku ASSOCIates J. -i 1 9SM. It J TUE May 1:, 199: 10:11::6 Page 5-1 ~------------~-----~-------------------~------------~----------------------~---- 1919 SANTA MONICA BOULEVARD UPDATE YEAR :00: CUMULATIVE BASE F M PEA., HOUR ---------------~-~~-------~------~---------~~---------~------------~----------- Level Of ServIce ComputatIon Report 1985 HCM OperatIons Method ~***********~**********~***** * Base Volume AlternatIve * ~***~*~**.*********~********~************************~************************* IntersectIon #3 ~OTH STREET ~ SANTA MONICA BL . .****************~*****~***********************~******************************* lc1e (see': 60 CrItIcal Vol./Cap. (X): 1.434 Loss TIme (sec): 0 Average Delay (sec/veh): OVERFLOW n~tlmal Cycle: 180 Level Of SerVIce: F I ******************************************************************************* ~pproach: North Bound South Bound East Bound West Bound Movement: L T R L T R L T R L T R -~---------:~~~--~---~~~---: :-----------~---: :-~~-------~----: :-----------~---: :..~ntrol : Left Phase Left Phase Left Phase Left Phase RIghts: Include InclLlde Include Include 1 rl. Green: 0 (J 0 0 r) 0 0 (I I) 0 I) 0 ! :anes: 1 (J 1 1 (J 1 0 1 1 (J 1 0 1 1 0 1 I) 1 1 I) ---~--------~------------~--: :---------------: :---------------: :---------------: :Jlume Module: lnItlal Val: :291 <=",., C" 111 11: 1029 1~- 49 1710 147 91 1659 :259 ..J~..J :;'-' Growth AdJ: 1.00 1 . 00 1.00 1.00 1.00 1.00 1 . 00 1.00 1.00 1.00 1.00 1.00 CE AdJ: 1.00 1.00 1.00 1.00 1 . (1) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ....F AdJ: 1.00 1.05 1.00 1.00 1. 05 1. 00 1.00 1. 05 1. 00 1.00 1.05 1.00 User Ad]: 1.08 1.08 1.08 1. 08 1.08 1.08 1.08 1.08 1.08 1.08 1.08 1.08 - Inal Vol.: 314 595 1~0 121 1167 144 53 1939 159 98 1881 280 -----------~-~~------------~ :---------------: :---------------: ~-~-------------: qaturCltlor, Flow Module: at/Lane: 1800 1800 1800 1800 1800 1800 l80Cl 1800 1800 1800 1800 1800 ...dJL1stment: ().82 ().8: O.8~ 0.82 0.8~ (I.8~ 0.8:::: 0.82 0.8: 0.82 0.8~ 0.8: LClnes: 1.00 1. 66 0.34 1 . r)(l 1. 78 0.~2 1. ('0 1. 85 0.15 1.00 1. 74 0.:6 InCll Sat. : 1476 ~457 495 1476 ~6::8 324 1476 2729 .......... 1476 2570 ::8~ ---' t ~---~-~----:----~~~-~-~~---: :-------------~~: :---------~-~---~ :--------~----~-: J~apaclty P~~lySIS Module: : aI/Sat: (1.~1 (1.:4 0.:4 0.08 0.44 0.44 0.('4 0.71 0.71 0.07 0.73 (J.7~ Lrlt Move~: *~** **** ***_ **** GrEEn/Cycle: 0.15 0.~4 0.34 0.1~ 0.::1 0.31 0.0:: 0.50 0.50 0.05 0.5: 0.5: \ olume/Ca~: 1.4~ 0.71 0.71 0.71 1.4~ 1.43 1.4: 1.4~ 1.4~ 1.43 1.42 1.4: I L --____~~___:_____________~_: :_______________: :_______________: :_______________: . €vel Of SerVIce Module: elay/Veh: ::69 15.1 21.7 28.1 ~40 404.8 475 ~37 J99.: 4~5 317 35:.0 Delay AdJ; 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 .^dJDel/Veh: 369 15.1 :1.7 28.1 340 404.8 475 337 399.2 435 317 352.0 ueue: 33 8 2 2115 17 7204 19 12 19:2 31 '************************************~******************************************* ~...... 00114 r- Trafflx System VerSIon 6.3 I , ..... ( c ) 1991 DA Llcensed to Kaku Assoclates iSM. IN 1ue May 1~, 199~ 10: 11:~7 Fage 6-1 1919 SANTA MONICA BOULEVARD UPDATE YEAR :00: CUMULATIVE BASE PM PEA., HOUR Level Of SerVIce ComputatIon Report 1985 HeM OperatIons Method ***************************** * Base Volume AlternatIve * **********4*.**~************************************************************~ ersectlon #4 20TH STREET & COLORADO BL **********~~***************************************************************** le (see): 60 CrItlcal Vol. ICap. (X): 0.933 ,5 TIme (sEe): I) Average Delay {sec!veh): ~O.!) _lmal Cycle: 180 Level Of Servlce: C ~***************.************************************************************* .Jroach: North Bound South Bound East Bound West Bound ...-ement: L T R L T R L T R L T R -~--------~---~----------~~ :-~-~~--~--~----: :--~----~-------: :-----~--------~~ ntrol: Left Ph a se Left Phase Left Phase Left Phase ghts: Incl Ltde Include Include Incl Llde n. GreEn: (I (1 I) I) 0 0 (l (I I) 0 0 (l nes: 1 (l 1 1 (l 1 0 1 1 (I 1 (l .... 0 1 1 (l 1 1 (l ~ ----------:--------------~: :-----~-~~---~--~ :---------------: :---------------; ) 1 ume ModLll e: 11 t 1 al Vol: 30 47(1 60 ....~ 1069 ~1 45 l()~O 114 159 995 ::0 -~, -owth AdJ: 1.00 1.00 1.00 1.00 1 . 00 1 . 00 1.00 1.00 1 . 00 1. 00 1.00 1 . 00 :E AdJ: 1.00 1.00 1.00 1.00 1.00 1.00 1,00 1 . (H) 1 . 00 1.00 1.00 1. 00 _F AdJ: 1.00 1.05 1.00 1.00 1.05 1.00 1.00 1.05 1.00 1.00 1.05 1 . 00 ser Ad;: 1.14 1. 14 1. 14 1. 14 1. 14 1. 14 1. 14 1. 14 1.14 1. 14 1. 14 1. 14 tn2-1 Vol.: 34 563 68 26 1~80 ~4 51 1~21 130 181 1191 34 -----------:---------------: :-----~---------~ :---------------~ :---------~-----~ aturatIon Flow ModLlle: 3.t fLane: 1800 1800 1800 1800 180(1 18(\0 1800 1800 1800 1800 1800 180r:' jJL\stment: 0.88 0.88 (1.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.8-:: anes: 1 . (JI) 1. 78 (l .......... 1.00 1. 96 0.04 1.00 ~.OO 1 . Or) 1.00 1. 94 O.Oc - 1__ lnal Sat. : 1584 :8:5 343 1584 :: 1 1 ,) 58 1584 -:::168 1584 1584 3080 ES -~---------~--~----~-------: ~------~~~~~----~ :-~~------------~ :-~~~~----~-~~--: - :l.pil.Clty Ar 31 YSIS Module: :)lfSat: 0.0: o.~o O.~o 0.0::: 0.41 0.41 0.0-:; ('. :: 9 (I. 08 (1. 1 1 0.::9 0.:9 Xlt Moves: **-It* **-11:"" -It*** **** Jreen/eyele: 0.0:: (). 4~ ('. 4:: 0.04 0.44 0.44 ('.04 ('.41 0.41 (l. 1:2 0.49 (). ~9 :Jlume/Cap: 0.9:- 0.46 0.46 u.46 0.9:- 0.93 0.78 0.9:- (J . :(l 0.9:: 0.78 0.78 ------~----~--~------------~ ~--~-~---~---~--: :---~-------~---: ~---------------~ avel Of SErVICe Module: el2-y/Veh: 109 9.6 11.1 :6.0 :0.8 117.6 50.6 :1.8 8.7 5::.0 11.6 47.8 lelay Ad): 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ~dJDeI/Veh: 109 9.6 11.1 :.'6.0 20.8 117.6 50.6 :21.8 8.7 53.0 11.6 47.8 ueue: = 6 1 0:2 1 1 1 ~O 1 5 15 1 ~******************************************************************************* DOllS TrafflX System VerSIon 6.3 { c ) 1 991 DA LIcensed to Kaku ASSOCIates ~ 1 '='~"l. !;~ H",v .'l'n 4, 19Q~ 1"~1=-:~,: ~.;:.ge 1.....1 1919 SANTA MONICA BOULEVARD UPDATE YEAR :00: CUMULATIVE BASE PM PEAf HOUR Level Of SerVIce Comp~tatlon Report 1985 HeM OperatIons Method ***~*****************~******* ~ E~se Volume AlternatIve * ~***************************************~**********************~******~~******* ltersectlon #5 CLOVERFIELD BL ~ SANTA MONICA BL *****************~*******~*************************~*~*****~~******************~ C'ycle (see:}: 60 Crltlc~l Vol./Cap. IX): 0.980 :Jss Time (sec): (1 AVEt'"ilQe Delay' (sec/veh': 2~.9 uptImal Cycle: 180 Level Of Service: C ***********~*******************************~************************************ ~proach: North Bound South Bound East Bound West Bound :Jvement: L T R L T R L T R L T f;' ------------:-~-~------~----: :--~-~----------: :-----~----~----: :---------~-----: - .:Jntrol: Left F'hase Left Phase Left Phase Left Phase 19hts: Include Include lnchtde Include MIn. Green: 0 (l (I 0 0 (1 (l (\ (l (1 0 j-' I anes: '""' 0 (J 0 '""' (J (I I) I) (J (I (1 1 1 0 1 (I -. I) 0 - ~ ~-----~----:~----~--~------~ :---~--~--------l I I I-----~~-----~~~I Volume MOd~) Ie: nltlal Vol: 5()-:; (I 580 0 0 () (I 1::-89 ~r::-7 ~o4 1~"'~ 0 _I....J I ..._...J...1 rowth AdJ: 1.00 1.00 1. (II) 1.00 1. i)O 1.00 1 . 00 1 . (l(1 1. IX' 1.00 1.00 1 . (ll) F'CE Ad; : 1.0(1 1 . 00 1.00 1.0(\ 1.00 1.00 1. ('0 1.00 1.00 1.00 1.00 1 . 00 "LF Ad; : 1.05 1.00 1.05 1.00 1.00 1.00 1.00 1.05 1.00 1.00 1.05 1 . 01) SEr- Ad; : 1.08 1.08 1. (18 1. ()8 1.08 1.08 1.08 1.08 1.08 1.08 1.08 1.08 t-lnal Vol. : 57(1 0 658 (I 0 0 (I 146:2 :'86 :'18 1421 I) ------------:---------------r :----------~----: :----------~----: :---------------: ~atw- at 1 on Flow I'lodL\ 1 e: S~t/LanE: 18,~!(1 180,) 1800 1200 180(1 12')0 180(1 18:~'(' 180(1 1800 181)0 18(J(1 dJustment: (1.89 (1.89 0.29 0.29 0.89 0.89 0.89 0.89 (1.89 0.89 O.SS 0.89 ~nes: 2.00 (1. (1'~1 :. (\(1 (' . (I (1 (1 . (ll) (I. (1(1 (1. 0('- 1.58 ;..'. 4: 1.00 :.00 (I. t:I(~ FInal Sat. : ~:':l':; (, :'=04 0 n (1 I) ....... C'" ...... I;" ='69 160= :'=(14 '~l .o-.....J _1_' ----------~:----~----------: ~~-------~~----_. I_~__~_---------: :___~_______~___~ L~pa=l~\ ~nal~sl- MGdJle: .....'cl/=.:;.t: ~..lS I-}.:l("' t..i.:1 i:1 '1(1 (i. t_~(". 1). ~ I! J. (l( (Iz SE , ~,.... ... . ''') = :1. ~(=! .44 (, ~ ~ ~lt MwY~~: ***+ **** _ ~- EErn Cy: 1 e: (.:: 1 t1. ~ 1 (:'. .: 1 'i-'. (t(l ('. (~C-: \/=,lLlme.'C2j:: (l.8~ '-l.i=l) ~).9E '-).()I= (1. ()("I it-++it- ~*** (, !.\f-l ,~)(, (i It -=9 {-l. 5';;" I '-'j'l- ~. 79 (I.. --, =' (\ . i~l i L _ (J(l (l ~ 00 I). 98 ., . 9'? (J * 56 (I ()(. --~---~----:-------~~~-----: ---~-~~----~~-- -~~------------ --------------- Level Of ~2r~lc2 M~d~le: "elCl),.'i"Jeh: :4.7 ('.\:1 4/).5 0.0 C!.O (1.(' (\.1) :2-:::.:' :9.-::: 51.8 =.(, (I.') el~y Ad;: 1.001.(X1 1.00 1.00 1.00 1.(h) 1.0/) 1.0') 1.0") 1.(H) 1.00 1.0(1 HdJDel/Veh: =4.7 0.0 40.S 0.0 0.0 0.0 0.0 =-:::.-::: 39.:' 51.8 ~.O 0.0 Queue: 1 (' <) 15 n I) 0 (J ~8 10 9 8 ,-, ********************************~********************************************** OOllG Trafflx System VerSlon 6.3 ( c: ) 1991 DA Licensed to ka~u ASsocIates J.~19SM. Ir~ Tue May 12, 199~ 13:~1:0~ Page ~-1 1919 SANTA MONICA BOULEVARD UPDATE YEAR :00: CUMULATIVE PLUS GENERAL OFFICE AM PEA~, HOUh Level Of ServIce ComputatIon Report 1985 HeM OperatIons Method ~**************************** * Base Volume AlternatIve * ~*******************************.*********************************************** IntersectIon U1 17TH STREET e SANTA MONICA BL . ***********~******************************************************************* , tcl e (sec): 60 Crl tl cal Vol. /Cap. (X): 0.805 Loss TIme (sec): I) Average Delay (sec/veh): 17.9 ~Jtlmal Cycle: 117 Level Of ServIce: C ******************************************************************************* Approach: North Bound South Bound East Bound West Bound Movement: L T R L T R L T R L T R ----~------:---------------: :---------------~ :----------~-~--: :----~----------: ~wntrol : Left Phase Left Phase Left Phase Left Phase RIghts: Include In c I Llde Include Include In. Green: (I I) 0 0 0 0 (l 0 0 0 I) 0 3nes: 1 0 c) 1 (I 1 I) 0 1 0 1 0 1 (I 1 (I 1 0 ------------:----------~~---: :------~~-------: :-~------~--~---: ~---------------: olume ModL11 e: InItIal Vol: 68 302 60 10: 375 45 67 789 44 40 873 lOb Growth AdJ: 1 . 00 1 . 00 1.00 1.00 1 . 00 1.00 1 . 00 1.00 1.00 1. 00 1.00 1.00 CE AdJ: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 LF AdJ: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1. 05 1.00 1.00 1. 05 1.00 User AdJ: 1. 06 1.06 1. 06 1.06 1.06 1. 06 1.06 1. 06 1.06 1. 06 1. 06 1. 06 , Inal Vol. : 72 320 64 108 398 48 71 878 47 4: 972 11: -----------t-----~----~----~ :~~-~------~~--~~ :-----~---------: I I t----------~-~--l eaturatlon Flow Module: at/Lane: 1800 1800 1800 1800 1800 180<) 1800 1800 1800 1800 1800 1600 HdJLlstment: (1.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 u.78 0.78 Lanes: 1 . (1I) 0.8-:: 0.17 1.0(1 0.89 O. 11 1 . 00 1.90 0,10 1.00 1. 79 0.:1 Inal SClt. : 1404 1171 --<< 1404 1:54 15(1 1404 :666 14: 1404 :517 :91 ....... _"_I --~------~-:-------------~-: :---------------: :---------------~ :~---~----~-----~ - apaclty AnalYSIS Module: , aI/Sat: 0.05 0.':.7 0.:7 O. (J8 (I -,..., 0.3: 0.05 0.33 0.-::-:: 0.0-:: 0.39 (I. ~9 l ~ II: _1-. Crlt Mo.....es: ***-l> ...."'if **.... *+iHE. ,Areen/Cycle: (l.O6 0.36 0.-::6 0.10 0.-:'9 0.-:'9 0.06 0.50 0.50 0.05 0.46 ('.48 I olume/Cap: (}.81 0.77 0.77 0.77 0.81 0.81 0.81 0.66 0.66 0.66 0.81 Cl.E1 ~ --~-------~:~~--~----------~ :-----------~---~ :--~-----~--~---: :---------------: . evel Of Servl ce Modul e: elay/Veh: 47.~ 18.8 :'5.0 34.7 19.0 47.3 47.6 9.6 ~:.~ :'6.3 13.1 :8.8 Delay AdJ: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 '~dJDel/Veh: 47.3 18.8 ~5.0 34.7 19.0 47.3 47.6 9.6 22.~ 36.3 13.1 28.8 ueLle: 2 5 2 : 7 1 : 10 1 1 14 ,..., **************..***************************************************************** 00117 TrafflX System VerSIon 6.3 (c) 1991 DA LIcensed to ~aku AssocIates ~ ';>19SM. HJ Tue May l:t 199= 13:=1:0~ Page :'-1 -~~----------~---~----------------------~-~~---------------------------------~-- 1910 SANTA MONICA 80ULEVA~D UPDATE YEAR :00: CUMULATIVE PLUS GENERAL OFFICE AM F'EA~, HOUR Level Of Servlce Computatlon Report 1985 HeM Operatlons Method ***************************** * Base Volume AlternatIve * ,~*****~**~*********************************************~********~************** IntersectIon ~~ ~OTH STREET & WILSHIRE 8L ~********~*******~************************************************************* '/cle (sec): 60 CrItIcal Vol./eap. (X): 1.13~ Loss Tlme (sec): I) Average Del~y (sec/veh): 6~.6 rJtImal Cycle: 180 level Of ServIce: F ~****************************************************************************** ~ppr-oach: North Bound South Bound East Bound West Bound Movement: l T R l T R L T R l T R -------~-~-:---------~-----: :----~~---------: :-----~~--------: :---------------~ I....,:mtr-ol: Left Phase Left F'hi'tse Left Phase left Phase RIghts: Include Inel ude Include Include Ln. Gr-een: 0 0 0 (I 0 0 <) 0 I) 0 0 I) ,nes: 1 (I 2 0 1 1 0 0 1 0 1 (I 1 1 0 1 0 1 1 0 ------~-----:---------------~ ~--~-----~------: :---------------: :----~~---------~ .Jlume ModL11 e: J.nltlal Vol: 117 :::'46 110 180 4::0 60 4~ 1~43 13: 161 1030 59 9r-owth Ad;: 1.00 1 . Ou 1.00 1.00 1.00 1. 00 1.00 1.00 1.00 1 . 00 1.00 1.00 :E AdJ: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 _F Ad] : 1.00 1.05 1.00 1.00 1. 00 1.00 1.00 1.05 1.00 1. 00 1. 05 1.00 User- Ad]: 1.07 1.07 1. 07 1.07 1. 07 1. 07 1. 07 1.07 1.07 1.07 1 . 07 1. 07 ,- 1 nal Vol.: 1:::'5 '.276 118 193 460 64 45 1397 141 172 1157 6'"::" -' -----------~--~------------: :---------~-----: :-~-------------: :~--------------: C::3turatIon Flow ModLll e: lt/Lane: 1800 1800 1800 1800 1800 1800 1800 1800 18':'0 1800 1800 1800 HdJustment: 0.78 0.78 0.78 ().78 0.78 0.78 0.78 0.78 0.78 (1. 78 0.78 0.78 L~nes: 1.00 ::.00 1 . (H) 1.00 0.88 I). 1~ 1.00 1. 8:2 0.18 1 . 00 1 . 90 0.10 inal Sat. : 1404 :::'808 1404 1404 1~3~ 17: 1404 ~550 ......""0 1404 ~663 145 ___LU . -------~~~-:--~------------~ :--~----~-------: :---~--~-----~--: :--~~-----------~ .- 3.paclty A,,~lYS1S Module: i ~l/Sat: 0.09 O. 10 0.08 (1. 14 (l. ~7 0.37 O.(l~ ().55 ().55 o. 12 0.4:: ('.4:: I Cr- 1 t Moves: *""** **** **** **** preen/eyel e: 0.08 (j.17 o. 17 0.::4 (, 'I :;-:: ~). 3-:: 0.04 0.48 0.48 o. 11 0.55 ~). 55 ::ll ume/CClp: 1. 13 0.58 0.49 (l.58 1- 1" 1. 13 0.79 1. 13 1. 1':: 1.13 0.79 (l.7'7 -' , -~~~~~----~:------~~~~---~-~ :~--------------: ~---------------: :-------------~-I f :vel Of Servlce Module: : alay/Veh: 146 18.9 18.7 17.4 10~ 175.:: 54.8 8::.~ 1~3.0 1::3 10.:: :::'.9 Delay Ad]: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 "^uJDel/Veh: 146 18.9 18.7 17.4 10~ 175.:' 54.8 83.~ 133.0 13::; 10.3 ::3.9 Jeue: 7 4 ~ 3 ~o 4 1 55 8 9 15 ,..., ******************************************************************************** ))0113 TrafflX System VerSIon 6.3 (c) 1991 DA lIcensed to Ka~u AssocIates . i-?19SM.IN Tue May 1:,199: 1::::1:1)4 Page 4-1 ~ ' 1919 SANTA MONICA BOULEVARD UPDATE YEAR :00: CUMULATIVE PLUS GENERAL OFFICE AM F'EA~, HOUR Level Of Servlce Computatlon Report 1985 HCM Operatlons Method ***************************** * Base Volume Alternatlve * ~*****.***************************~********************************************* Intersectlon #:: :OTH STREET ~ SANTA MONICA PL ~************************************************.***************************** leI e (sec): 60 Cr 1 tl c a 1 Va I . / Cap. ( X) : 0.917 Loss Tlme (see): (I Average Delay (sec/veh): ::.9 r-o.,tlmal Cycle: 180 Level Of ServIce; C ~***********************************.****************************************** Approach: North Bound South Bound East Bound West Bound Movemen t : L T R L T R L T R L T R ----~-~~---:-~-------------: :-~-~-----------t :~--------------: :------~------~-~ .....antrol: Left Phase Left Phase Left Phase Rights: Include Include Include In. Green: I) I) 0 I) I) I) 0 0 3.nes: 1 0 1 1 0 1 (l 1 0 1 I) 1 1 Left Phase Include I) 0 0 0 o 1 0 1 1 0 ------------:---------------~ :------------~--: :---------------l :---------------: :llume ModLlle: initIal Vol: 160 748 143 111 615 52 59 793 48 56 10:26 :58 Growth Ad.J: 1.00 1. 00 1.00 1.00 1.00 1.00 1.00 1 . 00 1.00 1.00 1.00 1.00 CE Ad .J : 1. 00 1.00 1.00 1.00 1 . 00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 l...F Ad] : 1.00 1.05 1.00 1.00 1.05 1. 00 1.00 1.05 1.00 1. 00 1.05 1.00 User Ad]: 1.04 1. 04 1. 04 1.04 1.04 1. 04 1.04 1. 04 1.04 1. 04 1.04 1. 04 ,- 1 nal Vol. : 166 817 149 115 672 54 61 866 50 58 1120 268 --------~~-:---------------: :---~~----------: :-~----~--------: :---------------: ~atL\ratlon Flow Module: at/Lane: 1800 1800 1800 1800 1800 1800 1800 18(:>0 18(1) Hd]llstment: (J.8~ 0.8: 0.8~ 1).8: 0.82 0.8: 0.8: 0.8: 0.8: Lanes: 1. 00 1. 69 0.31 1 . (1) 1.85 0.15 1 . 1)0 1. 89 O. 11 Inal S2 t . : 1476 :497 455 1476 ~73: :2:(J 1476 ~791 161 1800 1800 0.8:2 0.82 1 . (, (. 1. 6 1 1476 :38: 18')0 0.8: ("'. =-9 ~70 . ---~--~~---:-------~-~~-~~-: :~~----~--------: ~------~---~----: t.......______________ I rapaCIty Anal~Sls Module: i <:Jl/Sat: ('.110.:::: Crlt Mo...e5: ,Green/Cycle: olllmE'/Ca~: 0.14 0.::6 0.81 0.92 O.~3 o. (8 (1'1 .....E:" O. ~E:" (J. l)4 o. 31 0.31 0.04 1}.47 n.47 ~-' ~_r **** **** **** **** C'. 36 n.09 O. -::;0 0.::0 () . 05 (). ~() (l.50 O. ('6 0.51 i). 51 0.9: I). 92 (). 81 O.Bl O. 9: 0.6: 0.63 o. 6:: o. 9~ ('.92 L ___________~--~------------: ~---------------: :~____________~_: :_______________: evel Of SerVlce MOdule: elay/Veh: 3~.7 ~4.4 47.6 60.1 19.~ 48.1 79.: 9.: 18.~ ~9.5 18.3 :::.1 Delay AdJ: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ~d]Del/Veh: 33.7 :4.4 47.6 60.1 19.~ 48.1 79.2 9.: 18.: 29.5 18.:' ~).1 ueue: 4 15 4 4 11 : :2 10 1 1 19 6 ******..*4********************************************************************** 00113 TrafflX System VersIon 6.3 ( c ) 1991 DA LIcensed to V-aku ASSOCIates 9SM.IN Tue May 1:, 199: 13::1:05 Page 5-1 1919 SANTA MONICA BOULEVARD UPDATE YEAR 2002 CUMULATIVE PLUS GENERAL OFFICE AM PEA. HOUR Level Of Servlce ComputatIon Report 1985 HeM Operations Method ***************************** * B~se Volume Alternative * ~***************************************************************************** :ersectIon #4 ~OTH STREET & COLORADO BL .*********~+****************************************************************** =le (see>: 60 CntIcal Vol./Cap. (X): 0.809 S5 TIme (see): 0 Average Delay (sec/veh): 1::.4 tImal Cycle: 119 Level Of SerVlce: B ****************************************************************************** proach: North Bound South Bound East Bound West Bound lVement: L T R L T R L T R L T R -~-----~--:---------------~ ~~-----------~--~ :----~----------: ~---~-------~---: mtrol: Left Phase Left Phase Left Phase Left Phase ghts: Include Include InclLlde Include n. Green: I) 0 0 0 (I 0 (l I) 0 I) I) (I :\n es: 1 (l 1 1 (l 1 (I 1 1 0 1 (I '"" (I 1 1 0 1 1 l) .:.. --------~--~-----------~---: ~---------------; :---------------: :---------------~ :;lume Module: rn t 1 al Vol: ""I 766 158 36 608 ~7 39 10::4 64 50 586 44 .... rowth AdJ: 1 . 00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1 . 00 CE AdJ: 1 . 0<.."\ 1 . 00 1.00 1 . 00 1 . 00 1.00 1.00 1 . 00 1.00 1.0(\ 1.00 1.00 LF AdJ: 1 . (10 1.05 1.00 1.00 1.05 1 . 00 1.00 1. 05 1.00 1.00 1 . 05 1 . 1)0 'ser AdJ: 1. 16 1.16 1. 16 1. 16 1. 16 1. 16 1.16 1.16 1.16 1.16 1. 16 1. 16 lnal Vol.: "'\ 933 183 4'2 741 31 45 1247 74 58 714 51 - --------~--~~-----~-----~--~ ~-----~----~----~ :~---~----------~ ~--------------~: ~ atur-atlon Flow Module~ ~t ILane: 1800 18(1) 1800 1800 1800 18('0 180(1 1800 1800 1800 1800 18C\() ,j]ustment: i).82 0.88 (l.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 _CInes: 1.0(\ 1.67 0.-::-:: 1.0Cl 1. 9:2 (l. 08 1.0(\ :2.(;(1 1. (II) 1 . (H> 1. 87 0.1:: 1 nal Sa t. : 1584 :2648 520 1584 3C139 1:?9 1584 -:'168 1584 1584 2957 211 -----------~~----~---------: :---------------: :---------------: :~~--~------~---: - apaelt'y Ai, 20 1 Y S 1 s Module: aI/Sat: (I. l"\(1 0.-::5 0.-::5 0.0:: 0.:24 0.:::4 ('. ,):: ('. "39 (1.05 0.04 0.:24 0.:24 ::rIt Moves: **** **** **** **** :;reen/Sycle: 0.00 0.44 0.44 0.0: 0.47 0.47 O. (i6 0.49 0.49 (1.05 0.48 (1.4e olumelCap: ()..5~ {J.81 0.21 0.81 0.5:: 1).5:2 0.51 0.81 O. 1(; 0.81 0.51 0.51 -----------:-----~---------~ :~--------------: ~-----~-----~---~ :-~-------------; evel Of ServIce Module. elay/Veh: 69.5 14.5 ~4.4 61.~ 9.0 14.9 :5.0 1:.4 6.4 53.0 8.6 11.8 Delay AdJ: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ~dJDel/Veh: 69,5 14.5 24.4 61.:' 9.0 14.9 ::5.0 1:.4 6.4 53.0 8.6 11.8 lleue: 0 1:' 3 1 7 0 1 16 1 2 7 1 ~******************************************************************************* 00120 TrafflX System VerSIon 6.3 (c) 1991 OA Llcensed to ~a~u ASSocIates = 1 ':"'~ t : !'-I L 1 2 I_t '--1 4- 11 1 ~..} C" :. : I. i: 1 ~ : ": t: F'~;e :-1 1919 SANTA MONICA BCULEVARD UPDA-~ YEAR :00: CUMULATIVE PLUS GENERAL O=~ICE AM PEAf HOUF: ~eyel Of SerY1Ce COffip~tatlon Repcrt 19S5 HeM Operations Method ******************~********** * Base VolJme Alternatl~e * ****************************************~***********~4************************* nterEe:tlon ~5 CLOVERFIELD BL ~ SANTA MONICA BL ******~**+*****************~****~*********************+************************* f"'yc 1 e 1 S2':) : 60 Ct-l t 1 C~ 1 Vol. ICa;:. (X): 1.015 OS5 Tl~e (sec): 0 Average Delaf lSEc/veh): :9.7 Gptlmal Cycle: 180 Level C; ServIce: D ******~**~**~*****~***********************+*******+***~~****~******************~ pproach: North Bound South Bound East Bound West Bound oveme~:: L T R L T R L T R L T R --~~--------:---------------: :----~-~~-~--~--i :~~~--~-----~~--: --------------- ,~ontrol : , 'lght5: MIn. :..:ot-2o=:I: anes: (l (l Lef t Phc:,se Incl ude (' ,) Left Phase Include (1 l) ,) Lef t F'h,;lse Include (-, (; Left Phase Include .) (1 '-1 " o (1 \) " ~ I) l) (, I) o (1 ,-, 1 (, 1 o " ('. l~ .' ~----------:-~~~~--~~~~----; : , I f-----~~--~~-~--I Volume :":::Jjul e: nltloOlol -...Ie-l: 60e CI ~7~ (. C' C (I B'o :.97 4~' 1l9~ (I '-J...J ' --.J -' -' rowth ~~ ... 1.00 1.00 1 .00 1 .00 1 . on 1.0(1 1 . Of) 1 . f)(1 1 . 00 1 . 00 1.00 1 . 1)(1 ....-'. peE Ad j : 1 . (a) 1. (10 1.00 1.00 1.00 1.0(' 1 . (11) 1 tI (~() 1.0(1 1.00 1 . (ll) 1 . (10 o..tLF Ad]: 1.05 1.00 1 . 05 1.00 1,00 1 . (ll) 1.00 1.05 1 . (ll) 1 . 00 1. 05 1.0(' Iser- Ad]: 1. 1~ 1- 1~ 1. 1: 1. 1: 1. 1: 1. 1: 1. 1~ 1. .""" 1. 1:2 1. 1~ 1. 1~ 1. 1~ .... t-lnal Vwl . . 806 0 :::0 (I I) 0 (I 1'"'-- 445 485 14(1: (, . ------------:-------~-------~ ' , ~---------------: ~---------------: I------~--------I ~,a.tllr.::tl 0:-' Flow Module: Sat/Lare: 1800 1800 18)(' 18 r)r) 18(1(1 180') 1 eo.:, Ieee 18r)0 lSCl(J 18('0 160') Id J LIS t:r2lit ; 0.89 O. 89 O. 89 (1. 89 O. 89 CI. 89 - 0-' (1. S~ l). e9 0.89 (t.89 0.89 .). WI anes: '""' (JI-I C'.OO : . O(] O. 0(' (1. (J(' 1-' (l(' (i. ('(1 1. .- ('. b(l 1.00 ""'I Cl(l (1. )(, - . '. .....i) -. Flnal =~~. . :: :' l) 4 I) -::::04 (1 (1 C' ~=":I) OtA It.r): -::=(\4 '-I . ---~--~-~-~-~-----~------~-~~ . , -----------...-....-------- , , .....C;pcCl~... ~;-,.~l)=lS \/cI1 /Sc.~: '.~I.. ::=; r10ju 1 e: (, . 0,.:1 f). 1 C (I . ~:I( (I. r.~l= , r 1 t M.=. '= == : ***~ +-loc++ L - 'I - C. ,,- - - , -t~ . - . -~ - . ~-;-+.... ( ( -,: - , - 1 - - - " 4r= , . ! - " f, . - -' - . -' r r), "I I - n, - 1 r ,.., 1 ( ,-, . - . . - . ~ II _ _ l- ., .-~ _. l_1 **** l~reen/=.=lE: Cl.~:'. f)..r:,C' 'Joll_.mE :~p: 1.0= o.n(i , ,e ~_ .. ...-._1 t).. (1;:\ 1:' ~ i) (I () II -:;(1 ('. 75 '. I -~ 1 . 0= (J. 5:: ,.. 0 ': ().41) (, . 00 i'. ')1) ~----------:-~~---~-----~--: ---~~-----~---~ ---------~----- ---------~--~~~ Level ~~ Eer'"lCe MCdule: -nel~y/\'e~~: 45~9 (l.~) 14.7 o.() (J.(I c). (1 (1.(' ::6.~ 5C'.(l 5~.1 :2.8 (lat) lelay Ad]: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 HdJDel/":Eh: 45.9 n.r) 14.7 1).0 (1.(1 O.f) (1,(' :.e.=: 50.0 5:.1 :.8 1:.(' DLleLle: ::Xl 0 4 ,', 0 0 f:':4 1'3 13 9 () -****~**~~~*******~******************************~***~******~******************* 00121 Traffl;~ System VerSlon 6.3 ( c ) 1 991 DA LIcensed to fa~u ASSOCIates l-r19SM. I~~ Tue May 1:, 199: 1:::4:51 Page :-1 1919 SANTA MONICA BOULEVARD UPDATE YEAR :00: CUMULATIVE PLUS GENERAL OFFICE PM PEA. HOUR Level Of ServIce ComputatIon Report 1985 HCM OperatIons Method +**************************** * Base Volume AlternatIve * ********+********.***************+********************************************* IntersectIon #1 17TH STREET ~ SANTA MONICA BL **********************************+**********.***+***************************** ycle (se::): 60 CrItIcal Vol./Cap. (X): 1.007 Loss TIme (see): 0 Average Delay (sec/veh): :;:::.9 nptImal Cycle: 180 Level Of ServIce: D ********+********************************************************************** Hpproach: North Bound South Bound East Bound West Bound Movement: L T R L T R L T R L T R -----------:---------------: ~---------------: :--~------------: :--~------------: _antral: RIghts: In. Green: anes: Left Phase Include 000 1(011) Left Phase Include <) 0 0 10010 Left Phase Inc1Jde I) 0 0 1 0 1 1 0 Left Phase Include o 0 0 10110 ~~-----~--~-:--------~------: :---------------: :---------------: ~---------------: olume Mocule: lnItlal Vol: 61 ::;04 46 1:'6 ::;60 -..... 4:: 1353 67 55 lOa:: 79 .:.o~ Growth Ad;: 1.00 1.00 1.00 1.00 1. 00 1.00 1.00 1 . 00 1.00 1. 00 1. 00 1.00 CE AdJ: 1.00 1.00 1.00 1.00 1.00 1 . 00 1.00 1. 00 1.00 1.00 1. 00 1.00 LF Ad.]: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1. 05 1.00 1.00 1.05 1.00 User AdJ: 1. 10 1. 10 1.10 1. 10 1. 10 1. 1 I) 1. 10 1. 10 1. 10 1. 10 1.10 1. 10 '-1 nal Va 1 . : 67 334 51 150 396 35 46 1563 74 61 1250 87 ---------~-:-~-------------: ~-------~-------: :-------~-------~ :--------------~: SatLlrat I 0-. Flow Module: at/Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 ndJLlstment: 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 Lanes: 1. (10 0.87 (J. 1::: 1.00 0.9'::. 0.08 1 . 00 1. 91 0,09 1.00 1. 87 O. 1::: Inal Sa t . : 1404 1~19 185 1404 1~89 115 1404 :68: 1::6 1404 :6::5 18::: ----~------:~--~--------~--: --~-~-~------~-: ~---------------: ~---------~-----; : ,... ap ac 1 t) t":,nalysls Module: aI/Sat: ('.05 0.:7 (). ~7 O. 11 (I. :: 1 0.::1 (I. ()'3 (1.58 0.58 O. (\4 0.48 0.48 Lrlt Move =: : *~** **** -jt-.IHH" *~** Green/Cycle: (1. (15 0.:7 (I. ::7 (I. 11 (I. J:: O. -:.::; o. ('4 ()1I ~8 0.58 0.04 0.58 (J.58 olume/Ca;:: 0.94 1.01 1.01 1.01 0.94 0.94 0.8':: 1.01 1.01 1.01 r).82 0.8':: I t 4 ~ I I t I -----------I-----~-~~----~-. I~-~~-----------~ .---------------, ,---------------1 evel Of SerVIce Module: 'elay/Veh: 8:::.0 56.7 117.4 79.6 35.9 10'::.6 60.7 '::8.0 93.3 114 10.3 ~:.5 Delay AdJ: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ,~dJDel/Ve~: 8:::.0 56.7 117.4 79.6 35.9 10~.6 60.7 28.9 93.3 114 10.3 3~.5 'Lleue: "3 10 3 5 9 2 1 33 3 3 16 :2 ******************************************************************************** 00122 TrafflX System VerSIon 6.3 ( c ) 1991 DA LIcensed to Ka~u ASSOCIates L -f 1 oSM. IN Tue May 1~, 199~ 13::4:51 F'Clge 3-1 1919 SANTA MONICA BOULEVARD UPDATE YEAR ~OO~ CUMULATIVE PLUS GENERAL OFFICE PM F'EAk HOUR Level Of ServIce ComputatIon Report 1985 HCM OperatIons Method ***************************** * Base Volume AlternatIve * ~*************************************************~***************************** IntersectIon #: =OTH STREET & WILSHIRE BL f****************************************************************************** ';cle (see): 60 CrItIcal Vol./Cap. (X): 1. ::10 Loss TIme (sec): 0 Average Delay (sec!veh): OVERFLOW ~~tImal Cycle: 180 Level Of ServIce: F ~****************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L T R L T R L T R L T R --------~--:---------------: :------~-~---~--~ -~-~~-~--~-~~--~ :---------------: ......Jntrol: RIghts: In. Green: ~nes: Left Phase Include 0(10 1 020 1 Left Phase Include 00(1 1 0 0 1 0 Left Fhase Include 000 10110 Left Phase Include 000 10110 ----------~-:------------~--: ~---------------: I , f-----------~-~-. ~lllme Module: InItIal Vol: 8:: 385 168 1.....0:- 419 44 4::: 1401 58 261 1134 51 _...J Growth AdJ: 1 . 00 1.00 1. 00 1.00 1.00 1.00 1.00 1.00 1. 00 1. 00 1.00 1.00 :E AdJ: 1 . 00 1.00 1.00 1.00 1.00 1.00 1 . 00 1.00 1.00 1. 00 1. 00 1.00 _F AdJ: 1.00 1.05 1.00 1.00 1.00 1.00 1.00 1.05 1. 00 1. 00 1.05 1.00 User AdJ: 1. 17 1. 17 1. 17 1. 17 1. 17 1. 17 1. 17 1. 17 1. 17 1. 17 1. 17 1. 17 - lnal Vol. : 97 473 197 146 490 51 50 1721 68 305 1393 60 -----------:---------------: :----------~----: :---------------: :---------------: ~aturatIon Flow Module: ~t/Lane: 1800 1800 ~dJustment: 0.78 0.78 Lanes: 1.00 ~.(10 I nal S:-t.: 1404 :2808 1800 0.78 1.00 14\)4 1800 1800 0.780.7e 1.00 0.90 1404 1:271 1800 0.78 0.10 1800 18':'0 1800 1800 1800 1800 o. 78 0.78 0.78 0.78 0.78 0.78 1 . (1(1 1 . -~: 0.08 1.00 1. 9~ 0.0:3 1404 '27',1 1(17 1404 :269:- 115 . , . , t--------------~I ,--~------------. 1~3 -~---------:-----~---------~ :-~-------------: ~ 3.paCI ty- Analysls Module: :Jl/Sat: (I. (17 (1. 17 0.14 n. 10 0.-:'9 0.:-9 O.Cl4 O.'s4 (~. 64 c). ~~ 0.5~ (). 52 Crlt Moves: **** ***-If ***-. **** Green/eycl e: o. (l5 0.=1 0.:21 o. 1- 0.29 0.:9 0.04 l). ':'9 0.49 o. 17 0.61 0.61 -' :Jll.J.me/CCl~~ 1.:'1 0.78 (\.65 0.78 1. :.1 1."3",1 0.85 1.-:,1 1. :.1 1.:'1 0.85 0.85 -----------:---------------: :~---~~----~----: ---------______1 I . I evel Of Servlce Module: elay/Veh: :97 ~1.8 :20.0 ~2.4 226 346.:: 65.5 208 318.9 =41 10.4 46.2 Delay AdJ: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ^dJDel/Veh: :97 21.8 ~O.O 32.4 226 346.3 65.5 :208 318.9 :41 10.4 46.= Lteue: 9 7 3 -3 36 5 2 1:24 7 :23 1 7 ~ *****************************~************************~************************* 00123 ~ TrafflX System VerSIon 6.3 (c) 1991 DA LIcensed to Ka~u AssOcIates ! 91 S'SM. HJ Tue May 1:, 199~ 13::4:5~ Page 4-1 1919 SANTA MONICA 80ULEVARD UPDATE YEAR ~Oo: CUMULATIVE PLUS GENERAL OF~ICE F'M PEM HOUR Level Of SerVIce ComputatIon Repc~t 1985 HeM OperatIons Method ***************************** * Base Volume AlternatIve * *********************************************~*******~+************************ IntersectIon #3 :OTH STREET & SANTA MONICA BL ******************************************************~************************ rele (sec): 60 CrItIcal Vol./Ca~. (X): 1. 46:!, Loss TIme (see): 0 Average Delay <sec/veh): OVERFLOW "otImal Cycle: 180 Level Of SerVIce: F ******************************************************************************* ~pproach: North Bound South Bound East Bound West Bound Movement: L T R L T R L T R L T R ----------~:-------~-----~-: :--~------------r :--~~-~-~~------: ~~~-------------: ~ontrol : Left PhasE Left Ph.:lse Left P~;ase Left Phase RIghts: Include Include Include Include In. Green: l) 0 0 I) 0 (3 () {) I) 0 0 0 anes: 1 0 1 1 0 1 0 1 1 0 1 0 . 1 0 1 0 1 1 0 & , I ------------I---------~-----I :---------------: . ~ 4 ~ I----~-------~--f 1---------------L olume Modul e: Inlti.:11 Vol: ~99 ""'"''''' 111 130 1077 146 49 17E' 147 91 1663 ~59 ....J~....J Growth AdJ: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 CE AdJ: 1.00 1.00 1 . 00 1.00 1.00 1.00 1.00 1.0':' 1 . 00 1.00 1.00 1. 00 LF AdJ: 1. 00 1. 05 1.00 1.00 1. 05 1.00 1 . 00 1.05 1.00 1.00 1. 05 1.00 User AdJ: 1.08 1. 08 1.08 1. 08 1.08 1. 08 1.08 1.08 1.08 1. 08 1.08 1. 08 - Inal Vo 1 . : 323 595 1~0 140 12~1 158 53 1939 159 98 1886 280 ---------~-:-----~-----~---~ :---------------~ :~----------~~--: :--------------~i C:;aturatlor. Flo~ Module: at/Lane: 180(' leOO 1800 1800 1800 1800 1800 18(":: 1800 1800 1800 1800 HdJLlstment: 0.8: 0.8:' 0.8: 0.8:2 0.82 0.8: 0.8: 0.8: 0.8:2 0.8~ (l.8~ 0.8:2 L.:.nes: 1 . (10 1. 66 0.:'4 1 . (1(1 1. 77 (J. ~:; 1 . 00 1. E:S ('. 15 1.00 1. 74 0.:'6 InClI Sat. : 1476 :'457 4Q5 1476 2614 338 1476 :7:'Q ...,.....,- 1476 ~571 ::81 --- I ~~---------:----------~----~ :-------------~- 4_~_____________1 , , ~cpacIty ~nalysls Module: cl/S.:It: O.:~ 0.:'4 0.:4 'Crlt Mo....e5: **** ,Green/Cycle: 0.15 0.:'4 (1.::4 'olume/C~~: 1.46 0.7:' 0.72 O. 10 0.47 0.:::: 0.47 0.04 O. 71 **** (I. ~....., O. '-C ().. 4:::' ~.~ (I. 71 **** 0.49 1. 46 0.07 0.7-:' **** 0.05 0.51 1 . 46 1. 45 0.7~ (1. 1 ~ 0.51 1. 45 0.7~ 1.46 1.46 1.45 1.4~ ---~--~----:---------------: ~--------~~-----: :----~~---------: ~--~------------~ evel Of SerVIce Module: elay/Veh: 403 15.6 ~~.8 ~7.4 :'75 435.6 518 :7: 4-:'6.~ 47~ -:'54 -:'90.1 Delay AdJ: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ^dJDel/Veh: 403 15.6 ~:.8 :7.4 375 4~5.6 518 37~ 4-:'6.: 473 354 390.1 ueue: 36 8 ~ 3 130 19 7 :18 ~1 I: :08 34 *********4********************************************************************** 00124 f. TrafflX System VerSIon 6.3 (c) 1991 DA Licensed to kaku Associates ~Q1QSM. IN Tue May 1~, 199: 1~::4:5~ F.:-ge 5-1 1919 SANTA MONICA BOULEVARD UPDATE YEAR ~OO~ CUMULATIVE PLUS GENERAL OFFICE PM PEAV HOUR Level Of SerVIce ComputatIon Report 1985 HC~ OperatIons Method *******.******************.** * Base Volume AlternatIve * ***.*********.*******************.********************************************* IntersectIon #4 ~0TH STREET ~ COLORADO BL ******************************************************************************* ycle (see): 60 CrItIcal Vol./Cap. (X): (\.940 Loss TIme (see): (l Average Delay (sec/ve-h): ~O. 7 nptlmal Cycle: 180 Level Of SerVIce: C ******************************************************************************* Hpproach: North Bound South Bound E8st Bound West Bound Movemen t : L T R L T R L T R L T R -----------:~---~~~~-~~----: :---------------: :---------------: :---------------~ antral: Left Phase Left Ph.:'l.se Left Phase Left Phase RIghts: Include Include Include Include In. Greer. : I) 0 0 0 0 I) (I 0 0 r) I) 0 ames: 1 0 1 1 I) 1 0 1 1 0 1 0 2 0 1 1 0 1 1 0 ----------~-:---------------: :----~-~~---~~~-: ~------~--~-----: :-~-------------~ olume ModLll e: ..n1tlal Vol: 30 475 60 38 1088 :1 45 10:::'0 114 159 995 - - Growth AdJ: 1 . 00 1 . 00 1 . 00 1.00 1 . 00 1.00 1 . 00 1. (10 1.00 1.00 1.00 1.00 CE AdJ: 1.00 1.00 1.00 1.00 1.00 1.00 1 . 00 1.00 1.00 1.00 1. 00 1.00 LF AdJ: 1.00 1. 05 1. 00 1.00 1.05 1.00 1.0(1 1 . 05 1.00 1.00 1.05 1.00 User AdJ: 1. 14 1. 14 1. 14 1. 14 1. 14 1. 14 1. 14 1. 14 1. 14 1. 14 1. 14 1. 14 -1 nal Va 1 . : 34 569 68 4' 1302 ~4 51 1221 130 181 1191 38 -' -----------:--~-----~~-----: :------~-~~-----: :------------~--: :---------------: Saturatl o~, Flow Module: at/Lane: 1800 180(1 180(1 1200 Isno 1800 1800 1800 1800 180(1 1800 18(1(1 ,dJLlstmen':. : 0.88 0,88 0.88 0.88 0.88 0.88 0.82 0.88 0.88 0.88 0.88 i)" 82 La.nes: 1. (1(. 1. 79 I). ~ 1 1.00 1.96 0.04 1.00 ::. t)~) 1 . (Il) 1.00 1. 94 (l. (l::. lnal Sat. . 1584 ~8~8 340 1584 ::111 57 1584 :'168 1584 1584 ;1)71 en . -----~-~---:-----~-------~-: :--~~------~~---~ ~-------------~-: ~-~---~---------: ,....~paclty ~nCllyslS Module: ~ ol/SClt: O.O~ n.:?o O.~O O.()~ (1.4= (1.4::: 0.0: (1 -0 0.08 ('. 11 (;. ~9 O.~S' _ . _, f 'U-l t Moves: **** ~HHHi' **** **** jGreen/Cic 1 e: ('. ')2 0.41 0.41 (1.06 0.45 (1.45 0.04 (1.41 0.41 O. 1: 0.49 0.49 01 L\me lC8j:.: ('.94 1).49 ('.49 1).4C:; 0.94- 0.94 0.79 0.94 {) . ~t) O.Q4 ('.79 O.7'=' -----------:---------------: :--------~~-----: :----~~-~~---~--: :--------~------: , evel Of SerVIce Module: 'e 1 ay IVeh : 112 1 <). 3 1:::'. 1 ~4. 4 ~ 1.5 1: 1 . 1 5~. 1 :?~. 8 8. 8 54. 7 11.9 47. ~ Delay AdJ: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ~dJDel/Ver.: 11~ 10.3 12.1 ~4.4 21.5 121.1 5~.1 2~.8 8.8 54.7 11.9 47.~ lueue: "':I 6 1 1....., 1 1 21 1 5 15 1 ~******************************************************************************* 0012S TrafflX System VerSIon 6.3 ( c ) 1 991 DA Llcensed to Ka~u ASSoclates & ~ ltt19SM.IU Tue May 1:, 199: 10:51:57 P<Olge 4-1 1919 SANTA MONICA BOULEVARD UPDATE YEAR ~ou: CUMULATIVE PLUS GEN ~ MED OFFICE AM PEA. HOUR Level Of Service ComputatIon Report 1985 HCM Operatlons Method ***************~*******~***** * Base Volume AlternatIve * ~*******~************~*********************************************************~ IntersectIon #: :OTH STREET & WILSHIRE BL ******************************************************************************* ycle (see): 60 CrItical Vol./Cap. (X): 1.13:- Loss Tlm~ (sec): 0 Average Delay (sec/veh): 6~.6 npt 1 mal eycl e: 180 Level Of Servl ce: F *********************************************************************~********* Approach: North Bound South Bound East Bound West Bound Movement: L T R l T R L T R L T R -----------:-------~~-~~~--: :~--~~~-~-------: :-----~~--------~ :--------~------: ~ont,..ol : Left Phase Left Phase Left Phase RIghts: Inc1 ude Include Include In. Green: 0 I) 0 I) 0 (l (l 0 anes: 1 0 .... I) 1 1 0 0 1 I) 1 0 1 1 .. left Phase Include 001) 0 010 1 1 0 -------~----:~----~---------: :---------------: :--~------------: :------~--------: olume Module: !nltlal Vol: 117 ~46 110 180 430 60 42 1243 13: 161 10:'0 59 Growth AdJ: 1 . 00 1. 00 1.00 1.00 1 . 00 1.00 1.00 1.00 1.00 1. 00 1.00 1 . 00 CE Ad;: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1. 00 1. 00 1.00 1.00 LF Ad;: 1.00 1. 05 1. 00 1.00 1.00 1.00 1 . 00 1.05 1.00 1 . (u) 1. 05 1.00 User AdJ: 1.07 1. 07 1. 07 1. 07 1.07 1. 07 1. 07 1. 07 1.07 1.07 1. 07 1.07 '-1 nal Vol.: 125 276 118 193 460 64 45 1397 141 17::2 1157 6~ -' ---------~-:-----~~--------~ ~---------------: :---------------: :-------~----~--: t::aturatl'::ln Flow Module: <Olt/Lan~: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 HdJustme;-;t: 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 Lanes: 1.00 :.00 1 . (II) 1.0(1 0.88 O. 1: 1 . 00 1. 8::2 0.18 1.00 1.90 o. 10 in.:\! Sat. : 1404 :S()S 1404 1404 1....'.... 17: 1404 :550 ~58 1404 ::2663 145 --'- , I ----~-----~I-~-------------I :---------------~ I , I t---------------i I ~ apaclty AnalysIs Module: ol/SClt: 0.09 0.10 O.OS o. 14 0.-:'7 0.-:'7 (1. (1-:' 0.55 0.55 O. 1:: 0.4:- 0.4:- Crlt MO'v2s: **** **** **** **** r:;reen/C;lcl e: ('.08 0.17 o. 17 0.:24 0.3-::: 0.3-::: O. (,4 ('.48 (1.48 o. 11 ~). 55 l).55 olume/C3p: 1. 1-:' 0.58 0.49 0.58 1. 13 1. 13 (}.79 1. l' 1. 13 1. 13 (J.79 O. 7'7' -' --~---~----:---------------: I I I I C I .---------------, .---------------, t--~-~--~-------I evel Of SerVIce Module: elay/Ve~: 146 18.9 18.7 17.4 102 175.:' 54,8 8-:::.2 133.0 133 10.3 33.9 Delay AdJ: 1.~) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ~dJDel/Veh: 146 18.9 18.7 17.4 10~ 175.3 54.8 83.~ 133~O 133 10.3 33.9 'ueue: 7 4 2 3 20 4 1 55 8 9 15 ..... ******************************************************************************** 00125 TrafflX System VerSIon 6.3 (c ) 1991 DA LIcensed to kaku ASSOCIates l~19SM. IN Tue May 1~, 199~ 10:51:58 F'age 5-1 1919 SANTA MONICA BOULEVARD UPDATE YEAR :OO~ CUMULATIVE PLUS GEN ~ MED OFFICE AM F'EM HOUR Level Of Se~vlce ComputatIon Report 1985 HeM Oper~tlons Method ***************************** * Base Volume Alte~natlve * ~******************************************************************************* IntersectIon #3 ~0TH STREET ~ SANTA MONICA BL ******************************************************************************* ycle (sec): 60 C~ltlcal Vol./Cap. (X): 0.918 Loss TIme (see): 0 Average Delay (sec/veh): :3.0 '"':Jtlmal Cycle: 180 Level Of ServIce: C ******************************************************************************* Approach: North Bound South Bound East Bound West Bound Movement: L T R L T R L T R L T R ---~----~--:-~-------------: :-----~------~--: ~--------~------~ :----------~~---: ~ontrol : RIghts: In. Green: anes: Left Phase Include I) 0 0 10110 Left Phase Inclllde 0<)0 10110 Left Phase Include o 0 0 10110 Left Phase Include I) 0 0 1 0 1 1 0 ------------:---~----~------: :---~~-----~--~~: :---------~-~---: :---------------: olume Modul e: InitIal Vol: 159 748 143 113 619 ...- 59 793 48 56 10~5 ~58 ..J_' Growth AdJ: 1 . 00 1.00 1.00 1.00 1.00 1.00 1.00 1. 00 1.00 1.00 1.00 1.00 CE AdJ: 1.00 1.00 1.00 1.00 1.00 1.00 1. 00 1.00 1.00 1.00 1.00 1 . 00 LF AdJ: 1.00 1.05 1.00 1.00 1.05 1.00 1 . 00 1.05 1 . 00 1.00 1.05 1.00 User AdJ: 1. 04 1.04 1.04 1.04 1.04 1.04 1. 04 1.04 1.04 1. 04 1.04 1. 04 lnal Vol . : 165 817 149 118 676 55 61 866 50 58 1119 268 -----------:-------~------~: :---~-----------: ~---------------: :---------------~ C::aturatIon Flow Module: at/Lane: 1800 18(10 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 HdJustment~ (l. 8~ 0.82 0.8:2 (1. 8~ 0.8: 0.8: 0.8~ 0.8~ O.8~ 0.8:: 0.8:: 0.8:2 Lanes: 1.00 1. 69 0.31 1 . (1(1 1. 85 e'.15 1.00 1. 89 O. 11 1 . 00 1. 61 0.:9 1nCll Sat oil : 147t :497 455 1476 '::.7:9 ..,"'- 1476 ~791 161 1476 ~381 571 ~~- --~--------:-------------~~: ~-----~---~---~-: :--~--------~---: :---------------: - <3pac It)' AnalYSIS Module: ol/Sat~ o. 11 o. -- O. -- O.OE c). :5 0.:5 0.04 c). :: 1 0.::1 0.04 0.47 0.47 : - - - - Cnt MovE':: **** ***+- *-li-** ***.. Gt-een ICyc 1 e: 0. 14 0.-:"6 (). ~6 (I. 09 0.::0 0.-:"0 0.05 0.49 0.49 0.06 0.51 n.51 olume/Ccp: 0.81 O.9~ 0.92 0.9: 0.81 0.81 O.9~ 0.6:- 0.6:, 0.62', O.9~ 0.9:: -----------:-~~~--~~-~-----: :----------~----: :-------------~-: :---------~--~-~: evel Of ServIce Module: elay/Veh: ::3.8 ~4.5 47.9 59.9 19.1 47.8 79.6 9.:2 18.3 ~9.6 18.4 ~~.~ Delay AdJ: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ^dJDel/Veh: 33.8 ~4_5 47.9 59.9 19.1 47.8 79.6 9.2 18.3 29.6 18~4 33~3 ueue: 4 15 4 4 11 : 2 10 1 1 19 6 ******************************************************************************** 00127 TrafflX System VerSIon 6.3 (c) 1991 DA LIcensed to Kaku AssocIates ! 9 1 951'1. It ~ Tue May 1:, 199: 10:51:59 Page 6-1 1919 SANTA MONICA BOULEVARD UPDATE YEAR 200: CUMULATIVE PLUS GEN ~ MED OFFICE AM F'EA.~ HOUR Level Of Service Computatlon Report 1985 HCM Operations Method ***********~*************+*** * Base Volume Alternative * ,********.*******+**********************~*************************************** Intersect:on #4 20TH STREET ~ COLORADO BL ********.********************************************************************** ycle (sec): 6(1 Cr-ltlcal Vol./Cap. (X): 0.809 Loss Tlme (see): 0 Average Delay {sec/veh): 1:::.4 ~ptlmal C\"cle: 120 Level Of Servlce: B ********+********************************************************************** f4pproach: North Bound SOLlth BOLlnd East BOLlnd West Bound Movement: L T R L T R L T R L T R -------~-~-:---------------: :---------------~ :---------------: :-------~--~-~~-: _ontrol: Left Phase Left Phase Left Phase Rlghts: Include Include Include In. Green: (l 0 0 0 (J 0 0 (J anes: 1 I) 1 1 0 1 0 1 1 0 1 0 2 (I Left Phase Include o 0 0 0 1 1 0 1 1 0 ---~--------:---~-~---------: :----------~--~-: :---------------: :--------------~: olume Module: !nltlal Vel: .... 765 158 37 610 ~7 ::9 10::4 64 50 586 4:- - Growth Ad; : 1.00 1 . 00 1 . (JO 1.00 1.00 1.00 1.00 1. 00 1.00 1 . 00 1.00 1.00 CE AdJ: 1 . 00 1. 00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 LF AdJ: 1.00 1.05 1 . 00 1.00 1.05 1. 00 1.00 1.05 1.00 1.00 1 . (15 1.00 User AdJ: 1. 16 1. 16 1. 16 1. 16 1. 16 1. 16 1. 16 1. 16 1. 16 1.16 1. 16 1. 16 - 1 nal Vol. : 2 932 183 43 743 31 45 1~47 74 58 714 50 -----------:-------~-------: :---------------: ~--~------------: :-------~-------: C:atur.;.tIo;- Flm<l ModLll e: at/Lane: 1800 18(11) 1800 1800 1800 1800 18[)(1 1800 180(\ 18(10 1800 1800 ndJustmen":.: 0.88 n.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 O.SE Lanes: 1 . (1(1 1. 67 (1 ~~ 1.00 1. 9~ n.ns 1 . (1(. :.0(\ 1. n,) 1.00 1. 87 0.1:' - . -,_. lnal Sat. . 1584 :647 521 1584 :'040 l~e 1524 ::168 1584 1584 ::961 :07 . -----------:----~~~~~~-~---; ~~~~------------: ~---------------~ ~~--------------~ ~ apaclty c...nal 'y"~l s Module: aI/Sat: u.oo O. ~<::" 0.:'5 0.0:' 0.~4 0.::4 t). (I-=- 0.::9 0.05 0.04 C'. :4 0.::4 _.....J Lrlt Mov e ~ : **** **..* ..**~ **** Green/Cy.==- e: 0.1)(1 0.4:: 0.4::' 0.03 (\.47 0.47 O.Ot (1.49 0.49 0.05 0.48 (1.48 olume/CC',:: t). 5:' 0.81 O.Bl (1.81 0.52 0.5:2 0.5~ 0.81 O. 10 0.81 ().51 0.51 ~ ~-~~~~-----:-~------~~~----: :---------------: :---------------: :--------~-~----: evel Of ~2rvlce Module: elay/Veh: 70.0 14.5 ::4.5 60.7 9.0 15.0 25.0 1:.4 6.4 53.1 8.6 11.8 Delay AdJ: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ~dJDel/Ve~: 70.0 14.5 :4.5 60.7 9.0 15.0 25.0 12.4 6.4 53.1 8.6 11.8 lueue: I) 12 3 1 7 0 1 16 1 2 7 1 ******************************************************************************** 00128 TrafflX System VerSIon 6.3 ( c ) 1 991 DA LIcensed to Kaku ASSOcIates . .. ...1Q=....i.. !~.. 1 '-,...1 ,} L"', 4 ~ 1 Q 0:::. .: l' I: 1":; : ~. =, ~.=,;:;e 1-1 1919 SANTA MONICA BOULEVA~D LP~ATE YEAF. :\)\ C CUMULAT I VE PLUS GEN ~) MED OFF ICE AM F'EA~, HOUR ~--------------~-~-~~-------------------~-------~--------~-~~--~--~-~~----~--~-- Le~el Of SerVIce ComputatIo~ Repcrt 1985 HeM Ope~atlons Method ***********~~**************** * Base Volume Alternatl~e - ~~~**~**.*****~******************~*********~*********************************** ,te~se~tlon n5 CLOVERFIELD BL ~ SANTA MONICA BL ******~**+************************************************~********************* r\/cle (se:;:): 60 Crltlcal Vol./::ap. (X): 1.016 : :JSS TIme: {sec): (I Aver-age Delay (sec/veh>: :?9.9 uptlmal Cycle: 180 Level Of Se~vlce: D ******~************************************************************************* Jproach: North Bound South Bound East Bound West Bound ~vement: L T R L T R L T R L T R ------------:-~--~--------~-: :-~-~-----------: :---------------: :---------------: - Jntrol: Left Phase Left F'hase Left PI-leIS€? Le+t Phase 1 ghts: Include Include Include Include MIn. Grec-': (- C- O 0 (l (I (J I) (l (l (I (F I ~nes: 0 I) 0 -. 0 (I (, 0 (J (J (i 1 1 0 1 (J .... (l I) ~ .' ~ ------~----:-~-~-~---------; t----~----~--~--: :----------~----: :~--------------: Volume Mo::ule: "HtlClI Vol: 685 0 ~7~ 0 I) 0 0 878 399 4~~ 119~ 0 ' . ~owth AcU: 1.00 1.0(l 1.00 1.00 1.00 1 . (ll) 1 . (II) 1.0e1 1. (lO 1.00 1.00 1.00 PCE Ad]: 1.00 1 . (l(l 1. (1(1 1.00 1.00 1.0Cl 1 . (ll) 1 . 00 1 . 00 1 . 00 1.00 1.1)(\ ."_F AdJ: 1.05 1.00 1.05 1 . 00 1.00 1.00 1. (II) 1.05 1.00 1.00 1. 05 1.0(J 5er Ad]: 1. 12 1. 12 1. I:? 1. 1:: 1. 12 1. 1:: 1. 1:: 1.12 1. 1:: 1. 1:: 1. 1:: 1. 1:: Flnal Vol. : 806 0 ::::::0 0 0 0 0 1 ("1'-::;<: 447 485 140:: I) ------------l---------------: ~---------------: :---------------: :---------------: ,-,aturCltlcn Flow Modul e: Sat/LanE: 18(1(1 18(10 1800 1800 1800 18Clel 1900 lE(-!) 1800 180() 1800 1 gCJ(l jJ...;stme:-t: ('.89 0.89 ('.89 0.89 0.89 ('.89 0.89 0.8i 0.89 0.89 0.89 0.89 3.n E s : :?,(i(i (1, (1(' :? Ot) O. (ll) O. (10 (i.OO (~. ~:1 (~ 1.40 (i. .t,C) 1.00 ~. (:() ().. (1("' FInal S~t* : 3204 I) :;::04 0 (I 0 (1 :::"36 9b8 16 c):: :;~O4 (, ___________i____~__________~ , , :------~-~------: :---------------, Lap~clt> ~~Bl,--- Mo~~l_: ;..lc,1/SCit: '),::5 (-I.C(i (I.lel : ,- 1 t Mev EO ::: : *' *., t- l_reeJ'1/C'1=le: ,=5 ~-. {)(I (.:= \'01 ume i C.=,;: : 1 t)2 \-'. 1:'(1 \-, 4(1 I ,,'. \ ('. ((t (). < ( . - () c; '- 46 I .-+c ~*:H" (1. _,;.\ (. 44 **** c.. j -C'- t-*+~ ('. (Ie' ('. e'l) e,. ( ,(' :. (11) ('. i_ \ (~ (I II L -H-' ~'. 4 S .Ie:- . ......,...) o. 'W" -, r-l. 75 1 . (I:: (I. 5E ,-\ "'71::'" \.. , T.... '"I. ,....,(-. U. ':J' 1. U:: 1. (C (~ ()f:". i ________~__:_______~~______ :__________~___~~ ;_~~__~___~____~: :~_~__~________~~ Level Cf SerVIce Module: nelay/Ve~: 46.1 0.0 14.7 0.0 0.0 0.0 0.0 38.4 50.1 5::.~ :.8 0.0 elClY Ad]: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Hd]Del/Ven: 46.1 0.0 14.7 0.0 0.0 0.0 0.0 ~8.4 50.1 5::.: ::.8 0.0 OLleue: 20 (1 4 I) n (I n 24 1'3 13 9 0 *******~***~***************~*************************************************** 00129 TrafflX System VerSion 6.3 ( c ) 1991 DA LIcensed to Ka~u Associates ,. J.~19SM. IN Tue May 1:, 1992 10:~8:45 Page :'-1 1919 SANTA MONICA BOULEVARD UPDATE YEAR 2002 CUMULATIVE PLUS BEN ~ MED OFFICE PM PEA. HOUR Level Of SerVlce Ccmputatlon Report 1985 HeM Operatlons Method *~*************************** * Base Volume Alternatlve * k*********************~******************************************************** Intersectlon #1 17TH STREET ~ SANTA MONICA BL f****************************************************~************************* I Jele (see): 61) Cntlcal Vol. /Ci'lp. (X): 1.1)10 Loss TlmE (sec): (1 Average Delay (see/vet-d: :'4.5 r?tlmal Cycle: 180 Level Of Servlce: D ~************************~***************************************************** Hpproach: North Bound South Bound East Bound West Bound Movement: L T R L T R L T R L T R -----------:-----~---------: :~--------------: :---------------: :-------~----~~-: L .3ntrol : Left Phase Left Phase Left Phase Left Phase Rlghts: lnclllde Include Include Include Ln. Green: 0 0 0 I) l) 0 I) (> I) 0 0 0 ;l,nes: 1 (I I) 1 0 1 0 0 1 0 1 0 1 1 0 1 0 1 1 0 ------------:---------------: :-~---------~---: :---------~~----: :---------------: J 1 LIme Mod..Jle: J.l'H t 1 al Vol: 61 :;04 49 136 :'61) ~..... 4: 1356 67 <="<=" 1085 79 -'... .J...J Growth AdJ: 1 . (II) 1.00 1.00 1. 00 1.00 1.00 1. 00 1.00 1.00 1.00 1.00 1 . 00 :E AdJ: 1.00 1.00 1.00 1.00 1.00 1.00 1.0(' 1.00 1.00 1.00 1.00 1.00 _F AdJ: 1.00 1 . 00 1.00 1.0(1 1.00 1.00 1.00 1.05 1 . 00 1.00 1.05 1.00 User- AdJ: 1. 10 1. 10 1. 10 1. 10 1. 10 1.10 1. 10 1. 10 1. 10 1. 10 1. 10 1. 10 - lnal Vol. : 67 :::34 54 150 396 35 46 1566 74 61 1253 87 -----------:------------~--: :------~---~----: :---~---~------~: ~---------------: c;~tLtratlor. Flow ModLll e: 3.t /Lane: 1800 1800 1800 1800 1800 1800 1800 1800 18(1) 1800 1800 180n ndJLtstment: 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 Lanes: 1 . (l(i ().86 0.14 1.00 o. 9: 0.08 1 . I)(J 1. 91 0.09 1 . (Ii) 1. 87 O. 1:' Inal Sat. : 14\)4 1:09 195 1404 1289 115 1404 :682 1~6 1404 26~6 1E2 --------~--:------------~--: :---------------: : ~______~-_____~I I I I r3pac 1 ty A-I<31YS1S Module: . :>l/SClt: O. (IS () . :28 (~.. 28 o. 11 n.:;l c).31 (l. I):; ('.58 ('.58 O. ()4 (1.48 0.48 Lrlt MO'ves: **** **** *~** **** f3reen/Cycle: (1. .:)5 0.'::.7 0.:7 (1. 11 n. ~- o. -- (l.04 O.5E ().58 0.04 0.58 0.~8 - - -~ ..... :=,lLlme/C~i=: o. q4 1.01 1.01 1.01 0.94 0.94 ('. 8~ 1.01 1.01 1.01 0.82 t)" S= ---~-------:-------------~~~ :------~--------: ~--~----~-----~-: :---------------: avel Of ServIce Module: ~Iay/Veh: 8~. 1 57.8 116.0 80.9 35.5 101.5 61.5 ~9.8 94.9 116 10.4 33.1 Delay AdJ: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ~dJDel/Veh: 8~.1 57.8 116.0 80.9 :'5.5 101.5 61.5 :9.8 94.9 116 10.4 33.1 ueue: 3 10 3 5 9 ~ 1 34 3 3 16 ~ ******************************************************************************** 00130 TraffIX System VerSIon 6.3 ( C ) 1991 DA LIcensed to Kaku ASsocIates . . !. 9 1 9SM. IN Tue May 12, 199: 10:58:46 Page 4-1 1919 SANTA MONICA BOULEVARD UPDATE YEAR :00: CUMULATIVE PLUS GEN ~ MED OFFICE PM PEA. HOUR Level Of Service Computation Report 1985 HeM OperatIons Method ********~******************** * Base Volume Alternatlve * ********************~********************************************************** Intersection D: :OTH STREET & WILSHIRE BL *******************~*********************************************************** ycle (Eec): 60 Crltlcal Vol./Cap. 0): 1.310 Loss TIme (see): 0 Average Delay (sec/veh>: OVERFLOW "ptlmal Cycle: 180 Level Of Service: F ******************************************************************************* Hpproach: North Bound SOLlth Bound East Bound West Bound Movement: L T R L T R L T R L T R -----------:----~----------: :--~-----------~: :----------~----: :---~~~---~~----: _antral: Left Phase Left Phase Left Phase Left Phase Rights: Include Ioc 1 L\de Include Include In. Green: 0 0 I) 0 0 (I 0 I) (I I) 0 0 anE'S: 1 I) "') (I 1 1 0 0 1 0 1 I) 1 1 0 1 0 1 1 0 - ------------:-~~--------~---: :--------~------: :---------------: :~-------~-~----~ olume Module: ...nltlal Vol: 83 :::87 168 1""'C' 4~0 44 4- 1401 58 ~61 11 :'4 51 _0 -' Growth AdJ: 1. 00 1.00 1.00 1 . 00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 CE AdJ: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 'LF AdJ: 1.00 1.05 1.00 1.00 1.00 1.00 1.00 1.05 1.00 1. 00 1. 05 1.00 User AdJ: 1. 17 1. 17 1. 17 1. 17 1. 17 1. 17 1. 17 1. 17 1. 17 1. 17 1. 17 1. 17 - lnal Vol. : 97 475 197 146 491 51 50 1721 68 305 1393 60 -----------:---------------: :~--------------: I I ~ t I-~----~~-------. ~---------------t SaturatIon Flow Module: at/Lane: 180(1 1800 lsnl) 180(1 180(1 1800 1800 1800 1800 18(1l) 1800 1800 .....dJLlstment: 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 u.7S 0.78 Lanes: 1 . (1(1 ~.O(J 1.00 1. (1(1 0.91 0.09 1.00 1. 9: (1.08 1. (ll) 1. 9: ,).08 Inal S~ t. = 1404 :808 1404 1404 1:71 1~~ 1404 :701 l(q 1404 :693 115 ---~~~-----:---------------~ ~~--~-----------; :----~-~--~-----~ ~-~~-~~-----~---: r"'apaclty {:.,'1.;\! YSl S t10dul e: '01 /Sat : 0.07 O. 17 ell 14 O. 10 (, -0 (\ -0 (I. (14 (1.64 (1.64 (). ~:: C' <:>...... (t. 5:: - . _, .I' _ . _- t _ .1...l_ CrIt MovE'=: **** **** **** **** ,Green/Cycle: (1.05 0.:': 0.:: (I. 1:: (J III ::(J 0.:'0 ('.04 (1.49 0.49 O. 17 (\.61 0.61 I '01 ume/Cal=': 1.-:.1 0.79 0.65 0.79 1. ::1 1. ;.1 0.85 1. :,1 1. 31 1.::1 (1.85 0.85 l __~________:_~~__~__~__~___: :__________~_~__: I I . t !---------------I.---------------t evel Of SerVIce Module: Ie I a y / Veh : :98 : 1 . 8 19. 9 :,:. 6 ~::7:;4 7. : 65. 6 :09 319.8 :41 10. 4 46.:' Delay AdJ: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ~dJDel/Veh: :98 21.8 19.9 32.6 ::7 347.2 65.6 209 119.8 ::41 10.4 46.:' lueue: 9 7 ::: 3 36 5 .... 1 :4 7 23 17 2 ******************************************************************************** 00131 TrafflX System Version 6.3 (c ) 1 991 DA Licensed to Kaku ASSOcIates 1'7'19SM. Ir~ Tue May 1:, 199: 10:58:47 Page 5-1 1919 SANTA MONICA BOULEVARD UPDATE YEAR :00: CUMULATIVE PLUS GEN ~ NED OFFICE PM PEA. HOUF.. Level Of ServIce ComputatIon Report 1985 HeM OperatIons Method ***.************************* * Base Volume AlternatIve * ~~******...*****************************************************~*************** IntersectIon #3 :OTH STREET ~ SANTA MONICA BL f****************************************************************************** 'jcle (se.::): 60 Ct-ItIcal Vol./Cap. (X): 1.474 Loss TIme (sec): (I Average Delay <sec/veh): OVERFLOW ~~tlmal Cycle: 180 Level Of ServIce: F ~*******.********************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L T R L T R L T R L T R ----~------:-----------~~--: :~~----------~-~: :-~-------------: :---------------: .....:>ntrol: RIghts: In. Green: 3.nes: Left Phase Include 000 1 I) 1 1 0 Lef t F'hase Include o 0 0 1 0 1 1 (I Left Phase Include 000 10110 Left F'hase Include o 0 0 1 0 1 1 0 ------------~---~-----------: :---------------: :---------------: :---------------: :Jlume Module: J.nltlal Vol: 306 <=",,0::- 111 1-0::- 1090 149 49 1710 147 91 1666 :59 oJ_oJ _'oJ Growth Ad] : 1.00 1.00 1.00 1.00 1 . 00 1.00 1.00 1. 00 1. 00 1. 00 1.00 1.00 :E AdJ: 1.00 1.00 1.00 1.00 1.00 1.00 1. 00 1.00 1.00 1.00 1.00 1.00 l _F Ad]: 1.00 1.05 1.00 1.00 1 . 05 1.00 1.00 1. 05 1.00 1.00 1.05 1.00 User Ad]: 1. 08 1. 08 1.08 1.08 1.08 1. 08 1. 08 1.08 1. 08 1.08 1.08 1. 08 ---I nal Vol. : 330 595 120 146 1236 161 53 1939 159 98 1889 280 -----------:-------~-------: :---------------: :---------------~ :---------------: c:lturatl0. Flow ModLlle: :It/Lane: 180(\ 1800 1800 180(1 18(10 1800 18C'0 18r)0 18('(1 HdJllstment: O.8~ 0.8: 0.8: 0.8~ 0.8: 0.8: 0.8: 0.8: 0.8: Lanes: 1.0CI 1. 66 0.:'4 1. (Xl 1. 77 c).. :3 1. l)() 1. 85 ('. 15 Inal Sat ~ : 1476 :457 495 1476 ~61:: ::40 1476 :7:9 ",,- ......-.-. 1 8(\0 180(1 0.82 0.8: 1 . 0(1 1. 74 1476 :::'571 180n 0.8: '-'. ~6 :81 -----------:---------------: :---------------: :----~------~-~~:: ~~paclty ~nclysls : oI/Sat: (1.. ::: Crlt MOVE=: **** ?reen/Cycle: 0.15 ; :)lume/Ca;J: 1.47 t _________~_~_~~~__~________~ :_______________: :_____________~_: M':Jd u 1 E: (1. :4 (1. :4 O. 10 0.47 0.47 0.04 0.71 0.71 (1.07 (l.T:' (1. r:. **** **** **** (1. :'4 O. :.4 O. 14 ~). -::~ o. -" 0.0:::' 0.48 0.48 (\, (15 (1.5() i). 5() -'- 0.7: O~7'2 0.7: 1. 47 1. 47 1. 46 1. 47 1. 47 1. 47 1.46 1. 4t: evel Of ServIce Module: elay/Veh: 417 15.6 :~.9 :7.1 :'88 449.0 537 :'86 451.1 488 :'71406.9 Delay Ad]: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ~dJDel/Veh: 417 15.6 2:.9 :7.1 388 449.0 537 386 451.1 488 371406.9 ; uelte: 38 8 2 3 135 20 8 :24 :' 1 13:' 15 35 ******************************************************************************** ~ , l J 00132 i - Trafflx System VerSIon 6.3 ( c ) 1991 DA LIcensed to Ka~u ASsOcIates r ~ -i19SM. p~ Tue May 1=. 199: 10:58:48 Page 6-1 1919 SANTA MONICA BOULEVARD UPDATE YEAR :00: CUMULATIVE PLUS BEN & NED OFFlCE PM PEAl HOUR Level Of ServIce ComputatIon Report 1985 HCM OperatIons Method ***************************** * Base Volume AlternatIve * .****************************************************************************** IntersectIon #4 :OTH STREET & COLORADO BL ******************************************************************************* y'cle (see): 60 CntIcal Vol./Cap. 0): 0.94: Loss TIme (sec): 0 Average Delay (sec:/veh): :0.9 n~tImal Cycle: 180 Level Of ServIce: C ******************************************************************************* Hpproach: North Bound South Bound East Bound West Bound Movement: L T R L T R L T R L T R -----~-----:---~~----------: :---------------: :---------------: :---------------~ _ontral: RIghts: In. Green: an e s : Left Pha.se Include I) 0 011 (I (I Left Phase Include (I 0 1 I) 1 1 I) o Left Phase Include o o o (J Left Phase Include o 0 011 o 1 1 .... - o 1 1 o -----~------:---------------: :-------------~~: :~-~----~----~--~ :---------------: olume Module: .inItIal Vol: :'0 478 60 4< 109: :1 45 10:0 114 159 995 36 -' Growth AdJ: 1.00 1. 00 1 . 00 1.00 1.00 1.00 1.00 1.00 1.00 1.0(1 1 . 00 1.00 CE AdJ: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 LF AdJ: 1.00 1. 05 1.00 1.00 1 . 05 1.00 1.00 1. 05 1.00 1.00 1.05 1.00 User AdJ: 1. 14 1. 14 1.14 1. 14 1. 14 1. 14 1.14 1. 14 1. 14 1. 14 1. 14 1. 14 - Inal Vol. : 34 572 68 49 1308 :4 51 1221 130 181 1191 41 -----------:------------~--~ :----~----------: :---------------: :---------------: C:aturatlon Flow Module: Clt /Lane: 1800 1800 180(' 1800 1800 1800 180(' 18('0 18(10 1800 1800 1800 MdJustrr.ent: 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 (1.88 0.88 0.88 0.88 ~.;r.es: 1.00 1. 79 ('. :1 1.00 1. 96 0.04 1 . 00 ::. (.r:~ 1.00 1 . (J(1 1. 9:; 0.07 Inal S~t ~ : 1584 ~830 3:;8 1584 :;111 57 1584 3168 1584 1584 :;06: 106 I I. I I I I i -----------I~~~------------I I--------------~t I----~----------I I----~-----~~~~-. ;~.,;.pacl t, Anal'y:51S ModLlle: I aI/Sat: (l. ~)~ o.~o 0.:0 I). (,:; ('.42 0.4~ ('. O~, ('. ~9 (1.1)8 c) . 11 0.:;9 0.:'9 1 '_t-l t M.:J\'e=: *JI'** *.jo.** **** **** J:r-een ICyc 1 E: (1. (1~ ('.41 0.41 (1. ('6 (l.45 (1.45 (l.04 ('.41 0.41 ( . 1= C'. ..:1.9 C' oil 49 clume/Ci"p: 0.94 0.50 0.50 0.50 (1.94 (1.94 0.79 0.94- (J. :2(\ 0.94 0.79 0.79 --~--~-----:----------~-~-~: :---~-~~--------: :---------------: ~---------------~ , evel Of ServIce Module: .elay/Veh: 11:; 10.5 1:.5 :4.1 :1.6 1:~.0 5~.9 ~~.O 8.8 55.1 1:2.0 46.0 Dela.y AdJ: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 .^dJDel/Veh: 11:' 10.5 12.5 24.1 =1.6 1~~.1) 5~.9 23.0 8.8 55.1 12.0 46.0 uet.le: 2 6 1 1 ~2 1 1 21 1 5 15 1 ******************************************************************************** 00133 - Trafflx System VerSIon 6.3 ( c ) 1 991 DA LIcensed to Kaku Assoclates ':>1C'-::1".~'. Thu Jur. 4, 1'7(~.~ 1(': 19:~"'" FC1:;je 1-1 1910 EAN1A MONICA BOULEVARD UPDATE YEAR :00: CUMULATIVE PL~S GEN ~ MED OFFICE FM PEA~ HOUR Level Of SEr~I=E ComcutBtlon Re~Grt 1985 HeM OperatIons Method ******.**~~*~~*************** * Base Vol~~e AlternatIVE' * ~~~~***.**********************~***~******************************~**~*****~.*~* ,ters2ctIon #5 CLOVERFIELD BL ~ SANTA MONICA BL *******~*~***********************************~.************~*********~*****~~**~ r'ycle (S2'::); 60 CrItIcal Vol./Cap. (X): (l.982 :JSS TI:n~ (sec): 0 A...'ErClge Delay (sec/veh): :A.(J wptImal C(cle: 180 Level Of Serv1ce: C ****~**.~~******************************.****~********************~**.*****~**** ~proach: North Bound SOLth Bound East Bound West Bound :Jvemert: L T R L T R L T R L T R ---------~~-:-~~-----~----~-: :---------------~ :----~----------: :---------------: '"':Jnlrol: Left PhasE' Left PhaSE Left PhasE' Left Phas2 19hts: Include Include Include Include MIn. Gt- e;en : 0 0 (I (i (~ (I I) 0 I) I) 0 r) Lanes: .... I) 0 I) .... r) (; (J 0 (1 (I (I 1 1 I) 1 (I .... 0 c' ~ ~ ~ .' , , , , -~~~-~-----I-~-~--~--------r E 1______---______1 i_______________, I 4 I . Vol LIme Module: ; nltla.l Vol: 507 0 580 0 0 [) <) 1~98 ::71 :294 1:25t (l ""'owth Ad] : 1.00 1.00 1.00 1.00 1. (It) 1. (ll) 1 . 00 1. or) 1.00 1.0C' 1 . (l!) 1.00 FeE AdJ: 1 . (ll) 1.00 1.00 1.00 1 . (H) 1.0(1 1.00 1. ('0 1.0(1 1.00 1. (0 1.0(' t-tLF Ad J : 1 . 0:::- 1.00 1.05 1. Or:, 1.00 1.00 1.00 1.05 1.0(1 1.00 1.05 1.00 I ser Ad]: 1.08 1.08 1.08 1.08 1 . 08 1. i)8 1.08 1.IJ8 1.08 1.08 1.08 1.08 rInal Vol. . 575 (J 658 0 (J (i [) 147~ 401 :18 14:4 C' . ------------~----~----------: :------------~--~ :---------------: :--------~------: _:\turatIon Flow Module: Sat/LClre: 190(- 1800 1800 1 :3(\(' 1 :="-.(1 18(\(1 18(10 1800 180(\ 181)(' 181: .) 190 :., jJu::trr-er.t: (1 00 0.89 0.89 () a 89 (', g9 (i,89 (1. 89 0.89 0.89 (1.89 ':'.89 r.se; . . '-I I .:ones: ~. (J(l (1. (II) :2.00 O. (1(' l ,.-\ t) ,., (,(- O. ('l) 1. ~7 C'.4: 1 ,}( I ~, . If) 1+ . ':1(' . . ~. Flnc;l ::.:::-:. : -::=04 0 :::21)4 (, (1 (; 0 ::515 686 160= =.~1-)4 (1 -------------:---------------: . I I----~~~-~~-----I ._~p2CI:,. ':'n,;I..~SlS M,.:.dule: \'. ell .I S c. t : ) 'II 1 S (1. (11 ~"I : t-1 t I'i::> ,'e:; : l. r-e:e:-,/C"t=l e: \-'cl UiT,2 1:_=-=: C.:::1 ('. St n .., 1 .. _.L - i 21 , 1 ( - , - " - 1:.'(1 ,) (;1:1 C'. ~::! (\ 58 '). ~(. 44 L - . - . - - . . - -' . . - **-l\-~ **-;0-+ **** *++* ('. =1 , i'l - - - , ! i . It--I ( . ('l - , ( ::9 C ~9 ,', ~(: I)... -0 ....,c - . . - - . - . - - . . '.' * . O. qC; (' !o.-\,._ , ()(I ( l 0(1 ,-, 09 ( , 99 ( ) 9'7 (1 S~ ( l( - . . . . - . . . . . . - o . .)() -----------:----------------~ ~---------------: , . , ,---------------1 .--~~~------~---, L Level C~ SerVIce Module: f\ela,J'/\..~el-.: :5.: Cl.C) 4:2."3 ('lie! 1~1.':l ':1.() {).(~ ~4.8 4f)t17 5:;.9 ::".(~ ~).Ij ~lay AdJ: 1.00 1.00 1.00 1.ne 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ..."jJDel/VEh: 25.7 0.0 4:2.:: (i.':' (-J" ('.0 0.0 :24.8 40.7 5::.9 :.0 ':'.G OueuE'; 10 (I 15 (1 0 (J [):;O 11 9 8 0 *****~*~******~~**************~***.***************************************~**** 00134 Traff1:~ System VerSIon 6."3 (c~ 1991 DA LIcensed to Kalu ASSOCIates J. =?19~M. ItJ Tue May 1~. 19Q~ 1~::q:5~ Page ~-1 1919 SANTA MONICA BOULEVARD UPDATE YEAR ~00: CUMULATIVE PLUS GEN & MED OFFICE WITH PAID MITS AM F'EAI HOUR Level Of Service Computation Report 1985 HeM OperatIons Method ******************~~********* * Base Volume AlternatIve * *****.~*****~~*********************************~******************************* IntersectIon #~ :OTH STREET ~ SANTA MONICA BL ******************************************************************************* yele (see): 60 CrItIcal Vol./Cap. (X): 0.827 Loss TUTH? (sec): 0 Average Delay (sec/veh): 16.9 nptlmal Cycle: 132 level Of ServIce: C ******************************************************************************* Hpproach: North Bound South Bound East Bound West Bound Movement: L T R L T R l T R l T R ---~-------~--------------~: :-~~~-----~-----: 1_______________4 I , ~------~--------: _ontral: left Phase Left Phase Left Phase Left Phase RIghts: I nc1 ude Include Include Include In. Green: 0 0 0 I) I) I) (l I) I) 0 l) <) anes: 1 0 1 1 (J 1 0 1 1 0 1 0 1 1 0 1 0 "" 0 1 .... ---~------~-:---------------: ~----~~-~-----~-: I______--~______I , , :--------------~~ i 01 LIme Module: .I.nltlal Vol: 159 748 14:- 11::: 619 1::"< 59 79:' 48 56 10~5 ~58 "",-' _I Growth AdJ: 1 . 00 1.00 1 . 00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 . CE AdJ: 1.00 1.00 1. 00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ; LF AdJ: 1.00 1. 05 1.00 1.00 1.05 1.00 1 . (J(l 1.05 1.00 1.00 1.05 1.00 User Ad]: 1. 04 1. 04 1.04 1.04 1.04 1. 04 1. 04 1. 04 1.04 1.04 1. 04 1.04 ("1 nal Va 1 . : 165 817 149 118 676 55 61 866 50 58 1119 268 -------~---:--~~----~------~ l-----~---~-~~--: :---------------~ :---------------: c:.:aturatlon Flow Module: at /L.;.ne: 1800 1800 1800 1800 leon 180(' 1800 18(1) 1900 18('0 18('0 180(J "dJustrr<?n~: O.8~ 0.8~ O.8~ 0.8::? 0.8~ ('. 8~ 0.8: (1.8: 0.82 0.8: (I.8~ ().82 Lanes: 1.00 1. 69 (1. ~ 1 1 . (lei 1. 85 (1. 15 1 . (10 1. 89 O. 11 1 . (Il) :. ell) 1 . (J( InCll c_~ 1476 :497 455 1476 :27:9 '""1-.- 1476 :791 161 1476 :-95~ 1476 ....J'::'- :... .. . ~~- I -----------~--~-_-_~_~__~-~~ I , 1~--------------1 ~---------------: , . t---------------. ('apaCI ty ':'ICllYSlS Modu 1 e: r 'oI/Sat: 0. 11 (l 7- O. -- 0.08 (\ . -'1::" O. -.t::" 0.04 0.-:1 0.::1 0.04 0.::8 O. 1e f . . -'-~ - - ~-' ~--' ~ LF""lt r1c w'E:::: : **** **** **** **** {Greenlet c 1 e: O. 15 0.40 0.40 0, 10 (1. :'4 O. :::4 0.05 O.4~ (1.45 0.06 0.46 !) . 46 'olLlme/:-i'l~: (, . 7:' 0.83 0.8:' 0.8:- O. " O. 7< 0.83 0.69 0.69 O.6Q (J.83 0.4':' , -' -' --~-~~~----~----------~----: :-~~-------~--~- --------------- ~-------------~-: evel Of Eervlce Module: 'elay/Veh: ~6.4 16.7 30.~ 41.6 15.5 :'~.8 55.4 11.~ ~5.4 ~4.9 14.0 8.5 Delay AdJ: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ~dJDel/Veh: ~6.4 16.7 :O.~ 41.6 15.5 3:.8 55.4 11.2 :25.4 34.9 14.0 8.5 'Lleue: ~ 13 ~ 3 10 1 "" 11 1 1 16 3 ~********~********~************************************************************* 00135 Traff1x System VerSIon 6.3 (c) 1991 DA LIcensed to Ka~u ASSOCIates -1 :',="-1. : ~ '"";" ~I __I ,~;.. If 4, 1:: ~ 2. 1 ( ~: 1 ':: : --: 1 :-:<;lE 1-1 1919 ~~'JT..i 1'1Ot.JI=~ BOULEVARD UF'DA"7"E YEAR 2002 CUM~lATIVE PLUS GENERAL OFFICE F 1'1 F'E?i HOUR LE\el Of SE~YlCe C~mputatlon Re~ort 19~5 HeM Op~~atl~ns ~ethod *+*****~+~**.~*~~************ ... Sa5€? ....'olume Altet-natlve ~ ~****+*~4***~~****~**********~****+**+~+~*****+************~******************+ iters~.::tlon #5 CLOVEF'FIELD BL ~, S?:oNTA MONICA BL ******..*.**********************************~*********************************** ryele (see): 60 CrItlcal l"..'ol./Cap. (X): i:;.986 ~ss Tl~E (see): 0 A~erage Delay (sEc/veh): 2:.7 ....,ptlm,;l Cycle: 18(' LevEl Of Ser.....'lce: C ************.********************~*****.**********~***+**~*****~****+*********** ~proa~~: North Bound Scuth B~und East Sound West Bound :>vemer- t : L T R L T R L i R L T R ----~-------~--~--~---------~ ~---------------~ t---------------: :---------~~---~: ~:'ntrol : Ights: MIn. Gr-2er-t: I an es : Left Phase I nc lLlde (1 (1 ei Left Fhase I:-;o:lude (l (4 (J o Left Fhase In=lude (I r) Left F'hClse Include 1 o o n (I .., o 0 u <) (\ 0 0 o (I (I 1 1 (l (, -' I) ~~~--~-----:---------------: , , I~~--~---------~I :~~-~-~--~----~-: ~------~~---~~--: Volume Meo,-ll e: nltlal \.'01 : 5(~5 I) 580 (1 (, 0 0 1:::06 ::68 ~Cjl4 1'"'cC (, ~...J-.J , 1.00 1.00 -owth AdJ: 1 . (If) 1.0(' 1.0(; 1. ()r:' 1 . (1-) 1.00 1 . 00 1. ('i) 1. (10 1.00 peE Ad~: 1.0(1 1. (II) 1.00 1 . ell) 1.0(' 1.00 1.00 1. ')0 1. uo 1.0(1 1.00 1.0(1 ""~F Ad;: 1.05 1.00 1.05 1. (10 1.0(1 1.0(1 1.00 1.05 1.00 1.00 1.05 1.00 ser Ad]: 1. (18 1.08 1. (18 1.08 1.0e 1.08 1.08 1.08 1.08 1. (}8 1.08 1. (18 l-Inal l,..'w1 . : 573 (; 658 0 c) 0 0 1470 397 ::18 14~3 (l ------______1______---______1 :---------------; ~---------------~ :---------------~ I ' 1 _3tLlra~lcn Flow Module: S~t/Lal"",2: 1800 1800 18(1(\ 1 0(;(", 18(""("- 18(;(' 1 E'(l(l 1E :.(1 12(1\:1 18\:1(1 18el(1 180':! w_ _ d JLlsti'"2rt: O. 89 (I. 89 O. 89 l) . 8'7' O. Ec:;' O. 89 -, CICI O. ClC' O. 89 (.... 89 (1 89 O. E'o ~.'" W, '-0' j - . ' , ~nes: -, (.e, (i ( - .(- .., CI(~ (J'II (>) i..; . I.,,'" (I. ~:1(; (~. ('0 1 e, (1. 4- 1 (1(' ""' 00 ('. (1("' ~. - . - . . - . ...! i -' . ~. Fl:-Jal c-+- : ::~O4 (! ::=04 ~) I - ,-, () """'C='I-""'"'I 68::::: lbO~ =-=(14 0 '- ~ ..... ------------:-----~~--~-----: :---------------: 1______---------, , , ~2p~CI~j ~n~l~sls Modul~: Vel '52<"':: ('.18 , i ~-l t Me:. E'S : Lr.;en..'C,=:e: ':1.':'1 '.'C'l UfT"IE': = =;::: C'. 86 l_ , - ,/- ,-I -. 1 ( - , . - ~ ~ . - **""* ***~ (:1.. 21 l-l. ,..., 1 , - C I, - , ~ . - - (j . l)i:1 (1. C;Cjl ("-, (....., 1_'.: '1_ ", ~_'I - (\ .. 'f - , ( <=r (1 <=,..., -', , - 44 l " ( 'l , . - . -':: . ~I :;:, \ . ~ . , **** ***,.. O. C- ,! - ; ( 0(' (1. =9 (I, c::-o (1. ~(I ~., 70 O. -:'c , ~, - . I C' . (li) C 0(; C. t C.q { I 00 ( - 99 (I. 56 r) (i( - . . - . ). , t-' i -~ 1- _ a . . (1 . (:'I'~ ~ --------~--~------------~~-: ~-------------- --------------- -------------~- l Level Cf Eer~lce Module: inelay/Veh: :5.:: 0.0 41.9 0.0 0.0 0.0 0.0 2(.4 40.4 5::.5 :.0 0.0 : elay ~jJ: 1.001.0l) 1.00 1.0') 1.('01) 1.00 1.00 1.00 1.00 1.0(' 1.l)C-J 1.00 ~dJDel/~Eh: ~5.:: 0.0 41.9 0.0 0.0 0.0 0.0 24.4 40.4 5::.5 ~.O o.n OLleue: 10 (I 15 (1 (J (l t) ~9 11 9 8 0 *****~*~*******~***********..***~**....*+**...*********..**..************************* 00136 Traf'f1:~ System Verslon 6.3 (c) 1991 DA Llcensed to t a~u Assoclates . , .. .1 ~19SM. n~ Tue May 1:, 199: 10:51:57 Page :'-1 1919 SANTA MONICA BOULEVARD UPDATE YEAR 200: CUMULATIVE PLUS GEN ~ MED OFFICE AM PEA. HOUR Level Of SerVIce ComputatIon Report 1985 HCM OperatIons Method ***************************** * Base Volume AlternatIve * ^*****.************************************************************************* IntersectIon #1 17TH STREET & SANTA MONICA BL ~****************************************************************************** fcle (see): 60 CritIcal Vol./CcOID. eX): 0.805 Loss TImE' (sec): () Average Delay (see/veh): 17.9 '""''jtImal Cycle: 117 Level Of SerVIce: C ******************************************************************************* Approach: North Bound South Bound East Bound West Bound Movement: L T R L T R L T R L T R -------~---:~-----------~~-: :---------------: ~--------~~--~--: :---~~~------~--~ ~untrol : Left Phase Left Phase Left Phase Left Phase RIghts: InclLlde Include Include Include In. Green: (I (I I) (I n 0 I) (I 0 0 0 I) 3nes: 1 0 0 1 0 1 0 0 1 0 1 0 1 1 0 1 0 1 1 I) ----~-------:-----------~-~-l :---------------: :-----~~~-------: :--~---~--~---~-: :Jlume Module: .1nItIal Vol: 68 30~ 59 102 375 45 67 788 44 40 874 106 Growth AdJ: 1 . 00 1.00 1.00 1 . 00 1.00 1. 00 1.00 1.00 1 . 00 1.00 1.00 1.00 CE AdJ: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1 . 00 ~F AdJ: 1.00 1 . 00 1.00 1.(H) 1.00 1.00 1.00 1.05 1.00 1.00 1.05 1.00 User Ad]: 1.06 1.06 1 a 06 1.06 1.06 1. 06 1. 06 1.06 1.06 1 . 06 1.06 1.06 ~ Inal Vol. : 72 3:0 63 108 398 48 71 877 47 42 973 11~ -----------:~--------------~ :-----~-~-------~ :---------------: :---------------: C::aturatIo' Flow Module: at/Lane: 1800 1800 1800 180(1 18(lO 1800 1800 1800 1800 1800 1800 1800 MdJustment: 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 Lanes: 1 . 00 0.84 0.16 1 . 00 0.89 (l. 11 1. (10 1 a 90 (I. 10 1.00 1.79 0.~1 I nal Sat. : 1404 1175 ~~9 1404 1~54 150 1404 ~666 14:2 1404 :517 :291 -~---------:-~~--~---------: I________~~___~_t I , I , I I I~-------~~-----. ~---------------I - E..pacIty ;;n~lysIs ModLlle: oI/Sat: (1.05 0.:27 0.';:.7 O. 08 O. -~ o. -~, 0.05 0.-':::- O. -- 0.0:' () . -:9 n. -'::9 1 -'- -'- - - (Xlt Meve:: **** **** **** **** .'~reEn /Cy= 1 e: (1. (It, 0.:::6 0.-'::6 () . 1(, (1 ~q (1. -0 0.06 0.50 O. 50 0.05 o. 48 (I. 45 - . -' . -' , olume/Cc::;:o: 0.81 0.76 0. 76 0.76 ('.81 0.81 0.81 0.66 0.66 0.66 C'.81 0.81 ~----------:-~-~----------~: :-~--~~~-~------: I . J ~ .---------------.l---------------f evel Of SerVIce Module: . elay/Veh: 47.4 18.7 :'5.1 34.5 19.0 47.4 47.7 9.6 22.1 36.~ 1:'.1 :8.9 Delay Ad]: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 r^dJDel/Veh: 47.4 18.7 35.1 34.5 19.0 47.4 47.7 9.6 ~2.1 36.~ 13.1 28.9 L1eue: '"' 5 2 ..... 7 1 2 10 1 1 14 ..... ******~..*********************************************************************** ()f)1~7 Traffl/ System VerSIon 6.3 \:d ( c) 1991 DA LIcensed to Kaku ASSOCIates 91 ~::M. ItJ lue May 1:, 199:2 1~:4G:~9 PagE :2-~ 1919 SANTA MONICA BOULEVARD UPDATE YEAR :20u= CUMULATIVE PLUS GEN t /'1E8 OFFICE WITH PAID MITS FM FE~I HOUR Level Of Se~~Ice CompJtatlon ~eport 1985 HCM Operations Method **~********~*******~*~******~ * Base Volume AlternatIve * **************~*******************~******~*********************************+... IntersectIon #~ :OTH ST~EET ~ SANTA MONICA BL ***************************************************************************+*+* ycle (;:;ec): 60 Cntlcal Vol. leap. (X): 1.474 Loss TIme (see): 0 A~erage Delay (sec/veh): OVE~FLOW npt1rnal Cycle: 180 level Of ServIce: F **********~***~*~******************************+**************************~**+~ Hpproach: North Bound South Bound East Bound West Bounc Movement: L T R L T R L T R L T h I It J -----------1---------------. .---------------t , , I , ontrol: Left Phase RIghts: Include ''In. Green: (l (' 0 . anes: 1 0 1 1 0 , - I t I I -~--~--~~---I--~------------. I-------~--~----I Left PhClse Left PhasE Left Phase Incl,_'de Include Include (I 0 0 (~ 0 0 0 0 ,- .- - 1 0 1 1 0 1 0 1 1 0 1 (J ... 0 1 .L ( , o 1 Ll me Module: ..nltlal Vol: ~('6 .,....,c- 111 1~'" 1090 149 ....J-...J _'..J Growth AdJ: 1.00 1 . (l0 1,00 1.00 1.00 1. ('C, CE AdJ: 1 . 00 1.00 1.1)0 1.00 1 . 00 1.1)0 LF Ad]: 1.00 1.05 1.00 1.00 1.05 1.00 User AdJ: 1.08 1 . 08 1.08 1 . 08 1. (18 1.08 '1 nal Vol. : ~3(\ 595 1:?0 146 1~36 161 -~---------~-~~------------: :------~--~-----: SatL\ratlon Flow Mod Lll e: at/Lane: 180(1 18(1(1 1800 1800 18r)(I 18('(' ,d]ustment: O.8~ C.8~ (1. 8~ 0.8:? 0.8:2 0.8: Lo.nes: 1. c,n 1.66 (1, ~4 1. ell:' 1. "7-' (\. ::..:: ( ( 1 nal Sat. : 147t: ~457 495 1476 :261:2 -::4':' -----------:~~--~----------: ~--~~~~-~-~~~~- ~apa~lty An3lysIs Module: .cl/Sat: 0.== 0.24 0.:4 L~lt MOV23: **** G ~ e e ill eye 1 e : (I. 1 5 "-.'. ~ 4 ('. ~ 4 ( - : 'olume/C~p: 1.47 (1.72 ':'.72 I -__________1_______________1 . , I 49 171 (1 147 91 1666 -.c~ 1 . CO 1.0(1 1.00 1.00 1 . 00 1 . (1 : 1. (10 1.00 1. 00 1.00 1.00 1.00 1.00 1 . 05 1 . 00 1 . 00 1.05 1. (1-) 1 . ('8 1.08 1 . 08 1.08 1.08 1.0e 53 1939 159 98 1889 ~8') , . I , I---------------t .---------~-----I 19,:'(' 18r);:' 180(1 180(1 180(' 13( . O. 0"'" 0.8: 0.8:2 Cl.8:2 0.8:::' (: wE=- w~ 1. ('e' 1.25 (1. 1:: 1.0(' :. (~~l) 1. ,- - - - 1476 :7:9 ....,,,~ 1476 ~q5: 1 .- - ___I ~- - _........-.------------- --------------- O. 1 (I (). 47 (\ . II~ ("1-11 r:'4 1--' 71 C\.71 (1.07 (r. tA ( . - ,;-1 -' . - - +*** **** **** 0. 14 (f, ~..., r) . ~--. O. n-::-; 0. 4'3 ().. 48 (I. 0=, ('. Sf) (' "" - -'~ -'~ - . (J. 7~ 1 47 1 47 1 ......'12 1. I!- 1 47 1 47 1 -'0 . . . "'-t, . . . _w . - - --------------- --------....---------.......------ I .....-.....------------- , I _evel Of SerVIce Module: ,lelaylVeh: 417 15.6 ::.9 :7.1 :'88 449.0 -::19 ~86 451.1 488 18::: D~lay AdJ: I.Ot) 1.0c) 1.00 1.00 1.()O l~O(:) 1.00 1.C)O 1.()O 1.00 1.()O 1.(:: ~dJDel/Veh: 417 15.6 22.9 27.1 :88 449.0 ~19 "386 451.1 488 18::: '. ~ llleue: 38 8 : :. 135 :0 5 ~24 ~1 13 128 ~~*******~****~***************************************~***********************~* TrafflX System VerSIon 6.3 ( c ) 1991 DA nnl1~ -" -" . Llcensed to Ka~u ASSOCIates ATTACHMENT G 00139 T ~;:: 7".' ^ r--. .---. ---.. .r--., ^ --;-- ~ ~~,'4ooOJ! \~0'-........;,-_.df ..,: =:: - _.... Lo.....,:: - - ~-;:....., r~ - ;; U ,_ l"" - r-=,-,= ~ - - - - - -.-....:::::: MEMORANDUM TO: Ron Fuchlwakl. CIty of Santa MOnica FROM: REF: 622 SUBJECT' DATE: This memorandum 1S In response to your request to provide further informatIon regarding the potential traffic Impacts and need for mitigation measures relating to the 1919 Santa Monica Boulevard Office BUlldmg proJect As you know, we prepared a traffic study for the 1919 Santa Momca Office BUilding project In November of 1988 which was Incorporated mto the environmental Impact report (EIR) prepared by Cotton/Beland/AssocIates, lnc for the project At that time, the proposed project consisted of 6,366 square feet of medical retail space on the first floor and 39,844 square feet of office space on the upper three floors. for a total of 46.210 square feet of bUilding area not Including parking (or a total of 51,832 square feet If the 5,622 square feet of covered parking on the first floor IS Included) ThiS study determmed that the project as onglnally proposed would have a slgnrflcant traffIc Impact at the mtersectlon of Santa Monica Boulevard and 20th Street, and suggested restfJPlng Santa Momca Boulevard to provide an exclusive nght-turn lane on the westbound approach to the intersectIon as a project mitigatIon measure We subsequently prepared an addendum to the 1988 traffic study and EIR which evaluated a proJect alternative consIsting of a total of 46,210 square feet of butlolng area but With all of thiS area deSignated as general office space (I e . the retail use Originally proposed would be replaced by offlce space) ThiS addendum concluded that, wltn the reduction In traffiC expected by replacmg the retail space With office space. the project would not have a Significant Impact at the Santa MOnica Boulevard/20th Street IntersectIon and no proJect mitigatIon would therefore be necessary The EIR was certlTled on Aprrl i 1. 1989 at which time It receIved Its approval from the City OT Santa MOnica City CounCil Among the conditions of approval for the proJect adopted at that time were the follOWing · The project proponent would pay for the Implementation of the suggested mitigation measure at Santa Monica Boulevard/20th Street by prOViding the City With the necessary funds to construct the Improvement /tI17WflLl&NTfIr - .;53 Th,{;:;' -~. Se' '" 4(;': 0 0 1 4 0 - .p"(::J ..~""":....,....= ~...:: ~~.1.""'~ Ron Fucrllwakl June 2 1993 Page 2 · The project uses would be restricted such that no retail. retail financial lnslltutlon or medical office uses would be permitted . The project would be reduced In size by 5,000 square feet 01 rentabfe noor area, thus reducing the overall proJect sIze to 46,832 square feet (Including the 5,622 square feet of covered parking area), of which 41,210 square feet would be general office space However. It IS Interestmg to note that. If the oro/ect had been reanalyzed at the tune of approval, the reduction In proJect-generated tripS which could be expected to result from Implementation of the second and third conditIons of approval referenced above (I e., the restriction on retail or medical office uses and the reduction In size by 5,000 square feet) would have ehmlnated the projected signIfIcant Impact at Santa Monica Boulevard/20th Street Thus, based on the project as approved, the project would have resulted In no SIgnificant Impact to any of the analyzed IntersectIons, and there would have been no need for the project mitigation measure at Santa Momca Boulevard/20th Street As a result, It would appear that the condition that the project proponent pay for Implementation of the mitigation measure was In fact unnecessary given the two other condItions referenced above Please feel free to contact me If you have any questions or comments regarding the above or deSire additional mformatlon 00141 ATTACHMENT H ,-< 0 0 1 L\ 2 ~~ J- P&Z:DKW:shk:dR92002 Santa Monica, California Planning Commission Mtg: April 7, 1993 TO: The Honorable ?lanning Commission FROM: Planning staff SUBJECT: Development Review 92-002 Address: 1919 Santa Monica Blvd. Applicant: 9th and 34th street Partners INTRODUCTION Action: Application to amend Condition 35 of Development Review 441 to allow 16,000 sq. ft. of general office space to be con- verted to medical office use. Recommendation: Denial. SITE LOCATION AND DESCRIPTION The subject property is a four-story 46,832 sq. ft. office build- ing with two levels of subterranean parking located at the corner of Twentieth street and Santa Monica Blvd. Surrounding uses are a three and four-story convalescent hospital to the north (CP), Santa Monica Hotel to the south (C4), st. John's Medical Center to the east (CP) and general commercial uses (C4) to the west. Zoning District: C4 Land Use District: General Commercial Parcel Area: 150' x 150' ~ 22,500 sq. ft. PROJECT DESCRIPTION The applicant is proposing an amendment to Condition 35 of Development Review 441. Condition 35 states that fino retail, retail financial institution or medical office occupancies shall be permitted in the development due to the related traffic generation rates which are higher than general office occupancies." The applicant is proposing to convert 16,000 sq. ft. of the exist- ing general office use to medical use. The hear~ng on this application has been delayed several times at the applicant's request. 00143 - 1 - 1t'TfA:CH7vl UvT ::tJ. MUNICIPAL CODE AND GENERAL PLAN CONFORMANCE The proposed project is consistent with the Municipal Code in that it provides the required number of parking spaces and is an allowed use, but is not in conformity with the General Plan in that the increase in traffic congestion is in conflict with cir- culation Element of the General Plan. CEQA STATUS An Environmental Impact Report (EIR) and three Addenda were pre- pared for this project prior to approval of DR 441. The second Addendum specifically presents recounts of the traffic levels at the intersection of 20th street and Santa Monica Boul~vard. This Addendum also proposed new traffic mitigation measures. The Third AddendUlll, prepared at the request of the applicant, addressed the potential traffic impacts of an all-office scenar- io, substituting office space for the proposed 6,366 sq. ft. of ground floor retail space. Table A-2 of this Addendum presented no significant traffic impacts in either the a.m. or p.m. peak hours associated with an all-office scenario. The EIR and three Addenda were certified at the time of the proj- ect's original approval. RENT CONTROL STATUS Commercial exempt. FEES Fees were paid under DR 441, but this particular amendment is not subject to any special fees. PUBLIC NOTIFICATION Pursuant to Municipal Code Section 9.04.20.20.080, within 30 days after the subject application was deemed complete, the applicant posted a sign on the property stating the following information: Project case number, brief project description, name and telephone number of applicant, site address, date, time and location of public hearinq, and the Planning and Zoning Division phone number. It is the applicant's responsibility to update the hearing date if it is changed after posting. In addition, pursuant to Municipal Code Section 9.0'.20.22.050, notice of the pUblic hearing was mailed to all owners and residential and commercial tenants of property located within a 500 foot radius of the project at least ten consecutive calendar days prior to the hearing. A copy of the notice is contained in Attachment B. - 2 - 0014'-* ANALYSIS Background The City Council approved Development Review 441 on April 11, 1989. In its approval, the city Council reduced the square footage of the project by 5,000 sq. ft., from the 51,832 sq. ft. proposed, to a maximum of 46,832 sq. ft. The 1919 Building was completed and received its certificate of Occupancy on April 15, 1991. Condition 35 of the City Council's approval restricts the 1919 Building from leasing space to retail, retail financial in- stitutions or medical tenants. At present, roughly one-half of the building is occupied. - During the past two years, the owners of the 1919 Building have received requests from doctors wanting to locate in their build- ing. Agreements to lease space to several doctors were apparent- ly made, which came to the City'S attention when business licen- ses were applied for. These applications were denied. According to the applicant, since the 1919 Building is located so close to st. John · s Hospital, doctors could vis it patients by walking across the street rather than driving their cars to the hospital, thus reducing traffic generated by doctors. However, patient trips to this location would increase. After this application to convert general office space to medical use was submitted, the ci ty of Santa Monica requested that a traffic study be conducted to assess the impact of this application. Parking The parking requirements for this proj ect were based on Code parking requirements of 1 space for every 300 sq. ft. of floor area for general office and retail uses for a total of 138 spaces. A total of 158 spaces were provided with a variance ap- proved to allow 40% of them to be compact spaces. The current application shows 158 spaces with 35% of them being compact. Code parking for medical use is 1 space for every 250 sq. ft. of floor area. Converting 16,000 sq. ft. to medical use would re- quire an additional 10 parking spaces. The total required for this revised project would be 148 spaces, which is already available. Traffic and Circulation One of the major areas addressed in the EIR prepared for DR 441 was traffic and circulation. The following intersections were analyzed in the EIR to determine detailed Level of Service (LOS) and Volume/Capacity (v/e) ratios during the morning and evening peak hours in accordance with the Critical Movement Analysis method of intersection capacity analysis: - 3 - 00145 Santa Monica Boulevard and 17th Street Santa Monica Boulevard and 20th Street Santa Monica Boulevard and Cloverfield Boulevard Wilshire Boulevard and 20th Street Colorado Avenue and 20th Street The November 1988 Addendum clarified certain discrepancies between the original EIR and other EIRs which previously had been prepared for nearby projects. These revised traffic counts found that, prior to mitigation, a significant traffic impact would be expected at the intersection of Santa Monica Boulevard and 20th street during the p.m. peak hour. The 1919 Building was not projected to create a significant im- pact on any of the other study intersections in eithe~ morning or evening peak hours, but this Addendum did reveal that a signifi- cant impact would occur at 20th Street and Santa Monica Blvd. under unmitigated conditions. The Addendum proposed feasible traffic mitigation measures which were incorporated into the Con- ditions of Approval. The following improvement was included as a condition of approval: Santa Monica Blvd. east of 20th street shall be re-striped at the developer's expense to accommodate a total of six lanes, including the addition of an exclusive right-turn pocket on the westbound Santa Monica Boulevard approach to 20th street if requested by the City Parking and Traffic Engineer. The applicant paid for this improvement, but the improvement has not yet been implemented. The need for mitigation is based on full capacity and since the building is only 50% occupied, the city is monitoring the situation. The fee paid by the applicant is being held in an account by the city. The EIR traffic study and the subsequent Addendum used the appli- cant I s original proposal of 51,832 square feet which was later reduced by the city Council to 46,832 square feet. There was no traffic study done which analyzed the impact of the reduced square footage. A Traffic study for 1919 Santa Monica Building was prepared for the applicant per the request of the City by Kaku Associates in June 1992 to evaluate the potential i~pacts of converting 16,000 sq. ft. to medical use. The applicant hoped to show with this study that no significant impacts would result from the change of use. The report analyzed traffic conditions at the same five intersections as the EIR. This traffic study uses the 1992 Master Environmental Assessment for information on baseline con- ditions and the Highway Capacity Manual (HCM) method for the level of service analysis. The Traffic Study Report is in this report as Attachment F. The traffic study report concluded that the proposed change would aggravate traffic conditions at a level that would be considered - 4 - · 00143 significant at the 20th street and Santa Monica Blvd. intersec- tion. The report also states that the implementation of the pro- posed mitigation measure originally identified in the EIR and included as a condition of approval (as listed above) would not mitigate the impacts of this project. According to the report, no additional improvements can be made at this location without the acquisition of additional right-of-way, maj or capital con- struction, or both. The Kaku Traffic Study Report concludes that the change in use as proposed in this application would result in an unmitigatable impact at this location. The proposed change could result in a very small number of addi- tional trips, but the actual number of vehicles was_not calcu- lated in the study. Under the city.s definition of a siqnificant traffic impact, the addition of one to two vehicles in an inter- section could potentially create a significant impact. RECOMMENDATION It is recommended that the Planning Commission deny Development Review 92-002 to allow an amendment to Condition 35 of Develop- ment Review 441. DEVELOPMENT REVIEW FINDING 1. The proj ect is generally consistent with the Municipal Code in that adequate parking per Code requirements is provided, but it is not consistent with the CirCUlation Element of the General plan in that this proj ect would create a significant environmental impact which cannot be mitigated. 2. Reasonable mitigation measures cannot be included for all adverse impacts identified in the Environmental Impact Report, in that the traffic study's analysis of its effec- tiveness indicates that the measure would not mitigate the impacts of this project. No additional improvements can be made at this location without the acquisition of addi- tional right-oi-way, major capital construction, or both. Prepared by: Susan Healy Keene, Assistant Planner Attachments: A. Municipal Code and General Plan Conformance B. Notice of Public Hearing C. Radius and Location Map D. Photographs of Site and Surrounding Properties E. Statement of Official Action for Development Review 441 F. Traffic Study for the 1919 Santa Monica Blvd. Building prepared by Kaku Associates, June 1992 G. Plot Plan, Floor Plans and Elevations - 5 - 00147 SHK PC/dR92002 03/31/93 - 6 - 00148 ATTACHMENT A MUNICIPAL CODE AND GENERAL PLAN CONFORMANCE Category Land Use Element Municipal code project Permitted Use Service & specialty Commercial C4jHighway General Commercial Medical Offices & Parking Space Number N/A 1 space/300 84 + 64=148 sq. ft. of general office and retail 1 space/250 sq. ft. medical use Compact Parking % N/A maximum 40% 35% - 7 - ~ 00143 ATTACHMENT I 00150 PLANNING COMMISSION STATEMENT OF OFFICIAL ACTION PROJECT CASE NUMBER: Development Review 92-002 LOCATION: 1919 Santa Monica Boulevard APPLICANT: 9th and 34th Street Partners CASE PLANNER: Susan Healy Keene, Assistant Planner REQUEST: To amend Condition 35 of Development Review 441 to allow 16,000 sq. ft. of general offi ce space to be converted to medical office use. CEQA STATUS: An Environmental Impact Report (EIR) and three Addenda were prepared for this project prior to approval of DR 441. The second Addendum specifically presents recounts of the traf- fi cleve 1 s at the intersect i on of 20th Street and Santa Monica Boulevard. This Addendum also proposed new trafflC mitigation measures. The Third Addendum, prepared at the request of the appl i- cant, addressed the potential traffic impacts of an all-office scenario, substituting office space for the proposed 6,366 sq. ft. of ground retail space. Table A- 2 of this Addendum presented no significant trafflc impacts in either the a.m. or p.m. peak hours associated with an all-offlce scenarlO. The EIR and three Addenda were certified at the tlme of the project's orlginal approval. PLANNING COMMISSION ACTION 4/7/93 Date. xx Approved based on the following findings and the conditions below. subject to Dem ed. Other. EFFECTIVE DATE(S) OF ACTION(S) IF NOT APPEALED: 4/21/93 Development Revlew 92-002 - 1 - 00151 A-7ThCAfMaJT I EXPIRATION OATE{S) OF ANY PERMITS GRANTED: 4(21/94 Development Review 92-002 lENGTH OF ANY POSSIBLE EXTENSION OF EXPIRATION DATE(S): Any request for an extension of the expiratlon date must be received in the Planning and Zoning Division prior to expiration of this permit. 3 months Development Review 92-002 DEVELOPMENT REVIEW FINDING 1. The physical location, size, massing, and placement of proposed struc- tures on the site and the location of proposed uses within the project are compatible with and relate harmoniously to surrounding sites and neighborhoods, in that the proposed medical use is located in an exist- ing office building which conforms to required setbacks and is of a compatible height and scale with surrounding development. The project bUllding is located in the C-4, Highway Commercial District and is ad- jacent to the CP, Commercial Professional Oistrict, where the City's hospital and health-care facilities are located. 2. The rights-of-way can accommodate autos and pedestrians, including parking and access, in that adequate parking is provided on-site that can accommodate 16,000 square feet of medical office use. 3. The health and safety services (including, but not limited to, sanita- tion, sewers, storm drains, fire protection devices, protective ser- Vlces and public utilities) will be adequate to accommodate the change from general office to medical use. 4. Anyon-site provision of housing or parks and public open space, which are part of the required project mitigation measures required in Sub- chapter SG of the City of Santa Monica Comprehensive land Use and Zoning Ordinance, satisfactorily meet the goals of the mitigation pro- gram, 1n that all these cond1tions were met prior to this building ob- taining a Certificate of Occupancy. A traffic mitigation fee is being held pending improvements. 5. The proJect is generally consistent with the Municipal Code but it is not consistent with the Circulation Element of the General Plan in that this project would create a significant environmental impact which can- not be mitigated. However, the need and demand for medical offices in close prox1mity to local hospitals, which benef1ts the public health, safety and welfare and lmproves patient care, are considerations which overnde the po tent1al negative impact of add,tional trafflc at the intersection of Santa Monlca Boulevard and Twentieth Street. 6. Reasonable mitigation measures cannot be included for all adverse 1m- pacts ldentlfled 1n the Initial Study or Environmental Impact Report, 1n that the trafflc study's analysis 1ndicates that the restriping of - 2 - 00152 Twentieth Street, a required mitigation measure for the original proJ- ect approval, would not mitigate the impacts of this project. No add1~ t10nal improvements can be made at th1S location without the acquis1- t10n of add1tional right-of-way, major capital construction, or both. However, the need for medical offices in close prox1mlty to local hospitals benefits the publ ic health, safety, and welfare, by improv- ing patient care. This consideratlon overrides the potential negat1ve impact of additional traffic. VOTE Ayes: Nays: Abstain: Absent: Pyne, Parlee, O'Connor, Mechur Polhemus None Gilpin, Morales NOTICE If this is a final decision not subject to further appeal under the City of Santa Monica Comprehensive land Use and Zoning Ordinance, the time within which judicial review of this decision must be sought is governed by Code of Civil Procedure Section 1094.6, which provision has been adopted by the City pursuant to Munlcipal Code Section 1400. I hereby certi fy that this Statement of Offi cial Action accurately refl ects the final determination of the Planning Commission of the City of Santa Monica. signature date Ralph Mechurt Chairperson Please Prlnt Name and Title I hereby agree to the above conditions of approval and acknowledge that failure to comply with such conditions shall constitute grounds for potential revocation of the permit approval. Appllcant's Slgnature Prlnt Name and Title - 3 - 00153 ATTACHMENT J 0015,: ~W<U^SSOCI^TES t CC,.DOia fIO"': - i"ra.,S.Dor:a'.on CI3fi....j...g "ra"': ::,..,C'I'lee'j....c P=rk"'C: S rUa!es MEMORANDUM TO: Evan James, DominIon Property Company cc Ron Fuchlwaki, City of Santa MOnica FROM: Srlnath RaJu Tom Gaul SUBJECT: 1919 Santa Momca Boulevard Office Building - Updated Traffic Impact AnalysIs With 1993 MEA Base DATE: September 21, 1993 REF: 700 This memorandum summarizes the supplemental traffic Impact analysIs performed by Kaku Associates, Inc. for the 1919 Santa Monica Boulevard Office Building ProJect, The traffic study we prepared In June of 1992 evaluated the potential impacts of converting 16,000 square feet of the proJect to medical office space, mcorporatlng the City'S traffic study procedures as of that time. The purpose of thiS supplemental analysIs IS to evaluate the potential impacts of the medical office conversion usmg the recently updated 1993 eity of Santa Monica Master EnVironmental Assessment (MEA) traffic projections provided by the City as the cumulatNe base condition Also, to be consistent with the City'S current traffic study gUIdelines, the proJect trip generation was updated uSing the trip generation rates given In Institute of Transportation Engineers' (ITE's) Tnp Generation, Fifth EditiOn (1991) This supplemental analysIs IS directed at two mtersectlons located near the 1919 Santa MOnica Boulevard Office BUIlding The two intersections analyzed consisted of · 20th Street and Wilshire Boulevard · 20th Street and Santa MOOlca Boulevard 80th AM and PM peak hours were analyzed far the fallOWing two project land use scenanos 1 Scenario 1 - Project consists of 41.210 square feet of General Office use, as approved by the CIty CounCil 2 Scenano 2 - PrOject consists of 25.210 square feet of General Office use and 16,000 square feet of Medical OffIce use (I e . the proposed conversion) - 1453 T/rrra Slreel SUJle 400 Santa MOnica CA 904()1 GCi55 ,31()i 458-9916 Fax i3'(); 394 7663 Evan James September 21. 1993 Page 2 TRAFFIC IMPACT ANALYSIS The updated (1993) MEA traffIc volume proJections for the future year were used as the future cumulative base, and traffic generated by the two alternative project land use scenarios descnbed above were added to obtaIn future cumulative plus project traffic vokJmes. The trip generation estimates used for the two proJect alternative land use scenarios were computed uSing the rrE Trip Generation, Fifth Edition and are shown in Table 1. The 1985 Highway CapacIty Manual (HeM) method of intersection capacrty analysis, as Implemented in Trafflx software, was utilized to compute the projected levels of service at the two analyzed intersections for the two project scenanos, and the results of the analysIs runs are shown In Table 2. The same Intersection lane geometrrcs and traffic flow parameters utilized in the updated MEA traffic analyses were used for these runs. CONCLUSIONS The conclUSions of the supplemental traffic Impact analysIs can be summanzed as follows: It can be observed from Table 2 that the volume-to-capaclty (VIe) ratio or the delay at the two analyzed Intersections under Scenano 2 do not show any SIgnificant Impacts beyond that prOJected under Scenano 1 conditions 2 Usmg the CIty of Santa Momca's SignifIcant Impact cntena, the mtersection of Santa MonIca Boulevard and 20th Street would not be Significantly Impacted under either proJect scenarro (I.e., Scenario 1 With 41 21 ksf general office only nor Scenarro 2 With 25 21 ksf general office and 16 ksf medical office). With the updated MEA future projectIons used as cumulative base projections 3 USing the City of Santa MOnica's slgnrflcant Impact cnterla, the Intersection of Wilshire Boulevard and 20th Street would be signtflcantly Impacted under both project scenarros. With the updated MEA future projections used as cumulative base projections The project traffiC Impact under Scenarro 2 at this Intersection, beyond that of Scenano 1. IS an Increase In vIe ratio of +0002. WhiCh, by Itself, would not be slgi"lIflcant 00156 TABLE 1 PROJECT TRIP GENERATION AM Peak Hour Tnps PM Peak Hour Tnps Project Size Dally Scenario ~ksf) Trips Out Total In Out Total In - Scenano 1 0l4- Ill? 10, General Office 41.21 718 85 11 96 16 81 97 Scensno 2 1~4 uq l4-0 , ./ General Office 2521 495 58 7 65 11 56 67 Medical Office 1600 547 33 -1Q 43 19 46 65 Total 41 21 1,042 91 17 108 30 102 132 00157 (h en ~ <( z <( w u :; c: W N(h wu. -10 m...J ;:g;! w ~ z o r= u w en a: UJ I- Z I I C\J ..- o (/) 0 .~ .=1 "::=' m (f) (0 co;c 8 > ~ (IJ (j) 13 Q.l '0 .... a..C\l rn 0 ::1._ - .... eLm <1) C > CP .- 0 Cd(/) :J E ::I o - o Q.l '0 a: ..... (/) 0 .2 '- n.. Co Q.l c > Q.l .- 0 (OCI) :J E ::I o ~E<t ;ow ~:::~ :J EQ.)C') :J~(j) OIIl~ ~C' c- CJ)C _ m (/)0 , ..... 0 .2 L) -= C o Q.l "0 CC'- -OlD C >. (f) rG Q) rG ,gcoco "2: - . CJ)OE -to:J en ~o E >. 0....(0 >0t3 '0 CC'- -OQ) C >. (f) ~ Q) ('0 :scoco C - " CJ)OE _ a:J ::I (f) c.. 0 E >. o.....ro -OID > Cl >. 0..... co -OID > 0 :x:. ..... lU ::I ell 0 a.. I I o 0 Z Z o N o 0 o 0 o 0 + + C/l <:) >- C') ~ o + CI) o ...J u.. ...... C\/ C') ...... Vl Q) >- C") ...... o o + (J) o .....l u.. ...... (\J C") ..... rn o ~ u.. co o C") , ~12 1 ct i D- C o .;:::; (.) Q) (f) .... Ql 'E m_ Ql(/) ~.z J::.- C/lO -C\J ~~ o Z ...... () o CJ,) + (f) (/) (I) >- o Z o ...... ~ o + NO OlD + (f) u.. CD '<:t C\l C') 0)0 a)~ ...... o Q) >- o Z co o o o + ......0 OQ) + (f) u.. III N C\J C") co () O'l~ ..... u.. al v ..... (") t-.. 0) ~ ~ <( 0.. 1Il.... (f) a:J a:J0.c -20 lijoC\l rn~~ o Z '<:t (,) o 0 + (/) o Z Vo ......Q) +0 al mo ......lD ......0 o Z 00 ......Q) + (f) III me.> ...... Q) ......0 CD ~ o (l0153 1919 Santa Monica 81 Traffic impacts Ori~inal AnalysIs The onglnal traffic Impact report for this development was Drepared In SeDtemoer 1988 with an Addenaum In November 1988 Onglnal Proposed PrOject 46210 sq ft (39 844 sq ft offIce and 6 366 sa ft retail). plus 5.622 sq ft parking on ground floor Methodology used Cntlcal Movement AnalysIs (CMA) Tnp Generation Manual ITE Trip Generation, 4th Edition Definition of Significance 002 Increase In volume/c8oaclty (VIe) ratio Traffic counts conducted by consultant PrOject tripS Retail 1,240 ADT. 33 AM peak. 184 PM peak Office 688 ADT. 91 AM peak. 92 PM peak Total 1,928 ADT. 124 AM peak, 276 PM peak Cntlcal Intersection 20th and Santa Monrca BI (PM peak) Levels of Service EXisting LOS C, vlc = 0 78 CumuJatlve Base LOS E. vlc = 0 95 Cumulative Base plus Project. LOS E, vie = 0 99 Note: The Council approved a reduced size and use project. The final approved project was reduced by 5,000 sq ft and limited to general office uses. Based on the approved proJect, the development did not create a significant impact. Medical Office Analysis A new traffic Impact reDort was orepared In June 1992 to determine the Impact of convertIng 16 000 sq ft of general offIce to medIcal offIce use New proposed project 41 210 sa ft (25.210 sq ft office and 16.000 sa ft medIcal office) piUS 5.622 sq it parking on the ground floor Methodology Used Highway Capacity Manual (HeM) OperatIonal Method Tnp Generation Manual SANDAG Traffic Generators, June 1991 Bnef GUide 00151 Deflnltron of Slgmflcance No Net Increase If LOS E or F Traffic counts conaucted by CIty for 1992 MEA Project tnos Scenario 1 EXIstIng OffIce Only 824 ADT ~ 15 AM peak 107 PM peak Scenario 2 OffIce 504 ADT 71 AM peak 66 PM peak MedIcal Office 800 ADT 48 AM oeak 80 PM peaK Total 1.304 ADT. 119 AM peak. 146 P'VI Deak Cntlcallntersectlons (Scenario 1) 20th and Wilshire BI 20th and Santa Monica Bl Critical Intersections (Scenario 2) 20th and WIlshire 81 20th and Santa MOnica 81 Levels of ServIce See attached Note: If the old definition of significant impact were applied, under both Scenario 1 (Existing Office Only) and Scenario 2 (Office and Medical Office), there would still be a significant impact at 20th and Santa Monica 81. However, the intersection of 20th and Wilshire 81 would not be significantly impacted. Final Note: The findings in the 1993 MEA show that 20th and Santa Monica 81 is projected to operate at LOS C in both the AM and PM peak hours under cumulative unmitigated conditions. The proposed change to 16,000 sq ft of medical office would add 80 trips to the AM peak hour (an increase of 2% of the total intersection volumes) and 120 vehicles to the PM peak hour (an increase of 2% of the total intersection volumes). Although actual HeM calculations have not been conducted, it is determined there will not be a signifcant impact. The findings in the 1993 MEA show that 20th and Wilshire BI is projected to operate at LOS F in both the AM and PM peak hours under cumulative unmitigated condItions. The proposed change would add 10 trips 10 the AM peak hour (an Increase of 0.3%) and 25 tnps In the PM peak hour ( an mcrease of O.6%). However, although actual HeM calculations have not been conducted. It is determined that the Increase would create a Significant impact. i\.n1S:! . ~ I I , I - !C'J ~ i~ ~ c c i~ z. - I 2: - >- z >- z - - Z ia -. ici5 'c '''I! ,~ ~ C\; C) C'> 0 "- .,., Q '<r ~, ~ '2 g ;:. C\. c 0 I ;2 ;;' 6 '=' c::- o .~ ~ 0 c 0 c 0 c 0 c ::;; 0 .- J OJ >" VJ r:: C'<l "ij}, ~ r- < <( Of) <( C') r-- C> 0:) OJ 0 Z Z Z 0 g 0 0 0 0 0 ,- E I (/) 0 0 U () C U 0 U. l.l.. Ll. to ...J Q .2 a: ~ on r-- M 0 ,.., M en 0 on (0 - c: 0 0 0 (") ~ .- <.D 0 v .- 0:) I .:i OJ m 0 - M m '<r 0:) OJ 0 OJ z bl >~ 0 0 0 0 0 UJ Ql (,)- ::l en rJ) ,0: -=- Q.i I en rJ) Ii > >- ::> g (7) C1> CD . '<r r-- ,.., t- ....J ....J ...... M N M 0 Ol M - <( a. e C'? N {\J N N Z W IE >-1 ::l,g <( 2: u tV ~ LlJ I- 0 () :5 I , - 5' I ::> fI) cr: 0 u 0 U. Ll. U Ll. OJ P C U w :E ...J It) en ::> ! w u. (.) I! v N r-- co CD '<r Ol M 0 0 ...J 0 0 0 0 0 N 0 0 rn en M .- co ;; co 0 -- rn CD '<r r-- C'l 0 {]) co ...J Z 0 0 a 0 0 <C w <( ItV I- > LU 2 LlJ ~ ..- (/') .&: ...J <( '5 (I). ;>1 "0 Z CD E -I Of) N '<r . 0 co Ol ~ Q w ::J ~ ..... <'? ~ M 0 co N '" U!!!- C"? N - (\; N N ;- ;> ::> I"" U - (.) ~ ,~ ~ - W <( '-I u . I C) . CI) -l :D! OJ a: -. r> -' W :2 <5 I- ::> c i z "" .:.:; -"" -"" -"" -"" -"" "" "" ,;;,,; c () ~. '" ct:: '" m m ro r:: ro r:: '" <ll ~ C QJ OJ Q) c:> (I) 0 f:. III OJ <..> C'\I (5, c... i::... ~ c.. ~ CL. CL. c.. ~ ;>. 0 ZI :::E :::E :::E ~ ~ ~ ~ :::E :::E ~ ro 0 w C'\I < Ii. < CL. < c.. <( c.. < CL. I '0 a: QJ < r::n n; UJ >- ~ . - -:; ~- '- - 0.-: c '" r.; 5 ~ ~ :> ~ '" C ~ -:::: y,. ~ :s ~ 0 ~ ::;::; ~ 2. co u - ~ t" -: ":: ::- ":: ~ <>C o.C oC '<': ~ - ~ - '=? .::;. ~, ~ 0 < 0 C -'" :; <1.' - C - .~ - .:: - <].' ~ - ~ ~- rJj -- -n r. 0- r.; ~- .:: '::: =- .~ =- - = - - r::: ,- is ~ 6 '" 6 ...:: '" :; fh C'~ "< (/) "< '-" U f.') 0 <IJ " ...., ~ ~-. Q 0 z 001 6 ~ 28 1 - - ------ - I I '" L: -: ~, 0 z ;: ~ .- ~ .s z z "- >- z z z z - 0- cr. '~ u CO <.0 ~ C C C ~ g , '" '" ;; 0 0 5 - g I c; 0 0 c - :::; .~ .~ 0 c .- ::; ::; ;:; :::; ;:; 0 - I'::: iQ;! >. I '''' <tI ro ~ '<t" C'} 0::;: 0::;: Q < ("') C> .Il) Z Z 2 it> Oi c - c c 1.5 s:::: II en u 0 0 III U 0 () '" 0 u. ~ Ll.. C\l ....I 0 0 'C a: ll:I lCl 0 C') 0 co <it Q) C\,I r;g co c:: ~ 0 ;:; C') - t-- 0 ..:- co <C Q) a:I ~ C7l o;r co (1) 0 en - Z I~ > 0 - c 0 0 - 0 - W i !Ill ..... U 1=1 CJ) en Ie::: :2 Cf) ~ c.I - CI) ~ 0'1 0 > =' ~ 0'1 l.t'l 0 '<t" 0'1 ...J ...J r; ,... '<t" M (") 0 0'1 v < a... "5 .!!l. ("') N N N C\I -... E >. Z UJ 18 rei. < > -a;; UJ ~ ,Dj U < \ ~ ~ :> ...J ICfJ a: :J 0 0 0 u. u. () u.. III C,) 0 (.) LU ::iE ....I l.O fJ) ~ w u.. U Q) '<t" N t-- <D co .... O'l M 0, 0 ...J 0 0 '" ~! 0, 0 N 0 0 M O'l M co III co 0 M 0'1 v ,... (]) 0 Cl m ...J z III ;> I 0 - 0 - 0 0 ... 0 <. w < l<l.l I ~ > W I ~I""'" UJ CJ) 11=5 .c::: ...J <: 1~lil "0 -... Z CD U"l N ..:- . 0 co en ~ Q w ,... M .- M 0 co N .!! M N N N N ;.... > Q () i= I rei I W <: IQ) . u L:W v., -i :0. Q) - -.. ~ -" ., ::::!': c ~ :J c Z x "'" "'" -= "'" .x "'" x "'" '"'" u OJ "" <C '" ~ <": ro <': '" II CJ Q) Q) <5 ~ CJ c; <:: C; ell L: C\l C- Q.. C- .~ C- ,.. c- c- o. >. .... 0 ::E ::E :E :E ::E :E :E :E :E ~ re 0 Q; C\l <C C- <:: C- <:: ~ <C Q... <C 0. '0 n: III <: 0> LlJ .~, >- > c. - - ::- <>: - - > ~ 2 - , - - - g ~ - ;; --' := - ,.... 0 ~ ;= -- - ,-. > -: - -, 5: .:, - <>:: 0.-:- ~ - <<: - - - - ;= --0- 0::;: - - t - :i - ;:. c - Z - ~ ""= ..;:: -= u: '"" ~ ~ - ,,.. 2. ,.., ~ - -= - .r:: -= - -= ~ - ;::: r.o ~ '" c 8 ro :> - fh ;:;: (\J C/) N 0 Cf) c '" 0J " "'" ;..') Q) '0 z 001 6 ') ..., 30 ATTACHMENT K . CA:F:\ATTY\MUNI\LAWS\MTT\PARKING2.0RD city council Meeting 12/14/93 Santa Monica, California ORDINANCE NUMBER (CCS) AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF SANTA MONICA AMENDING SANTA MONICA MUNICIPAL CODE SECTION 3.16.210 AUTHORIZING THE SETTING BY RESOLUTION OF PARKING RATES AND THE PARKING REVENUE SYSTEM USED TO COLLECT PARKING FEES THE CITY COUNCIL OF THE CITY OF SANTA MONICA DOES ORDAIN AS FOLLOWS: SECTION 1. Santa Monica Municipal Code Section 3.16.210 is amended to read as follows: Section 3.16.210. Parkinq ~~t~:;:" Zone "Oil. (a) All parking structures owned or operated by the City of Santa Monica located in the area bounded by wilshire Boulevard, Fourth Street, Broadway, and Second Street shall constitute Zone "Oil. (b) Parking ::. ..~""~~,~ ..-.......-....- r n" r..1....k Lr'J L',' ~.('..~ v~n .t.:J e in a designated space in Zone "0" ."j 1 't:.t:~ p.u.:.c. ~ nq rt~\'f;!nUE" :.y~tc"r., ~J:..':.rJ ~(') c:'.l' f".:t ":' hc~ F'u oC : r-.q J et~ . naIl be l.:::_.f~l f::;:;:- &G ~i.::'~.:::t::::::; ~p~~ ~""~ ..........- ...:J____.:.... --.-J::-'-....~- _& &-': &.... ---....- "'.&. ......L.L.....J .....................~...oI' I~ I::'n\ ..: _ __..:_ ...:1____--= ......_...:1 \""-~I ~.. ~~~.. ~-~~~~~-~ ~""~_~_4>~__ _..............a.. .......'i.&.L. ................ . l!..it,Jul .I :'.~.C=..1 1,-;,' c i t;.... . C~j .:".t: i 1 c.:! ~t'f' r". .J IlJt l:"lr c 1 .. '~C' C i i.. I 01" f.idnt..'!. r-~c;rl ~ t.:.1 . (c) Parking meters shall be operated in Zone "0" at such times as posted by the Parking and Traffic Engineer. 1 ~-:D DEe j ~ 1993 .J firf' i ,1 1993 t?-]) . SECTION 2. Any provision of the Santa Monica Municipal Code or appendices thereto inconsistent with the provisions of this ordinance, to the extent of such inconsistencies and no further, are hereby repealed or modified to that extent necessary to affect the provisions of this Ordinance. SECTION 3. If any section, subsection, sentence, clause, or phrase of this Ordinance is for any reason held to be invalid or unconstitutional by a decision of any court of any competent jurisdiction, such decision shall not affect the validity of the remaining portions of this ordinance. The City Council hereby declares that it would have passed this ordinance, and each and every section, subsection, sentence, clause, or phrase not declared invalid or unconstitutional without regard to whether any portion of the Ordinance would be subsequently declared invalid or unconstitutional. SECTION 4. The Mayor shall sign and the City Clerk shall attest to the passage of this Ordinance. The City Clerk shall cause the same to be published once in the official newspaper within 15 days after its adoption. This Ordinance shall become effective after 30 days from its adoption. APPROVED AS TO FORM: Jt~/~~~ ( ~~SEP~ LAWRENCE ,~ting City Attorney 2 I CA:F:\ATTY\MUNI\LAWS\MTT\PARKRAT3.RES City Council Meeting 12/14/94 Santa Monica, california RESOLUTION NO. ~6(CCS) A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SANTA MONICA ESTABLISHING PARKING RATES IN THE DOWNTOWN PARKING STRUCTURES, AUTHORIZING AN EXIT PAY SYSTEM AND FINDING THAT PARKING RATE INCREASES ARE EXEMPT FROM THE PROVISIONS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT WHEREAS, the downtown parking structures serve the Third Street Promenade and adjacent commercial district; and WHEREAS, the City desires to provide convenient and uuser friendly" parking to visitors, residents and employees; and WHEREAS, the City has affirmed its commitment to the continuing revitalization of the Bayside District; and WHEREAS, the City has declared its intention to replace the parking meters with an Itexit pay" revenue control system. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF SANTA MONICA DOES RESOLVE AS FOLLOWS: SECTION 1. The rates to be charged in Zone D shall be: a. During the hours of 8:00 A.M. to 6:00 P.M., parking shall be without charge for the first two hours, and $.60 per 30 minutes or part thereof, for all time beyond the first two hours up to a maximum of Seven Dollars ($7.00) per day. b. During the hours of 6:00 P.M. to 8:00 A.M. the following day, parking shall be $2.00 per entry for each vehicle regardless of the amount of time the vehicle is parked a space in 1 , Zone D. c. Permits for parking in Zone D can be sold at a rate of $50.00 per month for unreserved spaces. SECTION 2. The City Manager is authorized to determine the revenue collection system for the payment of parking fees in Zone D. The revenue collection systems to be considered shall include, but is not limited to, an "exit pay" revenue control system, which includes entry/exit gates, attendant parking booths, and central pay stations in addition to or in place of parking meters. SECTION 3. The city Council finds that the establishment, modification, structuring, restructuring or approval of parking rates in the downtown parking structures contained in section 1 is for the purpose of meeting operating expenses, including employee wage rates and fringe benefits and/or obtaining funds for capital projects necessary to maintain service within existing service areas. SECTION 4. The City Council hereby finds as follows: The increase in parking rates in the downtown parking structures is established to meet operating expenses, including employee wage rates and fringe benefits, or obtain funds for capi tal proj ects necessary to maintain service within existing service areas. SECTION 5. Pursuant to Public Resources Code section 21080(b) (8), the rate increase provided for in section 1 is exempt from the provisions of the California Environmental Quality Act of 1970, Public Resources Code Sections 21000 et seq. 2 SECTION 6. The City Clerk shall certify to the adoption of this Resolution, and thenceforth and thereafter the same shall be in full force and effect. APPROVED AS TO FORM: ~ ( ~~SEPH LAWRENCE ~ting city Attorney 3 ". . -!I; Adopted and approved thIs 14th day of December, 1993 fl. t~ i~ l<~"'ayor I hereby certIfy that the foregomg ResolutIon No 8696 (CCS) was duly adopted at a meetmg of the City CouncIl of the City of Santa Momca on the 14th day of December. 1993 by the followmg vote AYES: CouncIlmembers Genser, Greenberg, Holbrook. Olsen, Rosenstem. Vazquez. Mayor Abdo NOES CouncIlmembers NONE ABSTAIN CouncIlmembers NONE ABSENT. Councllmembers NONE ATTEST ~ f1~ ~ J _- /1/ ,/'?.4IJPP'.-- . ~ ~ -city Clerk I