Loading...
SR-506-003-06 (10) - - . , ft'J6-/J03-o6 -- Santa Mon1ca, Ca11fornia, September 11,1980 G,T To: Mayor and CIty CounCIl Sf? 2 3 l~bO From: Ci ty Staff Subject' Proposed Traffic Signal at Main Street and Ashland Avenue Introduct1on Th1S report discusses two alternatives for the deslgn and implementation of a traffic slgnal at the lntersectlon of Ma1n Street and Ashland Avenue. Background At the August 12 Clty Counc1l meet1ng (Item 11-B), Staff was directed to report regarding the appropriateness of a traffic actuated or regular (flxed tlme) traffic signal at the 1ntersection of Main Street and Ashland Avenue. The eXlsting traff1C slgna1s on Main Street are fixed time at the 1ntersections of Pler Avenue and Ocean Park Boulevard and an actuated traff1c signal at Hill Street. The primary reason there 1S no progression between slgnals is outdated controllers and no interconnect between traffic slgna1s. The outdated traffic controllers wlll be updated as part of the traffic slgnal improvements the City Councll approved in July. The new controllers will be traffic and pedestrlan actuated. This means that Maln Street will rema1n green until either a vehicle on a side street drives over a detector or the pedestr1an button 15 act1vated. A flxed tlme traffic 51gnal installation at the inter5ect1on will not guarantee progressive traffic flow unless lt 15 1nterconnected to the traffic actuated signals at Marine Street and Hill Street. An actuated traffic signal would be more responsive to the actual pede5tr1an and vehlc1e demands. In additlon, time clocks may be installed ln an actuated controller to make the slgna1 operate durlng the peak traffic volumes as a fixed tlme traff1c slgnal to ensure progres- sion. b~ SEP ~ .3 WoO - . ~ -- , To: Mayor and City Councll -2- September 11, 1980 The cost for a fixed time traffic signal would be $45,000 and the interconnect between Marine and Hlll Streets would be $13,700 for a total of $58.700. The cost for a trafflc actuated traffic signal would be $50,000. RecolTllllendation It is recornnended that CmITlcil a:?propriate $50,000 for the design and 1n- stallation of a traffic actuated s1gnal at the intersection of Ashland Avenue and Main Street. Prepared by: Stan Scholl Ray Davis - -