Loading...
SR-6-X (2) e e 6-X APR 2 8 1987 Supplement to Item 6 CM: LCB: dvm city Council Meeting 4/28/87 Santa Monica, California TO: Mayor and city Council FROM: Lynne C. Barrette, Assistant city Manager SUBJECT: Library Remodel Contract Award Please note that the attached staff report is a skeleton version as the bids will net be opened until Monday, April 27, 1987. A completed staff report with a recommendation as to selected contractor and appropriate budget analysis will be available at the meeting on Tuesday evening. We apologize for the short turn-around but would like to keep the project on an expedited schedule to the degree possible. - 1 - 6-% APR 2 8 198-7 e e GS:SES:JAS Council Meeting: April 28, 1987 Santa Monica, california TO: Mayor and City council FROM: city staff Award of Contract for the Remodel of the Main Library SUBJECT: Introduction This report requests that the City Council award a contract for the remodel of the Main Library to ----------- responsible bidder, in the amount of $------. the lowest Background At the April 22, 1986, Council directed staff to abate the Main Library of asbestos and remodel the Library to improve the efficiency of the work space/ provide additional space wherever possible for public use, and to restore interior finishes. contracts for asbestos abatement work, moving and interim storage of the Library furnishings and stacks, and construction management of these projects were awarded at the July 29, 1986, meeting. On August 12, 1986, a contract was awarded to A. Quincy Jones and Associates, Architects, to design the remodel of the Library. The remodel project consists of: Reinsulation of all supply ducts Remodeled main entrance lobby New Audio Visual area Relocated Circulation Department Remodeled Technical Services Room - 1 - e e Relocation of service areas and new circulation patterns Complete refinishing of interior surfaces. This includes fabric wall coverings in the back of the Auditorium, Conference Room, staff room, south wall of office on first floor, and aisles in second floor surrounding the full height ceiling. The existing wood paneling at main entry and all cabinetry will be refinished. All other walls will be painted. New interior lighting system which includes fluorescent lighting in all main reading areas, and recessed fixtures in the Technical Services Room, Circulation Work Room and staff offices. New floor coverings which includes resilient floor tile in foyer of Audi toriuln in basement, and in the Technical services area, and work and storage areas on Second floor. All other areas will be carpeted. All ceilings on the first and second floors and the basement Conference Room will receive new acoustical tiles. Exposed trusses in Main Reading Room will receive plaster and paint. All doors and frames will be repainted. Construction of October, 1987. the remodel Main Library is estimated to be completed in stacks and furniture currently - 2 - e e stored at the Airport and the SDC Building on Colorado Blvd. will be moved back to the Library in November and December. It is anticipated that the Main Library will be opened to the public by mid-December. A formal opening will be scheduled for January. The plans and specifications of the Library remodel were completed by the consultant and reviewed by ci ty staff. A Notice Inviting Bids was published on March 26th and 27th, 1987, in the Evening outlook, four construction journals, and seven minority associations. Plans and specifications were issued to twelve contractors. Bids were opened and read publicly on April 27, 1987, by the Deputy City Clerk. ---- bids were received as follows: city Engineers's Estimate: $775,000 References ... Budget/Financial Analysis FUNDS REQUIRED Contract contingencies Total $------ $------ - 3 - e e Appropriation authority is available in the following accounts: Account No. Amount 01-710-613-000-909 $ 407,012.00 01-710-613-000-922 267,052.46 01-710-613-000-926 280,000.00 01-710-451-238-936 7,000.00 $ 962,064.46 Recommendations It is recommended that the city Council: 1. Award a contract for the remodel of the Main Library to -----------, the lowest responsible bidder, in the amount of $------; and 2. Authorize the city Engineer to issue any necessary change orders to complete additional work in conformance with the Administrative Instructions. Prepared by: stan Scholl, Director of General Services Desi Alvarez, P. E., City Engineer - 4 - . H. A. KAUFM1CO. I4t>D 1:0 6~_x" GENERALCONTRACTORS~R28m7 11747 W. Ploo Blvd., Lo. Angel.., Calif., 90064 /213} 477-5006 Apnl 28, 1987 The Honorable Mayor James P. Conn Santa MonIca CIty CounCIl 1685 MaIn Street Santa MonIca) CalIfornIa 90401 Re: Santa 1>tJuca M3m Library Ferodel Project [bId date: 4/27/87] Dear Mayor Conn, Yesterday we were the low bIdder of three prIme bIds receIved for the remodel of the maIn lIbrary In Santa MonIca. ThIS mornIng we were told by your EngIneerIng Department that the project poSSIbly w 111 be re- bId. We WIsh to pOInt out to the counCIl that we submItted a proper, competItIve bId. We receIved complete coverage of all trades and, In most cases, had three or more subcontractors coverIng each trade. SImIlarly, each prIme bIdder submItted, as a part of theIr bId) a lIst of subcontractors for the major trades. Each lIstIng amounted to SIX or seven subcontractors per prIme bidder, and name~ ll~ were dIfferent for each prIme bIdder: this shows a complete coverage. and a mul- tItude of tradesmen Involved in the lIbrary bId of AprIl 27th. A rebId of the lIbrary project WIll not create a major dollar change unless the QualIty of the project IS sacrIfIced. We respectfully request that the bId of the H.A. KAUFMAN Company. properly sUnltDOO on Aprll 27th, be accepted, and that a contract be lssued based thereon. Respectfully, H.A. KAUFMAN Company ~:f~~ HAK/bcs AM to C;.:x . APR 2 8 1987