SR-505-006 (2) t "--" . . (&I-I- .5~.J ~ (;/ D(:" JUL 11 \989 SS/BG/CR/mpr:ast192 council Meeting: July 11, 1989 Santa Monica, California TO: Mayor and City council FROM: city Staff SUBJECT: Recommendation to Amend the Professional Services Contract with Kennedy/Jenks/Chilton for the Design of Additional Treatment Capacity for the Domestic Water Supply System. INTRODUCTION This report requests the City Council authorize the City Manager to execute an amendInent to the professional services contract with Kennedy/Jenks/Chilton (K/JjC) to include additional engineering work on the water treatment plant expansion and upgrading as required by the South Coast Air Quality control Board (SCAQCB). BACKGROUND On November 11, 1986, the City Council authorized the City Manager to negotiate and execute a professional services contract with K/JjC in the amount of $182,000 for the design of an aeration facility and the expansion of the City water softening plant. Both improvements will allow the city of Santa Monica to produce and treat additional local qround water, thereby reducing the city's dependency on the Metropolitan Water District (MWO). ~ 1i~~ " . . In February 1988, City staff submitted designs to SCAQCB for their review. Based upon changes in design and test procedures required by SCAQCB during the permitting process, several items must be added to the final design contract. These items include: A. Additional modifications of facilities $ 64,000 Due to emission controls established by SCAQCB, an activated carbon absorption system will be constructed. The system, will remove the carbon vapors before they are discharged into the atmosphere. B. pilot study $ 30,000 A pilot study will be performed to evaluate and verify the effectiveness of carbon vapor removal by surface aeration and to confirm the necessary air flow requirements. c. Geotechnical sampling and testing $ 12,000 For the final design and construction of the softening plant expansion, the existing soil conditions need to be determined. This will help eliminate problems that may exist due to unknown soil conditions. TOTAL $106,000 Project design is estimated to be completed by November 1989 and construction is estimated to be completed by December 1991. - - . . BUDGET/FINANCIAL IMPACT The additional funds of $106,000 will increase the K/J/C contract amount from $182,000 to $288,000. Appropriation authority is available in Capital Improvement Account 25-760-671-000-922. RECOMMENDATION staff recommends that City Council authorize the City Manager to execute an amendment to the professional services contract with Kennedy/Jenks/Chilton in the amount of $106,000. Prepared by: stan Scholl, Director General services Byron Gaines, utilities Manager Cheryl Read, Admin. Water Engineer