Loading...
SR-6C (14) 6C l EPWM:CP:LR:rita.CC1393{S:\CC1393} Santa Monica, California council Meeting: March 28, 1995 MAR 2 8 1995 TO: Mayor and city Council FROM: City Staff SUBJECT: Recommendation to Authorize the city Manager to Negotiate and Execute a Professional Services Agreement for Roof Design Services for the pier Carousel Building Roof and the City Yards Transfer station INTRODUCTION This report recommends that the city Council authorize the city Manager to negotiate and execute a Professional Services Agreement with Pugh Scarpa Kodama Associates in the not to exceed amount of $82,000 for roof design services for the pier Carousel building and the City Yards transfer station. BACKGROUND During the FY 1994-95 budget process, the city Council approved funding to design and construct necessary repairs to or replace the Carousel building roof and install a new roof over the Transfer station site at City Yards. pier Carousel Buildinq Roof: The roof of the Carousel building at the pier is currently in need of repair. For the last several years, leaks and condensation have resulted in damage to the hand-carved wood carousel horses and to the roof support structure itself. This scope of work is unrelated to any repairs associated with earthquake damage. 6C 1 HAR 2 8 1995 Roof Over Transfer Station Site: The Transfer station is located at the City Yards, 2500 Michigan Avenue. Solid waste debris is unloaded at the Transfer station site from City and private waste haulers. The waste is compacted and loaded into transit trucks and then hauled to an appropriate landfill. The state requires these types of transfer station areas to be covered. DISCUSSION: Requests for Qualifications (RFQs) were sent to 21 firms. A selection committee composed of three (3) people including the pier Manager, the Solid Waste Operation Manager and the Engineering Project Manager, interviewed and reviewed four (4) qualifying firms. The selection committee concluded Pugh Scarpa Kodama Associates is the most qualified and recommends their selection. Pugh Scarpa Kodama Associates is a minority owned business and has extensive experience with similar commercial projects. A member of their architect team has also recently designed the City's electric vehicle charging station to be installed near City Hall. pier Carousel Buildinq Roof: The Consultant will study alternate roof repair design solutions to the Carousel building. This may include installing additional ventilation to prevent condensation, repairing or replacing the metal roof~ and repairing the leaking skylights and adjacent roof areas. The Consultant will prepare construction documents for bidding once a study 2 has been completed. Construction costs are estimated at $90,000. Roof Over Transfer Station: The roof over the transfer station area will be a long span structure which will prevent rain water from washing through the trash. Function, aesthetics and environmental considerations will be incorporated into the design. The actual construction cost is estimated at $500,000. A loan to the Refuse Fund from the General Fund to pay for this project was included in the FY 1994-95 budget. The transfer station roof proj ect will contribute to Santa Monica I s sustainable City Program in various ways: contaminated storm water entering the storm drains and ocean will be reduced; use of recycled and/or recyclable construction materials will be investigated~ drought tolerant landscaping will be installed; and the use of photovoltaic solar panels to generate electrical power will be considered. The city is exploring the potential for Southern California Edison to assist in the funding of these solar panels. Once installed, these solar panels would reduce the electric bills at the city Yards by about five (5) percent. 3 BUDGET(FINANCIAL ANALYSIS FUNDS REQUIRED Contract (Design) . . . . . . . . $75,000 contingencies . . . . . . . . . . $ 7,000 TOTAL $82,000 Funds are available in the following eIP account numbers: Contract Project Account Number Amount Continqency Total 27-710-441-20095-8900-99321 $60,000 $6,000 $66,000 "Install Roof Over Refuse Transfer station" 30-720-625-20095-8900-99415 $15,000 $1,000 $16,000 "Carousel Roof Replacement" RECOMMENDATION It is recommended that the City Council: 1. Authorize the city Manager to negotiate and execute a professional services agreement for roof design services for the pier Carousel building roof and the city Yards transfer station with Pugh Scarpa Kodama Associates, in the not to exceed amount of $82,000. 2. Authorize the city Manager to issue any necessary change orders to complete additional work in conformance with the Administrative Instruction on change orders. Prepared by: craig Perkins, Director of Environmental and Public Works Mgmt. Jeff Mathieu, Director of Resource Management Anthony Antich, City Engineer Tom Dever, Solid Waste Operations Manager David Gazek, pier Manager 4